Loading...
HomeMy WebLinkAboutPermit File BLD-2016-1721 608 J Avenue -- I �,.r:o� Anacortes Planning & Community Development )hepte Permit Center P.O.Box 547,Anacortes,WA 98221-0547 PH(360)293-1901 ,raoa,�i Don Measamer,Building Official,Planning Director FAX(360)293-1938 December 31, 2019 RE: Temporary Occupancy for: New Single Family Residence at 608 J Ave and ADU at 1601 6th Street Permit#BLD-2016-1721 This letter will stand as a"Temporary Certificate of Occupancy"for the project at the above referenced address. This will expire within 90 days from the above date, at which time the corrections listed below will be completed, and the final Certificate of Occupancy will be issued. The following items must be completed in 30 days from the date of this letter: 1. Finish building south ramp to main residence with the necessary handrails and guards (block off access to these areas until the work is complete and passes inspection). 2. Finish building south porch and east porch roofs (block off access to these areas until the work is complete and passes inspection). 3. Finish decks and have them pass inspection before using them. 4. Install air gap device for ADU dishwasher above the kitchen sink countertop. 5. Provide report for all backflow preventers showing that they function properly. 6. Provide Blower Door Test report showing that the house passed the Blower Door. 7. Provide Certificate of Insulation. 8. Pass Public Works Final. 9. Cut back pipes, in mechanical room, above bell drain so that they terminate 1 %" above it to provide the necessary 1 %"air gap. 10. Add a second strap on the top 1/3 of the boiler in the mechanical room where it is missing. 11. Provide verification that the man door to the garage from the house is 20-minute-fire- rated. 12.Cover all bare soil with approved material and maintain until landscaping is complete. 13. Apply for an obtain a permit from the City of Anacortes for the solar panels that are installed above the roof, which are covering vents and roof jacks, and have them Items to be completed in 90 days: 1. Finish building the rain garden 2. Finish landscaping and install the required amount of trees and 8"minimum required depth of proper soil in accordance with Department of Ecology regulations. 3. Pass landscaping final. 4. Pass Stormwater final. I.,M1 Ps must be maintained, and inspections and reports submitted as required by the City until the landscape is complete and passes the landscape and Stormwater final inspections. If you have any questions, please contact me at 360-293-1901. Thank you, Groc Fyrrce City of Anacortes Building Inspector Acknowledgement and agreement to finish the above terms and conditions for the Temporary Certificate of Occupancy: Owner/Contractor: � ignature Date