Loading...
HomeMy WebLinkAboutPermit File 1708 6th Street CITY OF ANACORTES GtT Y Oet+ r m 9,! ** � I�` iootor win TJSM EXEMPTION FROM SHORELINE MANAGEMENT ACT SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT TO: Skagit County Public Works Department ATTN: Barb Hathaway AMENDED 1111 Cleveland Avenue Mt. Vernon, WA 98273-4215 The proposal by the Rert-of-A,nacert- Skagit County to undertake the following development: Mobilization of tug and barge with crane to the Skagit County 6uemes Ferry Terminal for replacement of the north 77 feet of treated timber breakwater and wales with reinforced plastic timbers and steel W-beams wales. Upon the following property: Waterward of the intersection of 6th Street and T' Avenue, 6uemes Ferry Terminal, Anacortes side, Section 13, Township 35 North, Range 01, Anacortes, Skagit County, --Washington Within (name of water area) 6uemes Channel and/or its associated wetlands is exempt from the requirement of a substantial development permit because the development constitutes: Normal maintenance or repair of existing structures or developments, including • damage by accident, fire or elements WAC 173.27.040(2)(b) Description of any other work planned in the future which is related to this project. N/A Corps Public Notice Number Unknown CONSISTENT INCONSISTENT (Check one) ® ❑ Policies of the Shoreline Management Act. ❑ El The guidelines of the Department of Ecology where no Master Program has been finally approved by the Department. ® ❑ The master program �-17-02 Jam,.. Date (Signature of Authorized Local Government Official) DOE NW Region Office ATTN: Shoreline Planner 3190 160th Ave SE Bellevue, WA 98008-5452 Building Department 0) CITY OF ANACORTES bil is ,= 9 AT 7Plili • .cogs, WJfl XY8F EXEMPTION FROM SHORELINE MANAGEMENT ACT SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT TO: Skagit County Public Works Department ATTN: Barb Hathaway 1111 Cleveland Avenue Mt. Vernon, WA 98273-4215 The proposal by the Port of Anacortes to undertake the following development: Mobilization of tug and barge with crane to the Skagit County 6uemes Ferry Terminal for replacement of the north 77 feet of treated timber breakwater and wales with reinforced plastic timbers and steel W-beams wales. Upon the following property: Waterward of the intersection of 6th Street and 'I' Avenue, 6uemes Ferry Terminal, Anacortes side, Section 13, Township 35 North, Range 01, Anacortes, Skagit County, Washington Within (name of water area) 6uemes Channel and/or its associated wetlands is exempt from the requirement of a substantial development permit because the development constitutes: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements WAC 173.27.040(2Xb) Description of any other work planned in the future which is related to this project. WA Corps Public Notice Number. Unknown CONSISTENT INCONSISTENT (Check one) El El Policies of the Shoreline Management Act. ❑ ❑ The guidelines of the Department of Ecology where no Master Program has been finally approved by the Department. ® ❑ The master program /� d—1 1—v2 ..S.S,., o��w-> Date (Signature of Authorized Local Government Official) DOE NW Region Office ATTN: Shoreline Planner 3190 160th Ave SE Bellevue, WA 98008-5452 Building Department ,, �\ 0 SKA 3 - NTY PUBLIC WO. PARTMENT 1111 Cleveland Avenue, Mount Vernon, - (360) 336-9400 FAX (360) 336-9478 May 9, 2002 Ms. Cathy Janke Shoreline Administrator City of Anacortes P.O. Box 547 Anacortes,WA 98221 Subject: Guemes Ferry Breakwater Maintenance- Shoreline exemption Dear Ms. Janke: Skagit County proposes to perform maintenance on the marine breakwater at the Guemes Ferry slip on the Anacortes side of Guemes Channel. We are requesting exemption from Shoreline Permitting because the project is maintenance and repair of an existing structure. The work will entail removing creosoted timbers and wales and replacing them with plastic "timbers"and steel W Beam wales. The wales and timbers in the breakwater have insect damage and rot. This project will repair the north 77 feet of the breakwater wall. This JARPA is also being submitted to Brian Williams, WDFW habitat biologist, and Olivia Romano, U.S. Army Corps of Engineers. Our work will be performed according to the work window allowed by the Hydraulic Projects Approval,USFWS and NMFS. If you have any questions I can be reached at 336-9400. Sincerely, da,frAtharatt)a, Barb Hathaway Field Engineer Encl: JARPA,plans,photographs Committed to Community Service in Transportation,Surface Water Management and Solid Wastes, AGENCY USE ONLY I l Agency Reference#: Date Received:_ • Circulated by: (local govt.or agency) JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (JARPA) (for use in Washington State) PLEASE TYPE OR PRINT IN BLACK INK ❑ I am applying for a Fish Habitat Enhancement Project per requirements of RCW 75.20.350. You must submit a copy of this completed JARPA application form, and the (Fish Habitat Enhancement JARPA Addition) to your local Government Planning Department and Washington Department of Fish & Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working days. Based on the instructions provided,I am sending copies of this application to the following: (check all that apply) ja Local Government for shoreline: ❑Substantial Development ❑Conditional Use ❑Variance N Exemption ❑ Revision ❑Floodplain Management 0 Critical Areas Ordinance CI Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region) ❑ Washington Department of Ecology for 401 Water Quality Certification Nationwide Permits(to Regional office-Federal Permit Unit) ❑ Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification ❑O Corps of Engineers for: 0 Section 404 0 Section 10 permit ❑ Coast Guard for Section 9 Bridge Permit ❑ US Fish&Wildlife Service or National Marine Fisheries Service for Endangered Species Act(ESA)Consultation li SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT SKAGIT COUNTY PUBLIC WORKS MAILING ADDRESS 1111 CLEVELAND AVE., MOUNT VERNON,WA 98273 WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# 360-336-9400 barbarah@co.skagit.wa.us n/a 360-336-9369 If an agent is acting for the applicant during the permit process,complete#2. 2.AUTHORIZED AGENT MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# 3.RELATIONSHIP OF APPLICANT TO PROPERTY: O OWNER o PURCHASER 0 LESSEE ❑OTHER: 4.NAME.ADDRESS.MID PHONE NUMBER OF PROPERTY OWNER(S).IF OTHER THAN APPLICANT: 5.LOCATION(STREET ADDRESS.INCLUDING CITY,COUNTY AND ZIP CODE,WHERE PROPOSED ACTIVITY EXISTS OR WILL OCCUR) The ferry terminal is located waterward of the intersection of 6th St and 'I'Ave., in Anacortes,WA. The breakwater eis located along the west side of the ferry slip and extends north approx. 202 feet. LOCAL GOVERNMENT WITH JURISDICTION(CITY OR COUNTY)Clty of Anacortes WATERBODY TRIBUTARY OF WRIA# Guemes Channel Strait of Juan de Fuca 03.MARI ''A SECTION SECTION TOWNSHIP RANGE GOVERNMENT LOT SHORELINE DESIGNATION 13 35N 01E URBAN 2 LATITUDE& 48° 31' 15" ZONING DESIGNATION LM LONGITUDE : 122° 37' 30' TAX PARCEL NO, DNR STREAM TYPE,IF KNOWN Parcel#31540 N/A JARPA,Revised 12/98,contact Ecology's Permit Assistance Center for latest version,360/407-7037 Page 1 of 4 • ILDESCRIBE THE CURRENT USE OF THE PROPEROD STRUCTURES EXISTING ON THE PROPERTY, IF ANY PORT` )F THE PROPOSED ACTIVITY IS ALREADY COMPLETED ON IS PROPERTY,INDICATE MONTH AND YEAR OF CM..PLETION. - This is the Skagit County Guemes Ferry Terminal,Anacortes side. The facility includes a dock, dolphin wingwalls, a breakwater, piling dolphins and a steel headframe and transfer span to the ferry slip. The marine structures located in the channel guide the ferry to the landing slip. These include seven pile-dolphin fenders and a 202'longpilingbreakwater e that runs north-south.There is an Aid to Navigation at the north end of the piling breakwater, at the Outer Harbor line. The breakwater deflects the strong current,wind and waves from the ferry slip,which aids the ferry landings. IS THE PROPERTY AGRICULTURAL LAND? 0 YES ONO ARE YOU A USDA PROGRAM PARTICIPANT? ❑YES 0 NO 7a. DESCRIBE THE PROPOSED CONSTRUCTION AND/OR FILL WORK FOR THE PROJECT THAT YOU WANT TO BUILD THAT NEEDS AQUATIC PERMITS COMPLETE PLANS AND SPECIFICATIONS SHOULD BE PROVIDED FOR ALL WORK WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE,INCLUDING TYPES OF EQUIPMENT TO BE USED. IF APPLYING FOR A SHORELINE PERMIT,DESCRIBE ALL WORK WITHIN AND BEYOND 200 FEET OF THE ORDINARY HIGH WATER MARK. ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. The project includes the following activities: Mobilization of tug and barge with crane to the ferry terminal. Replacement of the north 77 feet of treated timber breakwater(hanging pilings)and wales with reinforced plastic'timbers' and steel W-beams wales: including welding new steel W beams to the existing steel pilings and bolting plastic timber hanging piles to the steel W-beam wales. The crane will be used to hoist the steel wales and timbers into place. All material for the wales will be steel; no creosote treated timber will be used. Divers will be used to weld the lower wale to the steel piling and to bolt the timbers to the wales. All timbers to be reinforced 12"square plastic, replacing creosote timber piles in their original location. All wales to be 9"x 9"" steel w-beam. lb. DESCRIBE THE PURPOSE OF THE PROPOSED WORK AND WHY YOU WANT OR NEED TO PERFORM IT AT THE SITE. PLEASE EXPLAIN ANY SPECIFIC NEEDS THAT HAVE INFLUENCED THE DESIGN. This is maintenance and repair. Marine facilities require periodic replacement of the elements of the structures that are susceptible to weathering and decay. The treated timber part of the structure is at life expectancy,with insect damage and rot in the wales and timbers. The bottom wales have substantial section loss and are crushing causing the hanging piles to fail. An aid to navigation with solar panel, light and battery are mounted on the end steel piling. The steel pilings are in good condition and do not require maintenance at this time. 7c DESCRIBE THE POTENTIAL IMPACTS TO CHARACTERISTIC USES OF THE WATER BODY. THESE USES MAY INCLUDE FISH AND AQUATIC LIFE,WATER QUALITY.WATER SUPPLY, RECREATION,and AESTHETICS. IDENTIFY PROPOSED ACTIONS TO AVOID,MINIMIZE,AND MITIGATE DETRIMENTAL IMPACTS.AND PROVIDE PROPER PROTECTION OF FISH AND AQUATIC LIFE.ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. The barge will not be grounded on the bottom. The duration of the project is short,and the barge will not shade eelgrass beds for period of time sufficient to cause damage. There will be no permanent impacts to the waters or aquatic life in Guemes Channel. No changes will be made to the length, breadth or depth of the structure being repaired. PREPARATION OF DRAWINGS: SEE SAMPLE DRAWINGS AND GUIDANCE FOR COMPLETING THE DRAWINGS ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE DRAWINGS MUST REATTACHED.NOTE:APPLICANTS ARE ENCOURAGED TO SUBMIT PHOTOGRAPHS OF THE PROJECT SITE,BUT THESE DO NOT SUBSTITUTE FOR DRAWINGS. THE CORPS OF ERGWEERS AND COAST GUARD REQUIRE DRAWINGS ON8-1,2 X 11 INCH SHEETS. LARGER DRAWINGS MAY BE REQUIRED BY OTHER AGENCIES. B.WILL THE PROJECT BE CONSTRUCTED IN STAGES? ❑YES O NO PROPOSED STARTING DATE: July2002 ESTIMATED DURATION OF ACTIVITY: Two months 9.CHECK IF ANY STRUCTURES WILL BE PLACED: No new structures will be placed. D WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH OR TIDAL WATERS;AND/OR DWATERWARD OF MEAN HIGH WATER LINE IN TIDAL WATERS 10 WILL FILL MATERIAL(ROCK.FILL.BULKHEAD,OR OTHER MATERIAL)BE PLACED. No fill will be placed. ❑WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH WATERS? IF YES.VOLUME(CUBIC YARDS) /AREA (ACRES) D WATERWARD OF THE MEAN HIGHER HIGH WATER FOR TIDAL WATERS? IF YES,VOLUME(CUBIC YARDS) AREA (ACRES) JARPA,Revised 12/98,contact Ecology's Permit Assistance Center for latest version,360/407-7037 Page 2 of 4 11.WILL MATERIAL BE PLACED IN WETLANDS? ( 1 j El YES ONO IF YES: -' A. IMPACTED AREA IN ACRES: B. HAS A DELINEATION BEEN COMPLETED? IF YES,PLEASE SUBMIT WITH APPLICATION. 0 YES 0 NO C. HAS A WETLAND REPORT BEEN PREPARED? IF YES.PLEASE SUBMIT WITH APPLICATION. 0 YES 0 NO D. TYPE AND COMPOSITION OF FILL MATERIAL(E.G.,SAND.ETC.): E. MATERIAL SOURCE: F. LIST ALL SOIL SERIES(TYPE OF SOIL)LOCATED AT THE PROJECT SITE.8 INDICATE IF THEY ARE ON THE COUNTY'S LIST OF HYDRIC SOILS.SOILS INFORMATION CAN BE OBTAINED FROM THE NATURAL RESOURCES CONSERVATION SERVICE(NRCS): 12.WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ID YES ElNO IF YES,IMPACTED AREA IS_ACRES. 13.WILL EXCAVATION OR DREDGING BE REQUIRED IN WATER OR WETLANDS? ❑YES ONO IF YES: A. VOLUME: (CUBIC YARDS)/AREA (ACRES) B. COMPOSITION OF MATERIAL TO BE REMOVED. C. DISPOSAL SITE FOR EXCAVATED MATERIAL: D. METHOD OF DREDGING: 14.HAS THE STATE ENVIRONMENTAL POLICY ACT(SEPA)BEEN COMPLETED? EXEMPT—IS MAINTENANCE ❑YES ElNO SEPA LEAD AGENCY: SEPA DECISION:DNS,MDNS,EIS,ADOPTION,EXEMPTION DECISION DATE(END OF PERIOD): SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION 15.LIST OTHER APPLICATIONS,APPROVALS,OR CERTIFICATIONS FROM OTHER FEDERAL,STATE OR LOCAL AGENCIES FOR ANY STRUCTURES,CONSTRUCTION,DISCHARGES,OR OTHER ACTIVITIES DESCRIBED IN THE APPLICATION(I.E.,PRELIMINARY PLAT APPROVAL,HEALTH DISTRICT APPROVAL,BUILDING PERMIT,SEPA REVIEW,FEDERAL ENERGY REGULATORY COMMISSION LICENSE(FERC),FOREST PRACTICES APPLICATION.ETC.)ALSO INDICATE WHETHER WORK HAS BEEN COMPLETED AND INDICATE ALL EXISTING WORK ON DRAWINGS. TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETED? NO. Hydraulic Project Approval-JARPA WA Dept Fish Wildlife COE NWP#3-maintenance Corps of Engrs Shoreline Exemption City of Anacortes 16.HAS ANY AGENCY DENIED APPROVAL FOR THE ACTIVITY DESCRIBED HEREIN OR FOR ANY ACTIVITY DIRECTLY RELATED TO THE ACTIVITY DESCRIBED HEREIN? ❑YES IFNO IF YES,EXPLAIN: SECTION B-Use for Shoreline and Corps of Engineers permits only: 17.TOTAL COST OF PROJECT. THIS MEANS THE FAIR MARKET VALUE OF THE PROJECT,INCLUDING MATERIALS,LABOR,MACHINE RENTALS,ETC. $150,000(EST'D) 18.LOCAL GOVERNMENT WITH JURISDICTION: CITY OF ANACORTES 19.FOR CORPS,COAST GUARD,AND DNR PERMITS,PROVIDE NAMES,ADDRESSES.AND TELEPHONE NUMBERS OF ADJOINING PROPERTY OWNERS,LESSEES,ETC.. PLEASE NOTE: SHORELINE MANAGEMENT COMPLIANCE MAY REQUIRE ADDITIONAL NOTICE-CONSULT YOUR LOCAL GOVERNMENT. NAME ADDRESS PHONE NUMBER See attached list of adjacent owners List includes owners within 300 feet of the ferry property. DARPA,Revised 12/98,contact Ecology's Permit Assistance Center for latest version,360/407-7037 Page 3 of 4 Guemes Ferry Terminal Breakwater Repair Property Owner List Anchor Cove Marina, 1600— 5th St.,Anacortes, WA 98221 360-293-7033 Boisvert, Kathleen, P.O. Box 639, Lake Stevens, WA 98258 n/a Braley, Casey O., 1709 - 6th St.,Anacortes, WA 98221 n/a Carr, Larry C., 1708 7`h St., Anacortes, WA 98221 360-293-0658 Cooper, Isabella, 4214 Glasgow Way,Anacortes, WA 98221 360-293-4821 DeBellis, John, 1620—7ch St. Anacortes,WA 98221 360-856-5966 Gilhousen,Anna M., 1601 —6`h St.,Anacortes, WA 98221 360-293-2287 Hoots,Kathleen,P.O. Box 122,Anacortes,WA 98221 360-299-2376 Kilpatrick,Bruce, 1713 —6th St.,Anacortes, WA 98221 360-293-7085 Lavine, Shirley and Joan, 2804 `M'Ave., Anacortes, WA 98221 360-293-6370 Mansfield, Steven and Mary, 1719—6th St., Anacortes, WA 98221 360-293-4245 Miner,Fred W., 1605—6th St.,Anacortes, WA 98221 360-293-5570 Mueller Lvg Trust—L. Mueller, 1610-6`h St, Anacortes, WA 98221 n/a Swetz,Michael, 616 `I' Ave., Anacortes, WA 98221 n/a ' SECTION C-This section MUST be com feted for anpermit covered b this a lication gg 20.APPLICATION IS HEREBY MADE FOR APE - IR PERMITS TO AUTHORIZE THE ACTIVITIES DESCRIBED( IN. I CERTIFY THAT I AM FAMILIAR WITH THE ICI INFORMATION CONTAINED IN THIS APPLICATI ,.,ko THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF,,._ INFORMATION IS TRUE,COMPLETE,AND ACCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH ii THIS APPLICATION IS MADE,THE RIGHT TO ENTER THE ABOVE-DESCRIBED LOCATION TO INSPECT THE PROPOSED,IN-PROGRESS OR COMPLETED WORK. I AGREE TO START WORK ONLY AFTER ALL NECESSARY PERMITS HAVE BEEN RECEIVED. SIGNATURE OF APPLICANT OR AUTHORIZED GENT DATE tY I HEREBY DESIGNATE V (i TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PEERRMIT(S). 1 UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED, I MUST SIGN THE PERMIT. SIGNATURE OF APPLICANT DATE SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS.E.G.DNR) DATE • THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED. 18 U.S.0§1001 provides that: Whoever,in any manner within the Jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. COMPLETED BY LOCAL OFFICIAL A. Nature of the existing shoreline. (Describe type of shoreline,such as marine,stream,lake,lagoon, marsh,bog,swamp,flood plain,floodway,delta;type of beach,such as accretion,erosion,high bank, low bank,or dike;material such as sand,gravel, mud,clay,rock,riprap;and extent and type of bulkheading,if any:) Low bank, marine existing ferry terminal. B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level,indicate the approximate location of and number of residential units,existing and potential,that will have an obstructed view: N/A C. If the application involves a conditional use or variance,set forth in full that portion of the master program which provides that the proposed use may be a conditional use,or,in the case of a variance,from which the variance is being sought: N/A These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions. JARPA,Revised 12/98,contact Ecology's Permit Assistance Center for latest version,360/407-7037 Page 4 of 4 /64 _— '36 — i ., ^688 Boot )) _• O _ Harbor Z 'J ,o c „ JEEP TR4IL 4 • � 547 • ill ,I : Oa I I-- , 112 _— IP 5 l y - • Lsl' • _f.� et �. - 76 NI ROA —,-� •_yr p , Huckleberry Ii /i _' . : t. )�` I ios Island • PEDPW)010II a \'. % °5N. Boy t1 it El-- .I, D wood 20 • . . % l • r Loop Bay II U °, 50 Ar3z 1- s5 r-4 • Core .I Boot 4 _ I) II L:4 IiGuemes 1734 '1 III a ;,I. Southeast ' 75 iL oo Gable Pool',L Point `i P , CHANNEL ' 0. ;6 ,v MEN • m ' A• A, 7E0.MINhL• I — )0 y , rI �� "1-1'I(- I 1•"Tide Point =s S.r•• ,a 74 vI - MTIIIL -L 19 -ire! sT I• _a�168 liE - _ .__ 1, I°•. ...H •1�1 iG y:` i. _. :691 /-^.ir. l; '.., Cap Sante ">_ ,eM ` it` _.il 1 L a_r2- I I:I tiA r L I 9n.'_ :ipi_Eir it, CI _ 11 _i�_ 1 �' i�T w I�181 �i a. • \Cl,rc - - I 1'a _ CO_RTl�S li -I — n '`vi, •"i,, ±-,os .I .: is ebf 55 I; 1, it U/98 1 // ,4 7 . q , / R III ) , Sell d>� � :C � D tr IY ` )¢• - 1 ILI , I' ! ' • li f0 __�I li i\ I .GPI Jr H$ I,mu l. off` I. • :I .1 Cfi, �llI, ?LTN Ft—I- > 1,-„ F = D A L G 0 B 1. A Y _IIIsland N:� i -±, ' j $eh Y °37'30" . , 529 11 570000 FEET 530 35' 531 (AN)4CORTES Sot - 1480 I NE Mapped, edited, and published by the Geological Survey SCALE 1 240( Control by USGS and NOS/NOAA * 1 + B I Topography by photogrammetric methods from aerial ON �N 1000 0- 1000 2000 3000 photographs taken 1972. Field checked 1973 5 �- Selected hydrograohic data compiled from NOS/NOAA I / 22° '—' J Charts 18424(1974)and 18427(1975) 5 w�5ii -391 MILS CONTOUR INTERVAL r t, _ eo co....oa..... ._ __.._a__,v_..1 r_-_......._a.,.,..,I .... P / nl6Tln nl AI crnncn^ WrOTlrel GuemesFerryTerminal #40152lx * y' Breakwater Photos q" 14/ a� .sn`? A 3 .Y a� ! View of end of rotten bottom wale Looking north at breakwater(left side of photo) +' 3k < f " - lSi z : :` fu\cam S [ s ; q $ fh I" g�� • 1 ,x, I `ti , 3 j E ^may �.. - � .. ,F, ;\_ tP1�� i' - a r- � �Yd e, View of rotten bottom wale. View of breakwater from east side. .;jt.✓ ' xt h x .0 r Ft _. — ; V- r�, y 1 y t yi j .,a t. , View of breakwater from east side. • 7V N` 1 -0 C 9 N rf h n Gl ror RI rD s PLASTIC pi u' � PILINGS I � INC. �r n / JOB NAME _ �i/ Skagit Coup y DESCRIPTION _ W Wave Suppress¢n Wall I. o Gender Panel .-.-. / ,. -- JOB ID. DRAWING NO. 00853,wka 00555 :TR::;D CATALOG N0. — DRAWING 8Y P.6artrakon APPROVED BY DATE _ m .---�"� --- 5 DATE DRAWN CO If i 4-3-02 DATE REVISED REVISION NO. SHEET NO. 2 of 3 d �� no.9Se�s comPutaton Pa 140 e Ii "71 GIc` sra' I `, L it L FLO _______________________t____Hi:/0 --ivy- 6100 ''''''--,_,ttit v. j MX R It sg r 9 ii 111 .001 G�'On X Nse`, each �'�hs /J se \ P i0 `� b / I 7 Pj Ina . Existing Lineof PLASTIC 44 Steelel Piles 1110 PILINGS &, , INC. 1111 IS iiii II It II II II II 16' II II II II II 9X C� �� W BEA/V II II II Ili JOB NAME „y�� II II II II II II II II II II II II I II II II II Sk2glt ��W II II II II II II II II II II II II II iiW II 0 II II II II II li II II II II II II II II II II II II II DESCRIPTION h 12' O.C. 'Nave StgpresNon Wall —� 2' Spacer Blocks Line of Fender Panel I Z��1(IZ�/Plastic Lnber w/ Between Lumber New WarkJ JOB I.D. DRAWING NO. 8-1'0 Steel Rebars UNIT WEIGHT CATALOG NO. QTY. REQUIRED DRAWING BY APPROVED BY DATE - NOT TO SCAL E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DATE DRAWN 4-5-02 DATE REVISED REVISION NO. SHEET NO. I of 3 PLASTIC 44 2 PILINGS h., 1cr INC. III~ Typ ' JOB NAME 1 I p - 5kSglt Caurrty DESCRIPTION In %'al Steel ��'L J�\ Wave Suppression lea lliagonal Bars i� Fender Panel JOB I.D. DRAWING NO. + 2' } 00853. k 00895 Y2'0 Steel LO' Cross Bars— II UNIT WEIGHT CATALOG NO, 1 'a Steel oro 'teel Cross Bars Diagonal tars lir lir QTY. REQUIRED DRAWING BY r L C Paimaklan p APPROVED BY DATE t' TYp t 1 _ 8-Vs Steel — `_Reborn m Steel Rebars Rebo I z x 12 DATE DRAWN 10\10 4-8.02 DATE REVISED REVISION NO. Section �,� Section ;) SHEET NO. 5 of 5 • . ' • _, ,43...".e.„.1:,-.: ;2•-•-'4,--. . *...g., -:-5,-:' .2 ;:k%-t. -;-,y ,.--; . , • - ' 4-. ,. , „litt•va,....,,,, • • ,t, ';' .43 ... .i..- ,,. ,..,,,-;;:;-,......;;Accitki*.-t*:;- , .'• ..-..'4'6;:.,,,.ty:',..-I- 11,141;14,•;::?.2.7•':::s":•****( ../.; •z#••1%.*:-:'''" ;..: 1 • •. ..•-41, • ' ' -,' , 4-1,*:).>: ''t, I ....44eCa..:--- •-•"-.' .:•-• - :,,,..A••,-.•:••••• •S41,42.44' :?-•:"•,•.,•-;, - - - Ails:Mt til,m4, ,-*•,c't, k- : • .':•..y...i, s. „.4.7f ,,p;. j..,-: ‘ tt ' :::eic,;;; -IftC,:;; .r?,-f -$74?,:: *.-. ,, ',.',.;, ''t+f,iir41141;04.1 r I' ., A. •-:•,:;4- -it, , •-•- •4%.,k.t. AA it'r'tz - "It. ..,'‘4, ' '‘'''vX,;,,:r.,;- '1-.''..;ei:rdetXtiltoer 1'01/4' k Cr . • %• • : • . 'A: '• nz- ^ :. 'HA'. ••••• '•A n-4 • t r-....2,- :,/. ..•••,,t,.: 4.,.. :c 14,1.•. 4 i :4';-• Pf1.5,..o.473,4z 4-•1•• -„,...;,• 44 ... :..:,.3•,• :4- - -: • :47,44. .4.4:4„,4„,,,,,;44:1•A,c4.. . i..„ . , is „ii. t,..,- -•:.., -1:4 •t••••••• • 4 1.•446- -,„S - ... • ''-`'.:;:%.';-(:‘‘..--Irtit Yr. •Th..t77." 4 Vit':fxre ''• "Firy'..•;q,etirlfrP"?'''.; r.1*•,,A-6'-' 4)'...:1••Yx*:•%:':%**4•4t4t- 7':-11.:., '.. ' : • It • ''.4:' 4* '4..." • '4..V1.-- '•it".:-.'•'• ';•-•.;,',.‘,•,..,: , . .,.1.. rz-.„,:et,--••--:::vir"-, .a -1._ •:-.:‘ . "1"- :*•"7.".“16., z:s- 3,, :4 .10.,1t;."..". ‘,..','.•••••-i'41.1. `'.,..••:-• 0.1.- • • . : •-• •••, . ' :,:,‘, r-.1-- -44... • 1 ni i.i0F.':2.4„ ' -S 4"' '1/4:01.....‘ 4 • .. ' 4 . )' t • 4,liWiefAs2 V.elt 'I. r ' ' , si `,..: '-Pi-lift.k•..- -. ..c . . i .i -.'.-...c- •u ' ...* la 1 yr ttkv4 .- ...,, ,.., , ..,„7::., 4-,„"4,..- nr1.1.c., ‘,...:,:f M.....;•:-,4,A4.. .4. .. .,- •- ••- . •:- :. : ::. • --....-c4U: ia, •:‘..A., ..-... ALI. :. • . • IS. It .1 9,A•46".i:r.'7',1"...,41S,•• • : • ••••••<•:!tt.-77•0;',41;• :line::s. •tr.:::-:‘, fr. :-.. :.:4.2.4:' -ft; ,..,,,.-.„,4::', ..z.4-4 :,,i'..14,41410, Aet• r - ' :' " 1, ' • 7.•* . : ? ' 1( 4g. • ' 441: f ',4:•..-4....::::.V.•::.•:'"! t;• ,,' : c.... •:.:,:4••;,.,*‘04?.:11•E:t„“sa••"tatict Pn-,:1:3'. ;, .,,, Notik„asial4 • I ... . X e.,:.t..4*.• ::‘,..7.ffc.-............ >i:.•-.•••.. ...-::::......„-fr.:;-.,..v.i,.4.rik..,...1:;477,.... -: :,r.: ., - - rris.....7r,A.r.,,...,,-. ••..,;',,i, . . "f ' ' :': ;2,- %-. '-` zt.,,..4 V--.V. u.9:1‘ Ar #rgitZ:%-pial". A"..C"::eXil Z.Z14:.,...4.7.3.,a,&'?;;;O:5.ii1/44.F.:*\a,•TM.'<"4*,.:14'''''.....:;,.: ' t',. 0., ....tttlii,.;:t1:Prf..::.1'1?-.1:.;i:c....:rar .1": ..', ' ••:', -;.,.... ..c.,.....H,.:,....i. 4 -/C..;•/i.*;d14dattityli• • .. .Et t. . • -it ..,.. --„t • • ,... \ tic*,,r„ st .:. -1,...stt,s,„ -,..v,:futu„,„ , •„.. ..44,..i. ...• •,. . . IV 1 • ', - : ';‘,:klei*c;•::•-')..i,-: :'-'.? IS:,••••••:'.•.i'•;i:r::::•:.5,:' ':';'•;••• '...C.,,,;••••2:-.:‘el ' 4••• 4r-.10-14•„rti‘At* '' I'' . - • * **7 .- 'hi,' •'• *••;.: * :; ;;; L' sZe.` r . • .".":,.....f, vig.:.-.....,......:.•, ....,.:::::.,..,,.:,..,...-.,•::::....-...:.:4,-......i.,i ....:frii::•.::.7. ,....,;•-. .• 7. , 04 Iiit";1„,:i,01\11.4,...,,ilt....:,... V.. 4 ..,:: .4.it, ,,.Ltitv "..,.. -:::,:ii, \ jr,ffiz_,\ \s„ , ., • . ., •••.:•„:... ,, i. .. ....:,-, .. ... . , a ift‘.....„1„doliv-,air At: ,• i ,. . .. ... it 4.1.• i. •s. it, .,...J.... \ ),t`e,144t...44..2..i. saitnto,.,•:, t::,,,,\,..,...iv,r.„.• ...kat. i, •• • 1 1.: ...; , • c • •• ,(4,441:„. ,,,, , .f. ,.„ ,. ..e trr,. .. 4? ••• ., . .e . . o.'.. . .. . ...% :• 4% ... . . 'IP?.... .4 • ...,-; • n n* n (-^?f,.ri "'wrsOtWoi t - s. li .04.- • Vett is .5 ‘, s,,•*..*: ..? ....-. • .i.: \ ' ' .2•:"- ....` ' :' 4 ,.•., ••••:....: t& . #41nr ''',.; -::'C'3":1 r-g-''Cliti-11. ' . ::' 411 . -;••• ,6. , ''' -yet k m• • . :, .. .., • ,.•: :.. ....,- • .... . . , ..• . : „...s,14y. ;..f'... : .t.:ii l'"'.1'1;12,":::13,:y" 4::. e :I'll • ,,..,... t. 1.• 4.,i11%. 4.44 A-• .4 1 , • :4 .11 f. ritt.... .. ,......< r....,.. 4. .., . ...... : .,; . , .. .. ., tt.:.. , .. .,....:$ _ 4 . kt . • • • .: . •4visoiwooriativisi- . .;. 4.-, •, .• 1 ......„: .• • , :. .:...!;•• ••••": • - .. . .: ,•• •• •stri-, • - c.• tvivis „nig*. ski; .. •ii.a.::••e- 1,; :;•;•:••evr'•-• ' : . . : •• *...• • ..u.: 1"*: • : - ••• • ;• • • • •* ••• : r' 4 - •: iiiiiillw tialkill, •1° * a • .i VAttli; ' I .., .., ., tt, -elortati • ii•-• tAt4o..,,,,t;.:”.-.... bonih .• . ,---., s try,A vooltimm• a id -' •••-i }t.:%it..:./. 43 ,. • ' • ”. . , . .. . • • C.A- •t'.1ttA ;:iicq,rThitilhititi IS i t .':S'itt l'Attiett4 4 ”•iit.3.. tlitalliSlr! . : itlit : "1,..t • . , • • li IIII Int ... .. .. . :•• : • . S • t, . . . . . ' ..• . , • , . . . , r-ce ,hti , t• :. . • • •:-• t ',.! • • •• '•• • • ."- •. 1./.., , ;..,Alm. .. .atitttir) 44 A- . ••: - • • cit... fit.:p"...: t • .• • ••• : • • • • • • . , • -, ttti:t:Altilatiaillilirin4141211 .;;:tz' . . • . ,. .. • • .... • : ilWittiC m . . . • . , . . • •• ' Mt% '' st.M11111 • "1 taulimailliertil:is,J" c4 .. .., . . . . . . . . , . .. . . -Ar.tikk,..•i.pzt-Pl'Ijc-' V% -t.• . . . . . • .. tiZtt;. tilk,if 4 An‘li k 14:... . • I. • 4• . • • •. •• • t • • • • • • • ii • • • • • . ,44 . • • • # • t4 • • . • •IIV•\1: 4 t•At4.4‘'''''46 4C4 4 rjk4a;4,;;MlieS k 1' . 4 ; • el 4 • • 1 - ..N 4. _,tosisi TOILVICHril •••••••.114 Vor. IS . 't'..1.1-: fail.' rAINWV,"it..-1 u%4 o•a a Ns \ . •-• gi It ' 'see 1•„uplett,.•, 0 'rit-Ira „.5 fsr.- b-•:i•:--,',4041 -Ai 1.,„1 . ... • • • t s' tti 1 I s Ilk ti'.4a,,,,i-A -k.'.•1 aiair--k%1 : ois• ' a, -.1y •4,-••0,;••aidionik • t• tbs '„ai 1. t\a,'IC'tt'•"Qiivit • • '''''.4 iii . • • is° ....:,--- . • •%/4 ?.1 as , • .. - • $ 4 ft tt .. .. 1 ' • i - I . ... .;•L.. k • . a t I>-'T. ' . • 0. . . ' • .' • 'a I:-..wir • - T4 . t 1m-.....! dr. • • . . " • . • L. . . • . • ne 0,. It . ' • lin. 51. . Jail . . 1 • , . ,. , • . \ra, .. . • ' • . . ,74t 1r. . ' • 1 t •t 4P so pia I t . . alt ., ........ • • 11 tti 6. • 0 it ° •• . • 6 . . • ' ' It' - • • • . .. 4 es _ ‘41 • _ ---...:-.:;71r • raltli.le a. . , . * , tt AWAY IS • %,o, „ . . castor . 1S.; . 0, : 6 • 1.Vitay I . 11 I% to pab. its . VX .. . . . - . z -,t•ett - -1 - at, I ttis .. ... . . : . r : ., ' th * a. 44 . •4' .weip- • 1‘, 1 • •--liat.,1 z "Wifirg 1 .• . . ... . C . 1111t101011 14 zi.:....= t cisicaalk sl , . - . ....etta- • it unillif t ti el ts Zu 1 1 *I,.Ota• It fli t %.• 0119 4 . -,. .. __ . 1 . AI: k '.1/4 " 1.1ait ' 0„, . a , .. .... . , l . . .,. : . ilt tw dal 'at t k - . . la0 • - ut:4, :0-•• • nu . ,... • -ttatill-wet mon ;;4• 4 it \ • .11 . . . \ . . , n* ",4,1 v,t • -k. %a . , . • 1 Inn 4.4 14 lia 14 _Ulu . . tit. -II -i . . , •.k, 1H I a* f_t 1 • 14 . ..t Imistat qn illim • k% 04-/e....H' A • Isl. • I i \ 1. • )1 \ tiait g• • •A k *A .L"---.''----. . ft: Al iel ast • • ‘11 . to . =et it c2k A ,. , • ..n .‘ 1:, 4 It'4 IBS: tiA •••* li '' fro It* V . of ti •I .„,ts ---- "g• t ft.% try= . . il1/4*10111$7 1 .. • Iv Aillb,11,-- ' A . . • .4 . . , li t iikii,,,-‘11:til • tr 11) tlin. • I• • ,„ :, . sKi . • ,-- a 4 4 # • • III "on '41 tA . ' tt . ' :t, ..s• Cittiotlor *."; 11 I 'Ike %, •e.9.? . • t ..0.4.%1 . t. t neit -'. ., it • it ll 4* • At ki --14 a .0 4 • ; 4 • . ....-- % -III „-- -44 ....---- • t • Ili . . - 1 4 704141/4., tysijasf:tc. ._ilk•avt . • d I' . ..„, .. •, • • . . • . • 1 _ - - Fiberglass Re-Bars: State-of-the-Art Products Designed for non-corrosive - - =.r`t j and non-magnetic applications, The staff at PPI has the knowledge,experience E; -., PPI's composite plastic pilings, and engineering skills to fulfill each client's - - - * _ fiberglas s rein specific marine construction needs. Designed for Plastic Marine forcing bars,are environmentally structural flexibility, environmental compatibility superior to concrete, wood and user ease, PPI's line of products include: Products, An and/or unprotected steel pilings. �r-z...4 �= t . 0 Environmental,. S : cy ! psi 47- �` P-y 12 Marine Pilings a -inte s :'r` Investment PPI's plastic fender and load bearing pilings Within the marine environment, PPI's proprietary meet stringent customer specifications and • T—f environmental requirements.Theyare available v, patented products display several remarkable M Marine Camels: in a variety of sizes and colors; ranging in �_ _ advantages over wood, concrete and steel pilings. diameters from 8 inches to 36 inches and up These include: PPI's composite plastic and steel pipe core marine camels are °'"'"' -., Via*w%'� _ i _ - -.<-, ;.•' unsinkable;the pipe core is filled with foam-in polyurethane. to 120 feet in length with or without steel or „m fiberglass reinforcement. • - • Maintenance free and graffiti resistant Pictured below is a PPI camel 36 inches in diameter, 40 feet in g _ _• `� I length, weighing 12,500 pounds. It is being installed by the • _4 ; • No creosote or plastic sheathing required, U.S.Navy in San Diego, California. totally resistant to marine borer attack , a ! Marine Camels ( - • Non-abrasive e + c I Constructed with a specially designed core, PPI's unsinkable urethane/pipe core plastic • Unaffected by seawater, ultraviolet light and/ `�'� camels have a normal use life expectancy of or petroleum products -- - - ' ji/ \,. over 50 years. Our marine camels are produced r t Y . 3 " • Will not corrode and not to dryrot ®`- "�' n sizes that range in diameter from 24 inches subject ' z sn ,, �.r „t 14; N�°tar ' to 36 inches and up to 50 feet in length. U, • Wide selection of colors and geometric shapes/ =a fi 3 , 3 • Can be nailed, screwed, sawed,and drilled ` 1,..._._11,_:71,1:41, Marine Lumber .k• Fire resistant when flame retardants are added Y s' `9 `ruPPI has designed, developed and delivered tv r st#-_ §',�11 f { iTi heavy-duty bullrails (backing beams),sheathing • Available with non-magnetic cores for electro- _ •�— L P� �i r�r , , planks,bolster assembly units,wales and chocks magnetically sensitive naval applications for marine installations in the continental U.S. • PPI's marine products can be custom design- , F;; 4 4 and in the Pacific Rim. Our lumber products are n ' a ed and assembled according to our client's �� � � available in various sizes and colors,from 3"x 6" specifications. to 14"x 20", in lengths up to 50 feet,with or Langstone Fairway, Marker Piling without reinforcement cores. Portsmouth Harbour, England Pier 160 A, U.S. Navy, 24-inch diameter marker piling San Diego, California installed by the British Royal Navy. Steelre o _ plastic pilings barcage instaclledre - 40 at Space&Naval Warfare ,.._._ Systems Center and 40 Naval Submarine Base. x a' Fes+:..' - r` Fender and/or Load Bearing Fender and • — Plastic Pilings: Load Bearing 4 " _ PPI's composite plastic and steel pipe core - -- Plastic Piles: -� pilings are manufactured in various sizes, IIIP PPI's composite plastic - .`r`` r s strengths and degrees of stiffness to allow - and steel re-bar cage h- ' for different pier design applications. - core piling achieves greater ,r, r t- strength per unit cost than any other composite plastic =- , �,:: pile available. "' - _ . -.. ;, L: - $00#, ,{k•f rev!ilm,,,,Artio, Qbwid r• ,•;% i :41,407.ell'i;1;44,44141tkiikuCtY,C'16444, ','"r#166 lir tidkikt,h;p11),?,4:.?0 ilIfY:),:',ri/iPtiii:e,4'st '4,6+ • f . i ii 4f i itsotzeiktoto/iliciiithi'..'iliftl'ilAt';',, i..,c,,,; I ,, i64At'.a 'It .9.01., ''''dfrjk.4' :Vidak.4.4riirity,4.74-"oti;-5,+/4„6,5,44k 6:5 1.,++.5._'`• ++ ,- , -, .-- .4+ 61,4:++6 +'5,kir PAIN ,IllifilOOF,''),t,t+45±.P,,?',,t`?%,i'ez41,.:14) ,:ir r.‘l!,1,1,':,,l','"' r 3 r. , • ' '' ' 1• `t14:,V'Elri' ifro ?I' ii ''''#•,4.4 40111,4. ;1{1q/i;:::,±fri',144",14tergi,k1;",',+5(6; ' , .' ' - •1 5+ '+„-;',:u4 1 t:i471°61-01:11.444/itf5t),6:(/63404:1tOr t'44 r.65; ,5?1,64'41,515, ''' -i', '155 4:-‘1W'milt,.4:57,446-5.1+,$:46+J:5554461:4k;•7,5555:5 46061:44,-;ri,firt4,666-.; 4 4, ' - 4, ,-- 6, + 47' 4,r.,p,tif$'1.,,,,r,-.4,,r,,iki ' .i1/4„-i.,;?, A','SP'-', ,e),j,#,Eir',,"4,1„q14,mtk tC1/419,,V1;4:,/,',.,?;,,t4,0dri'rVe,\l[fiR,i;',„i'llii,,' ,:,r'• ' ' c '' ' ‘ , k.:4 i 4,ilit:-IFIN)044cri,i:pl,t,?];'-‘,411!i",:1,;,i; 014'iliPt ili;t4,vreirilltfitf41,11,461.AP,° 0:21f,krt,p2,,, d'• .. ' .., . ] ,.!, • • -5-5:+kt-44 6,64-46!;+455 ic;?-rrN it.,41-f,L, ir ..-.,, ' $?cove.rit.r. it4.4,„itr:L.i.d,z,3,7,./.,14,4,,,.41)!ret4Ar'L ,-.T ,.r.,? •,' ' .. .P,..,fi P.,, ..i ',ks„.^4,1,R,4,0111,61,10.,41,-4.4,-,'„,,,,:„.,'Pl,'4141 .11.,)1e:irt iIffkb,k41 •n*,,.11.,4\t",r44i,„,\441.,,,i,t,„..,',4t,,,i ir,.,,,,.1. .r, , r, .,-. ,, „.„. ,, r i 44-,,..,Lif,ir,4.,s,,,,slii,tf„,,,,,,r,,,,,,,104,4.1,„ ,,ttrt 11,1r,It. '±k.. .i dy,I:4 hittiir Vitt,e44 tsjs'Lls 31kti:hipkitil?';4Licks iSE fr,,.: ;4 i' ,' 's s:" 4', ' -Afis tii*iss,s14sWip„1": /Is illtdsii11,0.eii?Fir, ,',#,,Lit•ge4:'t,1,1,v '',/,,ttilti•riCtql 4,410,!+i,‘.14,1',01 ttdif'VI'l 1.4.51‘t"0'I' ' ', 4 4 ' ' ,P,,,,,t;4{,Hriccnyn1/4SPritli o,A;44101,1'-fcti..±i$,,l'i,,:i'a'qr,t44 "A°1 1.4 V,"Ati. , 44,„41{,i1,01,A.il+46 so--$4,5465,4:611, 1/4;6,6 6 i• - ,„ , - - -, ,: 5 +: '" 6'1('4:'44+44 '' ei 1 :A + 6 v:+6•65+1. -,+:4++546+,,y+1-1++,Of:6+4 5:65+461+4-4,-4 5,6; 4 , , 4, , '6,4,,6,,4154+,,,,,,)4:5+,05:4,L)66,41455 6+6+45,44:+61++,547 „, ,e)L'-en! ' ..,RA.A.J".1t1 •SililipolitIo%.Y'"-'.1i tk,1-,iclligi-:'fl i',';,,,` 1,', : - , • . ogvirrizqioRlo-h„to t'L.,;(0,44,:rtiiriii"iht4 s'ii r;ft?. ',41,4Ye:t".' ett'It4i,,a rfir''!",`,";,;.,trikitr14,-,i',4t,+,,Iiii A,,,`,, , • ; ^i ]:tactri„tik,4410,titittxts4V4iiittg:',. , ,'''' '' T.riribrtiti.ttel;'itur,,, ii r e,000 rtlitAtit,ouvo. '7,.)/.41-, ,illo-,P.r,crt: . ]q. ' ' ' . , r , t k' '‘ • .;t ,4+-' lir * -t: AA,,,,„Ar'Aitit. ,../,',''2P:.' F.,,, ,, ..t. 14•.."'WA al r,r, ',tett,rt.,Ifv, ,, *OOP C l ' )43/r,,,,,,r4-„th Obi,. rt ,`,.NA-tgtee. A., — Tolli iT „,,,. ripet''',x ' 11" '4li‘.?'efq— a , 44001,1- 41.0 .1 s 9t c).1 . I rki s 4"i 'T{I"• 1..ite4 , "'E.,,‘4 4 e, % ";\,V4dritAi- , 't 0rik'Q. J"Ck'1.,%11' 1 CI) C — .. ._- II MINI ,J,t,"„ery li..,,, .lt.,q ' cikir4r". h.,".+4 A'r-, ie., . . a,„, a, 1 , . .._ .. . .., , — , ..,,,, ,4 .ir.rriP., a ,1... , . .. . . , .. . . . . . lY0-t -y_c )Rcni ) ne.0%2Y p4 T "\ \,bk!f ooa SHORELINE MANAGEMENT ACT - PERMIT DATA SHEET AND TRANSMITTAL LETTER PERMIT NUMBER 266 FROM: PLANNING DEPARTMENT TO: DEPARTMENT OF ECOLOGY CITY OF ANACORTES ATTN: SHORELINE PERMIT REVIEWER P.O. Box 547 NORTHWEST REGIONAL OFFICE ANACORTES, WA 98221 3190 160TH AVENUE SE BELLEVUE, WA 98008-5452 DATE OF TRANSMITTAL: OCTOBER 1, 2002 DATE OF RECEIPT: TYPE OF PERMIT: SUBSTANTIAL DEVELOPMENT® CONDITIONAL USE❑ VARIANCE❑ REVISION ❑ SPECIAL El LOCAL GOVERNMENT DECISION: APPROVAL® CONDITIONAL APPROVAL n DENIAL ❑ APPLICANT INFORMATION APPLICANT'S REPRESENTATIVE: NAME: MR. GARY ROBINSON NAME: MR. SAME ADDRESS: CITY OF ANACORTES ADDRESS: P.O. Box 547 ANACORTES, WA 98221 PHONES) (360) 293-1918 PHONES) IS THE APPLICANT THE PROPERTY OWNER? YES ® No❑ LOCATION OF THE PROPERTY: (SECTION, TOWNSHIP AND RANGE TO THE NEAREST 114, 114 SECTION OR LATITUDE AND LONGITUDE, AND A STREET ADDRESS WHERE AVAILABLE) GENERALLY, AT THE END OF 6T" STREET AND "I" AVENUE, SECTION 13, TOWNSHIP 35 NORTH, RANGE 1 EAST, 1708 67"STREET, ANACORTES, SKAGIT COUNTY, WASHINGTON WATER BODY NAME: GUEMES CHANNEL SHORELINE OF STATEWIDE SIGNIFICANCE: YES® No 0 ENVIRONMENT DESIGNATION: URBAN I DESCRIPTION OF PROJECT: (SUMMARY OF THE INTENDED USE OR PROJECT PURPOSE) UPGRADES TO PROVIDE A PASSIVE RECREATION PARK AMENITY INCLUDING CURBS, SIDEWALKS, PAVED PARKING AREA FOR 13 CARS, AND A PATH TO A LOOKOUT POINT; APPROXIMATLEY 3,500 CUBIC YARDS OF FILL NOTICE OF APPLICATION DATE: JULY 115� 02 5,, 2002 FINAL DECISION DATE: SEPTEMBER 25, 2002 BY: —sti� i2 IAN S. MUNCE, PLANNING DIRECTOR(360) 299-1942 9/30/96 (CH.173-27 WAC--9.15) a% Y i • 9QUS� P Shoreline Management Act of 1971 Permit for Shoreline Management Substantial Development Conditional Use or Variance Type of Action X Substantial Development Application No: 266 Conditional Use Permit Administering Agency: City of Anacortes Variance Permit Date Received: July 15, 2002 X Special Use Approved: yes Date: September 25, 2002 Pursuant to Chapter 90.58 RCW, a permit is hereby granted to: Name and Address of Applicant Mr. Gary Robinson, Park& Recreation Director City of Anacortes P.O. Box 547 Anacortes, WA 98221 to undertake the following development (please,be specific) Upgrades to provide a passive recrfeation park amenity including curbs, sidewalks, paved parking area for 13 cars, and a path to a lookout point; approximately 3,500 cubic yards of fill will be imported upon the following property (please list the legal description, i.e., section to the nearest quarter section, township, range) Generally, at the end of 6th Street and "I" Avenu, Section 13, Township 35 North, Range 1 East, 1708 6t8 Street, Anacortes, Skagit County, Washington. within Fidalgo Bay and/or its associated wetlands. The project will be within shorelines of statewide significance (RCW 90.58.030). The project will be located within an Urban I (shoreline area) designation. The following master program provisions are applicable to this development (state the master program section or page number.) If a conditional use or variance, also identify the portion of the master program which provides that the proposed use may be a conditional use, or that portion of the master program being' varied. (See Shoreline Administrator's "Findings of Fact") rTh Shoreline Permit#266 Development pursuant to this permit shall be undertaken pursuant to the following terms and conditions: 1. The scope of this project not exceed that as set-out in the shoreline application (including attachments), the accompanying SEPA checklist(including attachments). 2. Silt fencing shall be installed during construction. Vegetation removed during construction shall be replanted with vegetation chosen for its value as bird habitat. 3. Grade and Fill and Building Permits shall be secured from the City of Anacortes prior to any filling or construction. 4. This project is subject to applicable water, sewer, and stormwater hookup fees and transportation, fire, school, and park impact fees. These fees are payable at levels in effect at the time of building permit issuance and may differ from those fee levels currently in effect. 5. There shall be no impediment to hand launch boats under 20 feet. 6. The Park and Recreation Department shall bring back the landscaping plan to the Planning Commission for approval. 7. Any violation of this permit and its conditions shall constitute a violation of the State Shoreline Management Act and its regulations and be subject to its penalties This permit is granted pursuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58 RCW). This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the permittee fails to comply with the terms or conditions hereof. Construction pursuant to this permit will not begin or is not authorized until thirty days from the date of filing as defined in RCW 90.58.140(6) and WAC 173-14-090, or until all review proceedings initiated within thirty days from the date of such filing have terminated: Except as provided in RCW 90.58.140(5)(a)(b)(c). i2T.u-,-c 3o d2 Ian S. Munce, Shorelines Administrator Dat ************************************************************************************************************** This section for department use only in regard to a Conditional Use or Variance Permit Date received by the Department Approved • Denied This conditional use/variance permit is approved by the Department pursuant to Chapter 90.58 RCW. Development shall be undertaken pursuant to the following additional terms and conditions: Date 2 • 0 ' mod±. 1 tq y \•<9oos�k>; Before the Planning Commission, City of Anacortes Shoreline Management Substantial Development/Special Use Permit Application by City of Anacortes - Guemes Channel Kiwanis Waterfront Park Shoreline Permit#266 Findings of Fact and Conclusions of Law and Decision Thereon FINDINGS OF FACT 1. General Background 1.1 The City of Anacortes Planning Director has been designated the Shorelines "Administrator" and "Environmental Officer" for the City of Anacortes Shoreline Management Master Plan, Section 5 - Definitions, Appendix C. 1.2 Under Section 11: Permit Procedure, d) "Not more than 5 working days after the 30 day review period, or following a hearing, if necessary, the Environmental Officer shall recommend approval or denial of the permit to the Planning Commission who shall approve or deny the permit at their next meeting. If the Planning Commission does not act on the permit the decision of the Environmental Officer shall stand." 1.3 Application was made on July 15, 2002 for a Shoreline Substantial Development/Conditional UseNariance/Special Use Permit for: proposed upgrades to provide a passive recreation park amenity on a 1.5 acre site generally at the end of 6th Street and "I" Avenue including, ! but not limited to, curbs and sidewalks, paved parking area for 13 cars, and a path to a lookout point at 1706 6th Street, Section 13, Township 35 North, Range 1 East, Anacortes, Skagit County, Washington. The application is shown as Exhibit 1. 1.3.1 The vicinity map and site plan are shown as Attachment A to Exhibit 1 (four pages) 1.4 The proposed project is located on Guemes Channel. 1.5 The proposed project is designed so as to formalize and improve an area historically used by the community for recreation and enjoyment of the shoreline. 2. State Environmental Policy Act 2.1 A Determination of Nonsignificance (hereinafter "DNS") was issued for this project on July 17, 2002 by the City of Anacortes, the SEPA lead agency. Exhibit 2 (includes Environmental Checklist) 2.2 The DNS was made available for public comment on July 17, 2002 and mailed that same day to the following agency with a deadline for comment of September 3, 2002: State Department of Ecology. 2.3 The DNS was published in the Anacortes American on July 24, 2002 again with a deadline for public comment of September 3, 2002. 2.4 No letters of comment were received in response to this DNS. 3.0 Notice 3.1 Section 11: "Permit Procedure", page 6, item b) of the Shoreline Master Plan with regard to Public Notice states, in part: "Upon receipt of the application, the Environmental Officer shall instruct the applicant to publish notices of the application once a week for two consecutive weeks in a newspaper of general circulation in the City of Anacortes. In addition, the Environmental Officer shall post at least four copies of the notice prominently on the subject property or in conspicuous public places within 300 feet thereof. Within thirty days of the final publication of notice, any interested person may submit his views upon the application, in writing, to the Environmental Officer." 3.2 Notice of Shoreline Substantial Development/Conditional UseNariance/Special Use Application, Notice of Public Hearing, Notice of Completeness, and Determination of Nonsignificance were published in the Anacortes American on July 24, 2002 and July 31, 2002 (Exhibit 3) and four copies of the Notice were posted on the site and copies were also posted at the Municipal Building, Library and Post Office on July 19, 2002 (Exhibit 4). 3.3 Four letters of comment was received in response to this Notice of Application. Exhibit 5: July 28, 2002 letter from Ansel Hyland Exhibit 6: August 5, 2002 letter from Dean Genandt Exhibit 7: August 8, 2002 letter from Jack Hill Exhibit 8: September 2, 2002 letter from Guemes Island Ferry Committee 3.4. Written comments were received from staff and incorporated into these Findings as follows: The application was received on July 15, 2002 and distributed to City staff on July 19, 2002 requesting that the Planning Department be notified of any additional information needed to evaluate the application. No additional information was requested and the application was determined to be complete and the applicant notified. On September 4, 2002 city staff met to submit recommendations on merits of the application. Proposed conditions 1-5 are standard conditions. It is noted that additional issues will be addressed in City staffs review of the Building Permit Application that will follow on from approval, if granted, of this application. 3.5 The 30-day application review period for this project ended on September 3, 2002 and the SEPA review period ended on August 5, 2002. The Environmental Officer forwarded Findings of Fact and Conclusions of Law to the Planning Commission on September 5, 2002. The Planning Commission reviewed this permit on September 11, 2002. The meeting was continued to September 25, 2002 at 4:00 p.m. in order to conduct a site visit. The Public Hearing was reconvened on September 25, 2002. At the conclusion of the Public Hearing the Planning Commission voted to approve the project subject to the conditions outlined on Pages 8 and 9. 2 3.5.1 The following were submitted as Hearing Exhibits: Exhibit 9: October 25, 2002 letter from Ross O. Barnes Exhibit 19: October 25, 2002 letter from Philip Burton 4.0 Shoreline Master Plan 4.1 The subject property is in a shoreline area designated Urban I by the Shoreline Master Plan for the City of Anacortes. This designation is primarily for those areas which are heavily developed for industrial purposes and those which are appropriate for industrial purposes. The intent of the designation is to provide for efficient utilization of suitable shoreline areas for water dependent commerce and industry consistent with the Shoreline Management Act of 1971, as amended. (Corresponds to Heavy Manufacturing Zones). 4.1.1 Appendix A, Use Activity Regulations states: "Recreation — Urban I Designation: Permitted when meeting requirements for that use and shoreline area." 4.2 The applicable goals and policies of the Shoreline Master Plan have been addressed by this application as described below. 4.2.1 GOALS AND OBJECTIVES SHORELINE USE ELEMENT GOAL Shorelines are to be managed and activities coordinated in order to preserve long term multiple benefits of the various shoreline resources. Objective: Identify and designate those shoreline areas suited for particular long term uses, including conservancy, recreational, residential, commercial, and industrial. 4.2.1.1 As conditioned below, the proposed project will preserve both the long-term recreational environment and water quality of the shoreline. 4.2.2. SECTION 20: Use-Activity Policies and Regulations (18) RECREATION: Recreation and refreshment of body and mind through forms of play, sports, relaxation, amusement or contemplation. Policies a. Public recreation facilities should be planned and designed to augment and enhance private recreation facilities and vice-versa. b. Unique shoreline recreational areas and vistas shall be preserved for future generations. • c. Recreational planning and development should recognize the wide variety of needs generated by the diverse local and regional population. • 4.2.2.1 As conditioned below, the proposed project will protect and preserve the shoreline. 3 1 ^, C ) Regulations a. Commercial recreational developments shall conform to relevant regulations contained in this Master Plan. b. Recreational development shall not unduly burden or create conflicts with adjacent shoreline uses. c. Recreational developments, public and private, shall be located, constructed, and operated so as not to be a hazard to public health and safety nor should they materially interfere with normal public use of the water and shorelines. 4.2.2.2 This regulations are addressed in project conditions. (19) GENERAL REGULATIONS FOR SHORELINE AREAS: d) Street rights-of-way or utility easements which offer physical or visual access to the shorelines or water body shall be preserved. 13) LANDFILL: The creation of upland areas or the elevation of existing upland by deposition of soil, dredge spoil, or other solid material onto land or into shallow water bodies: Policies a. Landfills which reduce the area of marine surface waters should be permitted for water dependent uses only. 4.2.2.3 The proposed use is a water-dependent one. Additionally, the only landfill will involve an estimated 3,500 cubic yards of fill to be graded/moved in surface preparation. b. Fill materials are not to contain pollutants which could cause an adverse impact upon water quality. 4.2.2.4 This requirement is addressed in Condition#3. c. Landfills should be landscaped to maintain or improve existing views and prevent erosion where feasible. 4.2.2.5 This requirement is addressed in Condition# 3. d. Landfill proposals should demonstrate a reasonable need and consistence with the Act and this program. 4.2.2.6 The landfill proposed is necessary to provide parking and access for the waterfront park, a water-dependent use. e. Review of proposals for landfills should assess qualitatively and quantitatively the overall value of the landfill site in its present state versus the proposed shoreline use to be created and other future potential public or private shoreline uses; these should be expressed in short and long range economic, social. and environmental terms. 4 ♦ / / 4.2.2.7 In economic terms, the project will bring the project site into use as an important recreational site that is compatible with the surrounding neighborhood and adjacent marine environment. f. Landfills should be designed no larger than necessary for the proposed use. 4.2.2.8 The proposed landfill is designed to support the proposed waterfront park facility. g. Landfills should minimize and mitigate, by design and construction adverse impacts to the shoreline and aquatic environment and to nearby land and water uses. 4.2.2.9 The proposed waterfront park is designed to protect the shoreline. Regulations a. Landfills shall comply with "Criteria for Governing the Design of Bulkheads, Landfills, and Marinas in Puget Sound, Hood Canal, and Strait of Juan de Fuca, for Protection of Fish and Shellfish Resources," State of Washington, Department of Fisheries, February 5, 1971. 4.2.2.10 This regulation is included in Conditions#3. b. Landfill materials shall be of such quality so as to not significantly degrade existing surrounding levels of water quality. 4.2.2.11 This regulation is included in Condition # 3. c. All perimeters of fills shall use vegetation, retaining walls, or other means for erosion control. 4.2.2.12 This regulation is addressed in Condition # 3. d. Landfills which reduce the area of marine surface waters shall be allowed only for those water dependent uses consistent with this Master Plan. 4.2.2.13 The fill proposed is for the purposes of developing a transition area between the gravel parking area and the ordinary high water line. e. Landfills may be constructed if the applicant can demonstrate the following: 1) the proposed landfill location and design will minimize the interference with water flow and circulation, and disruption of natural shore processes. 4.2.2.14 No significant interference with water flow and circulation or disruption of natural shore processes has been identified. 2) the proposed landfill will not be located on a site important for wildlife, shellfish, or finfish, including feeding, reproduction, and rearing areas, or that impacts to such habitat areas are mitigable. 5 4.2.2.15 The proposed landfill site will not be located so as to impact habitat areas. 3) the proposed landfill will not pose significant restrictions on navigation or loss of public access. 4.2.2.16 The proposed landfill will enhance public access by reducing the grade from the parking lot to the water. 4) the proposed landfill location and design will blend with the existing shoreline features and adjacent properties. 4.2.2.17 The proposed landfill will enhance public access by reducing the grade from the parking lot to the water. Environments a. Urban I: Landfill is permitted in the Urban I shoreline area designations, subject to the policies and regulations, as provided below: 1) landfill involving placement of less than 1,000 cubic yards is a permitted use. 2) landfill in excess of the limits of subsection (1) is a special use. SECTION 23) Shoreline Special Uses. The purpose of special use is to allow greater flexibility in varying the application of the use regulations in a manner consistent with the policies of this Master Plan. Uses which are identified in this Master Plan as special uses may be authorized by the Planning Commission after a public hearing and upon a showing by the applicant that the following conditions are satisfied: 4.2.2.18 "A public hearing has been held on this application." 1. The proposed use will not have a significant adverse effect upon the environment or other adjacent or nearby uses, or such adverse effects can be mitigated, or the public benefits of such use outweigh such adverse effects. 4.2.2.19 The proposed use as described above and conditioned below will not have a significant adverse impact on the environment. As conditioned the waterfront park and site development will add public benefit. 2. The proposed use will be consistent with the policies and general intent of this Master Plan. 4.2.2.20 This requirement has been addressed in these Findings of Fact and Conclusions of Law. 3. The proposed use will not interfere with the public use of public shorelines. 4.2.2.21 The proposed use will improve public access to the shoreline in and around the project site. 6 > 4. The location, design and appearance of the proposed development will be compatible with surrounding uses. 4.2.2.22 Development of the site to productive use will improve compatibility with surrounding public facilities and neighborhoods. In authorizing a special use, the Planning Commission may impose requirements and conditions in addition to those expressly authorized in the use regulations to prevent undesirable effects of the proposed use. 4.2.2.23 The Planning Commission in its conditions has addressed potential undesirable affects of the proposed use. 5.0 Zoning Ordinance 5.1 The City Zoning Map establishes zone boundaries and the City Zoning Ordinance establishes (1) the permitted use of land in the various zones and (2) development standards. 5.2 The subject property is in a Light Manufacturing (LM) Use District, Chapter 17.18 of the Anacortes Municipal Code, Title 17, Zoning. 5.2.1 Section 17.18.010 - "Purpose" states: The Light Manufacturing District (LM) is intended to accommodate those businesses which are not compatible with uses found in the Central Business District, and industrial and other uses which do not create noise, smoke, odors, or other objectionable nuisances or hazards detrimental to uses in the LM District or surrounding districts. 5.2.2 Given its small scale nature and the supporting function it provides in this zone, the general purposes as set forth in Section 17.18.010 have been met by this proposal. 6.0 Anacortes Comprehensive Plan. 6.1 The City of Anacortes adopted a Comprehensive Land Use Plan (hereinafter "Comprehensive Plan") in 1982. The Comprehensive Plan contains general policies and goals which are to be followed for development in the City. Comprehensive Plan at 1. The Comprehensive Plan contains general overall goals and specific policies for certain types of land. The following portions of the Comprehensive Plan potentially apply to this project. 6.2 "General Goal #1. Create and maintain a healthy, aesthetically pleasing high quality environment that maximizes the opportunity for all citizens to share the social, psychological, physical and economic benefits of Anacortes/Fidalgo Island." Comprehensive Plan, p. 8. 6.2.1• The project will further this General Goal #1 of the City of Anacortes Comprehensive Plan by providing an attractive, safe waterfront park for the enjoyment of the community without changing the outward appearance of the adjacent residential neighborhood. 7 6.3 "Recreation and Tourism Goal # 6, Policy (c): Implement the Waterfront Improvement Program for the development of street-end parks. Comprehensive Park and Recreation Plan, City of Anacortes, 1989." 6.4 "Recreation and Tourism Goal # 7,: Increase the opportunities for public access to and enjoyment of the shorelines of Anacortes. 6.4.2 The project will further the Goals and Policies of the City of Anacortes Comprehensive Plan by providing shoreline access utilizing a waterfront park. 7.0 Findings of Fact 7.1 The requirements of the State Environmental Policy Act have been complied with. 7.2 The Public Notice and Public Hearing requirements of the Shoreline Management Act have been complied with. 7.3 The project is consistent with the shoreline designation, general goals and objectives of the Anacortes Shoreline Master Plan. 7.4 The proposed use will not have a significant adverse effect on the environment or adjacent or nearby uses, and in fact will bring additional benefits in line with the shoreline designation of the site. Conclusions • A Shoreline Substantial Development and Special Use Permit# 266 should be issued to the City of Anacortes for the development of Guemes Channel Kiwanis Waterfront Park, 6th Street and "I" Avenue, subject to the conditions that: 1. The scope of this project not exceed that as set-out in the shoreline application (including attachments), the accompanying SEPA checklist(including attachments). 2. Silt fencing shall be installed during construction. Vegetation removed during construction shall be replanted with vegetation chosen for its value as bird habitat. 3. Grade and Fill and Building Permits shall be secured from the City of Anacortes prior to any filling or construction. 4. This project is subject to applicable water, sewer, and stormwater hookup fees and transportation, fire, school, and park impact fees. These fees are payable at levels in effect at the time of building permit issuance and may differ from those fee levels currently in effect. 5. There shall be no impediment to hand launch boats under 20 feet. 6. The Park and Recreation DepArtment shall bring back the landscaping plan to the Planning Commission for approval. 8 J 7. Any violation of this permit and its conditions shall constitute a violation of the State Shoreline Management Act and its regulations and be subject to its penalties Sr - �/. i2 .f.4r'-�c ,/3/02 Ian S. Munce, Shorelines Administrator Date 9