Loading...
HomeMy WebLinkAboutPermit File BLD-2019-0236 3956 Rock Ridge Parkway (2) S 6 2-0dc_ � Q RI_ 0 - ao / -Steve WhitlockV � From: Tim K Garrison <timg@timkgarrison.com> Sent: Thursday, September 12, 2019 2:39 PM To: Steve Whitlock Subject: RE: Massey Residence Hi Steve, It is never okay to cut an I-joist flange without first checking. All of the bending stress is concentrated in the flanges. Please remind your plumbers, electricians, and HVAC guys about this. However, in this case you lucked out and are okay. The top flange is in compression and luckily was not cut all the way through.Also,the floor diaphragm helps take the compression. Approved as-is. Feel free to print this for Grock. Have a terrific day! Tim K. Garrison, P.E. 2316 Antone Way,Anacortes,WA 98221 email:TimG@TimKGarrison.com Phone and text: 360-708-1865 Facebook Page: Tim K Garrison Website: https://linkprotect.cudasvc.com/url?a=https%3a%2f%2frimKGarrison.com&c=E,1,dIExkPdW57BIPdh_wldmLpTmTMm31 IaTgE-PG6PoiQND3Y6KUYjvnmGcKxwl9LObAxYg_RxAgtXnyZb_uQT1ZgABQVzJs2omk- OnpDoZihNma4m156pJK30,&typo=1 Check my backlog and status of jobs in queue here: https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.timkgarrison.com%2fmy- schedule%2f&c=E,1,1vIKoPfXfKylggaZKPWcIRQGNY3AR_MsX4W0ehVgPjL6fkOgrstEsKXOYJvtr- Uc9FSXesm8GufHduwjIXAV7xje-cMbRppSgwDoae-b71Kak4E4V0,&typo=1 Original Message From: Steve Whitlock Sent:Thursday, September 12, 2019 2:14 PM To:Tim Garrison <TimG@TimKGarrison.com> Subject: Massey Residence Afternoon Tim , I just got my framing inspection and Grock happen to notice that the plumber cut some of the top flange on this I joist .The flange measures 2 1/4 and the plumbers cut 1/2 out of it First question is, is that ok? Do I need to fix it .The cut is about 4 inches from wall ? If I do have to fix, I was thinking of web filling the I joist from the cut/plumbing back to the hanger- roughly 15 inches on pipe side and put a 27 inch piece on the can light side of joist . Would that reinforce that end and help with any lost strength. Thanks Steve 1 I3Lb 26) 19 - 0 2 Leslie Richards From: Steve Whitlock Sent: Tuesday, September 10, 2019 8:08 AM To: Leslie Richards Subject: Fwd: Massey Shearwall Can you please print out 2 couples of this for me please ?Thank you . Steve Sent from my iPhone Begin forwarded message: From: "Tim K Garrison" <timg@timkgarrison.com> Date:September 10, 2019 at 7:30:14 AM PDT To: "'Steve Whitlock' <stevew@strandbergconstruction.com> Subject: RE: Massey Shearwall Hi Steve, The SDS in bottom plate is not required in mud sill on foundation. Also, If the plywood horizontal joint does not fall at the bottom of the bottom plate, standard bottom plate nailing can be used. Here is the new detail we're using but which may not be on the Massey plans. Please call if still unclear. 1 Typ. shear wall D3 BOTTOM connection on framed floor, NTS L./ALL E tin^� 1IC�1. i �6L.1�-.E"i A,cr k3.0 5t4EaT4-41/.1 i i{c4� I � S v I fiu.4. • 1191TE) o f Acr- ALL $4{60. tuALL. E.rT-14 riktA PER. -;T67s Pa 13 kt, of 14Elt~ 5�5 F' R �I I l I auk orc I I •bL44o7Z Tim K. Garrison, P.E. 2316 Antone Way,Anacortes, WA 98221 email:TimG@TimKGarrison.com Phone and text: 360-708-1865 Facebook Page:Tim K Garrison Website:TimKGarrison.com Check my backlog and status of jobs in queue here: https://www.timkgarrison.com/my-schedule/ 2 Original Message From: Steve Whitlock Sent:Tuesday,September 10, 2019 6:50 AM To:Tim Garrison<TimG@TimKGarrison.com> Subject: Massey Shearwall Tim , This letter is to give a alternative to the shearwall schedule bottom plate nailing that is in the approved set of plans for the Massey. If the plywood starts on the mud sill and carry's thru to break halfway on a top plate or on the rim for the second floor and then continue's to top plate of second floor or the plywood breaks on the top plate for a single story home. Then the requirement for SDS screws In the plate will be omitted. Thank You , Steve Whitlock SCI Sent from my iPhone 3