Loading...
HomeMy WebLinkAboutPermit File BLd-2018-0280 1604 Latitude Circle (2) MEM c x Y 0 PLANNING, COMMUNITY, &ECONOMIC DEVELOPMENT DEPARTMENT RESUBMITTAL/ PLAN REVISION /ADDITIONAL INFO COVER SHEET ° ', Mailing Address:P.O. Box 547, Anacortes, WA 98221 10) „ .;1 O, ,..V Office Location: 904 6th Street, Anacortes WA 98821 f EP 0 5 2019 Phone: (360) 299-1984, Fax: (360) 293-1938 P •a e` se�`tE 0-ak to submit revisions or additional information to your permit application. Permit/Project#: ,) -"2.0l g- (728D Date: 9- -- I ci Project Name: RA-1-0 L__CF-4149 Project Address: l(4— Project Contact: \I , Company Name:, � �� 1,i(1 c Contact Phone:S O-�l5` dl02t ,ecc: 16 Contact Email: \c� e vrl-ry ec,q•\ Has the permit been issued yet? V Yes 0 No cJ All revisions must be either clouded or highlighted &wet stamped by an architect/engineer(if applicable). Has this been done? r1 Yes 0 No What department(s)is this resubmittal/revision/additional information to go to? ❑ Planning Dept. Building Dept. ❑ Fire Dept. 0 Stormwater ❑ Public Works Dept. Is the plan revision or additional information,in response to a plan review letter? ❑ Yes. A copy of the plan review letter with itemized responses to each item is required. C No,the revision or additional information is initiated by the applicant, landowner, designer, or builder. If not in response to a Plan Review Letter, please explain the nature of the revisions and/or additional info: 0-41\t-ACt ciSc 7ND, cfl ot4 p cal (_DM A C- A wt_ SP.A-c-e -� A Sc-A.� �i - Are you submitting a full replacement? 0 Yes 17f No If not what page#is being replaced? 42- I Two full sized copies of all revised/additional information is required. Has this been done? CYes 0 No Two 11"X 17" reduced copies of revised site or floor plan is required.Has this been done? 0 YesANo Check the box next to the type of plan, report, or calculation where revisions or additional information can be found. ❑ Site Plan %i Building Plans ❑ Structural Plan ❑ Landscape Plan 0 Parking Plan 0 Tree Preservation Plan ❑ Arborist Report 0 SEPA checklist 0 Wetland Report ❑ Geotechnical Report 0 Storm Drainage Analysis 0 TESC Plan ❑ Civil Plan ❑ Lot Coverage Calculations 0 Impervious Surface Calculations ❑ FAR Calculations 0 Grading Plan 0 Survey(Boundary/Topo) ❑ Mechanical Plan 0 Plumbing Plan 0 Other: iY' ii SEP052019 j l:is , __9, A t,' September 5, 2019 Anacortes Planning, Community& Economic Development Dept. RE: Permit#BLD-2018-0280(1604 Latitude Circle) After excavating this site, it was determined that a crawlspace under the lower level was not necessary. Because of this,the foundation plan has been changed to show a slab floor/foundation, instead of the previous crawlspace foundation. A new foundation plan reflecting this change has been provided If you need anything further, please let me know. Thanks. Jack Reinstra Landed Gentry