Loading...
HomeMy WebLinkAboutStorm Water 1-5 BLD-2019-0170 MR 1 to 5 817 37th Street (41111*.1 Storm Water Minimum Requirements #1 to #5 ENGINEERING DEPARTMENT 904 6th Street Anacortes,WA 98221 ,�14 www.anacorteswa.gov ICO-W Official Use Only: (Information to Inspectors) Required Storm Water Facility and other related requirements: 4 e Tci.t3 Peer esr. SotLs - s 13MP T'S.1 bGr -eelz. eArri > -Piftt Gz al.1ec1oi.1 0 SP%U— ee*ic Kt-r -a..meeD- rue.#z. - ek-acres Project Address: _817 37' St Submittal Date: _3/28/2019Revised 6/18/2019_ Parcel Number: _P33118 Revision Number: Permit Number: _BLD-2019-0170 Acceptance Date (COA): Reviewer: _Steve Lange ,.a[ e4.1 l_AI- FRONT OF REPORT 4CC y - 4S P-r-9; Submittal Checklist: ca- TAB #1 through #.5- Drainage Analysis - Minimum Requirement#1 to#� (VAPPENDIX 1 - Survey performed by a Professional Land Surveyor 3---APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) cc,. APPENDIX 3 - Model Soil Management Plan for BMP T5.13 c. APPENDIX 4- Determining Construction Site Sediment Damage Potential (Appendix 7) cVAPPENDIX 5 - Site Plan with all applicable information (Minimum Size 11x17- 30 scale) co,- APPENDIX 6 - Documented Site Photos (North, South, East and West) • he e. Project Description: (What is it you are looking to do?Provide details regarding, but not limited to, Lot SF, Home SF, New and Replaced Hard Surface) Construction of new single family residence in conjunction with conversion of existing single family residence to ADU. The current site includes compact gravel driveways and paved walkways. The lot is 11,870 sq ft. The existing house has a 793 sq. ft. footprint and detached shop has a 620 sq. ft footprint. The proposed new structure has a 2,296 sq ft. footprint. The existing gravel driveway has 4,356 sq ft of impervious surface. The overall new and replaced hard surface sq ft will be 480 sq ft for the driveway and 2,296 sq ft for the structure for a total of 2,776 sq ft. The remaining 7,709 sq ft (65%) will be pervious landscaping and grass. 3,177 SF New Hard Surface. 7600 SF Total Disturbed Area Existing Site Conditions Summary: (Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography, vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed, Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction PhasinglSequence) Version Date: February 20, 2019 The existing site has not had any recent construction. The site is only slightly sloped from the rear to the front which is on 37th St. 37th street is on the northern border of the site and is paved but does not have a curb/gutter/sidewalk anywhere. A soils report has been prepared by Linda Spicher, Licensed Septic System Designer, and is included in this report.The report identifies unsuitable soils at 17 inches and 19 inches as well as anticipated water table at 17 inches and 19 inches respectively and where the observed water table was at 23 and 19 inches. See Soils Report for details. Developed Conditions Summary: (Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard surfaces , proposed contours) The existing gravel driveway on the north west portion of the property will become the new driveway which leads to the garage of the new structure. The new structure will replace most of the remaining existing driveway. Due to the soil, constraint of the lot, and natural slope beyond the construction area on site infiltration is not feasible. The site plans shows the tight line connected to a catch basin. Provide the Infiltration Rates found during the rainy season: .06 to .2 Inch\Per Hour What was the depth of the ground water table? 6-18 inches below existing grade (See completed Soils Analysis (Volume 1, Chapter 3.1.1) Site Sediment Transport Score: 50 Total Points (High1L cw) (See Determining Construction Site Sediment Damage Potential (Appendix 7) Drainage Basin (2007 Storm Comp Plan —City website\publicworks\engineering\comprehensive plans): What Drainage Basin are you in? F4, Fidalgo Bay, Outfall #42. Identify any downstream drainage issues (Storm Comp Plan: No downstream drainage issues. If so, describe: Complete the Applicability Requirements— Flow Chart (Figure 1-2.4.1 Attached, Figure 1-2.4.2 Attached and Figure 1-2.5.1 Attached) - Highlight the path and attach DOE Stormwater Management Manual Minimum Requirements: (MR#1 to MR#9 only). Refer to the 2012 Department of Ecology Manual, as amended in 2014 for further required information. Version Date: February 20, 2019 • Stan Here ir Does the site have 3%+ Yes See Redevelopment Minimum cc more of existing Requirements and Row Chart . impervious coverage? (Figure. 1-2.4.2). o Does the project oorvert', V...... l acres ormare of vegetation to Does the project result riir + lawn or landscaped areas, or 5,C00 square feet. or No convert 2_5 acres or more of $rea!ler, of new plus R native vegetation to pasture? replaced hard surface` e, area^ o Yes . .. 4 Ye Does the project result in 2.000 I •.. square feet, or greater, of new plus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted vegetation areas.. Yes .:: No V Does the proji have land • Minimum Requirements*1 11' disturbing actia�ties of 7,030 through#5 apply to the newYes , squarefeet r greater?and replaced hard surfaces and the land disturbed. O Minimum Requirement#2 applies. Acc-taneD oto.t5. trt �r�l� • Figure I-2A. I ._. fiZ -e--- Flow Chart for Determining Requirements for New Development DEPARTMENT OF Revised Jane 20'315 ECOLOGY Please see lirtc:.,A sww.Ky...we pt topyttititiliVror copyrIslt loll cc incliAlnil perrnssrc1 .. Slate of Washington urnit'ai31n Whammy,and dis lalTir. version uate: reoruary Lu, zu i y Does the project result in 2,1000 square feet. or more,of new plus replaced hard surface area? OR Does the Land disturbing activity total 7,C00 square feet or greater? Yes No Minimum Requiremen'#1 through#5 - apply to the new and replaced hard Minimum Requirement appliies_ surfaces and the land disturbed. Next Question Does the project add 5.000 square feet or more of new hard surfaces? R Convert acres or more of vegetation to lawn or landscaped areas? OR Convert 2.5 acres or more of native vegetation to pasture? Yes Na All Minimum Requirements apply Next Question is this a road to the new hard surfaces and the related project? No converted vegetation areas. Yes V Does the project add 5,0011 square feet or more of new hard surfaces? Yes No is the total of new plus replaced hard surfaces Do the new hard +v 5,C30 square feet or more, surfaces add W%or N No additional Na AN more to the existing 4 - does the value of the proposed improvements hard surfaces within requirements -including interior improvements-exceed the project limits? 50%of the assessed value (or replacement value) of the existing site improvements? f Yes All Minimum Requirements apply to the new and replaced` �` hard surfaces and converted vegetation areas. YeS Figure 1-2.4 2 M--> Cie•iciAs&c.. 1111 Flow Chart for Determining equirem s for Redevelopment DEPARTMENT OF Re+ilsed, une 015 ECOLOGY Please see nth:,Pmiw.ecy.rra.graaocopya,?.?!.nem'tar copyright nonce Mnclr aang permission, state or Washington i nitator °I llaollity,aid disclaimer. ver51011 udre. reuru uy zu, Lu w yes tre prose: c. a-:-;rarg to Firm COTIMo! Exempt V r:e-s per P .Jr.num Requirement ,1M ) REQUIRED: uple _ _. solo ilig BMIP`s wt ere Teas tale: 2 t, BMP T5.13: mast-Canstn tion .,.soil Quail No t v and Debtft Does tt!* proms pro.e,,_P G� a EMP T5. GA, B, or C: Oo irrspoul Hail trigger only Wiz #1 trtg> er a 1 ? kPerFigure 3.2or S is1ents., or PerfazolEi "tut-out Figure 3.3 In Ac ert lx ____._ r_. NO additional Conrrec Dn 1 t 2013- 1 B r a luiret _s • EMP T5.11 or T5.12.: COf: eit7 to"d Flow VIViiii. base It Permit OtsperVari or Meet Fires DIspers:;ort, & Phase I Pertritf. oT Rf QTJ.IR . .A P ever ieit .r 1 tile LID No the t Itg a ed -*eT rrnance Standard.Aplylr"g ir.e otfter nnty MR'6s a"' 1 - Ei? :Ps 1n Lift n11 cc List VP'2 41kilV is the p o j t Inside tie VGA'? # ire ect developerse to meet ,r' No the _lO 2'erri'rmanc and-�"d' Yes. ', - : . [ the projectr1 a parcel REQUIRED: For seat DU the Intel::: ce'i looter ,,.------No Yes surT r con V er the noose to meet the LID - V BrilPs In the order dorm nce Mordant? w.EQUIRED. Meet tfte LID siel In List 1 tar f :c ,`t. , . Perl'ormance Slandard thro• gr i tree of S t'a€ �es '' toe use cl aNtP(5) In the Tie first EMP '14 MM t except , � ns ere, feaslt e. ' . ` Fain Gardens 4tfte use of tiloretentlen is acceptablelt. DM. er eei` 01 -3 Q V `If the project cant meet t Petstear : a_ _ I EQULRE E): Fur each LIE) Performance ance Standard, it � � ' y,� ii . _._ -. � �/:rt�da.�r att� "�NIPs and be °�. t ed an .""". �u�4v7ilk the order I:�l an List 0-2 a��c+�a�ptfon�lvarlancs� REQUIRED: met�� � Ltd I�ertor�r,3nce Staridaxi through the t se o airy Pist In " Crlit ire of surface. °Use J ''tst El��R : !s REQUIRED,: : i�. 1P T5.1 k t !� 2L t � 1 :1 #�" � et for l n Gardens , � i �t1al �"'��i�'1�1�_ r�obt �.•o1�:btTl.�v31��1 Sol' Qua, �'!► t 1 ? �t,. �: reteri#ii r is acceptable:, aid Depett,. REQUIRED for PrVects ir1cige'ne MR #1-91‘:. ,n 0T REQUIRED: II ED: _ ,t kctile'`e ent of:re LID k :I"' P �1 j IREC+: ApDlytre t e Apply�I�SP T5.13 Post ����� r,�� l?�n °_-�L=�! � Standard.. E��i�s�In List =1 or L=� �r . ual ,end Performance ance :. NOT REQUIRED: App y•:ng the EMPs r n List it r Lis: Ia. *Recommended Itl°y Ecolcgy for projects trt'ggeing MRs g -45_ Azecx,ra--) As 4,4.4kst.X 's Figure I-. _u_ .1 -N1,_ ga- Flow Chart for Determining LICE MR ....iiii-,......i.„-- �T Requirements DEPARTMENT OF .m, ,yed Alt t'*e 2015 ECOLOGY _ _ ,_ Please see hIV:PArsw. .Wa.go iCo4pf ► itirc e for ::opyrIglit notice Inc1u4In perm Psslois..., state o' wasnitngto1 MIRY_or c'lla lilt` , 7.41t1 d+scialT°er. version uate: reoruary Lu, zu-i - TAB 1 (MINIMUM REQUIREMENT#1) • 1-2.5.1 Minimum Requirement#1 — Prepare a Stormwater Site Plan - 1.3 — Preparation of a Stormwater Site Plan - 1.3.1 — Stormwater Site Plans: Step-by-Step Note: The level of detail needed for each step depends upon the project size. Provide a narrative description of each step. 1-3.1.1 Step 1 - Site Analysis: Collect and Analyze Information on Existing Conditions Site analysis shall be submitted as part of the Existing Conditions Summary above. Part of the information in this step should be used to help prepare the Construction Stormwater Pollution Prevention Plan. Purpose of the Site Analysis is to provide for a Low Impact Development site design that is intended to compliment the predeveloped conditions of the site. The site is mostly undeveloped with slopes at an average of 3% down to the southeast. The site is mostly grass with some small trees and gravel driveway. A soils report has been prepared by Linda Spicher, Licensed Septic System Designer, and is included in this report.The report identifies unsuitable soils at 17 inches and 19 inches as well as anticipated water table at 17 inches and 19 inches respectively and where the observed water table was at 23 and 19 inches. See Soils Report for details. Survey AF 790820037 Included. 1-3.1.2 Step 2 - Prepare Preliminary Development Layout Based upon the analysis of existing site conditions, locate the buildings, roads, parking lots, landscaping features, on-site stormwater management BMP's, and preliminary location of stormwater treatment and retention/detention facilities for the proposed development. During construction most of the site will be disturbed.The existing grass in the front and rear side of the proposed house as well as the area around the existinghouse and shop will ae left undisturbed. See attached site map. See Attached site plan in Appendix 5. 1-3.1.3 Step 3 - Perform Off-site Analysis (at Local Agency's Option): Use additional Sheets, if necessary, Ecology recommends that local governments require an off-site analysis for projects that add 5,000 SF or more of new hard surfaces, or convert % acres of vegetation to lawn or landscape areas, or convert 2.5 acres of forested area to pasture. Off-site analysis extends to mile downstream of the project site. No downstream analysis was performed for this project. The City conveyance system downstream is app piped to the outfall at the bay. 1-3.1.4 Step 4- Determine Applicable Minimum Requirements Establish project size thresholds for the application of Minimum Requirements to new development and redevelopment projects. Figures 2.4.1 (Attached) and 2.4.2 (Attached) provide the same thresholds in a flow chart format. Based on the preliminary layout, determine whether Minimum Requirements #1 through #5 apply to the project; or, whether Minimum Requirements#1 through #9 apply. Version Date: February 20, 2019 Please note, that Minimum Requirement#1 through #5 may trigger additional Minimum Requirements, such as Flow Control. Total new impervious area is less than 5,000 sq feet at 2,776 sq ft. Minimum requirements 1 thru 5 are required. 1-3.1.5 Step 5 - Prepare a Permanent Stormwater Control Plan (Refer to this section of the Ecology Manual for requirements.) A storm water control plan is provided in the developed site plan and discussed in the SWPPP. MR#2 1-3.1.6 Step 6 - Prepare a Construction Stormwater Pollution Prevention Plan (MR#2— 13 Elements) Refer to Chapter 11-3— Planning for a detailed description of each element. See also attached Tables 4.1.1 (Source Control BMP's by SWPPP Element) and Table 4.2.1 (Runoff Conveyance and Treatment BMP's by SWPPP Element). See attached 13 Elements of a SWPPP—Minimum requirement#2 1-3.1.7 Step 7 - Complete the stormwater site plan The Stormwater Site Plan encompasses the entire submittal to the Local Agency with drainage review authority. Refer to this section of the Manual for further clarification of each item and what is required. See below: • Project Overview • Existing Conditions Summary • Off-site Analysis Report • Permanent Stormwater Control Plan • Construction Stormwater Pollution Prevention Plan • Special Reports and Studies • Other Permits • Operation and Maintenance Manual • Declaration of Covenant for Privately Maintained Flow Control and Treatment Facilities. (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Declaration of Covenant for Privately Maintained On-site Stormwater BMP's (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Bond Quantities Worksheet, if applicable The project overview has been provided at the beginning of this report along with an existing conditions description. Maps are included in the attachments. 1-3.1.8 Step 8 - Check Compliance with all Applicable Minimum Requirements A Stormwater Site Plan as designed and implemented should specifically fulfill all Minimum Requirements applicable to the project. The Stormwater Site Plan should be reviewed to check that these requirements are satisfied. Version Date: February 20, 2019 To take place during review and during and after construction. TAB 2 (MINIMUM REQUIREMENT#2) • 1-2.5.2 Minimum Requirement#2 —Construction Stormwater Pollution Prevention Plan (SWPP) - All projects are required to complete Minimum Requirement 2. - Refer to the 13 Elements of the SWPP (See document below, complete and attach) - See attached Table 4.1.1, Table 4.2.1 and Table - Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions, Waterways and Runoff/Stormwater Detention Calculations. See attached SWPP. Version Date: February 20, 2019 Table 4.1.1 Source Control BMP's by SWPPP Element Element Al Element#2 Element#13 Element#5 Element#6 Element#9 Element#11 Element t12 Preserve Establish Protect Loa"! BP.1P or Element Name Stabilize Protect Control Maintain Manage the impactVegetatianli.lark Construction Soils Slopes Pollutants BP.1Ps Project Clearing Limits Access Development BMP C101: Preserving Natural Vegetation ✓ BMP C102: Buffer Zones ✓ BMP C103: High fusibility Plastic or Metal ✓ V Fence BMP C105: Stabilized Construction ✓ Entrance I Exit BMP C106: Wheel Wash V BMP C107: Construction Road/Parking Area Stabilization BMP C120:Temporary and Permanent ✓ ✓ Seeding BMP C121: Mulching ✓ ✓ BMP C122: Nets and Blankets V ✓ BMP C123: Plastic Covering ✓ BMP C124: Sodding ✓ BMP C125: Topsoiling I Composting ✓ BMP C126: Polyacrylar ide for Soil Erosion ✓ Protection BMP C130: Surface Roughening V ✓ BMP C131: Gradient Terraces ✓ ✓ BMP C140: Dust Control V BMP C150: Materials On Hand V ✓ BMP C151: Concrete Handling ✓ BMP C152: Savcutting and Surfacing ✓ Pollution Prevention BMP C153: Material Delivery, Storage and ✓ Containment BMP C154: Concrete Washout Area ✓ BMP C160: Certified Erosion and ✓ V Sediment Control Lead BMP C162: Scheduling Version Date: February 20, 2019 Table 4.2.1 Runoff Conveyance and Treatment BMP's by SWPPP Element ,1 Element-1131 Eiarriit*4 Element*3 ' 7-:leinervt e Bement" F',.. 1 tm,i R Lfrivo-ri':tilt ill-Ilia"4" 1 Inetlin , Staiiety . Proicgt Lim L,::..,•:P -.1 .''I r ri...7 rt 't'.=-Ii-- Coiaitrol i Parotact Ptotec De. . contil:it ,. ,:.-.,stiltli Sodinteek etahan-forii ltrvict law Rate* Slopes Drain Irde Is - PizArtaitts lint9.C;i• :gs .., Gjfitrots anti Oulicia t i 1:1-Lowtt lot.ine nt I C.-.3rii. [ie,-Atcoipt_21 4761:9 Arid SVielt 1 44 P C201:: Grazi1.1-ATmd Chavtiela I D.Al (7202: Cho/Nell Lit(ii a 1 ., . -!, .1 P C lta: Watnr DiN3 •,•., i' • ,••••• ••• ...- 1 _ • 3.7 L irikt HP*StOrA DMMS V? •-- . AP C204: 414liimarfAca LltmliTz Ile i ... - - • Bror*r71167 Levti Sprefoitt I _, -.- LIMP C201: Chock Daus I( 1 _ . 1 Firbw r It Lziangular St ntiw vtelivo 1 i--- . I/ Lnr3ted Check Dom) _ ........-. ....•••••n, ,, - - 0 . 1 . citilP C2110.4: 0-Iniej Pytttdkn Eltil1it4C-„Zni: S-tom DrAin I..,44 ProWdlort f El 41 FP d231 1 I/ I , 1 -I FAIr(12321 Gravel Filter Berm st 1 •_. _ — -„,„„ _ -........ ...., ....-, IltAP C233: Sift Fence I . I IMP C2340 V4 St_V) lie V' -7 .............--ilmasaa.......* Ei rii 1 1 C 23 : 'Makin-, • ve, • ,-......= 4 - e --„-- Briir C236' Vngitotho Filtration IVAP ,,,-. t,.: Sc.diia.5rif,Trap I EcfelP Cd341: TeMpairbilay Stitt- 114Pand Elril P C250! GlilMlusetton Seer le -....., i se . __ . ... . .... - - 4 . . 1 _ Yr. isi -CI,t1tical 17t Jan vat .+.41IINVIPIM,-.....11.101r .-.= ...n. - A•-•-• ,61711" 0251,,Cutwiruction Stonwastat , veg I=lioftliirin DDT C252:Mgt pH NeWatteation Using 7 0_1; - ' - . ....i.... -. - .1 _ ihrelp Version Date: February 20, 2019 13 Elements of SWPPP (Construction Stormwater Pollution Prevention Plan) Please check off boxes to show that each element has been read and understood. Provide details where applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington (SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic Development Department, as well as under Stormwater on the Engineering Division of Public Work's page. Owner Name: Philip Steffen Site Address: 817 37th ST Prepared By: Philip Steffen The Stormwater checklist or building permit determined that: ❑ The 13 elements must be addressed ✓ These elements must be addressed for construction activity adding under for construction activity adding 2,000 2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area. This means that an attached narrative and site plan are required with this document. Under each element, explain the best management practices (BMPs) used or justify reasoning for those that will not be used. If needed, please attach a narrative to further explain plans or justification. ELEMENT 1: Preserve Vegetation/Mark Clearing Limits ✓ Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. ✓ Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum degree practical. Prior to beginning land disturbing activities, including clearing and grading, all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area shall be clearly marked, both in the field and on the plans, to prevent damage and offsite impacts. Plastic, metal, or stake wire fence may be used to mark the clearing limits (BMP C103). The duff layer, native top soil, and natural vegetation shall be retained in an undisturbed state to the maximum extent practicable. If it is not practical to retain the duff layer in place, it should be stockpiled on site, covered to prevent erosion, and replaced immediately upon completion of the ground disturbing activities (BMP C234). Clearing limits will be identified using BMP C233-Silt fence and BMP c103 high vis fence and Preservation vegetation BMP C234 Vegetated Strip Version Date: February 20, 2019 ELEMENT 2: Establish Construction Access ✓ Limit construction vehicle access and exit to one route, if possible. ✓ Stabilize access points with a pad of quarry spells, crushed rock, or other equivalent BMPs, to minimize tracking onto roads. ✓ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. ✓ If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary(ex: wet weather). Remove sediment from roads by shoveling, sweeping, or pick up and transport the sediment to a controlled sediment disposal area. ✓ Conduct street washing only after sediment is removed in accordance with the above bullet. ✓ Control street wash wastewater by pumping back on site or otherwise preventing it from discharging into systems tributary to waters of the State. Prior to construction, install BMP C105 (Stabilized construction entrance) or BMP C107 Construction Road/Parking area stabilization. Vehicle traffic to the construction site will be limited to one route at 37th St. Any dirt of mud that is tracked onto the roadway will be cleaned immediately. BMP to be monitored daily and repaired as needed.- ELEMENT 3: Control Flow Rates ✓ Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater runoff from the project site. ✓ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvement (e.g. impervious surfaces). ✓ If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. A silt fence BMP C233 is to be installed along the north side of the site to control runoff onto 37th st. ELEMENT 4: Install Sediment Controls ✓ Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. ✓ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in grading. These BMPs shall be functional before other land disturbing activities take place. V Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. ✓ Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard in Element#3, bullet#1. ✓ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. V Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration. ✓ Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. Version Date: February 20, 2019 Per BMP C233 a silt fence will be installed prior to construction on the downhill side of the site per the site plan. BMP to be monitored daily and repaired as needed. BMP C234 to preserve a vegetation strip as much as possible during construction. BMP C162 Scheduling, 15t install silt fencing and construction entrance and other ECS BMPs. 2nd install storm drainage. BMP C220 Storm Drain inlet protection in the catch basin adjacent to property. ELEMENT 5: Stabilize Soils ✓ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide (PAM), the early application of gravel base early on areas to be paved, and dust control. ✓ Control stormwater volume and velocity within the site to minimize soil erosion. ✓ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. ✓ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent erosion. o During the dry season (May 1 — Sept 30): 7 days o During the wet season (Oct 1 —Apr 30): 2 days ✓ Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. ✓ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. V Minimize the amount of soil exposed during construction activity. ✓ Minimize the disturbance of steep slopes. ✓ Minimize soil compaction and, unless infeasible, preserve topsoil. Stabilize exposed and unworked soil by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to:Temporary and permanent seeding, sodding, mulching, plastic covering, install a construction entrance with quarry spall base from 37th St during construction. Install plastic covering per BMP C123 on soils, stockpiles. BMP to be monitored daily and repaired as needed. ELEMENT 6: Protect Slopes ❑ Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (Ex: track walking). ❑ Divert off-site stormwater(run-on) or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from stormwater generated on the site. ❑ At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion. o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10- minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM)to predict flows, bare soil areas should be modeled as "landscaped" area. o Where 15-minute time steps are available in an approved continuous runoff model, they may be used directly without a correction factor. ❑ Place excavated material on the uphill side of trenches, consistent with safety and space considerations. Version Date: February 20, 2019 ❑ Place check dams at regular intervals within constructed channels that are cut down a slope. ❑ Consider soil types and its potential for erosion. ❑ Stabilize soils on slopes, as specified in Element 5. ❑ BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both mulching and straw erosion control blankets. There are no steep slopes on this property. ELEMENT 7: Protect Drain Inlets ✓ Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ✓ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). ✓ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ✓ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains without prior and adequate treatment unless treatment is provided before the storm drain discharges to waters of the State. ✓ Inlets should be inspected weekly at a minimum and daily during storm events. Storm drain inlet protection devices will be installed at existing catch basins in the immediate vicinity of the project prior to construction. BMP to be monitored daily and repaired as needed. ELEMENT 8: Stabilize Channels and Outlets ❑ Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following expected peak flows: *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in Element 6, above. ❑ Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. ❑ The best method for stabilizing channels is to completely line the channel with a blanket product first, then add check dams as necessary to function as an anchor and to slow the flow of water. No storm water runoff will be conveyed off site via channels, swales, or steams. ELEMENT 9: Control Pollutants ✓ Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. ✓ Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site in a manner that does not cause contamination of stormwater. ✓ Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On-site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double-walled tanks do not require additional secondary containment. ✓ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. V Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not Version Date: February 20, 2019 include wastewater from concrete washout areas. ✓ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and procedures. ✓ Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust the pH of stormwater if necessary to prevent violations of the water quality standards. ✓ Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land applications for discharging wastewater from concrete washout areas. ✓ Obtain written approval from Ecology and provide to the City before using chemical treatment other than CO2 or dry ice to adjust pH. V Woody debris may be chopped and spread on site. ✓ Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff using spill prevention measures, such as drip pans. V Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle. Per BMP C154 prior to construction a concrete washout area is to be installed onsite to capture contaminated water from concrete washouts. BMP to be monitored daily and repaired as needed. Provide spill prevention kits for excavation and concrete crews. In the normal course of construction there are not anticipated pollutants from fuel. Fueling should take place off site. ELEMENT 10: Control De-Watering ✓ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. ✓ Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do not route clean dewatering water through stormwater sediment ponds. Note that "surface waters of the State" may exist on a construction site as well as off site; for example, a creek running through a site. V Handle highly turbid or contaminated dewatering water separately from stormwater. ✓ Other treatment or disposal options may include: 1. Infiltration 2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. 3. Ecology-approved on-site chemical treatment or other suitable treatment technologies. 4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. 5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized dewatering. ✓ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam can create highly turbid or contaminated dewatering water. ✓ Discharging sediment-laden (muddy)water into waters of the State likely constitutes a violation of water quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration and preserving vegetation. Version Date: February 20, 2019 Project will take place during drier months to limit the amount of storm water runoff from construction activities. If dewatering is needed all discharge will be directed to a temporary sediment trap BMP C240 prior to discharge to the city storm drainage system. Size, Elevations and location on site plan. ELEMENT 11: Maintain BMPs ✓ Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specifications. ✓ Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment control BMPs are bio-degradable and designed to remain in place following construction such as compost socks. ✓ Provide protection to all BMPs installed for the permanent control of stormwater from sediment and compaction. All BMPs that are to remain in place following completion of construction shall be examined and placed in full operating conditions. If sediment enters the BMPs during construction, it shall be removed and the facility shall be returned to the conditions specified in the construction documents. ✓ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from removal of BMPs or vegetation. BMP to be monitored daily and repaired as needed, or as needed and or as required by the City of Anacortes. Property owner will maintain. Weekly reports to be submitted to the building department. ELEMENT 12: Manage the Project— Projects subject to Minimum Requirements 1-9 must have a Certified Erosion and Sediment Control Lead (CESCL)for site inspections. Projects subject to Minimum Requirements 1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the CESCL or inspector, who shall be present on-site or on-call at all times. ✓ Phase development projects to the maximum degree practicable and take into account seasonal work limits to prevent soil erosion and prevent transporting sediment from the site during construction. ✓ Inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure continued performance of their intended function. ✓ Maintain, update, and implement the SWPPP. ✓ Clearing and grading activities for developments shall be permitted only if conducted using an approved site development plan (e.g., subdivision approval). ✓ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of the following: 1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters. 2. Limit activities and the extent of disturbed areas. 3. Proposed erosion and sediment control measures. Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has the authority to take enforcement action per AMC 19.76 Stormwater. ✓ The following activities are exempt from the seasonal clearing and grading limitations: 1. Routine maintenance and necessary repair of erosion and sediment control BMPs; 2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil 3. Activities where there is 100% infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. BMP to be monitored daily and repaired as needed and is the responsibility of the owner. ELEMENT 13: Protect Low Impact Development BMPS Version Date: February 20, 2019 ✓ If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the Manual for requirements. WS/77 Applicant Signature Date TAB 3 (MINIMUM REQUIREMENT#3) • 1-2.5.3 Minimum Requirement#3—Source Control of Pollution All known, available and reasonable source control BMP's must be applied to all projects. Source control BMP's must be selected, designed, maintained according to the reference Ecology Manual. The intent of source control BMP's is to prevent stormwater from coming in contact with pollutants. They are a cost-effective means of reducing pollutants in stormwater, and, therefore, should be considered in all projects. During construction site will be open and subject to erosion. BMPs as descripted in the erosion control plan and SWPPP must be constructed at the source to limit erosion and sediment laden runoff. The most common erosion source is exposed soils to rain. This will be limited due to the fact that construction will occur during seasonally drier months. Covering exposed soils as discussed in the SWPPP shall be implemented. TAB 4 (MINIMUM REQUIREMENT#4) • Minimum Requirement#4— Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained and discharges from the project shall occur at the natural location, to maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. All outfalls require energy dissipation. The objective is to preserve and utilize drainage systems to the fullest extent because of the multiple stormwater benefits these systems provide; and to prevent erosion at the downstream of the discharge location. Refer to the reference manual for supplemental guidelines and additional information under this section. This site naturally slopes to the north to 37th St. During winter months and after rainfall, this site is very saturated with water and runs off into a City of Anacortes drainage catch basin. Natural discharge of this site will not be disturbed. Version Date: February 20, 2019 TAB 5 (MINIMUM REQUIREMENT#5) • Minimum Requirement#5—On-site Stormwater Management Project thresholds that trigger Minimum Requirements #1 through #5, shall utilize the On-site Stormwater Management BMP's from List#1 for all surfaces within each type of surface in List#1; or, Demonstrate compliance with the LID Performance Standard. Projects selecting this option cannot use Rain Gardens. They may choose to use Bioretention BMP's as described in Chapter V-7— Infiltration and Bioretention Treatment Facilities to achieve the LID Performance Standard. Refer to this section of the reference Manual for all Feasibility or Infeasibility Criteria. Is this project Flow Control Exem• es\No) (See Appendix I-E: Flow Control-Exempt Surface Water). If yes, provide reasoning fro - ...licability section of 1-2.5.7 Minimum Requirement#7: Flow Control). If No, then the project triggers Minimum Requirement#7 (1-2.5.7) and possibly Minimum Requirement#8 (1-2.5.8). Per section 1-2.5.7 The project site must be drained by a conveyance system that is comprised entirely of manmade conveyance elements (e.g., pipes, ditches, outfall protection) and extends to the ordinary diab � high water line exempt Perforated d Stub Out Connections (BMP T5 10C)will therefore exempt be used, see revised site plan andnl. Roofs: III-3.1.3 details. L APRAcis►8ik.rsi t4-N..,4•ck1. T 1—2.S•1• All sites are required to utilize BMP T5.13— Post Construction Soil Quality and Depth. For each surface, consider the BMP's in the order listed for that type of surface. Use the first BMP that is considered feasible. No other on-site Stormwater Management BMP is necessary for that surface. Feasiblity shall be determined by evaluation against: 1. Design criteria, limitations and infeasiblity criteria identified for each BMP in this manual, and; 2. Competing needs criteria listed in Chapter V-5— On-site Stormwater Management. Lawn and Landscaped Area: • BMP T5.13: Post-Construction Soil Quality and Depth. (Attach Detail in Report) Refer to this site for requirements and specifications. All projects are required to utilize this BMP. http://www.soilsforsalmon.orq/pdf/Soil BMP Manual.pdf See below for the "Model Soil Management Plan forBMP T5.13" to be submitted with Drainage Report and Application Material. Version Date: February 20, 2019 oto.lct.rt L.%s-r # I NA. c..,p.t,.._ Roofs: (Provide feasible detail and maintenance and operations specifications in the report) 1. BMP T5.30: Full Dispersion Feasible\Infeasible If infeasible, explain the criteri : Requires native vegetation on site and there is no native vegetation on this site that ould allow dispersion. Or, T5.10A: Downsp t Full Infiltration Feasible\Infeasible If infeasible, explai he criteria: Minimum setbacks shall be 10 feet from any structure and 3 feet from a property I' e with 3 feet or more of permeable soils to the seasonal high ground water table. The wat table is as found at a debt of 6-18inches and above the 36 inches required for infiltration. II infiltration is not feasible. 2. BMP T5.14A: Rain Gardens Feasible\Infeasible If infeasible, expla' the criteria: The depth required for Bio retention cells, swales, or planter boxes with engineere soils and holding depth is greater than the 29" plus 12" separations to anticipated water table o 41" requires. Not feasible due to the water table found at a depth of only 6-18". Or, BMP T7.30: Bioretention Cells, Swales, and Planter Boxes Feasible\Infeasible If infeasible, expl, n the criteria: The depth required for bio retention cells, swales, or planter boxes with engineer soils and holding depth is greater than the 29" plus 12"for a total of 41" separation t anticipated water table available. Not feasible due to the water table found at a depth of 6 8". 3. BMP T5.10B: ownspout Dispersion Systems Feasible\Infeasible If infeasible, xplain the criteria: A Downspout dispersion system requires a vegetated flow path of at least 50 eet for splash blocks and 25 feet for trenches to a property line o rstr5ucture. There is no room for this on the property as developed. 4. BMP T5.10C. erforated Stub-out Connections Feasible\Infeasible If infeasibl , explain the criteria: Perforated stub out connections will be utilized. See site plan for location a d size. Other Hard Surfaces: (Provide feasible detail and maintenance and operations specifications in the report) 1. BMP T.5.30 Full Dispersion Feasible\infeasible If infeasible, ex in the criteria: BMP T5.13: Post-Construction Soil Quality and Depth will be utilized. Retai , in an undisturbed state, the duff layer and native topsoil to the maximum extent practicable n any areas requiring grading remove and stockpile the duff layer and topsoil on site in a design ed, controlled area, not adjacent to public resources and critical areas, to be reapplied to other p ions of the site where feasible. 2. BMP T5.15: Permea a Pavements Feasible\Infeasible if infeasible, explain e criteria: 12" of separation from the bottom of the lowest gravel base course to the pea ater table is required or a difference of approximately 30". Permeable Version Date: February 20, 2 19 pavement is not feasible ue to the water table found at a depth of 6-18" and unsuitable soil at 17- 19". Or, BMP T.14.A: Rai Gardens Feasible\Infeasible If infeasible, explai he criteria: The depth required for Bio retention cells, swales, or planter boxes with engineered s ils and holding depth is greater than the 29" plus 12" separations to anticipated water table or 4 " requires. Not feasible due to the water table found at a depth of only 6-18". Or, BMP T7.30: B. rention Cells, Swales and Planter Boxes Feasible\Infeasible If infeasible, expl in the criteria: The depth required for bio retention cells, swales, or planter boxes with engineere soils and holding depth is greater than the 29" plus 12" for a total of 41" separation to anticipated water table available. Not feasible due to the water table found at a depth of 6-18". 3. BMP T5.12: S et Flow Dispersion Feasible\Infeasible If infeasible, a plain the criteria: Sheet flow dispersion system requires a vegetated flow path of at least 50 feet r 25 feet for trenches to a propertyline or structure. The driveway is proposed along the west downhill side of the property line with about 10 feet of property line and makes this option not feasible. Or, BMP T5. : Concentrated Flow Dispersion Feasible\Infeasible If infeasible explain the criteria: Like BMP T5.12 flow path length of 25 feet for a trench before reaching t e street. Not enough flow length for flow dispersion. If all BMP's have been declared infeasible to the project site, then the site is subject to Adjustments (Section 5) and ExceptionsNariances (Section 6) per the City's Phase II Municipal Stormwater Permit and the Anacortes Municipal Code, Section 19.76.040 —Stormwater Management Manual, Item G —Adjustments and Exceptions. The review type is considered a Type 2 —Administrative Decision, requiring a 14-day comment period, per Table 19.20.030-1 — Review Classification and Process Matrix. See attached document. „--------- /:,, 5--L 6//g/(q Appli ant Signature Date Version Date: February 20, 2019 City of Anacortes Engineering Department Attention: Steven Lange \� , 904 6th Street Anacortes,WA 98221 ' �C O 9 Ww\v.anacorteswa.gov Request for Adjustments and ExceptionsNariance To the Stormwater Management Manual If all BMP's have been declared infeasible to the project site, then the site is subject to Adjustments (Section 5) and ExceptionsNariances (Section 6) per the City's Phase II Municipal Stormwater Permit and the Anacortes Municipal Code, Section 19.76.040— Stormwater Management Manual, Item G —Adjustments and Exceptions. The review type is considered a Type 2 —Administrative Decision, requiring a 14-day comment period, per Table 19.20.030-1 —Review Classification and Process Matrix. The application will be considered a written request that covers the specifics below, as well as any additional information requested by the Planning Director. The deviation describes the process for exception to the Nine Minimum Requirements of the City of Anacortes Stormwater Management Manual. These requirements area as follows: • Minimum Requirement 1 —Stormwater Site Plan • Minimum Requirement 2—Construction Stormwater Pollution Prevention Plan • Minimum Requiremtent 3 — Source Control of Pollution • Minimum Requirement 4— Preservation of Natural Drainage Systems • Minimum Requirement 5— On-site Stormwater Management • Minimum Requirement 6 — Runoff Treatment • Minimum Requirement 7— Flow Control • Minimum Requirement 8 —Wetland Protection • Minimum Requirement 9—Operation and Maintenance Adjustments: Adjustments to the Minimum Requirements may be granted by the Planning Director provided that a written finding of fact is prepared that addresses the following: • The adjustment provides substantially equivalent environmental protection. • Based on sound Engineering practices, the objective of safety, function environmental protection and facility maintenance, are met. Exception/Variances Exceptions/variances (Exceptions) to the Minimum Requirements may be granted by the Planning Director following a legal public notice of an application for an exception or variance, legal public notice of the Planning Director's decision on the application and written findings of fact that documents the Planning Director's determination to grant an exception. The Planning Director shall keep records, including the written finding of fact of all local exceptions to the Minimum Requirements. Version Date: February 20, 2019 Project specific design exceptions based on site specific conditions do not require prior approval of Ecology. The Planning Director must see, prior approval by Ecology for any jurisdiction wide exception. The Planning Director may grant an exception to the Minimum Requirements if such application imposes a severe and unexpected economic hardship. To determine whether the application imposes a severe and unexpected economic hardship on the project applicant, the Planning Director must consider and document with written findings of fact the following: • The current (pre-project) use of the site, and • How the application of the Minimum Requirement(s) restricts the proposed use of the site compared to the restrictions that existed prior to the adoption of the Minimum Requirement; and • The possible remaining uses of the site if the exception were not granted; and • The uses of the site that would have been allowed prior to the adoption of the Minimum Requirements; and • A comparison of the estimated amount and percentage of value loss as a result of the Minimum Requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the Minimum Requirements; and • The feasibility for the owner to alter the project to apply the Minimum Requirements. In addition any exception must meet the following criteria: • The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of water of the state; and • The exception is the least possible exception that could be granted to comply with the intent of the Minimum Requirements. Version Date: February 20, 2019 APPENDIX 1 —Survey performed by a Professional Land Surveyor See Attached. Located 3 of 4 corners that correspond with the survey. A.0 ING2.re/WkN ) Version Date: February 20, 2019 , 1 ' I• . = PARCEL "A" AS SHOWN ON SURVEY FILED IN VOLUME 2 OF SURVEYS AT PAGE 173 UNDER AF#7908200037, RECORDS OF SKAGIT COUNTY, WASHINGTON. . . . 37th STREET 0,„,„„.....,,„...„..........,...„...„,. . 4 ,e...,,b wAs./1),:i>,..•A / f-o Z ....,,,...",.; , . ''.0.,;: ...,.&A •,,..1 4AiiIt 0' i-y- N89.56'29"W k: '',i ' #-•4' 1 0 I -- ...._ . . •- ., , • 130.02 4,11F:;:-., ,.,:'• . '" ii...g • iy, in'Z‘t PARCEL "A" In .'.. 4 EXPIRES 6/26/97 8 a 0 z 7/30/9 , _ N8949'42'E 0 5.4 154'--'----40-").--17771"1111. 41 ' . Scale 1”-= 50' Legend . di Found 1/2*X 18*rekii. rod "' with yellow plastic cop marked ..SKA SON 16224,set white 2' X 2* witness stoke, except as noted. , . EXHIBIT MAP . _ OF CORNER RECOVERY FOR JOHN BR UEMMER SUC4T SURWYORS, INC 806 rurcALT ST. YERO-VOCIIEVVA 95284 855-2121 ,Lly 30, 1996 /196100 - _ APPENDIX 2 — Soils Anaylsis (Volume 1, Chapter 3.1.1) See Attached. New test hole of 36" was dug and inspected by Steve Lange. ao•19.19 ADO°d7 D "-+rn 5 a r\ bet GI Seam rtt l-. Version Date: February 20, 2019 i r it l e. ,i.iv ram. Soils Report ,, fi xf .t i-' Linda Spiche-r, Septic System Designer CITY OF A ACORTE s s ;' License 5100294 CENSE°a G►ER (360)708-3004 li wins wins 09-27-„.dam Project/Client: Philip Steffen Page / of f Site Address: 817 37th Street, Anacortes I 1 Parcel Number: 33118 i i Date on Site: 2/5/19 i II Map Unit, Natural Resources Conservation Service: #20, Bow-Urban land complex, it 0 to 8% slopes I Hydrologic Soil Group: C/D 1 i Soil Type1 Loading Rate2 Soil Log 1 0— 12 dark brown silt loam 5 0,4 12 — 17 tan loamy medium sand, roots 3 0.8 17—23 gray fine sandy clay, fine roots to 20", mottles 7 not suitable ; observed at 23" anticipated water table et 17" Soil Log 2 0-9 dark brown fine sandy silt loam 5 0,4 9— 16 loamy fine sand 4 0:6 16-19 gravelly medium sandy loam 4 0.6 19 —22 medium sandy clay, mottles 7 not suitable observed at 19" anticipated water table at 19" I 1 One of seven numerical classifications of fine earth particles and rock fragments as described in WAG 247-272A-0220(2)(e). 2 From Chapter 247-272A WAC: "Hydraulic Loading Rate"means the amount of effluent applied to a ! given treatment step,in this chapter expressed as gallons per square foot per day(gal/sq.ft./day). i i h ' • f,f< '111 ti 10.1;1- 3 05 617 GOT .a 3 •509 • S 1-1 i' - 1 •' C 1 n't 9 20 Ci y �i L'V'_ C r L..— �7•. !7 - ` `]t I t` '12i1G—•I 06 T 3. 71-f�'t 11�5 T :{•t'{• �:U� '• r,__.., .� _ y y— 12C1 J-t)r, J'i-j _ r( r .j 617 (�( rir f. . Ar f: ♦ f0 .,�. J yT J t 7 T r.I 1 +7`I'1!f 1 c (''�` sr.-'4'Tl• . '4.t I f ST t „ T1-1 Si 3:i H r s1- 0 Mil f ' 35711 • 1.1'IS -.t1� ciC;ti .�� H i (3't. „�t� Ei c• .t . 1 V f V `r.,111 s 11#' `2 art-1-I ST r- U ;35TH S T r r s's'. .t.- i G t1•I T S '1 F it'17 STREET " _ ,;�TIi I. r �- _�1 I:j 4'7 ,r f c o. t3'!ti ;�t . 41T1113 - Ic�tr1�,+ t�t1r., 1201 ,it1�� i'fi1J / : :s ic,1' �f1-I ,�f _ L3:si"i•1:3" 3.i11, J i' :? T1- c . il1tl1S1' ; 5 -14i 35T1•1 3 -rel.ST } 1-1 ST 35T11 T ;1ii T F1 C:r�rs4i�1r1tf�J/1!_r4/ `tet ;jc ail On,5 • f+;l•;.Cf;l �i'1 t '{ �1 1- 1.�1F3 11• - 3;;U'I tt EE'r 1ti1 r LZ to �f' ' r. ; :i'rii�'E" '« H ` i :< TI :�1' �5 3t I'H 1 35111 ST LPL 1 5C!~ 4218 ST13(:0 : fT11 t�v c•�11-1 ;T 3:-ri-1 S7 c L� - :::11:7" T i; ;:4'f t 1 ;;T =: ar TF` +`i • 1S'1-t Th -(I ) 35f 1-1 S 1 �35'{TL S I' c{ [ ��':i! ;i= sr• ` r t1 Ii 3G1'f t T �:s^c -1► SI -.5 35 i`1- SI 505 Sit! ; t�11i-1 Si' 0' I 1 ,�' ?- MOO ::i • 4 :i5'11 i 35111 3 35Tt I St l 1 pv 3l' �,1- C etviMENC_IAL AY i:•1 r 1 'I�? • 1 ,•1. - t• sEi 1!1 1 Ur,f� :• 3 F is li {;rliflt;C 3611-•1 ST . i •,- "�,1.`is ' - 3+�TH S.' ti.t r_f r G5 f-,r D 'c's i��"-'Elr'•---Yr Ct.1+1MET:-E.-.1A1,.,�V J ',�`s•E I'I �_; '� �:" i%AVENUE :: +{ �j� .. 't` Tti.a • ;1il ''- •.rrlH �'L ►t�7f, .ST tl.W 01? 3GT11 STR� [ fiO:` TH Sti s AVE:3t {• =.r•: rr. ..... r - r 3G�tl ,1 41)1\f" ; .{ �i' .,;��=s` 3tiTJ!STREET:T .�(j • �'- rI 111 'AT tloa 'Ci11-1 ;~i 1:�►El;li1L 6pJ N At 1,4 �.. ~ill -, _ ` REE a3611.. :.'' ,,1 1 3 '1' • r'C 8. `• �`� . -fill l�t:�lvi111 # c.-iAl AVE. ;I v .1r:i.r i 1' 1 ;;7{i'{;fir i RI 1= .r . 'fl•! Si1113 T' 7i'11 1 •0'1C •1111-1 1' 7 71C-i :7 T 1-I r 6213 618 iT1.1 ST t 3 .i21i3 .I. ;i 37 13 ! 37T1i Sfi ',srT1 f 'I STI�, C'1' �.71'I! ' 1' ;if?'11•ST �, 01/111,44, fi si- '1115 tt iTH ST it) `�'71-IJ i T :37T1.1 '. c . 11117 37fii-1 si 31i r1 3711 �tl 1•k t i 7TH _ ' ;i15 ►,t1 r•1 f r •=c 3f1'i-1 `T 1 tiJliiatstEJ�t:tALAV i ' •u I '. ' ;; 't'I1 Ifs' < ' 1r}. - 013 ila 1 37T'I-I Si` 1:i10.t. 37 .. CC)k1(' Ef11,Lh,L M '.7i 5 491:, 81 I t=;; 3:TFf ,•1' ;:7'('{; ?,f 1-1 tti. ,Y +��°i I1 "f" �r(ta �� J iiJ� ` }, "t l'I t `-T1' 3- , t r z (kW •6111- S S' 3711i S T ,1.i 0_. T7TI-I S 1��1�f NI. ,:ti'1'H'�T StJ{'cr t�Citvil:iT:tcCl/t.ors_ tTH:;T3 I 1 bT �t �. . .,7 =1 f'IGti 'i0{-12 -�ioti ';, 7•E5 a- =;U? - i :.-.1: 1H;�r' 3`ri'I-1"" {i7.i :i7't'I:t• ;:T _;!•1 3'611{ aT NAVE ;ytt1't 1 :� ' :3i3T1 i -T38111 S`I. C;OMtvil~R,..I.,L4��& C!AV 1- - • `.-„. '' :}it Ti 1 :1T• TCI) +C 'f Fi .[ 79 `r �.1 ` 1{ill; ;i j t}i �,` � ' ,;3'1f'1 .,•1'.,/'17 �l?3TI-{ .�'! n 11 ti t�f ;} r 1 -50ci 24 11-1 ST • :t,j•r 110.1 1105 3,& 2 3rTH ST jl•)1i"1 . -I ,f ,r, .iii 111 S'1` ;1 ttEJ'll1 1 , 1 U11•S :1' i 1 t,�.Ir,ifdt-l:. 1i',I_ft:..3-8.11 /.1 . ST3 T1-1 811-051"'1 ,S C ..h i�Av `r;ii T F113 r . �TI•t S r °AVENUE ciiil2 JGTI-I ST' :,r:0 ~AV 'i` '�&?1,-. - TREEi�` & r_•1-1 .,cart- •� •1.1t~7 •f E{):r �i;t, ,,.Ei 1. �,50.: a � S S'1•t; :,, . C tr1101:1 c1AL ,.,.. 0��VEtivE• r 38.00 303 13 AV S AV 701 • (0 T r f •E N AVE:I/IJ1= I'!hVe ,30 Tl 15 T ;101-1•I ;►i :�1''Et'It)E Cuu8 ,�, 380:� .,- o �E1[{,} •c:•r t, 1 •r t�� ,i805� 3010 ColkiiME1--.1,1AL AV ." • - is Air :i`ii i;R1tL .�}s rt 1 .:T a�►{�� •3�Tf t �1 6 it1 3t31..i I`�T �f31'f l •`i'r t f�t�t:(clL1l, s11;t�C =i{ir15 3t;(2 C3A\r , . :3t3'It3 AVENUE !1'�•;3T13 ST �i#7- 618 505 .,0 Ri\VLI•IL•r� :,t3'11-t ,C 7- �Lon i1 t7A1t colviiiiii.:T ciAL I�t �i1,�1 60 ;�►c 4i Ci(1:� '3TI I S'1' 3L( f Gti7 1�1:et�EMIE. 3 10 11oa r -h!',tr1�NUE _31^ F ii :�>; 1 �. r,� r1`1;�L y . . +.If f 8114 ST ST, r t I.t:(•iC�ViL�t��! L+-�l�lC;t1lCYs,•Ali �,r,{r3 .3�11 ,icZ Lsi1•ltyV(Ed11 o i74 S I' 3fi 1i t 1,a• 113 fj 381;3 h AV 1�lJ:ilI IJtJL-- <a!tV , , , V a 3)1'1 i �T t,C t 1C t 1. 12.1 l�d[:i'�Ui= 3902 3�►t34 I'iftz't.CJi�ICt/tl;iicift��!"I�.111L"- t1r'I t.Crl�7ltJ i?E:1?.Iw,�V j;�� t'�' • STANIWS iib 'Ili l.C;l�lGVIEy 120 U21.) 7I'll �f••- 25{.�?Et! `iVIEW t•111-L?'-R1:;;1 rff;{d AVENUE 1 1105 At1C I.- c t>, .cr 1- rc�1 LC}i�C;'+Ilctir `�;v�!L"1dUi: µVT I�' Pl AGC- 51,�s �1 V !K •ac3 t 1113 t .rttNGVIEW �.c , .. r ;t 1" • :3 'F'l i ST = 9 REST 31-30 . i LONE d1E:ic /X/ AVEt•!LIL= -101 i 3 si 6- .•t101 ,9•1t? `t}�I' ;i,.U:t c tt� 3 L • ...9i7;. i•,f1_i.f:,. 11 I�t• 1 l:J t1E i �,. .. . r r- L1Q s- t• [6[�:l'!E • . ••¢ 1_r�NGVIL A 0. .1r=I`.UE ��I:L' li dl r =: 0" �s AtVr:NUF 1.1:)14GVIE-W swim( _ a1A1`I.iSU� -ICI.. a, 1 , �T�t1�,�i<s L!'1iLlCi;. t i�lr� lr LC?i•Jc:;tillC�^.1 f�!I i�ll1C z{] t iA1� c:31'i • G; fi AcE 3T1:15 ,i 11iE) I r1t�f;1 1)L•• t�.rt�� til .'..E� fJt17 "VENUE t:4 1111l.C:i EST -Si° Ul-f'd JS {al. Iti I ��kff±t�ila>r 1209 1'Il�f , I i�c :t2{t tl ci AV 1,ftt! �r 33`I1i 3911 �ri2u 1 Ill.{•c;r r_.�,'i I; 1-It •,rs�'OR 5I1 PLACE N;� �= 141i�1i� `i1 •,r, t�U6 i11Lt it:li�L ;;,�1 l IJl_Lt•r<T::a f'U( • tt 1r Itlt_Lt:FI'1 Ct[t _ , 1O r Lc'�#�.,;JI(�'tjt� i 11�f r�.�:,19'3 J 1 i AV 31r20 �i a91.9 ;i.'31tj 3918.; :`i7',y i i-111.I.c^1;C:f'f n^ i f11.1_t':1<E=77 J.�1: t'a���' i t:E1�1UC 1i�i KING •{• A`'�c,;�:f �� 0AV ' (.11W I•'A+f '� •SA\' NI!E • �: �10Q2 titl(Kw.:�;'#' I'f S3 I'fU-. . .2� 1 5!!"la �; TI;I:/, I, CtJicihlEt;t.:iiai.l��r R N r;;: 1_r�t, .Ai Ii1tt f't_ K1sc. � 1 - XING 1 ,it 1;- 1 ift.l_c'r:CS i'OR t lIl,LCF EST IDt ‘) December 19, 2018 fir► 300' e 0 106 330 660 Ft .}-.--!-•t I ... - i,—'-i—f • • Tax Parcels 0 0,05 0,1 0,21ct?l '1 MOAmtacy Warning:Ai f3IS gala via r_'eateil frnrrt varighle puh{fatecords and M 1 County Bailnl ai oxi$,p,;l map sources. Map featuros havo been adjusfoci to a:hiava a basttit mostratUcn.V1S1fjo tout CUE was(often In thts p ratemi,mopsfruit different toured° ' rstrelyanroe as to fhe Frc ho f ocati i at'geoj�rai*k features.Mop divotp_r•.cns cart • 1.....t Oty Limits ha as plead as,3CJfeet Caprmyht 2(06 ; . . . . . . . . . • . . . .. . . . . . . . .... 1. .. ....'4....l• • 1 .:"...111 i , . - it . •,..., ..6.....0..t...1. . ).$\ .. • •i 1 •••• t I I I 1 t;NtiN' ... •,..:;- \,_Nt . ....• .. i' . 1 1 1 • •fiti .1,i\t • &...k, •• sEmENT PHO \1E A.FA7485.5.5 . . , .,.., ..,, , . P'-. . , • . . \'44:•,,., 111 lit '. A ,i iiik . -4 r. b. • ,...... 1 i . b . ., co- ....: .. . .. . ;.1 i ,.." t Fiza' 1 -.15,1„,,,.1%4 ". :,..... ....,\1/4.:. . , a..,.....:,..;....,:,.., .....„-A4._. •.....00...............:-.-..-.....,. , I• 'I ''' k likliii --A, ,•\,,: x • . . . ..,I.a. ,6. I. .,.... ....zr . . ....._, ir , ap, ald;:: 0,0 1 I.t . • - V.'''. ..0...tk,‘•.._il• der 1 iNt ••••••••• . i'. if 0 .. 0 (4).....4J ire. - :::::A.Z ,It, ir.; Ig ".4. . ...1 e• 1 Ci ..,•^ 4..e ir 4.7 1 l'Ist./../:0 8? . s‘ ' • ...:"" ;Op. '1111111' • c‘N. t6, - A PitX , WI . \NI.OA X ...(s•+••,.I', 5% 4•4110. . li 76 -'4'''''•'•; ••:; .. . Iti;4$ :141.1- 1..1..4 . friglil•• AV' ;44-ZI. X'''- -1e.e. ir- 1 • li: I: 4bi• It:ik ,11- /1; P' air • I 4," • ellb I .,,,,,,•ti.....ir... ,...,,I.,.,, ..... ••• ., 1• 0 A qt. -* i• ../-blz'sd''' • -;4.• • .• .4 I , ., -•:,:,02;:z,, 1 I • / ie . . .i:Ai. .' , • ' .:4°- ''- •,,, ,,.. t.---is-1,' ...,. Pii: l til x . ..... / .f. tled. . ' s)1141" P.' . • . 10".no .a...... .......... 1 i 1 . es a Nt N Itill .it c . 1 i I I 1 a . L • .t. I id. 1 ,...... ...._.......... .1 .1•40.1.1•••• tmlar0....4,) 41 X 1 (444 d j• . d( I 1'1• ' , ..:-. ' .'7. , fikb \, . . 1 j 11.1,0 , I , "--"13 I 1 ......, \ if iv 11 ? (,,,,,t •, . I . .. ' 1 ---i.i. . , .%I ...,„ .".... ..f. . I 1 1 1 i I .4" 011•111m. • ...."..... ...a 1 I ... e.m........... ............ ....Y,,.....41,m.L.w.,ir:eal.:4; . t ""ir ' •I • [ '-'•-• ••••••• .......,..... .=,;,,,t4:44....".'w .....4....g.; i f. . • .i -I- fi.A 4 I . 1 .1 1 .it., ....... ..... ......t .._ ...... ..... • H 4.••••••• • . • :.V i • . • 1 1! . • /• $ 1 I 1 . i . . • . ' . 1 . . 1 .. . .. I 11 i L... .. . . 1 . I I, L. , , 1 • .:.... I , , 144-,. j I . '• - . •••.....44;744.. . I 11. i ......., .. 1 . . • ' t;. .1.. ...•• . I 11 Ei , X. • I •. r• 8 , 1 . •., •1 fl.'1 I . • a' I ; .L...ep I AO" . I -1)• /4 • ' III • 1 I .. . I I f . 1 I , 1 . , . .. . m • , .....:,......." 7 lizz.,?..,.. ........4,....-,„,„,, • _......i I. . . . . . . ... •... „ . I :. ,.. ." ... 1:i . . . .........:,... .. .: c:.. r -• 10........... .6....•••••••••••••• : ;' VI , ••el. • s. r ..--... ............. _. ____,..... l '' 't i 1 - i ..... r7-74 y,5A1 %...a. •• •• 3 .40.1. ' 111.s. ' ..,.514 .t. in.1.0. 1 1 1 _ _.... . .,.... • •.• .... ti ......,.._.,..—.....--------1 i \ , 't,'•,.!r.:'. t. .(.::-.4........; • i.t...:m.. ... I . ..t.i. \ .... t ' 1 . . - ..r.,. 1 .--2,f.e••• . ..,.... , \II t• I . 1 , • 1.,_?;,.• . ..., 1 4 I 11 -It ';'"'...i 1 T , • , -.-. • --- --••• - ' --- •?•-• •-•-•••••...••••••*•••-••Trre•-••z•••••-••-•-•-•-•"••••!.-- _-..:-.-.... .---•- ,•••- ..._,.....__--•_,...._.•.....-1.- _.,....,.. .....-I TV7.••=.......7.-- --• •----*--_;---1.-----:.--;,- . - . . I • • _ - . ._ .. - N. ... . _ -._ • ____r.__r..._.•...•.. _- ....�.....--... - • a -„ 1.1 w\ ti 6r at "f { 1iIVL; a )1.12^1 xal_aLI :IEJ13w Cli01. .5 vf;I_n :t c.� a.�:.w :;. r �'1 re; r<i ,.`! (.1L'I.b�Ci , a.f.•.�, T _. I .i�.... . . �w,..rr,. I . ,r � l \ . �jj�ti','+••.` c17tTS : . 1.. Tf *1 bG G✓L` Q V' • d ,y,{ , + "r , 1 r • S •'% 11I' ' C;'Fj \5 �• rl ) t •{ • • •4,1 • 1 , ' S N �J R ••.\ lth ,• • l � •_ t• .- fir , . .. .1: ,1 jr • • n •, T �1 �y/•� r11 r J, J I . • 1 - - ,� ��!. .rye •-• r 't J • 1 • • I 4. ••••••y' 1 1 ' r• • , .Ivy, \ Iw. , 11.• Ii 1 ,) r ' "' , a I• • i; .d • II L• .. : , -• 11 ., + I • Ig•T „, r I 1 r {r . I. r�,t r • ;lilt: Y '.:1 • e. I. 1 {1 ` rl�' _ �• - 1 ! �• , Li Ir 1 ' • • 1i'� 1• • �• '. ' i •1• j • • :t I1 • •••f • f , 1. J r ..I jA-.4.•• !'• i • 1 ., 1 al „ • t • .,a: Ir i%• �I •- ' - • ' ' 1.1 •f It � • • '• t. Ij ' rt • •-Lwt•).;•11 [(..r(j''�Q'► r: I •t �' I - , II II C , ' .YII t • - '1 '�• �•fC7�,JJI j 11, a � - r , ,i.. •adlrr II 1 I . + •L.: ' I• • --�•- .1- I", A ••••• • t,r,it r 1 ..r • ••• v • - .•rt. 1•I a • Ir .- 1 l �I"" i •.1�+• • •;'t• • • 4. ' I • . 11 . • � � . I 1 • r t I' 1 ' J. 11 , r I11 4: 1 r` r. :• ;„ M11p.47./!I\��A ./ _ 5 !`�„ ;-. j J `, l; , 1, 1; 1 11 - , � IR L,✓f - ' L 1 • , tom+ • 1 I 'itr•I• r tr .. • f•� '• If II'' I ?ir• .,l / •6' 1 , .'., • n. 'it v • • • • ••" I r,✓ u, CQ iv riJ IS r 1 I • i M .. 01 i.� • 'tr,i± r - ! :II r i IJ I - I • r II(• •J (�1 V `] • fl ' • • • ' ! ' F,St�q•: }•(h •'J• +' 1; '.I 1.1!(11{1 ei I I I • I • '/. , r ri:.V: 8 1 • r w .. I r' 1, (r•t • • , •• 1'1 • '11 •- • I- • • T. •• , I. i ./man , • I Y ' • (• .8 • I - 1 ' ' S;t :�.1. .�, t\ 1}i • • • 1 , 11 . ' t 1` t�l .. T' , f •i:l `Il ,'.' Z.7 f�., r� �'� I I . + ••, . • . 0 •. �t• II�L I lL 1 • ) r . • t • ••••1 11 /IJ \a' �f� �- 2. °' c�..• 'n : I . 4 2) me" I • • ' f i 1 _ I 1; _ .r...'•• 1 M -•11 r 1 1 •II'1:1 . I• �. . 'E. . •�l • ?'� ay • � ,I •it' •r 1••Ji' , I ,t .‘ ' �,1 1 1 _ I , \ , ,�r ' r .A • Iq r : r f 5 r +:, ij pi: ' I •'1 a 1 •:,1 ,.. I ' . r' ,Ala. t _I • 1 ^ 1, I,' �{ 1 `F el cL to 1 la 1 _ 1 • • •1 ' .+, • I .r •l ••1 . I 1 I• - / '' �l • a ws. • • • - l t�{y f , 1 , f'FSI» J i I . _ I : - It • 1 -• ; , 11 is • U. 1 • — ?.1, t tZ yr• 1 • I so ,,• t ' 11 .. l , ' ' • ' I `(�I �� a li 1 I r I I II I'• f t i t. J 'IL11 1 !.1 - - • J r• • "; ' .— •, • , �1 ' i .,.' : •I . - • 1 , •' I1 lL,` is ..: 1 • I•• ' i• r ter- it C . • �J rai ` .^ • : • , 7 ; - III ,1 i Pei , rr(- �J fa sr ,1. Ia.{ '1:. 1 I. 1 ° , + r ,I ;(l II • 1 � • 11 • 11 . e '.iFt �% Ii oio ;r l;i . 1, • • I ' ' yT•, _ •r - ' •n �, •'1 ,j.n� ' '� f.J1 I. " t �• : :.. . . . y:r!?� T X �f^r `` �•t 1 - r - - • �.�'I: Ilse t '� a'r r 4J t It *rt.1 1 .4.A• r • .1 ,11'tr - Iv •:1 ...1 3l — 1 • t AJ 1 11 Yr •\:1' , r ' i 1- I. 1 I,� • ,�• rb � •-. • ', , 1 I ,1 ' • od,4 'It L �..qj� •f ' 7r.w r 1 ' • rr wl , 1. J' •:S. t i '.I ' •i rY 1 I.t . •� .r.•' 4 • •,t :/' •. I I1 , 11 1 . r . •l jli '11i ���' ,1 I' , • t1'.1� r 17 • I n.l•1I . • ' ' t:i . t , . •I • I : y ' .• p .�, ' efts. 4 f 'idl Lr r ` y CS t •, .f' t. t•. \� �'• ;11 1 •1, • _ 1f1•••• •,,. 1 ! . . - .,• 1 •'` ili.rt•1;JJ yJ I l Sl i .• }1 ..1• ,:. 4,1211' ;,I ^t 1 .1 ,, '1 '.r' .' ' , II I . �' ` Itltt'Jf ti� IT• .� i1 f vu •, - ' • i^i- 1Yr ,• ' , 1' ' 4 'r r.. ` n�• �'' .•-.IZ • I I�•r. ,I. � , r 'Lr,, r' r .. ' , ••'•ly�.1' a'r�/'��•. 1 ( (` 1 `..1 r rT' •• to ›. t •r• ''( • •' IaQ ' '•I r ' 1�4`'►�'• ` , �• •1I+i' . r I+J4. r1 • '1-• ;"\ ytr fr .1 fr ' '• � 7.�'�1,•1'r) i C!f ti �, • I 0• •flIt:y . ''' ' : �' �� �J. , . :•� I 1 � •1 • •1I.•. • r r 1 1 1 �• •, ' • r I • ,, ' 1 i. •i 'i �1 ••( �1 • . ••Q• ,1.•71 �S r� ,,,,,•1'1� 1 • .) w I p A.tts1` ty 1 i1r, ,�1� ,..� _••.l^.•aii � • I.(, ._ t. • a r • :re i • _ I J1r ' 1� ..\ .NJ n 1, I• le• s. �•�' •• ••� .11•4. `1, la ' I ;j ? 1�J • I,_ /a. ' J 1 ' 1 4; • I• I 1 j t •t:"1 .., I•Mr ir`o 4•1'. • : •L r 4r I r I. •II '1- ,••••• ,IG." •-a 4r pi .r.• � f ,, •) ,. t -I/ GL•(• t .? I• ro�j•..' t1•1,4•1 I {, � ,ij 1 Imo• J •, f • • )1 +• • -\ .r5-• i .�1 1 «• i r• • I '1Ja. rydn"... •r . l 7r I : _ t •1 • r*.f I Ill' •'r 1 .Ii LJ 1 p , � . / '• a r • . •. • _ +i . , .•,••ter •f r : II (,7 1 Y1 •' nf' t ` •‘-•3 • '4 ( G La O .' J+ 1\t •!•� • ••,, _ 1 , � _ `.'� Ti/•li i.-: 1 rsi•> • , i 1•.tet. •rny: •l'% •a ` ...a. �• ( ••• r• . r• :" r} •..'. I.i..I;.t, ' CFia/1+ •r>• YI 4 1 I�I1I •' I .,r• . 1 ii.:01•Cu+jl'}r� f',014.5rt.•••f jj �i� �. .",11,,,,E i1.• ' '!"`/• ..1.4t,t I'3 11 C_1 Lr at•�}• • I' • • '•� • • ( 'i 14I •' �T .•li'l^••• •:�d,,a. •,•} � sy17�IA .11 •!.:•.ry()rS •I•.i�i l.r •c7'>' •tom -1 ^� t • .. •'Y,1 r I :r • f. , II• 1 rF • •,. k Ire ..• Y I1�1 ® q1`J' fJt 't',1' ,,.••. . i •! l • , . • '' • '(/�• 1 • , 1 • I,11 I 1 a t r���/1• 1}• 1 • ' •:11 LI ; • .,L 11.4. � . • I ' , ` I •..L r• t� a•• _'��...5[S tr 1 • ,r� • 1'� Cf l ' . .f n • • !it c. j• , • I{. \1L1 y" trl A .�'-,.i ••r,N� {', •1 A v`I' Y •�11�) C'T�w , 4j r 1 ' . •• i II I 1 �I I t -• 1 I' "rt'lt't �7lei Z• •. • b Ar• ii�i-t} ! t.:,�I •i'r as , • On d ll� r r'r• •( !r 1• r I :. 1.,tt ,,�r1 4.13 ,���• ri•:� ,,,,,,}}} 2•! � �i L'Fi �.+v' .•• ' •rN<. •J .qS� T� 1 I . • r •' 11 . � t '�• 1 � � S�,t',y +'�' ♦ � }�11� +..•y, 1 ,i3 Y' . . F_ V .� *.r I I, x't ?t«`"! � ,.. 1i1�• *•:,�w I •t'tf4• �t.1 +?.Ir. � �r�'.i �'} � . • -L•u.•I��M {P� . l. 1 tl '' .1.; ,� •ti'C.1, [ i , . :( • -,t:•.•.i }i�; �r.,,V� a�M J,i ••-••,' ••.I 1 r�',w T �i.. 1. r T 1 / . �/• 'q I• I • • 6.11- h�J .t � ) �1 �//�1 1 L '.SJ�a'..� } d Ls i I� . � +° 'f( s r 1 ' •.. ra^,• .l.ri •f'f ' �f-1/j,�rS1 `_ • •• QQ '.�".L•��"JTryj1�rr•{{�,.1 )) �• '• ••� .,'�'�•�� h )�Nt7'i� •'r it •�1'rt::.•�4i. •1• �/ r,���p1 - /r,/ '• r ' Iy I r ... !`'i;r;• l :[T11S•3...�/:.w' I: G.Y•:�•1.+'J .. • G1. '�! ..••.r) t . •. .4 . •.„1l•... .-...a. !•• J' itr. ".••.r�r�\ rN a7•/ti�{. J6L� Ali.. it ()MID; (k'L.\ifJ; ,fir t,•iYV1: �,.+tJ.tj�LJ.•.r/�l�+ ` �,.M•�M{/�� :3..i .r-ii 7 - aa r VG� •{• " • t 4r.�' .�t� y1 s L74 ' .• f a �+•.r•�..ti i1'.•J 1 " rev°j1i 09 2.9 c (J r� • r • , - 1 i z .,,....7c..w.--- ..5-,,,, -• ;-.4_,77- ,1 i Skagit County Area, Washington 20—Bow-Urban land complex,0 to 3 percent slopes Map Unit Setting e National map unit symbol: 2hvl 1 1 • Elevation: 0 to 450 feet /,,,c 0$.4.:,,, i 1 -0 Mean annual precipitation: 20 to 60.inches . O Mean annual air temperature: 48 to 50 degrees F _, -'.:-. t a, 6 Frost-free period: 150 to 220 days 0?-2 _s „" 6 Farmland classification: Not prime farmland ' --/Li =iiIlfteiN: II':'--,. Map Unit Composition WAAES Cf9.29..z.-e a 8ow and similar soils: 60 percent a Urban land: as percent • 4 Minor components: 5 percent • a Estimates are based on observations, descriptions, and transects of the mapunit, Description of Bow 1 I Setting i , 1 a Landform:Terraces, hilislopes a Parent material:Volcanic ash,glaciolacustrine deposits, and glacial drift I Typical profile e Hi - 0 to 7 inches: gravelly ashy loam 6 . 112 - 7 to 17 inchet:very gravelly ashy loam . I e H3 - 1.7 to 31 inches: clay loam I , • 1-14- 31 to 60 inches: silty clay Properties and qualities • , a $lope: 0 to 8 percent i a Depth to restrictive feature: More than 80 inches o Natural drainage class: Somewhat poorly drained I . a Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0M6 to 0.20 in/hr) . e Depth to.water table:About 6 to 18 inches a Frequency of flooding:None • Frequency of pond/mg: None a Available,water storage in profile: High (about 10.4 inches) Interpretive groups o Land capability classifitation (irrigated): None specified a Land capability classification (nonirrigated): 4w a Hydrologic Soil Group: C/13 - 1 a .Forage suitability group: Seasonally Wet Soils (GQ02X1112.02WA) . a Hydric soil rating: Yes Description of Urban Land interpretive groups a Land capability classification (irrigated): None specified a Land'capability Classification(nonirrigated): 8 a Hydric soil rating: No Minor Components Bellingham, undrained • Percent of map unit: 5 percent a Landform: Depressions a Hydric soil rating: Yes . ,• APPENDIX 3 — Model Soil Management Plan for BMP T5.13 Note: Document is provided under Minimum Requirement 5 in this document Version Date: February 20, 2019 PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age # _1 of_1 _ pages Complete all information on page 1; only site address and permit number on additional pages. Site Address I Lot No.: 817 37th St Permit Type: Single Family Residence Permit Number: Permit Holder: Philip Steffen Phone: 360-853-6500 Mailing Address: 1314 27th St Anacortes, WA 98221 Contact Person: Philip Steffen Phone: 360-853-6500 Plan Prepared By: Philip Steffen ATTACHMENTS REQUIRED (Check off required items that are attached to this plan) x Site Plan showing, to scale: x_Areas of undisturbed native vegetation (no amendment required) x New planting beds and turf areas (amendment required) Type of soil improvement proposed for each area Soil test results (required if proposing custom amendment rates) Product test results for proposed amendments AREA # 1 (should match Area # on Site Plan) PLANTING TYPE Turf x Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: _8180 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Topsoil import = cu. yards per 1,000 sq. ft. Amend with compost X ,000s sq.ft. in this area Stockpile and amend = cubic yards of amendment —> —> -> - > ---> QUANTITY: CU. YDS. ( cu. yds. stockpiled) (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil & compost lift X 3.1 _ Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu. yds. stockpiled) = cubic yards of amendment - > — —> - > QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch —* --> - > --f - > —> QUANTITY: CU. YDS. AREA # 2 (should match Area # on Site Plan) PLANTING TYPE x_ Turf _ Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: 1000 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED _3__inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Mulch mix topsoil from Topsoil import _9 = cu. yards per 1,000 sq. ft. Sunland x Amend with compost X 1 ,000s sq.ft. in this area Stockpile and amend _9_ = cubic yards of amendment - > — — —> --> QUANTITY: 9 CU. YDS. ( cu. yds. stockpiled) (needed to cover this area to designated depth) Version Date: February 20, 2019 CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil & compost lift X 3_1 Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu. yds. stockpiled) = cubic yards of amendment —> — —* —> —> QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch — —* —> — —* —> QUANTITY: CU. YDS. AREA # 3 (should match Area # on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation x_Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: 400 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED 4 inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Three way mix topsoil from x Topsoil import _12.4 = cu. yards per 1,000 sq. ft. Sunland Amend with compost X 400s sq.ft. in this area Stockpile and amend 4.9_ = cubic yards of amendment —> — —> —> ( cu. yds. stockpiled) — QUANTITY: 4.9 CU. YDS. (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil & compost lift X 3.1 Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu. yds. stockpiled) = cubic yards of amendment —+ —* --> — —f QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch — —> —* — —f —> QUANTITY: CU. YDS. TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS (complete on page 1 only, totaling all areas/pages in this Plan) U Product #1: U Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for native plants) "stable" (yes/no) U Product #2: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for native plants) "stable" (yes/no) U Product #3: U Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for native plants) "stable" (yes/no) Date: Inspector: Approved: Revisions Required: Date: Inspector: Approved: Revisions Required: Version Date: February 20, 2019 APPENDIX 4— Determining Construction Site Sediment Damage Potential (Appendix 7—NPDES Phase II Permit) Note: See attached Version Date: February 20, 2019 Western Washington Phase II Stormwater Permit APPENDIX 7 - Determining Construction Site Sediment Damage Potential The following rating system allows objective evaluation of a particular development site's potential to discharge sediment. Permittees may use the rating system below or develop alternative process designed to identify site-specific features which indicate that the site must be inspected prior to clearing and construction. Any alternative evaluation process must be documented and provide for equivalent environmental review. Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to determine the construction site sediment transport potential. STEP 1 —Sediment/Erosion Sensitive Feature Identification Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of sediment deposition or erosion. Special protection must be provided to protect them. Sediment/erosion sensitive features include but are not limited to: i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that would be Salmonid bearing if not for anthropogenic barriers; ii. Lakes; iii. Category I, II, and III wetlands; iv. Marine near-shore habitat; v. Sites containing contaminated soils where erosion could cause dispersal of contaminants; and vi. Steep slopes (25% or greater) associated with one of the above features. Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment is complete. STEP 2 — Hydraulic Nearness Assessment Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not be naturally attenuated before entering the feature. The conditions that render a site hydraulically near to a feature include, but are not limited to, the following: i. The feature or a buffer to protect the feature is within 200 feet downstream of the site. ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel or ditch. uclusi I. '3, Modified Jar., 16, Z015 7- Determining Sediment Damage Potential Page Version Date: February 20, 2019 A site is not hydraulically near a feature if one of the following takes place to provide attenuation before runoff from the site enters the feature: iv. Sheet flow through a vegetated area with dense ground cover v. Flow through a wetland not included as a sensitive feature vi. Flow through a significant shallow or adverse slope, not in a conveyance channel, between the site and the sensitive feature. Identify any of the sediment/erosion sensitive features from step one that are hydraulically near the site, and proceed to step three. If none of the sediment/erosion sensitive features are hydraulically near the site, the assessment is complete. vii. STEP 3 — Construction Site Sediment Transport Potential Using the worksheet below, determine the total points for each development site. Assign points based on the most critical condition that affects 10% or more of the site. If soil testing has been performed on site, the results should be used to determine the predominant soil type on the site. Otherwise, soil information should be obtained from the county soil survey to determine Hydrologic Soil Group (Table of Engineering Index Properties for step 1.D) and Erosion Potential (Table of Water Features for step 1.E) When using the county soil survey, the dominant soil type may be in question, particularly when the site falls on a boundary between two soil types or when one of two soil types may be present on a site. In this case, the soil type resulting in the most points on the rating system will be assumed unless site soil tests indicate that another soil type dominates the site. Use the point score from Step 3 to determine whether the development site has a high potential for sediment transport off of the site. Total Score Transport Rating <100 Low ❑100 High A high transport rating indicates a higher risk that the site will generate sediment contaminated runoff. Constructfion Site Seco9onent Transport Pozen fall Works heet A . Existing slope of site ( average , weighted by aerial extent) : Points 2 % or less > 2 - 5 % 5i > 5 - 10 % 15 > 10 - 15 % 30 > 15 % 50 B . Site Area to be cleared and /or graded : < 5 ,000 sq . ft 5 , 000 sq . ft . — 1 acre 30 > 1 acres 50 C . Quantity of cut and /or fill on site : < 500 cubic yards Q 500 — 5 , 000 cubic yards 5 > 5 , 000 — 10 , 000 cubic yards 10 > 10 , 000 — 20 , 000 cubic yards 25 > 20 , 000 cubic yards 40 D . Runoff potential of predominant soils ( Natural Resources Conservation Service ) : Hydrologic soil group A 0 Hydrologic soil group B 10 Hydrologic soil group C 20 Hydrologic soil group D 40 E . Erosion Potential of predominant soils ( Unified Classification System ) : GW , GP , SW , SP soils 0 Dual classifications ( OW- GM , GP- GM , GW - GC , GP- GC , SW- SM , SW-SC , SP - SM , SP - SC ) 10 GM , GC , SM , SC soils 20 ML , CL , MH , CH soils 40 entering site identified and intercepted 1 . F . Surface or Groundwater ente g p Yes 0 No 25 G . Depth of cut or height of fill > 10 feet : Yes 25 No 0 H . Clearing and grading will _ occur in the wet_ season ( October 1 — May 1 ) : Yes 50 No 0 P * IINTS 1 If no surface or groundwater enters site , give 0 points . APPENDIX 5—Site Plan with all applicable information (Minimum Size 11x17 at a legible scale) See Attached _1 I I I I I I I 1 • I GENERAL CONS RUCTION STORM WATER POLLUTION P '�i< �- N��• PREVENTION PLAN I0 444-,a-t., a n >, c 11 Purpose: To prevent the discharge of sediment and ( 11 JUN ( 2 2019 erect VA,Hu el iLve::d•A_4tryTGeTnother pollutants to the minimum extent practicable j ...,,r..Mvicor, — From small construction projects. 3E4De..ir(P) 70'•O'#1AXIODIN FOR DR1VE19AY CITY OF A mut... �•',fl fL�� ACCESS ND DIRECT DISCHARGE ,FC<:urt;ean{'K(U1:un.1•urrn wr.9e2'.7 Design d Installation: Plan and implement proper tEEDSTOEECc OF DR1VALIAT WATER TO STREET. LLECTED1 31Tf1 ST(30.00' ROW) clearing and grading of the site. It is most importantCG1vYERTEDUJL19T6) roRATEDBruD - ZfilTDRANT Du rr>rtvn at m 1r uffD aaar er I QIT LCMIEGTION EXISTCY.r WATER MC 0CTl11'MCI ANC9 O.00101 MCUOR :20. (GEE DETAIL) STORM DRALVAOE tirnt ` t n• h`u iz M enru r e only to clear the area needed, keeping exposed 589.56.29"E •LETPp71ECTICN Ex151INGSEUFR 1 ,�rtm ,>,,ur �rnw MEC,,,r�ra areas to a minimum. Phase clearing so that only those ° Tso•o2' PERa8�c7rc s1)!9 ;,�;+QG°�°�1�n" D# 4' ukUC,DIC0t 00W GTIr.TOpt �-L /j,SENIRMiCF/6CONSiAICYL�!%// / / ( av uce awrtIL OR meirxn(u r areas that are actively being worked areCr 29.98' ill \ IetCRr 1R?iW1L9. D1'•9' // COFdJU1T FOF MC MO ArC• CO3�LTAMI Mt COT 1 t SILT MCC-Q OP C733 i/ rr 0 1ER I,PE 1 - 1ck0ao,C Ton MITT , IWt uncovered. �c 1P C 4 %///%" �!`� 4 a�F3L ■ A t HSILT FENCE Et'?p73 �°Fr°a1 w ;tOM &,.,. /,II1A9H•OVT AIzEA ///// o xxq �T�Ite Exie1L` / •/// / I .�„ I LQIINAGIe1tti, ,YO eIRB! bWl Note: Clearinglimits shall be flagged on the lot or '/i/�/ii��/i//ii// - �l r�4 �'q"'�� � `�'0001404"' .00.MC It Cp0111 TO CC 1 0 W+r0 @ P[ p NIGH VI91941T(FENCE&1P CL93 WI LT MY V.1 VAIOTO men nC Dr0000 AO �� 3,j %%/j/ "1//j%/// - /��- • PeFaa+In�� 6�°Ri° MO&W w O OR D...A,rzs project area prior to initiating clearing. //�/ �,/ /`0,- A,�,� D {'� / fa"7'007,.. // T E)8"'Z N. FOAV L K I,At�na MC TD 00 i I / // lj / - HIGH Y1F18+LfrY • dbanW 10 Art FOR rave ne0R 10 /// /7'/�////// _r.c _ _ `-°ERr�rER EeuvT MORCARxaooewarumc .// ;,,�1'�// //l/ r._-:- r. :_ r-=-" `•-L PJ'PT513PgTCONSIFFl1C11GN601L9 • From October 1 through April 30, no soils shall >:3'-,' : c� ry S .1 -• -_. •r 'r�=- .. 1f ' �� remain exposed and unworked For more than two N°'`5• 7 h'. tM 17. �''' r n3.r°''-19 i,''. L�_ �\ y IRESIDENCE / 1 \ BM CIS) clays. From May I to September 30, no soils shall — —� I. ExIST1NG remain exposed and unworked For more than D3'-9'� • UPETR7-� T 1 Al ,1 I-IOUSE/ADU ,� seven days. L d -- , �1 _ rADUAGCEsSFFAH3,1H5v -I �• Soil shall be managed in a manner that does not FCR 1 3 1 �. �� 4al 7 r/ 1 DA1AAu mug.I� / , , ` 3`CLtDUI1FOR ppermanently compact or deteriorate the Final �''-°•` ' 1 i ' y p ; L7 ,- i--� �- I ELECTRICAL I 9 soil and landscape system. IF disturbance M� L N. U q and/or compaction occur the impact must be : I M� z corrected at the end of the construction Lij Z r• -_ _ z n+ 4'• �, rmDRrL-7 �� I ' - WO OE IN oa7AIIa. e) T — activity. This shall include restoration of soil v ! i I—tencoat ---• „ -- 1 JLRiSDTCT1at CITYCFANACORIE6 ° 1.1 , depth, soil quality, permeability, and percent yirI aDDF£Ss Bn3TU,blr«I. ILi 1104'-,• #4'-T ,17!'r 1. 1 '. ,p4'-• U4'-• Dj_•9' r13'-3' , , AnTco.tn 31thh tat E "T W •" organic matter. Construction practices must not �I =- - - - - -� E 1 • '� �, cause damage to or compromise the design of D`WOE.m me RA'1",FRET NeW Pa` ELt Ew P33ne �o y r tlaDE 7'DEEP GRAVEL u( 4 r FILMED W)PVC PER'.PIPE Q N`•��I permanent landscape or infiltration areas. a lAFIESC �'°� Residential1 `� u ++� X • r R5D' " �•--HIGH VI9191LI1Y LOT SIZE. f1p12 6Q F.(025 AC.) W r `• FENCE CID) I I— • Locate any soil piles away From drainage . CO \ 0 • IICUSEFOOTPRINT, Ig1AS0.FT. Zi GARAGE FOO7PRRtT, 19D SU.FT.systems. Soil piles should be Carped or mulched �. EXISTING COVEREDDEMPORCN, S(SO.FT. 1131 GARAGE/51♦OP • PAT1ON1Ajy/DRIVEZ14r, Boo 50 Fr. until the soil is either used or removed. Piles EXIST1FYa NCU..E(ADU). 193 SO.FT. m11 i • EXIST7Z ELOP/GARAGEI WO 6Q.FT. '_i. should be situated so that sediment does not ri TOTAL, 4593 SQ FT. run into the street or adjoining yards. - - _ - • Backlit' foundation walls as soon as possible N6wrTzm T00.03' s89-49'42"W"'� KwrizjIr 29.98' A o \„TREE 130.01' TREE �•—• IL and rough grade the lot. This will eliminate large soil mounds, which are highly erodable, and - • prepares the lot For temporary cover, which will further reduce erosion potential, • Remove excess soil fromt he site as soon as N possible after backfilling. This will eliminate any x '` sediment loss from surplus Fill. ...- 1 Joe: 19-001 The construction entrance shall be stabilized 511E PLAN ob.iq• 1C1 PREPARE)A B7: av 1,1 1.• I DATE: 6-12-19 where traffic will be leaving the construction &N • SCALE: Sae Plan site and traveling on paved roads or other L NO SURvEY Wig EEF3T FRONDED.OM ER I CR#TRACTOR TO Mare ALL RESPCNSI81LITY FOR LCCA1WL',E3rIsTTTG AI'N: P331I8 UTILITIES,ADAP1ttYA 61RIC1TII 10 EXISTTE TO OGRAPITr,Am,ENSURNG 1HAT PFLoPER SETISACKS ME MAINTAVED. t 7. MAIN ME@FOFYIATIGTT NA9 TSETH GATHERED FROM THE CLIENT,Tic'CLIENT'S CCNSIILTANTS,AND TIE CGINTY'S 7 y eu L watts paved surfaces. ASSESSOR*ME C LX,AND ressr DE VERIFIED ON SITE PRIOR To CO,ASTRI C1IOK (� DRAWING TITLE e Provide for periodic street cleaning to 3. NOTIFY ANC DESIGNGcMrDISCREPANCIE69E,T:EEN THIS 811E PLAN AND ACTUAL CO ITIg14,IWICF1PlAYP'.PACTTHE OvERALL DESIGN OR FUNCTIONALITY'CF WE PROJECT. Site {• remove any sediment that may have been " woER- AA=EL'ERLA'ESNOT70aAlP1•}.6YLhlYNap1DFORLIP51A1R5neDPI?RDllrER) Pan " k'WDBLE UR.4P ARCM,AIL CONCRETE PENETRATIcF1S tracked out. Sediment should be removed by _ shoveling or sweeping and carefully removed to a suitable disposal area where it will not be g a:co: 1r W1 MC D4,O, re-eroded. PRAIL - _ i 41.1 1 I I I I I I 1 I • • • I I I I I I I I I ijkii Joints In Pilaf fabric thou be spiked N C,Ii. ni posts. Use staplos,wire Wigs or O ¢ S 7 e tt oquivolonl 10 attach Wide to pouit random 6u YxY by 1.1 Ga.wire or aqulvntont, II standard abonpUh fabric used ®+ r�jp� 6 ....04.4........... firesc s•1 vet ^� • r ��lf�'tan aR�PQO lj�alipli :I-I rl i.'t'i�"•'t......'�7 :4• 4 N. _ Nlarfa ra.tit`iiar.•dcsix +n lJ - 0� ,9' I -r 6' . 4.y . .. _ brit u (F) ,� �I QIQ je rr>, a an 7� rut'.?!�?$�1=. Rti: ,I.l�v � �j I��p .1 .{.I- , `�i�I� ��ti a'parf plpo r .. `I El 3E0513.11GV i�0�t?<4,1 I 1 , . 1p'mM1 T1� �-.` �o II Yrw 5],ai�IOG.;,.jlV. G .~iTS`1 �%+ .� I I1f IJy r. .. • yIr) — �`✓i' 49' V `_, 1t1�Ms4paCC/1 171 4tr,� . I tr , L. •I n l " r, 1�. '��rIVI ' pqj 'INS:h HLltnn fvl I, / j I! 6040� �1Y,'���,�'1+�'. t yJ�'�l washed rock n �� ►4' '•. *ale %d�`rA�'ta � •4 MIL' �t I r�r" �+�yr%'.. �/ ht'tnt Yenm Wr...:11'� • j�• ate.-e , 1 !�!/ .z.—a:1:!..ti��1 / ' H • CV : ,d L• / . JUN 1-1- 24'min. 1 1 y ,11°w-. f veer s co roi MOoa /' I l 1 I I 2 201 + coa.�>'umet PO mnwcracer rcx Minimum .. 1 f 0'moR I Vs('bunch La i tut enure rm.= Ott reels IS i I rwlo im unto timer ArruHH freer na1 bG AM IaC Q nf1 OOar91i N A Pas100.11 pmbackinsed Trench X-Section acorn mar LT uaec A tw►Icv. Ia 0'U vdro backing Is used 2's2'wood posts, a1oo1 �n utrccrn > ColaeLLr,to ArK forleo osta,or a uivalont CITYOF . •� ae NCO annul OR eOULTRO r n R q �` ✓"V at Aw AIC5 cOeltkft tee 1CI 9 `" O�` T :s rcviceurAa VCR mum mean. ten ecAMo r' OOS=a a'CGtw0 cR nr cadriacmol a' nu MICR at — DIOpa —► 2'rl2•by 14 Go. win,orequlratonL vrary HO CO Frivaaue FOR Al If otandonl DlmnOtll fobdc ueod canruatsaa PO a.rxzw teLRL aroma*AW COCnba a1 kb Cr tic to rood x1s PC IS 10 CC Wtf[A w Aft vARAnna rrem DC DHOW* NO ,. \ roam Weal nC bWtfnt. WVcarton slow al OR oaatrarw % ;(\ Altar'raids dminnaa cyotom owner. to Pt PCP IOW r at TO • mac4 arlitrt► VC, a to cc 2•n1ln — natrAtlal SPOOR wrSUArat i.` /'' 2'x i0' ' %•• \ / /oval handl yam• en Oita hanthwith \\��y/,,,,� tli wiped pipe t.6^vmzlrodpmval y12'min' :j, i •i/gi 'Vo . �%' Minimum �j�•r ul axe^ trench — Tail/mod//mod poets,a tom Plan View of Roof lento posh, or equivalent NOT TO SCALE NOT 70 SC.kLE '4- bin .1, Figure 11-4.2.1 Nigin2 Figure III-3. 1 .8 �0 Silt Fence Z� Perforated Stub-Out Connection U DEPARTMENT OF Rovl edOdobor2014 DEPARTMENT OP RovbodDecomber2015 ECOLOGY Plano can king/Nzneecy.w>t.povhopyriphlldkd for copyrlphl no lice including pamils:lona, ECOLOGY Ploaae son ofOr/Avttw.ecy.wa.pot9WcopyrrphthuN for copyright notice Including pamdsatonc, • " z m 3 late of Washington limitatonotlinblbty.otd disclaimer. Stoic of Waohington limitation of llabliiy,and disclaimer. I Q 0 Q (n m :QT ti! I • .� � 11J —1+•- 3m Minimum t-+— —^'A ,6 al m Dmin prate .-.:.1.,{Y,:.� � rli; .. .rq('�• c t2 1•L• f Lath and fiapp(ng a;i :OeG 1 �. 1 li�•„=� ,� 'P`':. X 0 tar . : . �1'1 r f� �! on3oWbs t'r. T1'r) .iJ. . )'' •-.:A--c : , - r•,/ ConaoWblock \ ' Snndbap r;, •-t • : J.r 4'': nt!..' - e . 1I/-.II Y Y / I.+r1'�(//� _..• jt]lt,tiZi, • ( : ,_ n 1 o fla SumlbDp =t n r�j I ' � tOrNlp)mdellninp 'n_• � • '�' Hugo ^'r.-- '� • Omvot Oockrcl ..•n• ' 10= Valtoo A� U IA ▪�., c-cam 0D g fi g ll ilh'. ,'A. / • : ` �n -( ^ if n .. Yi ▪ ( I 4{ill ,. / la SI / 1 ✓,sir semi : pay f.:":1.,afrc.' -C,fJ . :'-'..tai.:a.;. / A .oi 11. r1 i tc f5j',�dv{-7f..f. , . 0 0 CI O 0 O Section A-A � , � • ~''./-''!nr. 'oLr•ri�',;r•_ �� eoj' -- - .. IL / ' to mil plastic lining �.4+r —s—A --sow ti,�b �;.. �r — Plan Nolot: wb� �43 1. Actual layout / ' /eat, ��,di��b'-.o E) p, tagnohnodInIhofield, Plan View "1 Typo "Below Grade" 2. Atenant°wathoul / i�A� e�������0����p�� g sign shall bo inataltod • 0I�� 6weip'�. *SI?�OIRW es".al.. - within tO m of the / aWt)�*CtOBPa lo,`a1Da>�ea6iB*ad�4Gl�dv,E�. ContvnIO blork ra." Oa"'1 ♦r"' ,Lob• .O�'1 •d4'1 .O�V 0 1d� 3m MlNmum mahoary con onto Wilt tones CT / 0 01d 0 i 0 0 0 u> u mahout Mollify. tdlor labdc 4.41""•p.^��10-g i'��i1-���'�,ii"���-0.b�4-��*-��. Gravel boddlU __ Ovarliow / Gfrw:.e_"��a''a���' ��9r ��9' w�e'gbNe9t J► V'� ��9b��9 (t� Fti ' walor Pondina iio10ht • > / afw-.bfr4�'p,��f��6i1�eVeia>��v.Ot�if10.`'��v,Ltt0�4,b��v$10. r IK Wood tmmo '.• "t t - Walt" • 1■--:•• r'r�' '� ' :. / . �`wif • 6I a f alit p1 O - \ oafs bet at . a B B eoarofyiDetonod : . . s ... ,,,-„ _ w- �- s,• j amuse anUro . . , f ,r-rnavu ■sax' a �w sw 1w s �1c "// edmetorwNl two A % % . :; • s� lir lO�t�� w 1 �� ��o4 M JOB: 19-001 In sUlmo Dro inlet •.• c� p 7%l/%r/ ' %:cii/ %• .: •.. �0�����e OHO B PARED ST: Y Voiles ! 10 mil e %e `.•: is ` : Ii ft1 _ Fi •o• ra ` 4 I PREPARED 1� Y �,il ; sfs• llNnp i;.//, ,1;.// free DATE: 6-12-13 .. . : : v . 1••M G1aLlf+CD KJOC OR fillet Mina ' txEMtot•eo�lal-e•moRATERS/0 SCALE: See pion Sinks Op.) Section A-A Section B-B °t•2' cL�rs stAetLtmv ccKSlTafcticN �x1RAr�E�Etcn Af'N: p331113 ' Nolan: Et? CI01 Cct15TF]IGTION ROADIPA iCh4 Af5A SIAJILITATION 10 mli plaolic linlnp 1. Drop IN al sediment borders am W ho mod far amo0,nonny lovol drrtnapo oroao. (Iota DRAWINCs TITLE •• e lilt 2x dim 12 rough Plan 2 Esovalt' n basin at sufficient slut adjacent to the drop inlet. wood Immo 3. TTolopofUrosinicluro (pondinphatch%) mustbowallbolowtho0roundatovntlon STABILIZED CONSTRUCTION ENTRANCE Site — Type "Above Grade" with Wood Planks dovmsbpo toptovonl runoff from hypo:singlhnlNol. A tampotary dike ntnyha { r1 nocoartory on lho downslopo side of the structure. stalls s' NOT TO SCALE NOT TO SCALE _°' Figure 11-4. 1 .7a Figure 11-4.2.8 .�— Concrete Washout Area 11111 Block and Gravel Filter DEPARTMENT OF Rovlsod Juno 2015 DEPARTMENT OF Rovitod/wouol 2015 cernerAnrAlat Day. - ECOLOGY ECOLOGY • DRAWINGPlatte ace hop/A„l++.ecywo.pov/copydphthtm!far capydghl notice Including parmlukm. Plaoao aoa hUp�Avww.cry.wa,Om'/�PYrtOhLhlmltor roRYtf9ht notice Including permissions, /1 Stnlo of Washington limitation of bobt1ly, and dlsdeimor. Stoto of Werth Inpton limitation of lbbility,and disclnimor. iLi ,G - — h I I I I I I I I I APPENDIX 6— Documented Site Photos (Show all directions of the site, including frontage) 37th Street I. i 11 AN CCRTES Y t_ } - --- , •_.- . _ J I • ' I r ir f f4 Location: 817 37th St Description of the photo: Ariel Ph*to Photo taken by: Skagit County r, '� I ;' I tit i `` i 1 \ , I h I . I 1 I'1 . I • = ' ° rl '•//. ' 'Ior 11 � l•� !1 I ? 11. it, I `I. t (1 . •\ l° :: • it I Il lir 1 , s _. ! , • a j` • v I ,. • I I t ,. r. • • II.' I - r I.1 • I • \t,r i li fo . 4 • ,, • • \ll ^ I t�1I • ,4. 1 ,.yl lV,yt111� .�I I ' 1 ' 1 1 • I f 1 ?• 0J} I i1 I c� I J .. =rf. S r I^•II .• � i I 1/2 L. tr x 1. y, Lv 16.1 it K♦ ,• f t I;t 1 '1 � • t . , . r ,� , r. .111- , ,.:k� I ; ! },F i11 �� g • I t' ,� _ <„`I 7 h y' •-,(. rl- 0 n ' lI 1 I ' _1, ` f1 .' ,°� M LJ f/ CZ `• f 1 ` • ...t.11' . I. a �' .. . ' � �i yy V I . y t 17t I• • ' A t , 1 t' • a, 111.?, 1 I11 9 ! • 14 Iw,.1 J '111 1 I ' "; • 1 1 1 I E • p 1 I hi • 1 I \ - , 11 AI- 4 rCp�p �� w _ ) �J = k 1n' S 1 ' 1 4 • 7 fr : : I 1 ,‘ 4-il 1 ‘.:PI a L:14 I ..14:•- . 1 1 1 1 1- C lu I • 1 . • EL ii ' 't• ' ' 1 it 1 II I 1 till M y 1. ' ; 1 r •, r I , lh y t� I 0 r A I iI <p_ I Ih �L. r \. - yt ' 1 I . n rt © Y li `� ,. C 11 O I — 1 I\ I� tl kin _ 0 1 ` I� �p �� • I' earl �'J , y_,.. l c a , ' " • ` ' CD • � . `.. er4 •� - "�t9 2� y g 1 •\ I 1 1.,' (^, 0 0 4y ' 't 1 t°' I �JJ •`� h , �� 4.`� �''_ • tot ,r - , 'I IG. ' 1 Sc o _.. I? 15"`.._ ba• .cam ,.r •• rI t . .� 1 Ed R{',yt S 1. IA % - tn� _.emu.• iy�;. •yV i ,• r •' O f'1 + i` �Jer�Ab ; ..t 0 -- Tt• If c.. 111 p,mmtltt\, i lM �r 'J i 0 p i1 , 0 �_ � I��♦ 1 � I a A et _ 11P— PENII-) UIC 6n — Doc me �rltS afr«,c P-' .1o`�os -��` 741171/117141 I' r?r.s7ftT: 4':11..9°._ Ilive:. `1 I2 / ' N, - lab( - . ."------ —.ow iki :- Tit', il t 11,1 • y' ., .11"1 t 14.4„Iiii_datra, 44 ., .- / 0. , •• , ter-�-- -L.,,�� 1.9 p ' �! �r 4�, �� ig , 7 t f 1• C II i 1 I I i, Y r � - ' 4. , / 1, 1 , :44‘11: '-N.'n � A I. r , , , tj ^ 'Ir.?' � taml .j 4 It I : I II ',��� ' 1'1 1 1 s , 1, I ,N ij 1F..T ¶!!9: r .. `-' , r!' ._._ J ;� r � '• 1 'r4 , ` • `�." ,k` t I , 1 1 ,� ♦` y t• , r TI •I.11:1 II rl 1Ijpl r. l� t i sf 11 "�� I �, i �r•y 4' 3\ , . J r! 1 H - iti ` I 11 if r I 1 ((, L • i .� �; �, _ , ` , . � `� 1� ; + ` ' ♦ f - III I ' , e •I ti , 1 1 • .r_ a _ . _ s'� [ - I . - r . !1,' _ _ _ --- _ �• _ a' isF: _ 'T-'_- -� r1 _ _. _ —L. �_. Y_- - -t\- 4.-r _ , _ A. f_ 1 - . . ate ' 1 - ►fla_ + �_1 V _ 7. . `�._� I _ .+ 11 •--- Y 1 ` � 1-11 nIC _ 1 `. R,�� -III\ • ,� ��- _ _ . �t_ __ ' -t. .L___ •..`t r r I — 4: r - fs— I . .•` r.• "+ -\ !S _ ...-�- , _ r t` I,' Id, / ,f n t rj y ` i 6 - ' . F l_;- - . , ,• \ _ - ' - �-4~ I ICY ®® _ � i� _y �•1 f- l ( • ' .. - _j{ r ' .`♦/ � ,1� of r a ..-i•...1 i1. i -11 • t \ • ti 4 ,,,11 - _ _ t i - f i - • i n ry ". . Is tg - • r� ` ;� a 71 i 1 El; • .i.c l t � -- _ - - L✓ar:'i t;,_ L`lJ ' '�tt - 1, 1 ^ .�t t �.. tt t + _ � f t • ti 1. I lik ` ! + `M t v ' I • . 1 l+ Ire;,Q p.:> -. a .tee - .9 v_?. - L _ `L� V c/l L 1j1 ► -1.--. liwrizMks 4.w y - , y 1 � • c 1 LA I ` '- yak. 5 i r C. 1 i `- it I 3i V c15 -- ` -- _'—. --- - - . = - - -' - �', _ - Esc — _. rJ�l' A' _ �' x� .:. . - - - _ - :-- - - " CC. • ' �6 - �I• - I o , iI.4 '-i - , Y - • . . _ in i ` • ' .. ems. - j .. :,., 41. ,, _ - ��,�, +i9. - , - I • i. 1. :r . . I _ :14v. -, . • , - , . _ .. 1 - ` I ' - __ T 1 . illi — — — - -- — B 1ocat o n : 817 37tn St ID) esor�optoon ®f the phot ® : Fronts northeast corner facing west Photo taken by : Phofop Steffen APPE NDD( 6 — Documented. Site h.t.s I- `4f: . ,r, ,.!_ a� :. .. _ J1 L :l f1 _ �� : s I tit, ` __ Ill * _ '._ aiona' �r ar' $y •4 .l1*.' � _.. ..;,• •' - � ^"P .n Ate.. 4: 4 qq -71. f r a ,, 1-' _oc it on: 817 37th St Description of the photo: roar, northwest corner fading north/northeast Photo taken by: PhHHop Steffen . I 1 ;� '" - 1! } . t' , I • • li I1., 31 I I 1 _ 1 . °o •I 4,- I 4 1 . ....till' ' . .. 1 II , I I i _. __ l . , I. f 1. !I , I. 1 1 I I. 41 - I , I. I 11 • `q I ' t ea , �t• ,` ; • _ I ti ,/ I, ' I T.', i , t- `Snr I 1, (� -.. .nr! . r.„ k" Y I. I O I •411 4 'tit \ li '',..• 1 1. QH..1 • -.'� ,', - , ' I ' ' 1 4 V � • ,. I I l II h�.,I 'I'." • % I t • e1 / + II. i 1 c. P I ' I I i I'.. 0 a )1 1 6 I . I r 1 I I •1 II. I 4. / 4 - I, ) ' b I, Q y Ak ?1 1, I (} 51 1 • 1• I• A r • (r, If\ I l ,1 t, t/t��y r t Jar 1 le ; • r , ►.trty Q - {� }1'. J•. . ' V • r. y I I. F tI� a ' I ti • C'''' ,} • ../• I I \ 0. CI • `� = — 'C Y, \^ \ II I. + n - ji I ,4 r . 1, Q . • 01 rl' `/ t 1�1^�^I I' •r , , 11 I , . 431�� I , 1I ,• ; . . � '(^,��1I 1 •"• I.) ' III I PC �_, �r1 V •.• I 4 U 4--� 1 • f - , ' • - , I 1 1 a 'J otio 1. 1 I ' 11 , I , l ' Ii I 4), 1 . O �p � ti i F I. 1\ l1' II II lJI ! , I !fi. O tom!' / ... ' . .,�.•. ' a a a O ( .. ll , I I '1t-'"' V V/ 1 I C••-7 � : Q .ice I' I I "� ' a o IFC^ U4 / 00 : I II •� I '.\ ,I IICr Q L CO Q I 1 I I I I I ► I • GENERAL CONSTRUCTION STORM LATER POLLUTION 1p FT d r NCB PREVENTION PLAN D D E S I G N Purpose: To prevent the discharge of sediment and JUN 1 2 2U19 (hest Val AnoCI other pollutants to the minimum extent practicable """'1.-"l`,''"cail - from small construction projects. 70'-0'MAX WIDTH FOR DRIVEWAY CITY OF ANAL-up i 11:.� ��y,L f ACCESS.NO DIRECT DISCHARGE OF DRIVEWAY WATER TO 6Iktt I. tAarlt'✓srrcr�\+.^.9,327. Design 4 Installation: Plan and implement proper NEEDS TO BE COLLECTED 4 37T1-1 5T (30.00' ROW) CONVERTED(AMC 1916) clearing and grading of the site. It is most important FIREHYDRANT / / PERFORATED STUB THE COMPETE 16 TO BE D;ED BLUELY BY [1241k our CONNECTION EXISTING WATER ° FAN CT, O aeOle only to clear the area needed, keeping exposed (SEE DETAIL) METER \ eFr °" b 120' 120ID' S89.56.29"E STOR1 DRAINAGE „m umlaut uwnrx INLET PROTECTION EXISTING SEWER FRat ANC.ANT ISE OF TM DOcuatl w A areas to a minimum. Phase clearing so that only those _ 130.02' PERE?C220 STUB THAT Mr CAM A LOB. 122'-4' t�EEER DHcn.r oR.V 1Lr,TO Al STABILIZED CONSTRUCTION-/ r r COEALTA10167 IS KEY: elFaciLr FsaaEItED. areas that are actively being worked are -Alai /,ENTRANCE(SEEDETAIL) // ��'`�� •� �4' 29.98' a OR I-'CONDUIT FOR ,li�� X N ANC AND Arlc'a cae,iTAIND axe NOT 122'-9' 0.°AFl01G N E FOR SAFETY PROGRAM uncovered. NI � SILT FENCE-BMP C133 i/ •, i WATER LIt� ■ - -- OR IIE CONSRIETICN�B GF I E DOTE 1 i► /BMP CET / /// I 4'T 3034 ■ XSILT FENCE BMP C223 CL PRIDCTITA OF TIE Deere 541004. !!`�\` ///WASH-OUT AREA ///// O SELLER LR1E �� /TX 111 EXISTItKa \.�\ // , /// / W \ SIL13MP G133 FENCE/X E MCCHIRACTO EE o .E FOR ALL TIE Note: Clearinglimits shall be flagged on the lot or -` ` �'/ice/iyy���/(//�/ii�/i «� TTLINEDIMENSIONS 415 CCNDMOIE CH kV°� g g i23 3"• /////'y j�" ,l ///// �I: �� STORM TO X -XX- HIGH VISIBILITY FENCE BMP C6a3 VARIATIONS e i apt oa D ANC�Ee V� / / / PERENNIAL lac FOND UNIN TIE PQO1 I1a e project Iect area prior to initiatingclearing //// eMPC105 ///.L , i" ,,�T DouNSParTs FAII5:'e. „�,R,a'e' ETC. A TO EE I v clearing. / //� �/ //� �� - EXISTING "- VI5131LITY &WITTED TO Art FOR REVIEW MICR TO /////'eMP ow/%///// ®.!�%l I� - FAaz�aT ar Aw,az wTAu�rari ////�'f///////// 1.1� F pR4M�R FENCE GI03 // 81 IP T5 13 POST CGN51131CTION SOILS • From October I through April 30 no soils shall 123'-1' '" rz - x 123'-5' 123'-4' Y13'-4' 121'-6' I22'-5' " , remain exposed and unworked for more than two X p � IIMI X RESIDENCE 7 1 air ci54 days. From May 1 to September 30, no soils shall �_ _ __ EXISTING S remain exposed and unworked for more than 123'-5* 0 - WPSTR2_/ I NOUSE/ADU * (ADU ACCESS FROM 31TH ST) seven days. 1 �'�� 2•CONDUIT FOR m • Soil shall be managed in a manner that does not 77 Li :7 iDATA I 3'CONDUIT FOR 124'-0' 11J �/ ,i1�1� I J ELECTRICAL permanently compact or deteriorate the final01,,1111 l ��t I o L soil and landscape system. If disturbances / ��� I � . Z and/or compaction occur the impact must be l 1 M II ; �__ �, !u o corrected at the end of the construction z .I z Q lI4'-4 I LAND USE INFORMATION: 22 q� PI U - activity. This shall include restoration of soil mom- +uTCHEN ri X -- .- JURISDICTION: GT7OFANACORTES n depth, soil quality, permeability, and percent I �' f ADDRESS: 811311hStreet. L '^ ii 124'-1' i t24'-l• 124'-9' 124'-1" 124.-3° 124.-2' 123'-9' 123'-3' i / Aneeoriee,LLbeh ton T organic matter. Constructionpractices must not �, " �� .���i��.�� - Z g fI �� X DRAIN FOR 5TORMWATER I' NEUI PARCEL NUMBER: P33118 1 Z i cause damage to or compromise the design of �_ WIDE,2'DEEPGRAVEL FILLED W/PVC PERF.PIPE AMERC m LL AR3oRVITAE, ZONIfG: Residential LL m permanent landscape or infiltration areas. IZS�' ' \-HIGHVI9181LITY TYPICAL LOT SIZE: IISI2SO FT.(025AC) x • Locate any soil piles away from drainage • �"`�G'� HOUSE FOOTPRINT: 1,524SQ.FT. I- \systems. Soil piles should be tarped or mulched EXISTING I GWEREDDEGK/T'ORGH: 198 so.Ft. 515aFT. i oc �� GARAGE FOOTPRINT: GARAGE/5NOP * PATIO/WALK/DRIVEWAY: 804 Sa FT. '6 until the soil is either used or removed. Piles I EXISTING HOUSE(ADO. 193EaFT. EXISTING SHOP/GARAGE: 620 SO.FT. should be situated so that sediment does not 040 I 0 TOTAL: 4,590SaFT. € . AgrAti►p•`�. run into the street or adjoining yards. - AT, - '- SB949'42"w"'� 29.98' • E3ackfill foundation walls as soon as possible TREE 11T 100.03' NEWFRIIIT Q \TREE 130.01' TREE and rough grade the lot. This will eliminate large - soil mounds, which are highly erodable, and - '4 prepares the lot for temporary cover, which will o further reduce erosion potential. N • Remove excess soil fromt he site as soon as - o 8 possible after backfilling. This will eliminate any Z sediment loss from surplus fill.l 1. '\ JOB: 19-001 W p SITE PLAN aO• • �7 PREPARED aY: ev i • The construction entrance shall be stabilized DATE: 6-I2-19 o) where traffic will be leaving the construction °\ -�_0.z" Q�.1.- i? j v NOTES: 1 SCALE: See Plan site and traveling on paved roads or other I. NO SURVEY HAS BEEN PROVIDED.OINER I CONTRACTOR TO ASS&T1E ALL RESPONSIBILITY FOR LOCATING EXISTING APN: P33118 UTILITIES,ADAPTING 5TRI/CIURE TO EXISTING TOPOGRAPHY,AND ENSURING THAT PROPER SETBACKS ARE MAINTAINED. al SHOWN SITE I'FOR'IATION HAS BEEN GATHERED FROM THE CLIENT,THE CLIENT'S CONSULTANTS,AND THE CO NTY'S DRAWING TITLE 2. paved surfaces. ASSESSOR*MITE ONLY,AND MUST BE VERIFIED ON SITE PRIOR TO CONSTRUCTION. Rieut.. woe-vs Q46• • 3 NOTIFY ANC DESIGN OF ANY DISCREPANCIES BETWEEN THIS SITE PLAN AND ACTUAL CONDITIONS,LLNICH MAY IMPACT THE— .Provide for periodic street cleaning to OVERALL DESIGN OR FUNCTIONALITY a THE PROJECT. Site remove anysediment that may MINER)been ^ UNDER SLAB SEWER LINES NOT TO SCALE.MAY ONLY NEED(I)FOR UPSTAIRS(TBD PER ER) Plan z ,. I3'BUBBLE WRAP AROUND ALL CONCRETE PENETRATIONS tracked out. Sediment should be removed by shoveling or sweeping and carefully removed to a suitable disposal area where it will not be COPTxr+IT tmn aNC D.17 re-eroded. DRAWING 41.1 -1 1 1 1 1 1 1 1 1 I I I I I I I I I _ Joints in filter fabric shall be spliced N Ca. at posts. Use staples, wire rings or equivalent to attach fabric to posts DESIGEI random fill sp) 0 " , ... 2"x2' by 14 Ga. wire or equivalent, j;4, ,p!"II'L tf standard strength fabric used Ws -- 4 `. firesc b' � nnryl t. filter fabrican . . Pa a pe PP__ 18' min. r � ft iii IP N1111 7 F i . . 1 ) ' - Wwashedrock Si a. /�\ / / ///• j\\; \ / a � \ � ', � s�� ���te 1cunYercn, Wa �• .c ._ rr � r IIF II 1 . 1 I I I I 24" min. 1 I�YI� 1 2 166 D00! F]IT a To BE FED SOLELY Br 6' max I I • Lo T /� NC DESIGN CAM/ AiC MENUS) avR Minimum I I I i t 9 4"x4" trench V FRC NC ANSPECFC u-CUTFRID TTEN is OC BILTANR6{ AND COMRACTOR'51 FOR �--r - FROHaf1ID lfTltLUt UFaTTEN AFi9XA'AL M et AVc. AT U6E of M DCA LUa IH A Post spacing may be increased .11C1 A TItAT MAY ruwc A LW661Tr, 2'x2' wood posts, steel Trench X-Section 11-ETrER DIRECTLY Qt TWt�CTLY, TO AM v1;` . .r- cw act QENT(6) OR taY+LLTANT(6) l5 to 8' i(wire backingis usedd �' �" 0� fence posts, or equivalent A p_� (' .� 64 COH TES 6NC M FTa7IV:�tEv. f! `LMQI ANC Ant ANtcon CORG) .OR .TA1rt6 ANT NCR RE6PCNNOLE FOR SAFETY PRCORAl15, • FET14:06, AND fltcEtURES OF q 132/40E CR TlE COOTRCTION OF TIE DESIGN 2'x2' by 14 Ga. wire or equivalent, slope —+ asiaat if standard strength labric used , _, CORRActOR61 AW SUPPLER) WALL YERFY AM Be fE6120r15+&LE FOR ALL ./\ C' j}I to road . MC IS TO ee NOTFED W ANY // Filter fabric ■l I drainage system camrnoN6 6No1FI of oR D6CTFPANCIE6 YAMATIO15 rd'RT 1W Dt'eao15 A 6 �//`.. DRA IROO, C84TTALS, ETC. ARE TO OE FOLD 11THlt TIE \'� ' 2' min 6tSl rE iIED TO PC FOR Y*Y POOR TO / _ FAEADCATICN AWAOR MTtLLATION ��% / iiade 2' x 10' Backfill trench with /•• /,,/ iingalmolar level trench •- w/perf pipe 1 nativea soil washed gravel • it /j 2" min.\ fi 1.5" washed gravel \; j2"/min Minimum #��, , / ,• 4"x4" trench 11 p 2'x2' wood posts, steel je Plan View of Roof W fence posts, or equivalent NOT TO SCALE NOT TO SCALE m Figure 11-4 .2 . 12 Figure 111-3 . 1 .8 R 111 Silt Fence giallPerforated Stub-Out Connection Lit DEPARTMENT OF Revised October 2014 DEPARTMENT OF Revised December 2015 U ill ECOLOGY Please see hftp://www.ecy.we.gov/copyrfght.html for copyright notice including permissions, ECOLOGY Please see httpJ/vnvw.ecy.wa.gov/copynght.html for copyright notice including permissions, • Z State of Washington limitation of liability, and disclaimer. State of Washington limitation of liability, and disclaimer. 67 R'p +, e a F, w CO Lg € LU cn3 t2 Ii fit mw% m 3m Minimum A 13/ Z c0 0 i Drain grate �� ' >, o J�< - = ,� .� LEI rI_i! Lath and flagging . i } : �` „-43S i.,.-4 +A on 3 sides 4,e�cL-4' •PI,` o.parr 'Pla, . .,.''j-1 -;yf'u U- `n Sandbag ,n.L�,v.�a y1' �b y- �`'r n 2•:\5; 4y Concrete block ILI x Berm Sandbag S1 e: 1 - !�!^^ I CD 1- r `_,ti r h ' 10 mil plastic lining 1`i�' c�� — ` Gravel backfillin � ' � Varies A A ;, ' � ohinnui0 - � r d; "04., / u) i,• 11 Ater 1 Berm r r < �y- ' u �,, t ctvn[J-1 -.� Z ? .}? Jar n>t1.1 / ( ( i Y . A-A � � Gt� ,] .� -1-1-1. �, 1N !� ,4 ' 01 / �:eN Q a 10 mil plastic lining Section4e�o�a ��� a•�elr Plan Notes: 5d A �/__..11((yy -4�-s`��� 1. Actual layout wa��sw118p.. 3 — determined in the field. / Sa�1�0 400iir tab... Type "Below Grade" 2. A concrete washout Plan View $ 0 0 �vr sign shall be installed _ / eY���r��4x��4ez��ie��� W within 10 m of the .e w • w s !' • 0 N 3mM1iinimumtemporary g P ry �9rs���rs��9rS���rS��9r����E� tem ora concrete Concrete block / .�4tiarrin i��t ea�ansigr4askiraYiB�stneeir ►. z washout facility. Wire screen or O 1�0 \7>�0 1��' \�� t�0 \�O \�O \�0 filter fabric / N Gravel backfill OVefffOW / ar�eL,•®�l -®�' •''®�l �'���"'������' r®�l���!-� r " _ ���as 0 i�0 ri�i s�0 Ois0 ka ►�0 ►*I N Oho o water Ponding height / • mow _ ��� �� �` �` �� �� �� �� �� ` Wood frame ��� � __ !i a,40u* 'afo A�a� �e9 �aAi �4di �ata �aeti �aeri��ar W B I. I . B securely fastened _ Water ��, n- _ : i •tt�e' •�O \t��r \fie Ike \t� 1,� Ike \�4I'\7 / around entire a.�. '/ / , /6zE2E2Uer.�7/. j / / % -��, "��' d' �' �' �' I90 IS perimeterwithtwo / ,.i l , / / / - Its 7Yff1 irs • �r+ss 9rs ,�rs- 9'�. ors. 9ri- 0�' Varies = stakes 10 mil O / i -'/ / Drop inlet / v;-'i i ,, : ' 4.41041714047111041194i .� .��� '�001 OSTIrefts ,JOB: 19-001 11 1/ ���� ����e-1 plastic lining 17' 1'*l 0 +-® 4 PREPARED RY: By ��0 +s�09 DATE: 6 -12-19 <'-DI C OISED MOCK OR ODER �a�il1R Stake (typ.) G1EMi h1Gti-SO ., PO4-Sift MATERIALS Section A-A SCALE: See Plan Section B-B BMP C105 STABILIZED CONSTRUCTION ENTRANGE/Exfi APN: P33118 in Notes: BMP CI01 CONSTRUCTION ROAD/PARKINS AREA STABILIZATION 10 mil plastic lining 1. Drop inlet sediment barriers are to be used for small, nearly level drainage areas. (less DRAWING TITLE Two-stacked than 5%) en 2x12 rough Plan 2. Excavate a basin of sufficient size adjacent to the drop inlet. wood frame 3. The top of the structure (ponding height) must be well below the ground elevation STABILIZED CONSTRUCTION ENTRANCE Type "AboveGrade" with Wood Planks downslope to prevent runoff from bypassing the inlet. A temporary dike may be Site yp necessary on the dovmslope side of the structure. ut w NOT TO SCALE NOT TO SCALE Details Y N an ten Figure II-4. 1 . 7a Figure 11-4.2 .8 Concrete Washout Area WSIIIBlock and Gravel Filter DEPARTMENT OF Revised June2015 DEPARTMENT OF Revised August 2015 rrathADeign ? ECOLOGY Please see http/Mnnv.ecy.wa.gov/copyright.hlml for copyright notice including permissions. ECOLOGY Please see htlpi/www.ecy.wa.gov/copyrighthtrnl for copyright notice including permissions, DRAWING - State of Washington limitation of liability, and disclaimer. Slate of Washington limitation of liability, and disclaimer- , .2 1 I I I 1 I I I I 11 L-. (.: [8 11 \'ll t' , ��', MAR 2-8 2019 N.�Fc` s .„ . Soils Report . !�`.: '). CITY OF ANACORTEP ,. ,� , Linda Spicher, Septic System Designer � + License 5100294 cegsro oES,Gw R (360)708-3004 EWES 09-29-''; Project/Client: Philip Steffen Page / of Site Address: 817 37th Street, Anacortes Parcel Number: 33118 Date on Site: 2/5/19 Map Unit, Natural Resources Conservation Service: #20, Bow-Urban land complex, 0 to 8% slopes Hydrologic Soil Group: C/D Soil Type' Loading Rate2 Soil Log 1 0— 12 dark brown silt loam 5 0.4 12 — 17 tan loamy medium sand, roots 3 0.8 17 —23 gray fine sandy clay, fine roots to 20", mottles 7 not suitable observed at 23" anticipated water table at 17" Soil Log 2 0 — 9 dark brown fine sandy silt loam 5 0.4 9 — 16 loamy fine sand 4 0.6 16 — 19 gravelly medium sandy loam 4 0.6 19 — 22 medium sandy clay, mottles 7 not suitable observed at 19" anticipated water table at 19" ' One of seven numerical classifications of fine earth particles and rock fragments as described in WAC 247-272A-0220 (2)(e). 2 From Chapter 247-272A WAC: "Hydraulic Loading Rate" means the amount of effluent applied to a given treatment step, in this chapter expressed as gallons per square foot per day(gal/sq. ft./day). i 4 cJ i 11.4 705 61t4 617 607 519 509 1206-'12U8 •r '35TH ST 35T1-1 ST 35TH f 920 906 3415 808 $03 t 34TH S'f 34TH _ 34TH ST ST 34TH ST720 34TH ST 3 34TH ST 34TH SiS '1202.04 '1112,14 3420 : , 3416. 17 1008 -35TH Si 35TH ST .0 AVE 35TH ST 3�2 ; 35'1 H ST 520 35TH ST -:35TH ST 35TH ST 0 AVER 91fa r 125T I,LC T at)fi O.4VE 35'Cl-[ 702 '35TH S i 3 TH'ST 35TH S T " .1.• .1 3a f H ST .35TH ST, 812 35TH ST 710 610 ' , 5'i8 51Ci 5i>>, 35Q'i 1205 1201STREET ' .351"1i ST 35TH ST 35T#1 SI- 3;51`H ST'. 35TH SI. 35TH 35TH ST 1'11., 1109 1.i319 :35tf M AV 35TH �5TH ST 35TH ST 35TH ST 35TH V 907 '819 1311 805 .7 701-0;3 619 STREETI' 40M1��ERc,lAL AV 35TH ST r' � r r'1113 3t;►04 STREET •it)15 c c 35TH ST • 35 i'H SI 35TH ST 715 �35T1'1 ST 35 I-H Sr 601 509 1 1f3 120235TH ST C)AV 'J1.} 905 903 ' ' 35TH ST 711 "Cl-I SMC 513 r 35TH ST 35i'H S'# . r . r 3: 35TH ST . •'; 36TH ST 36T1-! �U 1'1 02 35TH ST 35TH'ST • 35TH ST 351.1 605 35TH Si 505 ,501 _ .1214 i l ST PI ,i112 36TH ST 1(Jf)£i 3520 ,t . , . , SAV '35�CH _ 35THr r II ' c.` li,. ,_,_1_ - ' let STREET. 35 0 35TH ST' ►r~ . t 1� 11U5 36TH SI GC�iL MERCIAL 1V ;r,:►r,- 1*"';;tla 3..f1,. '�520 $ 1C;TH 1005 r `, 5 UAVENUF 12.19 a D" 1 .R-3 :3C-�:w ,�` '�A�, -L"#, 36TH ST 3uf) ' ,fr i �I16i T AVENUE 36TH ST 1��f'i � ti �'t ' 1 .3E, ! I-1 r n 805 3605 w . �, +~ •� y: -'(C T, t►t,,•. Ca(��1i34E1�C1ALAV 903 �6TH �'T ;,61)7->3hOCt • Litt::41 1214 20TH c 3 u # �� 36TH S I f I�.VEftilUi' R AVENUE wirrt,: .,:,i; .. �, ii... O ;i iDf��01 36 Ti� :,TREET t3C}9 801 3606 ,E=�r, .371#-1 .�T 3G�J11� •• 1 ‘ •• �;� . � •� - . ' H ST 36THS,,NA.); �� ,3t�Tl i '3TI?E ET 917 808 S T AVENUE 602 N Al ft x �=' RE ET 3612. , 37TH 320 812 37TH ST 708 ._ 616 :37TH ST 3B 5Y' a- ' '1111 COMMERCIAL AVE �7TH 716 37TH 620 6 I S Ti 3 71.1-1 S T 816 37TH ST37TH Si 703 N. '37TI-( ST 111'3 i215 120'1 A1' ' 11ia 37TH ST 919 I 37TH ST-, , , 37TH ST STREET 37TH Si 37TI-1 ST f 1ST - 37TH T �l° 8'15 ,+.i 7 • r :,,• , 37TH ST :37TH , . 11.17 37TH ST 37'11 �,7TH . i . 717 709 f?'i7 .Sr 37TH ST 37t34 COMMERCIAL AV ,I '•71H ST 3,•'Fl ST 37TH ST 37TH ST C�13 513 501 r' 1, COMMERCIAL AV 3" 91 3r- 37TH37TH <� _ `-i SiS•.i' 1204 �7fJ5 � 'I'I t34 ;,/1.� '� fi i.i c3 t 9 37TH ,.�(" ;,F .>1 ,38TH ST NA\/ 38TH ST COMMERCIAL AVE :37TH ST 37TH ST 37 r; 1ST 619 607 S I'1 507 1214 1006 1002 3706 \ 3715 802 - 712 37-TH ST r 604-' 371.H ST c '1'i08 �,• • 37TH �,T 37TH . • -- 3719 38TH E 1, 806 >3c3TH s C :313T1-1 Si' c 38-1H ST - �02 36 l H ST : ;381'I i '''.:.1.- 3811-1 S'1' COMMERCIAL AV AV �, T(� i N AVE1t3Ci;3 371cj 8 3S"f•{-# 0 '.�7'17 ,s �. G?t3 r 18 50t-i MTH ST • . . 3�.� � i1 �,1 ti14 _ h14 3801 1109 - • 1105 ' . 3802 38TH ST 1001 COMME LI 4L� i '''( H S'i R AVENUE ' • 38TH 51' 38TH ST 38TH 38TH 38TH ST NAV 38TH ST ' 38TH ST O'%VENUE 3802.3(3TH S I' :3806 RANI 3804 3805 STREET STREET!. 3c302 3805 '1107 .1103 COMMERCIAL SAV S607 r 3SU8 O AVENUE r. :380.9 &U3' . A! 701 601 515 N AVENUE ' , N AVE 38TH ST 38TH .5'T AVENUE 3U1a 38U5 iAVE 361"1-1 Si' 3807 .3F3TF-1 ST fi #9 3f31'!-i ST , - 3Ci1 I I ST ,3d06 3t3 iq COMMER,IAL AL C,?AV :3812 705 38TH S i n t;2 AV 3F310 •SAVEI�It.)f~ �t3Tl-1 ST t7'(7-2 518 5t)5 n AVENUE 0 AV E 3805 381�, 3t3'I�l AV `' 3tiTH ST r =fj0f i , = CEJf1r1ME:C;CIAL R AVENUE: 3t3T#1 ,�`T. '605 33TH ST 313TH ST 501 c 111ti I it)t3 c�A�r h AVENUE C�tlt3. 516 N AVENUE :3809 AVENUE3816 610 Lt7NGVIEW 38TH ST 381(-i ST 3f3'l5 NAV LONCVIEW LONG/1t=.tA�AV :3f31u 3816 3811 39T!~f ST R Al/ R AVEP,(U[� ''Ati/ LONt VIIviN AV AVENUE 39U2 11l_(i 10'182 416 , 'E', 3900 N A\�' LONGVIEW AVENUE, COMMCOftd(Lr( RC;IP,LAV 72082.4 STi•1NKUS 1-iILLCfi1::ST `�R !_ONGVIEW 3820 38203825 LONGVIEW PLACE 515 N AVENUE 11t1J AA: 1. LONGVIEW S AVENUC S4T8 c� 11'19 Lf)NGVII W t�AV 1: i� . ' RAVS AVENUE • 39114 ST ,3.,0?_ it71 39tJEi AVE �3�0�, �3�}:3 3909 HILLOREST t _ LoNGVIE tlt AV ikVF N.0 3`01 3y'tU 3�03 r-� 39°8 ST.\NKl_(S DRIVE N AVENUE i201 101 Lr7NG1/(E��l C2 AVENUE AV R AVENUE `'AVENUE WNGVI tV STANKUS , - i =tr AVE.:NUE R AV :.3914 618 PLACE 3905 LONGVIE lJ AV LONGVIEW> 3910 .}9 . P ACE j 3903 1120AVENUE C)AV .�811 .,,3 i2 : 513 ��1%►Nf�.4J�. 39U7 S AVE.I�#l1E 624 I-il1.l.Gl�E.��i [?i , 14 AVENUE 1102 icy ll t, O AV 1 AV / �, 626 HII.LCREST DR HILLCREST;DR 504-1 PLACE 1209' KING:ST KIf`.G ST ,- RA\ 91(i l IILLC RE.�T 13i-, 612. 1 IiLLC,RES`(' DR 1:_ 1 S-C r ,��2 3 3911 c► 3907919 C •t�MNiC,t{�I%aL ,� L 919 3f)i6 c AV AV HiLLCREST DR I'HILLCREST DR LON.GVIEIN 191 T 3920 39 1121 KING ST 0AVE 0AV ;a QAV i;AV 3913 S AVENUE NAV AVENUE r3A,! 4-092 4O011!#NG S•I' 1113 1103 . 3924 - 615 R/-�V 3920 3t�`i�` AS'i#;ER, I LAf: i'4'I J I >i._ # G '` KINGSi' COMMERCIAL iAt_AV' - } r� I }ll. _t- 1 i-�i, Hal :n.1=- :-i DR 1i December 19, 2018 1" = 300' Leon c) 0 165 330 660 Ft Tax Parcels 0 0.05 0.1 0.2 km Data Accuracy Warning: All 613 data was created from available public records and L j County f tLltiCiary existing map sources. Map features have been adjusted to achieve a best-fit registration.Vt iio great care was taken in this process, maps from different sources rarely agree as to the precise location of geographic features.Map discrepancies can ` I City Limits be as great as300feet. Copyright 2016 --- - ------ -- i - r - - i Is ...-_ 44,frewla . :1 ik at Lici,,, ,.4 t 1 1 0 i% 1 ) 1 0 en i • • 1 1 :-.:,- to • r. 1 1 ( , al rt- A� 1 1 1 . , irekoir:ic 'II •-• I D K 1 ,....0 , AlurTnli!.' _ s - 4 Iir ..,!f " l SSE0 D GNER . ii . STD 37THi ••T'�.�_. pry"• _� ..�.{r=V. .. _ - V .a - ��j �_�\.-..' - =_•f�.i 4I._ .Y�•Mp•Y.r_+..�"1M -M:. - s• ��•+w- `f..��rl,.rr•�rrtirr.- •'� - a\• " . •��• Sl r.w ►aft. . , ._r - r_ alia _ram ilm•••• a e• _sr r+ �. tn.:,tn.:,• � .,k 1 4 1 .\ . dr ' ` __ .�. l , . .__.___ ,� _.�... VI I ,Gr tt I e I �pp . ci t tin Vie y r . ., • �: 1 et: ifill H- . V . i °Feer i ). , .2 In :1 isa. I . f . WI 1 , :araP1/49. 1 ,k .._ eifil / .ii • Er.........:11117.1"..t. .7':. i f I 4 , rar , ‘,....,, . i 1 „,.....,_...„.....,.. „-- 1 1 I 4 Lo Finftitea AirsAnSe. i i , I 1 1 . .4% I . . 1 i . - `i 1 -� 1 No f 1 1 tear se --�---- - i i I i_.�.... I taIII _ _. nib-it-.___ ._.. __ . I 11/4 � 1 I o , ...•• -• s I -- -•• 'Mimi same 'Ism' ••••••• clell oats *Naiad?? - 1 CL I . «...•• . ..r.w._. S/YYwM..• .-..•. wea•. ass .n••r-__•. 1alkel...•I•••11 .•.wrw.r ..-. miaome ..•,_- ...wry ei•S• s..•a..•. •a.- ,ti, ••••=. --"is ...sa....• ..•_ame..... Mr z I LouLed C f t et A Soil Map—Skagit County Area, Washington 41. (817 37th Street) l� 5 521E V salvo 5�E10 �ip0 529710 5255i20 730 528740 5?8;50 .528?30 528770 5?57ty 43G �t3-]q I))l _ •'1 � i `j.-. .. ( x •I� �f zspf�t'l _r.. Sr '+. y rl ..r I r ^ 4 I:,{� 3Jy� t1t r f y t. .ti +.f l rar ! k _ 'a a er . ! li � ' . Y` ' - - ten lirf I t • - - i • ..' ni 'r+ ' * ',t" I•h, . . 4 S ,- • 1cAk , \ ♦ - . I: i ! w - • Oey, r • :; "3:+4 .F_• . 1 ` + : 5, < ! rt- * ��. � et q. 1, .� 1 , 5 r' �< y hyl. 1'4tl•_tr r�;k e.. . -, ' 'Y`cP-.f+f".,irti t? Asti s. _. - - . ' .. �,. .�o Ji � , ' V•. TI 4 S , " ! tr{If , r 4 rlA 1. {, ,.r 1 • - . • ,r , r rR .4 ., ` "� Y e 'ir.. rtl.. tr J t ."-'-' t4Th a�.._, 4'14 -.a ( •f ' 7 11 -' y. .� 2 C h 4 L _ . i - Sl..fy { G -b . , - >Q ( ' _ Yf ' �'" •I i c. i/� i/y�it J' .y. rs W • �Y' r 11 , Wt � r.0 '{.. r. : 1 • !enw` , ram` 0 Ieg • r„ - f . 1 .g , , II t • • •St # ! Fill ��6 )J p - r14 Li - . - - _ . - : .'1 r'• t_j'• . j I4.fa}'' YC' {.{�Yy f' , 7 .• \ 'ry . ''i 'S,=1r�i f , r f " y' r ...:Y { s�_ {4 ,.._ +. t1Y'. f n 1 _ u� •r L 1 ilk, { � r' &I q.•9it t t l 1 • 3. • r i•-._ 1 .i4 � is sU f c •1 - p. ti i r r t , . 4 aa- .+ I tn1! J'w.gt .ri.i r -- _ gr .e _ t n � . 1I , y. __... _ .. 4 —. .— r —'- __.,. t.. -.". ..,,, ... t i Y_ la i 1/41/4\1„ '• r j { '� �. � .. , / /2�?• h. ,M Ltd! f y- •.4. e£ r* Y�3-,'. . .�j uif furl r3tirr �1 �7r, t h � t£ .� lic� ail i: 1 � i �r 'Sc, �ilc: . r � t i`��� lYrSr � t� t :_ ! 'I J or 79 30' Npolik 5 8860 52070 0 528600 SiO/1u 528710 528720 52EP30 V9740 52879J 528760 5 t377{) M3793 \\ M Map Scale: 1:626 Wprinted on A landscape4111 (1l x B.5') sheet, reci A ........=. 0 30 GrJ 120 1 E0 Map projection: Web Mercator Corner c d'aiates: 1P/:;SEie1 Edge tics: t RM Zcne 10N WG584 % Vt USL), Natural R.050ue cos Web Soil Survey \� � i 2i 19/2018 r-.. Conservation -I Service National Cooperative Soil Survey Page 1 of Skagit County Area, Washington 20—Bow-Urban land complex, 0 to 8 percent slopes Map Unit Setting • National map unit symbol: 2hv1 � ; • Elevation: 0 to 450 feet r,'" • Mean annual precipitation: 20 to 60 inches r • Mean annual air temperature: 48 to 50 degrees F • Frost-free period: 150 to 220 days , Sly- ' ,� • Farmland classification: Not prime farmland u -s'ac-HER _NW)075+GNER Map Unit Composition , ,r r. EX1,1rtf"S (K-25•mac' • Bow and similar soils: 60 percent • Urban land: 35 percent • Minor components: 5 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bow Setting • Landform: Terraces, hillslopes • Parent material: Volcanic ash, glaciolacustrine deposits, and glacial drift Typical profile • H1 - 0 to 7 inches: gravelly ashy loam • H2 - 7 to 17 inches: very gravelly ashy loam • H3 - 17 to 31 inches: clay loam • H4 - 31 to 60 inches: silty clay Properties and qualities • Slope: 0 to 8 percent • Depth to restrictive feature: More than 80 inches • Natural drainage class: Somewhat poorly drained • Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) • Depth to water table: About 6 to 18 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: High (about 10.4 inches) Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 4w • Hydrologic Soil Group: C/D • Forage suitability group: Seasonally Wet Soils (G002XN202WA) • Hydric soil rating: Yes Description of Urban Land Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 8 • Hydric soil rating: No Minor Components Bellingham, undrained • Percent of map unit: 5 percent • Landform: Depressions • Hydric soil rating: Yes ANACORTES PUBLIC WORKS DEPARTMENT tisY ° Steven Lange, Project Manager p ,eta X ti P.O.BOX 547,ANACORTES,WA 98221 PH(360)293-1920 •Qr trV E-MAIL:stevel©cityofanacortes.org FAX(360)293-1938 Review Summary 1 Date: May 10, 2019 To: Groc Fyrrce(Permitting)and Rob Frisinger(Plans Examiner) From: Steven Lange Subject: Public Works Engineering Site and Drainage Review for 817 37th Street cc: Eric Shjarback, Kevin Cricchio A review of the Building Permit documents and Drainage Report was completed on May 10, 2019. Applicant will need to provide a letter of response to each item below and how each item was addressed. Site Plan: 1. There was no Erosion and Sedimentation Plan that matched Minimum Requirement#2. 2. 20-foot maximum wide driveway access for Residential Homes, per EDS Standards, Streets, STR-28. 3. Water, sewer and storm connections were not identified. 4. How does the ADU access 37th Street? 5. Recommend collecting and bypassing the sub-surface flows from the south. Drainage Analysis (Dated March 28, 2019) 1. Permit Number= BLD-2019-0170. 2. Project Description: • Sheet A1.1 identifies 3,177 SF of New and Replaced Hard Surface. • Total area of disturbance is 7,600 SF 3. Existing Site Conditions Summary: • Does the existing structure have standing water in the foundation crawl space? How is this foundation water conveyed away from the foundation? • Unsuitable soils found at 17" and 19". Similar situation at 24th and L Avenue. Shallow test pits. Visited the site and dug a test pit and found the F,O q urvA i • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste • Transportation •Equipment • Capital Projects • Development Services 4•P W p: clay layer to be only 6-inches thick with sand below it. Botched soils test. Standard depth of soils test pit is 36-inches. • Soils determination is different than what is found in the Soils Survey of Skagit County. City determined the soils to be Type A (Keystone), not C or D. 4. Developed Conditions Summary: • Soils are planned to remain on-site. How will this affect the topography? Currently the site is being identified as flat. No elevations are provided. • Minimum Requirement 2, Element 3 and 13 identify the use of rain gardens. 5. What method was used to determine the infiltration rates? 6. Depth of Ground Water Table identifies different information that what is stated in the Existing Site Conditions Summary. 7. Site Sediment Transport Score: • Based on the different soils determine from the soils analysis, a score of 50 was determined. 8. Applicability Flow Charts (Figure 1-2.4.1, Figure 1-2.4.2 and Figure 1-2.5.1) were all accepted on May 10, 2019. 9. Minimum Requirement 1, Step 1: • A survey was not part of the analysis. 10. Minimum Requirement 1, Step 2: • Site Plan layout should be inserted and found in Appendix 5. 11. Minimum Requirement 1, Step 3: • No downstream analysis was performed for this project. The City conveyance system is a pipe system to the outfall to the bay. There were no deficiencies identified in the 2007 Storm Water Comprehensive Plan. 12. Minimum Requirement 1, Step 5: • The Storm Water Control Plan was not found in the documents. 13. Minimum Requirement 2, Element 1: Revise to include • Clearing Limits will be identified using BMP C233 Silt Fence and BMP C103 High Visibility Fence • Preserve Vegetation using BMP C234 Vegetated Strip 14. Minimum Requirement 2, Element 2: Revise to include • BMP C107 Construction Road\Parking Area Stabilization. 15. Minimum Requirement 2, Element 3: References a rain garden. 16. Minimum Requirement 2, Element 4: Revise to include • BMP C220 Storm Drain Inlet Project in the catch basin adjacent to the property. f9., < • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste • Transportation •Equipment • Capital Projects • Development Services qp/p` 17. Minimum Requirement 2, Element 5: Revise as follows • Delete Erosion Control Fabrics and Matting, Soil Application of Polyacrylamide (PAM) 18. Minimum Requirement 2, Element 6: Agreed. 19. Minimum Requirement 2, Element 7: Agreed. 20. Minimum Requirement 2, Element 8: Delete last sentence. 21. Minimum Requirement 2, Element 9: Delete last sentence. 22. Minimum Requirement 2, Element 10: • If the project is going to utilize a BMP C240, then the project needs to include a design, which includes, but not limited to the following: Elevations, sizing and location on the site plan. 23. Minimum Requirement 2, Element 11: • Property owner will maintain and submit weekly report to the Building Department. 24. Minimum Requirement 2, Element 12: Delete first sentence. 25. Minimum Requirement 2, Element 13: References a Rain Garden. 26. Applicant to sign the 13 Elements of Minimum Requirement 2. 27. Minimum Requirement 3: Agreed. 28. Minimum Requirement 4: The natural discharge of the site will not be disturbed. 29. Minimum Requirement 5: Flow Control Exempt status • Provide reasoning from section 1-2.5.7. as to why this project is flow control exempt. • Roofs: Every BMP has been declared infeasible. It is determined that every project can utilize the Perforated Pipe connection. There is a question of uncertainty to the depth of the test pit. Is there water in the crawl space of the existing structure? • Other Hard Surfaces: Every BMP has been declared infeasible. Same question of concern regarding depth of test pit. • Applicant needs to sign Minimum Requirement 5. • Applicant needs to review the "Request for Adjustments and ExceptionsNariance to the Storm Water Management Manual. 30. Appendix 1 — Provide a Record of Survey, or be able to provide 3 out of 4 corners to determine proper setback requirements. 31. Appendix 2 — • Soil type differs from what is identified in the Soils Survey for Skagit County. • Further analysis needs to take place regarding depth of water table. • Suggest City and Property Owner visit the site and dig a post hole 3-feet deep.AA< K • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste • Transportation •Equipment • Capital Projects • Development Services 4`W P 32. Appendix 3 — Deferred Submittal 33. Appendix 4 — Further review determined a lesser score number, based on the Soils Survey for Skagit County. 34. Appendix 5 — No Erosion and Sedimentation Plan was provided in the Drainage Report. 35.Appendix 6 — Good. 36. Appendix 7 —To be determined. .(O q of, • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste • Transportation•Equipment • Capital Projects • Development Services q`�p: ApeStorm _ater Minimum Requirements #1 to #-S- , nn RgRilviN il ENGINEERING DEPARTMENT 904 Ch Street Anacortes,WA 98221 :7+11M0 MAR 2.8 7.019 www.anacorteswa.gov CITY OF ANACORTEP Official Use Only: (Information to Inspectors) Required Storm Water Facility and other related requirements: � I Project Address: _817 371h St Submittal Date: _3/28/2019 Parcel Number: _P33118 Revision Number: Permit Number: Acceptance Date (COA): Reviewer: Siv.-Na—, FRONT OF REPORT Submittal Checklist: o TAB #1 through #_- Drainage Analysis— Minimum Requirement#1 to#_ o APPENDIX 1 - Survey performed by a Professional Land Surveyor o APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) o APPENDIX 3 - Model Soil Management Plan for BMP T5.13 o APPENDIX 4- Determining Construction Site Sediment Damage Potential (Appendix 7) o APPENDIX 5- Site Plan with all applicable information (Minimum Size 11x17—30 scale) o APPENDIX 6 - Documented Site Photos (North, South, East and West) o APPENDIX 7 - Drainage BMP Facility Maintenance Covenant, if applicable. To be recorded prior to the Temporary Certificate of Occupancy, Certificate of Occupancy or Final Acceptance. Project Description: (What is it you are looking to do?Provide details regarding, but not limited to, Lot SF, Home SF, New and Replaced Hard Surface) Construction of new single family residence in conjunction with conversion of existing single family residence to ADU.The current site includes compact gravel driveways and paved walkways.The lot is 11,870 sq ft.The existing house has a 793 sq. ft. footprint and detached shop has a 620 sq. ft footprint. The proposed new structure has a 2,296 sq ft. footprint.The existing gravel driveway has 4,356 sq ft of impervious surface. The overall new and replaced hard surface sq ft will be 480 sq ft for the driveway and 2,296 sq ft for the structure for a total of 2,776 sq ft.The remaining 7,709 sq ft (65%)will be pervious landscaping and grass. hl• t = 3, ►'1E1 5F mev4 c ) = . -e • —1(00( DtsSveaa) Atezp. Existing Site Conditions Summary: (Additionally, provide information on previous permits, if any, like Grade and Fill, Clear and Grade, topography, vegetation, drainage, Critical Areas adjacent to the site and how it may affect this project if soils are disturbed, Soils Type (Included in Soils Analysis Report), Erosion Problem Areas, Construction Phasing\Sequence) Version Date: February 20, 2019 The existing site has not had any recent construction. The site is only slightly sloped from the rear to the front which is on 37th St. 37th street is on the northern border of the site and is paved but does not have a curb/gutter/sidewalk anywhere. A soils report has been prepared by Linda Spicher, Licensed Septic System Designer, and is included in this report. The report identifies unsuitable soils at 17 inches and 19 inches as well as anticipated water table at 17 inches and 19 inches respectively and where the observed water table was at 23 and 19 inches. See Soils Report for details. Developed Conditions Summary: (Additionally, to be shown on the site plan. Identify cut and fill areas, proposed slopes of all hard surfaces, propose ontours) ^ 'n�� ��L<r' S Ac-f z'-TiFaG2 The existing gravel driveway on the north west portion of the property will become the new driveway which leads to the garage of the new structure.The new structure will replace most of the remaining existing driveway. Due to the soil, constraint of the lot, and natural slope beyond the construction area pn site infiltration is not feasible. sip. N eL b•f, _ 3 M zo- 1 UT I L 12. h 1�• -t-4 6 c.bc cc Pt 6 '? LS . 12,,c i� '- J Provide the Infiltration Rates found during the rainy season: .06 to .2 Inch\Per Hour NaNi‘-1N-)• M( 2 E1ec r 13 What was the depth of the ground water table? 6-18 inches below existing grade (See completed Soils Analysis (Volume 1, Chapter 3.1.1) So Site Sediment Transport Score: 7 3-90 Total Points (High o�w) See Determining Construction Site Sediment Damage Potential(Appendix 7) Drainage Basin (2007 Storm Comp Plan-City website\publicworks\engineering\comprehensive plans): What Drainage Basin are you in? F4, Fidalgo Bay, Outfall#42. Identify any downstream drainage issues (Storm Comp Plan: No downstream drainage issues. If so, describe: Complete the Applicability Requirements- Flow Chart(Figure 1-2.4.1 Attached, Figure 1-2.4.2 Attached and Figure 1-2.5.1 Attached) - Highlight the path and attach DOE Stormwater Management Manual Minimum Requirements: (MR#1 to MR#9 only). Refer to the 2012 Department of Ecology Manual, as amended in 2014 for further required information. Version Date: February 20, 2019 Start Here Does the site have 3.5% Yes See Redevelopment Mini urn' or more of existing Requirements and Flow Chart impervious coverage? (Figufe 1-2 A.2.}. LNG ) Does the project convert 3,4 acres or more of vegetation to Does the project result i f lain or landscaped areas. or 5.000 square feet.or No convert 2.5 acres or more of greater., of new plus native#.+egetation to pasture`? replaced hard surface 4f. area? No Yes ♦ 4 'Yes Does the project result in 2„C0@ V square feet. or greater, of new pllus All Minimum Requirements replaced hard surface area? apply to the new and replaced hard surfaces and converted @ o vegetation areas_ V-71 N Yr Does the project have land MinitnTum Requirements #.1 disturbing activities f7,000 through #5 apply to the new 4 Ve$ square feet or greater'' and replaced hard surfaces and the land disturbed_ No !' '!r Minimum Requirement #2 applies. dc�x`P1�7 O t , •' Figure 1-.2. _ 1 How Chit for Determining Requirements for New Development DEPARTMENT OF Revised J une:1015 F 0 0 L 0 G Y Please see fif4rAirm'.ecp.,va.gavacppiatigrhf,fiA t+forr oapyrigiht nonce Including permissions, late of W33rrin9".01 'rrul".anon of liability,and disclaimer. version uaie: reoruary Lu, zu'w Does the projc t result in 2,000 square feet or more, of new plus replaced hard surface area? OR Does the land disturbing activity total 7,000 square feet=arr greater? v Ves No Minimum Requirements#1 through#5 apply to the new and reptaced hard Minimum Requirement#2 :applies. surfaces and the Iland disturbed. Next Question Does the prroject add.5,.CDCr square feet or more of new hard surfFaoees i" OR Convert 34 acres or morie of vegetation to lawn or(landscaped areas? OR Convert 2.5 acres or more of native vegetation to pasture? Yes E No All Minimum Requirements apply Next Question Is this a road to the new hard surfaces and the l~ No convertedvegetation areas related project? . Yes Does the project add 5020 square feel or more of new hard surfaces? Yes • N' is the total of nee plus repl.iaced hard surfaces Do the new hard ! 5,000 square feet or more, surfaces add 54fl% on No additional �� AND more to the e.kristnng ► , does the value of the proposed improvements (hard surfaces within requirements - including interior improvements-exceed the project limits? 50%of the assessed v lue (or replacement vallue) of the existing site improvements? Yes —* All Minimum Requirements apply to the new and replaced hard surfaces and converted vegetation areas_ Ves Figure 1-2.4.2 Flow Chart for Determining Requirements for Redevelopment DEPARTMENT Of ,+Ise Jun 0 5 E c C)L.0 :Y Please see ,era^iv .gotYcopjalirtrirnrarmr copyright notice Including permissions, •'3l3te of Wastrtngton rrnitat:om di Utility,and disclaimer. version vary: reroruary Gu, .o w C'Des ttne project discharge to Flow Control Exempt Wailers'der Mirimurn Requirement iiMI91 e7 I' ,I,Yes REQUIRED:Implement the folowing a61P5 No, uvhrere feasible: • EMP 75.13 Post-ConstrUNctlon ;Soli Qualify N1'1the and Depth Dods ihe project project • EMP 75.1+0A.E.inr C:Downspout Full trigger only MRs ell- nigigered !infiltration,Downspout Dispersion 057(Per Figure 3.2 or mil, uR Net, Systems,or Pec oraiert tutr�aut Figure 3.3'n AppentIlx I- No admDonal Connections 1 of ihde 2013-Z11.16 re llrement3 • SMP 75.1 r or T5.12:Concentrated Flow MA Phase Ill Permit Dispersion or Cheei Flow Dispersvn 3.Pfiase I Petero, N Olt REQ(t IRED:Acllleuerrnent of the LID No ipie protent triggered Perforrrnalroe Standard.A(ppiyir+g the muter ' Yes only tl1Ps et-e91 15►.1Ps in List#1 of Ust 42.. _If Is!fie protect Inside the UG.A? Dirt the project de4'eloper choose to irdeet ii, the LID Performance Ciandaid' Yes •IN* 11 staro project nriap r l ® , _ or 5 acres Di!Larger (REouiIR!D:For each 4 012 the prOiji.C1 developer No ,I Yes surface„consider the choose to meet the LID 13k1Ps In the order Perfornnance Stanitarit REQUIRED: Meet the _lO illisted!n List el Inrthat Performance Ciandard through type of sUI 3ce. trse Yes - :he use Vary IIMPI:s l•In the the tlrst EMP that is Yes j 0 2314 C-1VW` l'� W except for considered reasIb e. Rain wardens Atha use of • Hior tenfrrn'''IsacceptaI91e;1. NOT REQUIRED:: Actmiciennent or the LID T It the protect can't meet the l PerfoTrnarrce Standard./ REQUIRED:.For each LID Performance Stam:ard.It V r, surface,consldea life amp; most seek and be granted an REQUIRED: 3meet the LIID Performance ir Me order Ilsteit in'List re ex ceptionhratiance. Standard through Inc use of am EVPrs i In for that type of surface. U!se Me 20t4 SVr!VVI"+;IN exce-pit tor Rain Gardens thefirst SMP mat is REQUIRED:Apply EMP T5.1 3 pie use inr boretenton is accepiaDle , onnsidereiD fe3arlle. Post-Comatr> ction Soli Quarr`ry and Depth. REQUIRED rur Pro';rects TrIonernd MR#1-;': NOT REQUIRED: Apply SMP T5.13 Past Construcilnn Sol Achievement of the LIID NOT REQUIRED:Applying me oualtty and Depth. Perf'Ormanoe Stardars. BMPs In List eel or List e2. NOT REQUIRED:Appiyilmg Inc EtdPslin Lest el or List#2.. 'Recaarnmenden t.i,,Eonreg_ for proJe 1s triggering MRs e1 -nc5. Figure 1-2_5. I t Flow Chart for Determining LID iviR 45 Requirements DEPARTMENT OF RetdilSedJurte2015 t,.C_)L t){j 1 Please see na;..,,,, °Av►'.ec,Jr. 'a.gou�'crD. rigilt.�htr�rri far Dapyright notcie Including perrnisslons, Slate of Wash imitator,of liability,and disclaimer. version uate: reoruary zu, zu-w TAB 1 (MINIMUM REQUIREMENT#1) • 1-2.5.1 Minimum Requirement#1 —Prepare a Stormwater Site Plan - 1.3— Preparation of a Stormwater Site Plan - 1.3.1 —Stormwater Site Plans: Step-by-Step Note: The level of detail needed for each step depends upon the project size. Provide a narrative description of each step. 1-3.1.1 Step 1 - Site Analysis: Collect and Analyze Information on Existing Conditions Site analysis shall be submitted as part of the Existing Conditions Summary above. Part of the information in this step should be used to help prepare the Construction Stormwater Pollution Prevention Plan. Purpose of the Site Analysis is to provide for a Low Impact Development site design that is intended to compliment the predeveloped conditions of the site. AW'1� The site is mostly undeveloped with slopes at an average of 3%down to the southeast.The site is mostly grass with some small trees and gravel driveway. A soils report has been prepared by Linda Spicher, Licensed Septic System Designer, and is included in this report.The report identifies unsuitable soils at 17 inches and 19 inches as well as anticipated water table at 17 inches and 19 inches respectively and where the observed water table was at 23 and 19 inches. See Soils Report for details. ;R.- op11 QIs,a. s4s is sI-4.a.DLvPC 1-3.1.2 Step 2 - Prepare Preliminary Development Layout Based upon the analysis of existing site conditions, locate the buildings, roads, parking lots, landscaping features, on-site stormwater management BMP's, and preliminary location of stormwater treatment and retention/detention facilities for the proposed development. During construction most of the site will be disturbed.The existing grass in the front and rear side of the proposed house as well as the area around the existing house and shop will ae left undisturbed. See attached site map. — ATTACL A) t_.t IFJ x, 5 1-3.1.3 Step 3- Perform Off-site Analysis (at Local Agency's Option): Use additional Sheets, if necessary, Ecology recommends that local governments require an off-site analysis for projects that add 5,000 SF or more of new hard surfaces, or convert 3/ acres of vegetation to lawn or landscape areas, or convert 2.5 acres of forested area to pasture. Off-site analysis extends to mile downstream of the project site. i•.� �«.�t-�S t .,- L`tc,15 Zen o Frx_ " S ave I i . T?� c.tly Cc .►1IZ`1!4-C S4St- tS 1-3.1.4 Step 4- Determine Applicable Minimum Requirements Establish project size thresholds for the application of Minimum Requirements to new development and redevelopment projects. Figures 2.4.1 (Attached) and 2.4.2 (Attached) provide the same thresholds in a flow chart format. Based on the preliminary layout, determine whether Minimum Requirements#1 through #5 apply to the project; or, whether Minimum Requirements#1 through #9 apply. Version Date: February 20, 2019 Please note, that Minimum Requirement#1 through#5 may trigger additional Minimum Requirements, such as Flow Control. Total new impervious area is less than 5,000 sq feet at-2,776 sq ft. Minimum requirements 1 thru 5 are required. 1-3.1.5 Step 5- Prepare a Permanent Stormwater Control Plan (Refer to this section of the Ecology Manual for requirements.) 7 w 4•hci} IS N FIDE • A storm waterplan is provided in the developed site plan na d discussed in the SWPPP. -nit) 1-3.1.6 Step 6- Prepare a Construction Stormwater Pollution Prevention Plan (MR#2- 13 Elements) Refer to Chapter 11-3-Planning for a detailed description of each element. See also attached Tables 4.1.1 (Source Control BMP's by SWPPP Element) and Table 4.2.1 (Runoff Conveyance and Treatment BMP's by SWPPP Element). See attached 13 Elements of a SWPPP - MI}--1 r m izem,-T' Z 1-3.1.7 Step 7- Complete the stormwater site plan The Stormwater Site Plan encompasses the entire submittal to the Local Agency with drainage review authority. Refer to this section of the Manual for further clarification of each item and what is required. See below: • Project Overview • Existing Conditions Summary • Off-site Analysis Report • Permanent Stormwater Control Plan • Construction Stormwater Pollution Prevention Plan • Special Reports and Studies • Other Permits • Operation and Maintenance Manual • Declaration of Covenant for Privately Maintained Flow Control and Treatment Facilities. (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Declaration of Covenant for Privately Maintained On-site Stormwater BMP's (See attached Drainage BMP Maintenance Covenant BMP Agreement) • Bond Quantities Worksheet, if applicable The project overview has been provided at the beginning of this report along with an existing conditions description. Maps are included in the attachments. 1-3.1.8 Step 8-Check Compliance with all Applicable Minimum Requirements A Stormwater Site Plan as designed and implemented should specifically fulfill all Minimum Requirements applicable to the project. The Stormwater Site Plan should be reviewed to check that these requirements are satisfied. To take place during review and during and after construction. Version Date: February 20, 2019 TAB 2 (MINIMUM REQUIREMENT#2) • 1-2.5.2 Minimum Requirement#2—Construction Stormwater Pollution Prevention Plan (SWPP) - All projects are required to complete Minimum Requirement 2. - Refer to the 13 Elements of the SWPP(See document below, complete and attach) - See attached Table 4.1.1, Table 4.2.1 and Table - Provide Engineering Calculations as an attachment for Sediment Ponds\Traps, Diversions, Waterways and Runoff/Stormwater Detention Calculations. See attached SWPP. Version Date: February 20, 2019 Table 4.1.1 Source Control BMP's by SWPPP Element Element 01 Element#2 Element#13 Element#5 Element#6 Element#9 Element#11 Element 412 Preserve Establish Stabilize Protect Control f.laintain Manage the Protect Low BMP or Element Name � Vegetation/Mark Construction Impact Soils Slopes Pollutants BLIPs Project Clearing Limits l Access Development BMP C101: Preserving Natural Vegetation ✓ BLIP C102: Buffer Zones ✓ '' BMP C103:High Visibility Plastic or Metal V Fence BLIP C105: Stabilized Cons unction Entrance !Exit BLIP C106: Wheel Wash ✓ BLIP C107: Construction Road/Parking Area Stabilization Blip C120:Temporary and Permanent ✓ �/ Seeding I BMP C121: Mulching V 'r BMP C122: Nets and Blankets ✓ ✓ Bl;iP C123: Plastic Covering ✓ BfiP C124: Sodding BLIP C125: Topsoiling /Composting ✓ BLIP C126: Polyacrylairide for Soil Erosion Protection BLIP C130: Surface Roughening ✓ ✓ BMP C131: Gradient Terraces f '✓ BLIP C140: Dust Control BliP C150: Materials On Hand V V BMP C151: Concrete Handling BLIP C152: Sawcutting and Surfacing V Pollution Prevention BMP C153: Material Delivery, Storage and ✓ Containment BLIP C154: Concrete Washout Area '7 BLIP C160: Certified Erosion and Sediment Control Lead BMP C162: Scheduling V Version Date: February 20, 2019 Table 4.2.1 Runoff Conveyance and Treatment BMP's by SWPPP Element .l�rrer:rl ei.• E around it t Ciement s►8 El Ftenu�nt ti`i ertr nt Ei i►ty entwntN7 I Element . Flanrntt1H bask!!! I Str�billzo ! Protc'ct Low 13Ml' or Omani Name Ct n4.rol Protort PiotQct : Chr�rtirrol. Cnntiol Control De• (rr+puct Ftn-vl l�ale, S�tlirrw'i! Slopes Crain Inlets s Pollutants t'IItrrii'i� Control. and Outlets 7urelul;trrent `9 'CZAR: kitorcepl:r Diko anti Svrnlc ✓ 3Jt1P C20t: Grans-t msd Chanztc.is ✓' 30,fP C202; Ch.HHrrel 1.h1a6 -T—_ 4MP C203; 'Ater tt:IP C204; Pifer Slope Drains ✓ i LIMP C41.16: Subsurfaco Drains 1 ✓ ems, C206: Level S6utetrdur r! LIMP C2117: Chuck Oa-n ✓' F1MP C208; Trianutsiar Silt Uika Peoteiill.? — Lncased Check linrmi DMP C209; Outlet Protection 1 r nt91P C220: Storm Dr0n Inlet Protection { 1.3t41P C231: Brush Oarricr ►� l •� BMP C232: °raveI H«rm 13N1P C233: Silt Fence GIr1P C234: Vegelatr:►d?!,trip V �` Hfitis G236: WK:tttlas . ' DUMP C236; Vogitotivc Filtration 4' PIMP C246: Sc dirrtunt Trap ,i ✓ BMP C241; Terrrport,ry&ed.,titant Panel ✓ y�. l3rAP C2511: Coot:lruciion Storrmeter ,l ChetrJe 1 Tt9ati eat r BM ' C251:Construction Sturnrrhutut } • 1=llirk�llt�n BMP C2S2:High pH NeuirMixatlon U�irr0 CO: 1 • � i 1 BMP C253:pH Control for High pi-1 V1fttir i 1 �`' Version Date: February 20, 2019 13 Elements of SWPPP (Construction Stormwater Pollution Prevention Plan) Please check off boxes to show that each element has been read and understood. Provide details where applicable and if certain aspects are unnecessary or exempt, clearly justify. Details of the 13 Elements and the correlating BMPs are listed Above from the 2014 Stormwater Management Manual for Western Washington (SWMMWW). A link is provided on the City of Anacortes website, under Planning, Community, & Economic Development Department, as well as under Stormwater on the Engineering Division of Public Work's page. Owner Name: Philip Steffen Site Address: 817 37th ST Prepared By: Philip Steffen The Stormwater checklist or building permit determined that: The 13 elements must be addressed ✓ These elements must be addressed for construction activity adding under for construction activity adding 2,000 2,000 sq. ft. of hard surface area. sq. ft. or more of hard surface area. This means that an attached narrative and site plan are required with this document. Under each element, explain the best management practices (BMPs) used or justify reasoning for those that will not be used. If needed, please attach a narrative to further explain plans or justification. ELEMENT 1: Preserve Vegetation/Mark Clearing Limits V Before beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. ✓ Retain the duff layer, native top soil, and natural vegetation in an undisturbed state to the maximum degree practical. Prior to beginning land disturbing activities, including clearing and grading, all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area shall be clearly marked, both in the field and on the plans,to prevent damage and offsite impacts. Plastic, metal, or stake wire fence may be used to mark the clearing limits (BMP C103). The duff layer, native top soil, and natural vegetation shall be retained in an undisturbed state to the maximum extent practicable. If it is not practical to retain the duff layer in place, it should be stockpiled on site, covered to prevent erosion, and replaced immediately upon completion of the ground disturbing activities (BMP C234). CU)A-tsk, lAlmer5 Q t --1-►FtEn O51a-, c2.33-SI..-r- c I o; Iti, vks• F a. LLMENT 2: Establish Construction Access Version Date: February 20, 2019 --.cp,-1 S. ,P, ✓ Limit construction vehicle access and exit to one route, if possible. ✓ Stabilize access points with a pad of quarry spells, crushed rock, or other equivalent BMPs, to minimize tracking onto roads. ✓ Locate wheel wash or tire baths on site, if the stabilized construction entrance is not effective in preventing tracking sediment onto roads. ✓ If sediment is tracked off site, clean the affected roadway thoroughly at the end of each day, or more frequently as necessary(ex: wet weather). Remove sediment from roads by shoveling, sweeping, or pick up and transport the sediment to a controlled sediment disposal area. ✓ Conduct street washing only after sediment is removed in accordance with the above bullet. ✓ Control street wash wastewater by pumping back on site or otherwise preventing it from discharging into systems tributary to waters of the State. 0 vet � �� pi? Gtb ) -t-2, n..I,ABt 1.a1"tr Prior to construction, install BMP C105 (Stabilized construction entrance).Vehicle traffic to the construction site will be limited to one route at 37th St. Any dirt of mud that is tracked onto the roadway will be cleaned immediately. BMP to be monitored daily and repaired as needed. ELEMENT 3: Control Flow Rates ✓ Protect properties and waterways downstream of development sites from erosion and the associated discharge of turbid waters due to increases in the velocity and peak volumetric flow rate of stormwater runoff from the project site. ✓ Where necessary to comply with the bullet above, construct stormwater retention or detention facilities as one of the first steps in grading. Assure that detention facilities function properly before constructing site improvement(e.g. impervious surfaces). ✓ If permanent infiltration ponds are used for flow control during construction, protect these facilities from siltation during the construction phase. A silt fence BMP C233 is to be installed along the north side of the site to control runoff onto 37th st. The area where the permanent raingarden will be will be protected from infiltration. ELEMENT 4: Install Sediment Controls ✓ Design, install, and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. ✓ Construct sediment control BMPs (sediment ponds, traps, filters, etc.) as one of the first steps in grading. These BMPs shall be functional before other land disturbing activities take place. ✓ Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site. V Direct stormwater runoff from disturbed areas through a sediment pond or other appropriate sediment removal BMP, before the runoff leaves a construction site or before discharge to an infiltration facility. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must meet the flow control performance standard in Element#3, bullet#1. ✓ Locate BMPs intended to trap sediment on-site in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. ✓ Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration. ✓ Where feasible, design outlet structures that withdraw impounded stormwater from the surface to avoid discharging sediment that is still suspended lower in the water column. Version Date: February 20, 2019 Per BMP C233 a silt fence will be installed prior to construction on the downhill side of the site per the site plan. BMP to be monitored daily and repaired as needed. BMP C234 to preserve a vegetation strip as much as possible during construction. BMP C162 Scheduling, 1st install silt fencing and construction entrance and other ECS BMPs. 2nd install storm drainage. - -►oern OeptiN tom- . a -67._nts1.4 t ru ELEMENT 5: Stabilize Soils 2: ✓ Stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to: temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics and matting, soil application of polyacrylamide(PAM), the early application of gravel base early on areas to be paved, and dust control. ✓ Control stormwater volume and velocity within the site to minimize soil erosion. ✓ Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion. ✓ Soils must not remain exposed and unworked for more than the time periods set forth below to prevent erosion. o During the dry season (May 1 —Sept 30): 7 days o During the wet season (Oct 1 —Apr 30): 2 days ✓ Stabilize soils at the end of the shift before a holiday or weekend if needed based on the weather forecast. ✓ Stabilize soil stockpiles from erosion, protect with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. ✓ Minimize the amount of soil exposed during construction activity. ✓ Minimize the disturbance of steep slopes. ✓ Minimize soil compaction and, unless infeasible, preserve topsoil. Stabilize exposed and unworked soil by application of effective BMPs that prevent erosion. Applicable BMPs include, but are not limited to:temporary and permanent seeding, soddin , mulching, plastic coverin e with quarry spall base from 37th St during construction. Install plastic covering per BMP C123 on soils, stockpiles. BMP to be monitored daily and repaired as needed. ELEMENT 6: Protect Slopes Design and construct cut-and-fill slopes in a manner to minimize erosion. Applicable practices include, but are not limited to, reducing continuous length of slope with terracing and diversions, reducing slope steepness, and roughening slope surfaces (Ex: track walking). Divert off-site stormwater(run-on)or ground water away from slopes and disturbed areas with interceptor dikes, pipes, and/or swales. Off-site stormwater should be managed separately from stormwater generated on the site. At the top of slopes, collect drainage in pipe slop drains or protected channels to prevent erosion. o *Temporary pipe slope drains must handle the peak volumetric flow rate calculated using a 10- minute time step from a Type 1A, 10-year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour flow rate predicted/indicated by an approved continuous runoff model, increased by a factor of 1.6, may be used. The hydrologic analysis must use the existing land cover condition for predicting flow rates from tributary areas outside the project limits. For tributary areas on the project site, the analysis must use the temporary or permanent project land cover condition, whichever will produce the highest flow rates. If using the Western Washington Hydrology Model (WWHM)to predict flows, bare soil areas should be modeled as "landscaped"area. o Where 15-minute time steps are available in an approved continuous runoff model, they may be used directly without a correction factor. Place excavated material on the uphill side of trenches, consistent with safety and space considerations. Version Date: February 20, 2019 Place check dams at regular intervals within constructed channels that are cut down a slope. Consider soil types and its potential for erosion. Stabilize soils on slopes, as specified in Element 5. BMP combinations are the most effective method of protecting slopes with disturbed soils. Ex: Use both mulching and straw erosion control blankets. There are no steep slopes on this property. ELEMENT 7: Protect Drain Inlets ✓ Protect all storm drain inlets made operable during construction so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ✓ Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). ✓ Where possible, protect all existing storm drain inlets so that stormwater runoff does not enter the conveyance system without first being filtered or treated to remove sediment. ✓ Keep all approach roads clean. Do not allow sediment and street wash water to enter storm drains without prior and adequate treatment unless treatment is provided before the storm drain discharges to waters of the State. ✓ Inlets should be inspected weekly at a minimum and daily during storm events. Storm drain inlet protection devices will be installed at existing catch basins in the immediate vicinity of the project prior to construction. BMP to be monitored daily and repaired as needed. ELEMENT 8: Stabilize Channels and Outlets Design, construct, and stabilize all on-site conveyance channels to prevent erosion from the following expected peak flows: o *Channels must handle same peak volumetric flow rate as temporary pipe slope drains listed in Element 6, above. Provide stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. The best method for stabilizing channels is to completely line the channel with a blanket product first, then add check dams as necessary to function as an anchor and to slow the flow of water. No storm water runoff will be conveyed off site via channels, swales, or steams.'r d, """n e ELEMENT 9: Control Pollutants ✓ Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. ✓ Handle and dispose of all pollutants, including waste materials and demolition debris that occur on-site in a manner that does not cause contamination of stormwater. ✓ Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. On-site fueling tanks must include secondary containment. Secondary containment means placing tanks or containers within an impervious structure capable of containing 110% of the volume contained in the largest tank within the containment structure. Double-walled tanks do not require additional secondary containment. ✓ Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures. Clean contaminated surfaces immediately following any spill incident. ✓ Discharge wheel wash or tire bath wastewater to a separate on-site treatment system that prevents discharge to surface water, such as closed-loop recirculation or upland land application, or to the Version Date: February 20, 2019 sanitary sewer, with local sewer district approval. Wheel wash or tire bath wastewater should not include wastewater from concrete washout areas. ✓ Apply fertilizers and pesticides in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Follow manufacturers' label requirements for application rates and procedures. ✓ Use BMPs to prevent contamination of stormwater runoff by pH-modifying sources. The sources for this contamination include, but are not limited to: bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, dewatering concrete vaults, concrete pumping, and mixer washout waters. Adjust the pH of stormwater if necessary to prevent violations of the water quality standards. ✓ Assure that washout of concrete trucks is performed off-site or in designated concrete washout areas only. Do not wash out concrete trucks onto the ground, or into storm drains, open ditches, streets, or streams. Do not dump excess concrete on site, except in designated concrete washout areas. Concrete spillage or concrete discharge to surface waters of the State is prohibited. Do not use upland land applications for discharging wastewater from concrete washout areas. ✓ Obtain written approval from Ecology and provide to the City before using chemical treatment other than CO2 or dry ice to adjust pH. ✓ Woody debris may be chopped and spread on site. ✓ Conduct oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into stormwater runoff using spill prevention measures, such as drip pans. ✓ Clean contaminated surfaces immediately following any discharge or spill incident. Emergency repairs may be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle. Per BMP C154 prior to construction a concrete washout area is to be installed onsite to capture contaminated water from concrete washouts. BMP to be monitored daily and repaired as needed. Provide spill prevention kits for excavation and concrete crews. In the normal course of construction there are not anticipated pollutants from fuel. Fueling should take place off site. ELEMENT 10: Control De-Watering ✓ Discharge foundation, vault, and trench dewatering water, which have characteristics similar to stormwater runoff at the site, into a controlled conveyance system before discharge to a sediment trap or sediment pond. ✓ Discharge clean, non-turbid de-watering water, such as well-point ground water, to systems tributary to, or directly into surface waters of the State, as specified in Element 8, provided the de-watering flow does not cause erosion or flooding of receiving waters or interfere with the operation of the system. Do not route clean dewatering water through stormwater sediment ponds. Note that"surface waters of the State" may exist on a construction site as well as off site; for example, a creek running through a site. ✓ Handle highly turbid or contaminated dewatering water separately from stormwater. ✓ Other treatment or disposal options may include: 1. Infiltration 2. Transport off-site in a vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state waters. 3. Ecology-approved on-site chemical treatment or other suitable treatment technologies. 4. Sanitary or combined sewer discharge with local sewer district approval, if there is no other option. 5. Use of a sedimentation bag with outfall to a ditch or swale for small volumes of localized dewatering. ✓ Construction equipment operation, clamshell digging, concrete tremie pour, or work inside a cofferdam can create highly turbid or contaminated dewatering water. ✓ Discharging sediment-laden (muddy)water into waters of the State likely constitutes a violation of water quality standards for turbidity. The easiest way to avoid discharging muddy water is through infiltration Version Date: February 20, 2019 and preserving vegetation. Project will take place during drier months to limit the amount of storm water runoff from construction activities. If dewatering is needed all discharge will be directed to a temporary sediment trap BMP C240 prior to discharge to the city storm drainage system. 3t2,E,, GJ Th tw �S 6O L 4Z C. I- SITE Q' � • ELEMENT 11: Maintain BMPs ✓ Maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specifications. V Remove all temporary erosion and sediment control BMPs within 30 days after achieving final site stabilization or after the temporary BMPs are no longer needed. Some temporary erosion and sediment control BMPs are bio-degradable and designed to remain in place following construction such as compost socks. ✓ Provide protection to all BMPs installed for the permanent control of stormwater from sediment and compaction. All BMPs that are to remain in place following completion of construction shall be examined and placed in full operating conditions. If sediment enters the BMPs during construction, it shall be removed and the facility shall be returned to the conditions specified in the construction documents. ✓ Remove or stabilize trapped sediment on site. Permanently stabilize disturbed soil resulting from removal of BMPs or vegetation. stte pet the site . BMP to be monitored daily and repaired as needed, or as needed and or as required by the City of Anacortes. r i ti YZ rr t\...L rYIPA1Z17A.+4--1 UPEEK.L.11 R2'Paexc> . irrIz6 ELEMENT 12: Manage the Project- Projects subject to Minimum Requirements 1-9 must have a Certified Erosion and Sediment Control Lead (CESCL)for site inspections. Projects subject to Minimum Requirements 1-5 do not require the inspector to be certified. By the initiation of construction, the SWPPP must identify the CESCL or inspector, who shall be present on-site or on-call at all times. ✓ Phase development projects to the maximum degree practicable and take into account seasonal work limits to prevent soil erosion and prevent transporting sediment from the site during construction. ✓ Inspection and monitoring- Inspect, maintain, and repair all BMPs as needed to assure continued performance of their intended function. ✓ Maintain, update, and implement the SWPPP. ✓ Clearing and grading activities for developments shall be permitted only if conducted using an approved site development plan (e.g., subdivision approval). ✓ From Oct 1 through Apr 30, clearing, grading, and other soil disturbing activities is permitted only if shown that the site operator will prevent silt-laden runoff from leaving the site through a combination of the following: 1. Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters. 2. Limit activities and the extent of disturbed areas. 3. Proposed erosion and sediment control measures. Weather conditions can influence the seasonal limitation on site disturbance. The City of Anacortes has the authority to take enforcement action per AMC 19.76 Stormwater. ✓ The following activities are exempt from the seasonal clearing and grading limitations: 1. Routine maintenance and necessary repair of erosion and sediment control BMPs; 2. Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil 3. Activities where there is 100% infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. Version Date: February 20, 2019 P ion iuiies BMP to be monitored daily and repaired as needed and is the responsibility of the owner. ELEMENT 13: Protect Low Impact Development BMPS V If implementing any bioretention facilities or rain gardens, refer to the applicable BMP sections of the Manual for requirements. BMP sections for rain gardens will be followed as applicable. BMP T5.14A for downspouts to rain garden. -v/t Applicant ignature Date TAB 3 (MINIMUM REQUIREMENT#3) • 1-2.5.3 Minimum Requirement#3—Source Control of Pollution All known, available and reasonable source control BMP's must be applied to all projects. Source control BMP's must be selected, designed, maintained according to the reference Ecology Manual. The intent of source control BMP's is to prevent stormwater from coming in contact with pollutants. They are a cost-effective means of reducing pollutants in stormwater, and, therefore, should be considered in all projects. During construction site will be open and subject to erosion. BMPs as descripted in the erosion control plan and SWPPP must be constructed at the source to limit erosion and sediment laden runoff. The most common erosion source is exposed soils to rain. This will be limited due to the fact that construction will occur during seasonally drier months. Covering exposed soils as discussed in the SWPPP shall be implemented. TAB 4(MINIMUM REQUIREMENT#4) • Minimum Requirement#4— Preservation of Natural Drainage Systems and Outfalls Natural drainage patterns shall be maintained and discharges from the project shall occur at the natural location, to maximum extent practicable. The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters and down gradient properties. All outfalls require energy dissipation. The objective is to preserve and utilize drainage systems to the fullest extent because of the multiple stormwater benefits these systems provide; and to prevent erosion at the downstream of the discharge location. Refer to the reference manual for supplemental guidelines and additional information under this section. This site naturally slopes to the north to 37th St. During winter months and after rainfall,this site is very saturated with water and runs off into a City of Anacortes drainage catch basin. fS s,1-01 a(— (-..oc 0tJ Version Date: February 20, 2019 TAB 5 (MINIMUM REQUIREMENT#5) • Minimum Requirement#5—On-site Stormwater Management Project thresholds that trigger Minimum Requirements#1 through #5, shall utilize the On-site Stormwater Management BMP's from List#1 for all surfaces within each type of surface in List#1; or, Demonstrate compliance with the LID Performance Standard. Projects selecting this option cannot use Rain Gardens. They may choose to use Bioretention BMP's as described in Chapter V-7— Infiltration and Bioretention Treatment Facilities to achieve the LID Performance Standard. Refer to this section of the reference Manual for all Feasibility or infeasibility Criteria. "Is this project Flow Control Exempt? Yes(Yles1No) (See Appendix I-E:Flow Control-Exempt Surface Water). If yes, provide reasoning from theapplicability section of 1-2.5.7 Minimum Requirement#7: Flow Control). If No, then the project triggers Minimum Requirement#7 (1-2.5.7) and possibly Minimum Requirement#8 (1-2.5.8). �? iS ,hs� isu,.{ dS A 9T7. All sites are required to utilize BMP T5.13— Post Construction Soil Quality and Depth. For each surface, consider the BMP's in the order listed for that type of surface. Use the first BMP that is considered feasible. No other on-site Stormwater Management BMP is necessary for that surface. Feasiblity shall be determined by evaluation against: 1. Design criteria, limitations and infeasiblity criteria identified for each BMP in this manual, and; 2. Competing needs criteria listed in Chapter V-5—On-site Stormwater Management. Lawn and Landscaped Area: • BMP T5.13: Post-Construction Soil Quality and Depth. (Attach Detail in Report) Refer to this site for requirements and specifications. All projects are required to utilize this BMP. http://www.soilsforsalmon.org/pdf/Soil BMP Manual.pdf See below for the "Model Soil Management Plan for BMP T5.13" to be submitted with Drainage Report and Application Material. Version Date: February 20, 2019 Roofs: (Provide feasible detail and maintenance and operations specifications in the report) 1. BMP T5.30: Full Dispersion Feasible\Infeasible If infeasible, explain the criteria: Requires native vegetation on site and there is no native vegetation on this site that would allow dispersion. Or, T5.10A: Downspout Full Infiltration Feasible\Infeasible If infeasible, explain the criteria: Minimum setbacks shall be 10 feet from any structure and 3 feet from a property line with 3 feet or more of permeable soils to the seasonal high ground water table.The water table is as found at a debt of 6-18 inches and above the 36 inches required for infiltration. Full infiltration is not feasible. 2. BMP T5.14A: Rain Gardens Feasible\lnfeasible If infeasible, explain the criteria:The depth required for Bio retention cells,swales, or planter boxes with engineered soils and holding depth is greater than the 29" plus 12" separations to anticipated water table or 41" requires. Not feasible due to the water table found at a depth of only 6-18". Or, BMP T7.30: Bioretention Cells, Swales, and Planter Boxes Feasible\Infeasible If infeasible, explain the criteria: The depth required for bio retention cells, swales, or planter boxes with engineered soils and holding depth is greater than the 29" plus 12"for a total of 41" separation to anticipated water table available. Not feasible due to the water table found at a depth of 6-18". 3. BMP T5.10B: Downspout Dispersion Systems Feasible\Infeasible If infeasible, explain the criteria: A Downspout dispersion system requires a vegetated flow path of at least 50 feet for splash blocks and 25 feet for trenches to a property line o rstr5ucture. There is no room for this on the property as developed. 4. BMP T5.10C: Perforated Stub-out Connections Feasible\lnfeasible If infeasible, explain the criteria: Perforated stub require one foot of separation from the bottom of the trench, Minimum trench depth would be 18"plus 12" separation for a total depth of 30". Not feasible due to the water table found at a depth of 6-18". Other Hard Surfaces: (Provide feasible detail and maintenance and operations specifications in the report) 1. BMP T.5.30 Full Dispersion Feasible\Infeasible If infeasible, explain the criteria: Requires native vegetation on site and there is no native vegetation on this site that would allow dispersion. 2. BMP T5.15: Permeable Pavements Feasible\Infeasible If infeasible, explain the criteria: 12" of separation from the bottom of the lowest gravel base course to the peak water table is required or a difference of approximately 30". Permeable Version Date: February 20, 2019 pavement is not feasible due to the water table found at a depth of 6-18" and unsuitable soil at 17- 19". Or, BMP T.14.A: Rain Gardens Feasible\Infeasible If infeasible, explain the criteria: The depth required for Bio retention cells,swales, or planter boxes with engineered soils and holding depth is greater than the 29" plus 12" separations to anticipated water table or 41" requires. Not feasible due to the water table found at a depth of only 6-18". Or, BMP T7.30: Biorention Cells, Swales and Planter Boxes Feasible\Infeasible If infeasible, explain the criteria: The depth required for bio retention cells,swales, or planter boxes with engineered soils and holding depth is greater than the 29" plus 12" for a total of 41" separation to anticipated water table available. Not feasible due to the water table found at a depth of 6-18". 3. BMP T5.12: Sheet Flow Dispersion Feasible\Infeasible If infeasible, explain the criteria: Sheet flow dispersion system requires a vegetated flow path of at least 50 feet or 25 feet for trenches to a property line or structure.The driveway is proposed along the west downhill side of the property line with about 10 feet of property line and makes this option not feasible. Or, BMP T5.11: Concentrated Flow Dispersion Feasible\Infeasible If infeasible, explain the criteria: Like BMP T5.12 flow path length of 25 feet for a trench before reaching the street. Not enough flow length for flow dispersion. If all BMP's have been declared infeasible to the project site, then the site is subject to Adjustments (Section 5) and Exceptions/Variances (Section 6) per the City's Phase II Municipal Stormwater Permit and the Anacortes Municipal Code, Section 19.76.040—Stormwater Management Manual, Item G —Adjustments and Exceptions. The review type is considered a Type 2—Administrative Decision, requiring a 14-day comment period, per Table 19.20.030-1 — Review Classification and Process Matrix. See attached document. tWf-21/ Apprve nt Signature Date Version Date: February 20, 2019 cat( City of Anacortes Engineering Department Attention: Steven Lange 7+ 904 6 h Street Anacortes,WA 98221 C'(} ' www.anacorteswa.gov Request for Adjustments and Exceptions/Variance To the Stormwater Management Manual ...If all BMP's have been declared infeasible to the protect-site, then the site is subject to Adjustments (Section 5) and Exceptions/Variances (Section 6) per the Citv's Phase II Municipal Stormwater Permit and the Ai cortes- unicipal ode, Section 19.76.040— Stormwater,Management Manual, l a—Adj,us_tments and Exceptions. The review type is considered a Type 2—Administrative Decision, requiring a 14-day comment period, per Table 19.20.030-1 —Review Classification and Process Matrix. The application will be considered a written request that covers the specifics below, as well as any additional information requested by the Planning Director. The deviation describes the process for exception to the Nine Minimum Requirements of the City of Anacortes Stormwater Management Manual. These requirements area as follows: • Minimum Requirement 1 —Stormwater Site Plan • Minimum Requirement 2— Construction Stormwater Pollution Prevention Plan • Minimum Requiremtent 3—Source Control of Pollution • Minimum Requirement 4—Preservation of Natural Drainage Systems • Minimum Requirement 5—On-site Stormwater Management • Minimum Requirement 6— Runoff Treatment • Minimum Requirement 7— Flow Control • Minimum Requirement 8—Wetland Protection • Minimum Requirement 9—Operation and Maintenance Adiustments: Adjustments to the Minimum Requirements may be granted by the Planning Director provided that a written finding of fact is prepared that addresses the following: • The adjustment provides substantially equivalent environmental protection. • Based on sound Engineering practices, the objective of safety, function environmental protection and facility maintenance, are met. ExceptionNariances Exceptions/variances (Exceptions)to the Minimum Requirements may be granted by the Planning Director following a legal public notice of an application for an exception or variance, legal public notice of the Planning Director's decision on the application and written findings of fact that documents the Planning Director's determination to grant an exception. The Planning Director shall keep records, including the written finding of fact of all local exceptions to the Minimum Requirements. Version Date: February 20, 2019 Project specific design exceptions based on site specific conditions do not require prior approval of Ecology. The Planning Director must see, prior approval by Ecology for any jurisdiction wide exception. The Planning Director may grant an exception to the Minimum Requirements if such application imposes a severe and unexpected economic hardship. To determine whether the application imposes a severe and unexpected economic hardship on the project applicant, the Planning Director must consider and document with written findings of fact the following: • The current (pre-project) use of the site, and • How the application of the Minimum Requirement(s) restricts the proposed use of the site compared to the restrictions that existed prior to the adoption of the Minimum Requirement; and • The possible remaining uses of the site if the exception were not granted; and • The uses of the site that would have been allowed prior to the adoption of the Minimum Requirements; and • A comparison of the estimated amount and percentage of value loss as a result of the Minimum Requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the Minimum Requirements; and • The feasibility for the owner to alter the project to apply the Minimum Requirements. In addition any exception must meet the following criteria: • The exception will not increase risk to the public health and welfare, nor be injurious to other properties in the vicinity and/or downstream, and to the quality of water of the state; and • The exception is the least possible exception that could be granted to comply with the intent of the Minimum Requirements. Version Date: February 20, 2019 11 APPENDIX 7 —Survey performed by a Professional Land Surveyor See Attached Version Date: February 20, 2019 APPENDIX 2— Soils Anaylsis (Volume 1, Chapter 3.1,1) See Attached Version Date: February 20, 2019 's- w MAR.2'8 2019 Nfi$J1` Soils Report I Linda Spicher, Septic System Designer (TN OF ANACORTES � �� License 5100294 KGV SPICHCR CENSE() (360)708-3004 rxF+ s o9-as-4 Project/Client: Philip Steffen Page / of Site Address: 817 37th Street, Anacortes Parcel Number: 33118 Date on Site: 2/5/19 Map Unit, Natural Resources Conservation Service: #20, Bow-Urban land complex, 0 to 8% slopes Hydrologic Soil Group: C/D Soil Type' Loading Rate2 Soil Log 1 0— 12 dark brown silt loam 5 0.4 12 — 17 tan loamy medium sand, roots 3 0.8 17 —23 gray fine sandy clay, fine roots to 20", mottles 7 not suitable observed at 23" anticipated water table at 17" Soil Lou 2 0 —9 dark brown fine sandy silt loam 5 0.4 9 — 16 loamy fine sand 4 0.6 16— 19 gravelly medium sandy loam 4 0.6 19 —22 medium sandy clay, mottles 7 not suitable observed at 19" anticipated water table at 19" ' One of seven numerical classifications of fine earth particles and rock fragments as described in WAC 247-272A-0220(2)(e). 2 From Chapter 247-272A WAC: "Hydraulic Loading Rate" means the amount of effluent applied to a given treatment step, in this chapter expressed as gallons per square foot per day(gal/sq. ft./day). j r • D1 mur .t 705 617G07 a1�a • iC 1. 1)U6•'!?08 ;35TH ST 3:;TH s'T r101 # 920 06 :,•1'15 x)C�,, 0'. rr r r� fU t•- a , , :c 1202M4 : .1 35TH S'f 35 1= :11iTF1 �� C`AVEd T t S S 17�t3 34111 Sl. 3�1.1 t 1 `'t 3`• t F I 3.# fl-I tiT �.�-Tf t L:l' 1 [E ; 1'('1e-1 1 3 20 3415 7 •10 & T t ST T ,A E 35TH T �- 6.12 STREET r� S03 35'1 H ST 3 5TH ST 35 T€-1 ST t� A�%E_ 0 AVE: .`:Ti l + 918 90 x t3�'?.. C�ti2 :i5•t'I i I 702 ;i51-I( S'C 3�►f'`1 Si ;i ST t t35.11.1 ST :35TH ST .�5T11�T 11t} u1p )a'i8 51Oi RP 3,� 1 1'?l1} 1201 't'#1rs t (iJJ It}1J STREET, jTH ST ' ' S 35111 sT 35T1-1 . T 4 c-0• tii C1! ,�" ) r �;' 3 i f H sT 3.�fH 35 M 11V r >! , 35 4'' . . ,�'t t't S 1 :5T i s5TH ST ' .ST 'c , 4 . GC)A.4i�IC~Fi(,tAt.f\1 907 r t319 all 8,05 • j, 1- rG'19 STREET''�'H ,€�rl, L T ,3.�T1-1 �• o:� 111.3 3504 STREET 1015 c ,_ 35Tt-1 ST :,1)r S 1" 35T.H S i :is:II:.ST 715 ;3:�U1 S•i' 351.11 ST 601 509 12123 1202 35TH ST CJ,A1V .5 • • .,.1a9€)5 903 35T!( S'1" 711 :ii?Ct 1 �,T t�1: ' �- 't3TH �;l" ��f 1ST 3:5 rfi-s-1" ._- r 3a Tt t T �,6TH �l 35 HST {5TH'S 3.,7�1 ��T 3 I1 $t1F> >r r r rt1L)r_ r' 1 r'12'i 1 1 :j.i f,•1 Sl" ,,0,, �0'tA ''f17. 36T I ST 3:)'>U SAV 35TH :35`t1-I :;T 3�)Tf i 1 . low �,,• )t• TF1 , - C MMERCIAL A•Vrt ;c±. . , r>1U .)i>i'1-t �l' �PA, 1( �"�K '_ `�'t' i1t 'it>Tf 1 . 7 �� a tin. �,,,, S!'1:EE 1� rn s} ! t� ) _ ',C it-i 117flS ; .. .3515 U AvEldUE 12'19 Q' , t ''zyl.:\,' _t: 001 T AVE t�1UE 36'f!tE;`(' 1.;1.i ',�•�(,s v�A ,�;,, ' l SCTN ST t iiJ 1 c� 1^ 36TH 5'f SrG I t-1 Sl' 605 :•i'r3°5 ;607-3t609 :; ; ,, • I , 0 _ a__,t:-19 .b ,.- ,, CC�I�:If�11.RCIAL AV „t•3 �,, L ( rt.r 1?_14 6TH C c It f ... .31, '!' , 6T,1 �,1 AVENUE R AVFNUF t r'r,= 371't I �.1" t?XI :.�s t`` "�''1ih 36Tt{ ��T1 EET yr 809 801 ;3€300 162C� 1 ,.erg K 36TH STREET �' .•�T 1I 5T 308 3 .. 5lr,VEt�1l1F (i€)2 9�1I CT4-i € NA d kJ. REt'T 3612. 37TH rJr 708 .- 3�U c�i._.37T)i ST � (i 16 :3'l'Tl t ST . /3)5g' '�, . 1'111 Cta(vti��1EF�L:IAL AVE. :,rTH �_ )i tCti 37TH S1' 7'fr� ;c7Ti i t3?v 618 ti . 37TH 1ST 37TH37:T1i ..•f r. $Ta' ` 37TH{ Si 111.3 919 37TH ST .�f STREET �7T'I! Si 3/Ti 1 `�! �i2. 1.� 1A).1 j1AV 4* F1 Si 1 t1: 37TH ST :31'11-1 >T 9° 015 ± . ,.._> 37TH � ..�44." 11'f 7 37"f H ST 37t)-# ,-, t I .�71'1-1 Tl'I-1 :;T h �1 T 709 C� , 1:. ± r COt 1MEhCIALAE 3 I I 1 ; T 13 1? SU't :3t�'1-1 Si , 'c)i:� 37TH ST n 1'1; m- t, 37TH ST 1204 '- 3705 '1'10d COMMERCIALAJ './ t5 1• 81 I 0� 9 37TH Si 37TH ST ,.. 37TH ST 18Tl f ST 1�A f :.-.18T 1 `T C01G9ME1 C1AL AVE e71-H `;r 37TH ST 37 � 1 8-1 G Ica u�t7 a t t C,(1! 121�1 t t'it)t3 1006 •10t)2 3i0f3 '�. 3715 802 •' !12 3 7TH :ar 37TH ;r 60.4 :37'i'!-t ST 37TH .S;'T ?' T t-i �,T r 1J :3�i TFt .s f 3F311.1 ST COMMERCIAL�,L f�\!'�� C<t I\it 88 Irjj S' 3T(! i Tti,� 3u , NNE :381.1-f •iT >..' 001'1-3 1 41 j t i�tJ ;3si t•! :�� 1(lfj3 :tirtil �'; 38 H ST .. (31�1 bib >1�1 50l'i 1 :380'i 110,3 1165 3•802 38TH ST 1t)1)1 CC)MMEl�tt;l tL-AW- -18'T 3`i I S't' R AVENUE • . t,,:, 38 t H •�1' J6TH ST 36T1-i 38TH3B-In-1 Si' NAv '8TH sT . 38 IH ST 0 AV[ENUE 3802.•38T1.1 ST 3806 R AV 3804 3805 STREET STRI'Dt't 3 802 3805 1'107 1103` COMMERCIAL o ()AVENUE 380) c 03 SkV SAV; 701 607 601 515 N AVENUE- hl AVC• •38T1-I ST 3817.1 81' AVE:Nt1(= ''808 w i 38.10 �8�J5 (?NE {fi'111 ST 35n7 3£',Tt-131' ti (c) ;;f l'i 1 'r _, ,_ ,�dU6 :381() COMMERCIAL RCIAL AV t:.!A\f 3812 / r. r .38Tr I .•! .,c31"1.1 :,I f, 0 AV 313.10 S A\ EI)t 1E 7t)•-) 30TH ST f:;17-2 51S 505 0 AVENUE 0 Av E 3805 • a01G fZ AV(r1•41.t1 8111 ST `t 3806 ,3 ON CONIMLR(::IAL 38.14 �•AV C-08 381 ti ST ;UT, 30TH 1 S"i' 381115'i 501 1100, R AVEF,t JE :t�:1t3 :�1t3 r, (�!1tVEl�ll.Jl :3Pt)!) 111ta AVENUE 610 r: 38.11-1 ST - .38'1 H ST '�$`IG 3b11 �, i_l)(�1�V1E 1rV s 38.15 • ` f I.9 l%\'lEW LONC,VIEWIA' 8 ` .,At! t y 3•)TI� ST 1l.�1 3t31�� r 1,0NG\ E AV AVENUE 3902 112c3 r ti Al Iti AVENUE t,12 �. 416 n, 39oo I I/�k, t 1J 13 E..Clftf(l1€�I?C;If=,t..r\.4' r :j82�� �1F�NrCIJ� • t_c){Uc,VIEVt AVENUE L.t�NGVICV\r 38.�C! .1t310 720 3c^,25!.c)Nt:,\11EW _•. HILLCREST DR t�illVGt AVENUE 1•t05 S AVENUE PLACE ,s 15 =11ti AVEd • ; +i!r3,V • t+ . • R AV LONGVIEW S AVENUE 11'til 1_oNGVIEW AVE 3KJT1 I S f oc f-11t.Lt:i�ES'f \\\ :3�'.0?. L�:�NGV1E W AV A\11=P�UL tc715 Ciyt]6 3001 ,3y•{U �3JUc, 603 390 N AVENUE Lt71�1G\rlf l�l 0 AVENUEAV ;iT31J.i t1Vl�t�tUE Vlt �tV , )9t3t3 S %1�lKiJS C1Rl/E ��` 1201 1U t9 .. R AVENUE , t.Ctl�lLt ,�rltNltU:3 •,c r c Li (_ONGV}E',f'1 Ay L oNGVIEW AVENUE 3910 39`11 }L�t2 I L/�V tic}14 •� 618 PLACE PLACE S1• JKIJ,S V'\ 390 3 •,,. s:)U7 S f`�!► .NUE: t;2�t. I Ilt_L.CrkES'1'L?1;, h 14AVF:NUE 1120 1102AVENUL• C1AV t, cl�,\f RA\' ti'l�3 :� t-1SLLC1=:E51',�K ;i0l-P[�\Cl -� c� iC1(��a Si3920 , R AV 3916 3911 1�IL.t.CRE ,1 DR 1 , (t 120 . -KII G ST 7. r 111LLCR(:•;1'[its <<12 i 11LL�:f-.ES7'C�F� t�'-{) i �;007 LOI�GViC,rV c 39193:)#Y COMMERCIAL. ;?,c)r0 •`• 3�3ik; i!:3it' t\! :,.4t1HILLCREST DR t ,'f 1.) (_1 AVE1�1 E .41 ' 3918 .1•. HILLCREST t�C� NAV I�VFNIJL•: t•121 KING S I' -'ON L?�l' �r Cl t»/ C:AV ..3�1 f S A1r[:NtJr•. • h, 4002 , -400 IKING.S'1' 1113 '11tt'j (92�jr _,�. t t i AV 3920 39ZE�,. _ 615 _ ASft;1r{`, 1-'I_r�,C.•E: As t t'1_r1 pi_ 1 i�+ci S t 1\It�!<.� ST �vF+9f�1L1 t ..lA_t1l $AVF1�ft !It t 111.i_t:r;t S 1 1.1_t�l -t=_:i i L':t; 1,'t December 19, 2018 1" = 300' Legend 0 165 330 660 Ft Tax Parcels 0 0.05 0.1 0.2 Icm Data Ai curacy Warning: AtI(3 S cta1a was c teateit from r,vai(ah!e public records and 1 ; County Boundary oxistnD map sources. Map features have been adjusted to a;hiaie a best-fit - registration.Wnilo great care was taken in this [recess, m::ps from differcr,t sourced ,....- rarely agree as to the prcc ss Location of geographic features.Map duscrepsrcie5 can [_-_ ! City Limits he as great as 3C0 feet. Copyright 2016 1 N!1 1�r...a. ....�- '.s� � M eferes !l ilea/41;eit" otrez tai ne.-.0• "teas c it -,d 4( C.t.4. 11 ..# f tS Yl , ^t�4j. v Y f.t :Va•il • at •;.+.-44'. 1 �., n ./ 6) 1 .. pl. •CI I I ! I SA fi'llliS A crl i •► S r i ,r igii 41 tk, t 1 440/ I I • .•.,firA , PK i efl: t r ft t` ia__airat, - / .M�lJfr'. . _r ."'�.1"'. -• - -- ..r• r - - -- - - .. _ _ - t' IV1 ., i / d' • f . LIVICI. isw O S GNER ; i 4../ ' ; ORES 09-29-W 37TH St• ., , I elm/waftate..... +..ter. +airaani• N__.+r. i ..a._.••••__ 'SS'S ...... ."... .......91111.6_ ar.+•-••• M.i.+r. weave t-rw✓_.. ew.+.f+._ ea-wanly _...Meer +!' 1 — ovorA.._+s. rs+c� 1. uO.asr.r. � ...ti.r,,....r. �.- " . . . . . �•'_"' _..- .;�-r•..-.-�.-..«w. -•...._-..... .►.w..ram-•-- -.Mr+y'1....- ..---ra .-.. . ��.... _ -" • .. .. �. . :.. ♦ _ ..r....,. ....+w-Term., r ria .at'..:rr-�.•+ ..v: ✓- -�.... -.� _ ..s.' � . r� •.. M,i�a • s ue^ !'+."`t_% r.'w�a~r -r ram"+.�.. •. llw.sw�N ..-.�.r Veer. .��•O .r,p+.rr.�-.�..-.-� . . . :fir. -... . r. � .. w«�...._.=-✓i.r. •-w mere'. �+�--.s_:.... �.IR .jS� $ y , ,•.�. ...._ m•.on _a.. ._ _r ay la �. - .._.r gar . .•• .S- s -. .+. V —._ comma, V '< ik • I ` I s l % Af i ' •. ...... f -Teem _ - • •_•., - . M...... _._.. . _....._..,. I ....je111031j el � J I... '.. • t: Jet•,- ...• " ;,.. 'Ns.... itt-aci .- . \Iv( lit, il es Cif iiiti "I 1,3 . t �'. %f , •r • i f ..._..,. . -3 t 1 i t 1 t f; I {... 1 ry� ,,..,,,. ..„. • r ! {. 1� �� tI I 4 . L. 1 i 1 t iT :--.-' Li) ri,...fi„ 1-6,..Anse. 1 1 S'Lf-) I: J J co '' ` ' I iI _... ,..• .r . < painsanairsans•-30‘bot 1 . 11/4 ' .... a••• ea a-a•••--••••••••••• •---gm-4- \i' ` 4I ^ - — mega ,--, ..,... ,aver. •.n. r . ay.. .mi►rr ' ♦ ••••10 .a•.... ._sw.�.r► ......►-..�. .rr...r__ ..arvY—.. .Y.MiwM.•. .r...mN..._ .e.._ ..�.... . • . _.a.rr_....... .r- -U- R..Ohl..r.✓ •• gam e-- IA* • •_r —•w �...rar_ ..w.__..� _ H". 1 ihnl Z. • _r. I T.. 1 1 CO l : I 1 I ' • f Soil Map--Skagit County Area, Washington f rt (817 37th Sireet) FZ El- rY3.7:Q 63470 tl2aJ�) •LEC'03 i !(Q Ei'9/' fl 5277 r ..• I a-�•q .•, f�e . .:t .r . ♦., . r • ' !1 .. ♦ + .r i• f7 t. - t ,llJ• y . �r-. :<�r. .,. . I :PI rA �y L, . �J I-I ,ll • t. n 1/4 ! • 1[��'+ t i 5 NI p '� . -�� a • J • .-1,, t1!4 P. •�. . "'tit. <v • t 1 1- • 1• JI /• } •'.11 .t_' 'f a 4 a< • ,r r ,,• i - ` a-•• „ • lI .•Y+ In..„:, _ R `\ 5 P 3 if,Ir' 1 + dint IL • IY YYTiJ 1 . , I l v • tl � a R._y. tS`�21 '�p � i •\� , ♦ •jLt �.F�:. �.}I 1 t ' ti. (Cly• r ` _� . _ `i4., 1 •• 4..,J1, . . r I,i: 1 •., w', ..r`yq. •. ,.♦S^ 1 _s.PC'll • •;, . • Y , ...l� ,1 I. 5 - :.4y� Y_ ,i�: c , i, • . UI ` • _.. t . ` -,5 ' 1 9, Y 1 . rr -y..y g .. i ..i.gr.. `t .'i 7..+4.1• I , 1.• ..cy • . 1 1 .1 1 •- .., . •+ i .'` ti 1•- 1 ` o :rJ , i J -l.., :1.1.1....r i w''••�i"„•��+�• � . .a J'. _"I r� ,i r' : f, ". 1, ' ! . s`j. r,( . � .' .•• 'a t"-rr.J,; ..;,Yt. > + • ..� , / ./•. Y .[ • 1 . •,0 •_ .el:: ••• • 1 4 . - it, .< ♦" -^'1• •' :11APtet A• ri t. `� 1 4 • •` 1. r l �N't 1 ,1t- F'.1 _J .t _ 1••s . - - • i ` t 1V ], _ .t•. 7• Ql-�S� � J ♦tt • 1 •.•4 • •''!1 �4:� . $�2,i[�..1. df .` •.L ' I . . . .C.C� �. ^y. i_. .9, t•1 1 . • yi('•'.. Il<`[i rI•t 1 •`'•,• v •1•r 1 4t- , . t•T''1`, a W�, r yi' v ,♦ �1• Rr^' � I./ y• 't 4 fj r Kt.,. •.c.3 •~ I: •l 5' .\ R :riyl'i I 1•. }'' tii; �v1 �b Si•• .J I ' • • ' i•t ':i . t , f1:' --f• it' et i itte -c p.- +- _ � 1"f�yIyI.� r •1 t<' i .-- - • ./�. �, ♦• r,,r_it:r L�KJ4.l jj 151. !'. i" '..' S X•eZ,r.--r . ,'Ve; --, 7 � Cj.. • I r- L, 1 1 _ 4� . jt M :•:. •,i�v4 s}, - r.•. .Tpp J1 <_ J(. 1'}.nl12 �•:' . . ••l. ^ d l' .iJ..�1. . A !1 w. .'i�, 1 •t f: a . 1 � • ' -,•an < ! e, � •y >... - 9 �•!S,� � vY VtH�: i•. � it t, `- ` t :aa = ':Sl�.. �.• -• � ._ 1 ' r ' Of if •. 'I ri P' IL ! .. } . • 1. , > 1 ' frP � Le �• jf < . 1 T . x� .d�- �� a a'ir.,4 . ���••�_+� -f��: 4.. � . .� ?,. fi '1 i1 r1 : , _ 1 1 i. 1 _.1 ' a + a Lfi. 14. rT•. V7. _ 4 Z. !. •+\C•e. i:1 A lr,. • r 1 te- -•.. •tl ..... '' ''• �ikrk' 1.} °• \ .1 ( ♦ •- - y • .1. . r• 1 } 1. ; - � ' 1 t S 1;2 : . Z>' P >. ,_ir. k4•y. - • ' . -.,31_ 1•. ♦: e' t, F [ a 1'. � . µ - >n . • .a .. a . > � , � J >• I♦ .�K v ' ,.• A. . - - "• • r .ai .a. 1 . - - - ,j• rr• ' u J . o •-'� -11•,' il.y���J•S ., , • • ir' ;N� ,e.,� . - , ..0 ,7'1K f� ♦ t r 1 -1i . 1� _7% _ t - ' y� AJ • i. . _1 1 . Y )) 1 -Y . . . a.: � !'l:/ it .�. .Y � ••. . J `1 . 1 l 'e pp.. Z Z•. r . '1 :e • t. l rr t•J f. 0' s 'k 1 � . . ,a,.: i . : . ,,1+r e • ' F �. r � v; • ♦ � d- ' I. ,t ' rat ' 1 rl •, • . 1 •. � ♦ nM .0 t . l •TT may, r. . •' 1i. - ) • ,1}�,r IT l•. •5 �.1•. jt�5.. .t 1. . I vt' • ; ' }1v". 1 . L .. ` • _, l • .�Yl ,� ,•a 9 r.. 't '+ •1 :7 +' C 1 Yy f r _f. .\. t r • .i.' . . - r`. . r. '11 1: • (! - t . n .IT• a! _ •.3.+. -p V. '♦.)� t -_ 1• '.t•c.. . . �r . . r%, .. - ... - . '1 . r� }� •r, ,! Ca. ; � If 'jp1• • �1. / ( {11:� - 11✓I�i r�..1'.Ar /I � . 'f .C•• i t r . / a ,� T,j i • t \ '...)r, •R -. Pj� 1•. I ' l" .Y / .r • {_44. r .I r' r 11 �T4 1 + • � • 1 � , : ♦ (� r'1�. T • .. ., .. •5 . . r � '. __ _-._. •yr{glib •�. - .L..N � �• t ♦ ✓,1 ' 1+11Ji IC••. •! Q�. • 3‘14.1- kfc • • it V) a - ? ` r .r ., - i(• '... • la , • en lfY1C�+r3T!•s1 i ' ce. i '. .. ,�1. { 1•.'J , may • J. •- ." SI : 1 ``J;1; •J 'Vi` .a9lr� yl5_ JS!�•Ji �.- tz - .11 1 l5f . 1 it • Y . , 4`1f 1�y ` a I '7i V-< r 1. 4 S l•: e••TT 1 1 t_, 1 ••it;.i ilr �.� -1 • 1 -•1 11>tiG > •. •1 .` i , • i .{ , ri ^ I H r ; 1 -.. • • .t ~" r : u�Jye i ♦ r -' I : - _ 1 ' i )p . • •1 • rt •I , 1 , r- •,1 �� a: 4-'. i-• * •. . _ -_. . _. ._ sue• • - ` M -• - •:r'.-? �'_s _ J.• r<y��_� 3V l�.Y' _ • _.. . , _. - .. . . .• . 1 Ptrr --• ' I1 ` t� (A ! rf: ,{ 1� f , a {•S r� i• ..y i r: • , . I i• f > •ft i I. 11 P I till.I. _ t ./• • tt , r•'• '1 \ . r r ' 1 I '1 I _(, • 1 : l \t r1. � t1�,1. - ff 12° Y .i !. ..�J N :��,-x 11 J _ J ; vl 1 , t ••q 1 '.t 5 • Gi I , `1 • . . tt . :f, 5• : Pf:A r + • -fyy y� • j'. -;;I• -•• / �:;� .ii %,- ...1. ..,11 z-- 1 •-f `� [ .' b � . r ( i„ r .�}i'1:71• .5� ' J r �. .2$• •1 1i• - 1 • t^ ;j"°:� >{.:ti.•uv 4 r • _ i • _.24.,i: _ r :! : • 1 x i-fYt:S,jf, c• t :� _ f FKIi' pt>;. //�� r: • . 1 r • 1 , • (. r r) . •' IllSi,1'4! t t r• ' . ' ' - : f t -•, } r.:i . __I• •`' •i 1 . '7- TJ[ I t ,q - r• .i , .J-� - ' • , x: ` it• 114 • •}I .. 1i y: 1Pt .31 t .�: ' -r:! • . - - f i -,t. • 'J �.�. � } �Y f. � r• .., • � >S 'rb ttti> cYY}; . • 414 F�i ,:iilt {r.cl � ► . l Pr" , f♦ � .. �' bI•' 1J: i,tu-T . .�. �'. 11 l • [1J+ . . ,� 1 .�II_ l • 1 � 1. :�1 t_: �.l • ��•y li. 1i r:' 'f:' • r ? w �. a i, ^IJ . ?t 4 {. 1, •! ' / . e. p. rits - - i. Y :'• " :I ';ri •' IJitjf l ! _. /'♦w . .it 71' 2. ' t r'�Jc A� d - ...1 t I .1 {{ :y�.i • r '. .ii - a • • I•lt•7 ,t . • 1 g� ..•7 .=.. rt.? 'i •� ; ry� ': ii . i C� - ' n! •.." . it. . rt: �y} t r tJ . ' >' }y. . 1�n• r...Si-I1Iv' .• ?•iY.;_ g 'y.• : `�J ._rl '. t . i1 It 'a r -S. r1� !.. C] �I).. ? II ) f1 :_ 1 11 a: 1. ac -}1.' ••"�:f_•..`,ti . •_f`' l ,.�r l ••-! ! . Irk. F 6. . 'j Y Ci; 'a ._ t �.1 • a ' . )•. .1.' �,;,-b•.n • +'�•'• '• :1-., r; s + tea•• �+.,j 1y/ i . J : C , . l�"C•• _ .. ~, . .I. - • •-.) 1 a•• •t•: 1 i •.- • ,2 r a- I •RR • •r• v *cif 1. 'r 1:%. Tyrt ' .0 ' I ' ! a 1 1. 11 r r l ; i . r ' t.'-! IS•r 1 -1.1 ....i. /._,w1il /l _/� })T-([�( _ [" •a...�l i'f.. yJI l ��ii , 1 • f ' l . _ ♦ . 1 . ! ' .({1-.1 - 1 ` r �I {•. o • -• l •'.' ' • p. SA.: . • •.F�-4 et. 1) •4 'lam � IwIT`• ' I✓ J lT r ' •(••1 T l, / it, • • // .rr •1 .r - ,. ftt . l l .�i,.5. [VIt' ' S. Yi1( . > J !.r .. < r� r. t y .'), . •) w•Jr ,•ar•t•. 1 ( . _t' '� r: •' ., '•''� �1 •'!_ -•_ •1 � r ::}. . e . . x.4: ' •t , . f. . 4 ..? l.l; :: . '5...• v y .i 67 r-� I •.4 Nrl� : 1f dd , , t. -, -j . - • ' :•r^Ia t k J ' 1 r• -.I .Tu .7T 141. i .•'7 J � ♦ . .r 1 -Ii� :C r�'4::L� L .i.if*"'.)'�_�•il`ll /f nf(.. _r.1� ir •e. . 1 1' ,< •1 .. t , " 11 i t•-• e"'�,r.. fe i: • 'r ' ! _ :'.'i �; ,1t •15. •: .0-0i r< .10 :tr :. t� > v,• r. :"+> 'f .a:•/ n -9 .>-` �. } t lt 4'7 1 .1 , i . r: :�. 1�{ .1 _ . l .cl Ix f �..�:z >! • . r'.rJ_ kV', S7:< :i,5'• . J✓� :L 4•. f-P •5 s 1{ X .' � 1i (`.4'fi'\� .• :1. O. . ,l: tr� q} ( -1 �5 .1 : '\I. 1' . • it. • iv"Po). 'IS., • ' ;�?.i. tmg •.. ' • . ;,. ! `.�" •: r 1� •�'�}+t N.L?J .11f:� ..r .r.Y .`� �.�'. ,•i: ,J rtik ttyyi ��f1 .�/'ern . � � -t"1 F �. - 4t Rj• �.1:rS� v}: 'L .; c.1 . t. .R1, r1i 1' - •Lc • .. •' . . �� . '•r • ,r '„l rt ':5:4 ,1`(: ` i 1.v!Y �' �-• �i 'h�•' ---- tj • I'v�.t, � , ';�. t• •I I'• r •f•� .a` ._, ti .•, • 'dr v`: 151 .{j• �., t. ,f.i : i + " '�il•' '�6C: •.•�! t _ 1• } 'y. • , - • - . . . • (dirt 1 it ,(..5, / 1• 4 U. l �-rY . -.l II a5'.�xi`•>x�rr. 5 Y 4 t1. ..J J '., 1 ' ' , , 1 . 1- � f • M• ' . - • - • Y •.�,1•.! i� i+l,C=.' '(1 > • I�y!�✓ .}: •f'- ` $'j t! tr /. . � .f ', `t � 11 i .' - 1 fart 4 '.t�J i� . xlS1J 4, 1 1- J' yJ.: cl ' - "I .i • - �� �1_• L) II .f'� CI I) I ) If7 r,r. Id �) t , I ) ct . veiled at this SCf) t [T. � .` . 1`'�. }-i , • •. fla 1 1`; . 1 • r �) _t1 �J `1j tt �1 , tyl , ! '� l '7 . 1 a• 4 : t11 11� I I .!• 1i } t 1 , l 5J 11 f Kl: • 5, t4. L .= fit ; t R d _J•. l!•. r ' 7 \ : . r t { 'r. ,1(a., ./ f �r_.. •, .1 . . � Y ..l .I A� "�. • u •. Jl: Ak' Ai ttf'tJ x:, s. 3 -. i13 nX aYf N 1 t -_� 1- 1 1 1 I I> .e �.I.. 521ii.0 52a310 .a.) f2 l3 h??:113 1.03710 %lam 52073) MIN) 5ia79) 521)7W MITT-4 526FEL) L f I h ti t to rep frip Sale: 1:626 if wilted on A landscape (1l" x 0,5'i sheet, ti` risi A «J it 05 i0 20 30 . P'sA ( r : l [�'S`Z'••-H]R•--r�. ... ._ ^"ire-eT.a�.e.>.♦._,e.". .__....�t�t183 ~•� 1� SiMop pine tic�t: 1�( ti h't rcator Caner cardilatt:s: 4'/�� liAEdge tics: tJR•i Zone ION 1;/c�_ t 1 tglr ):i. Natural Resources Web Soil Survey j 121191201t3 Conservation SetVico National Cooperative Soil Survey Page 1 of 3 4,-„ Skagit County Area, Washington 20—Bow-Urban land complex, 0 to 8 percent slopes Map Unit Setting • National map unit symbol: 2hv1 • Elevation: 0 to 450 feet • Mean annual precipitation: 20 to 60 inches • Mean annual air temperature: 48 to 50 degrees F • Frost-free period: 150 to 220 days • Farmland classification: Not prime farmland u spic.Hal NSET.)07F.KiNER. Map Unit Composition C19-2 •,,17,0 a Bow and similar soils: 60 percent • Urban land: 35 percent • Minor components: 5 percent ® Estimates are based on observations, descriptions, and transects of the mapunit Description of Bow Setting • Landform: Terraces, hillslopes o Parent material: Volcanic ash, glaciolacustrine deposits, and glacial drift Typical profile • H1 - 0 to 7 inches: gravelly ashy loam • H2 - 7 to 17 inches: very gravelly ashy loam • H3 - 17 to 31 inches: clay loam a H4 - 31 to 60 inches: silty clay Properties and qualities o Slope: 0 to 8 percent • Depth to restrictive feature: More than 80 inches O Natural drainage class: Somewhat poorly drained o Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) • Depth to water table: About 6 to 1.8 inches O Frequency of flooding: None o Frequency of ponding: None 6 Available water storage in profile: High (about 10.4 inches) Interpretive groups • Land capability classification (irrigated): None specified a Land capability classification (nonirrigated): 4w • Hydrologic Soil Group: C/D o Forage suitability group: Seasonally Wet Soils (G002XN202WA) o Hydric soil rating: Yes Description of Urban Land Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 8 O Hydric soil rating: No Minor Components Bellingham, undrained • Percent of map unit: 5 percent A Landform: Depressions o Hydric soil rating: Yes APPENDIX 3—Model Soil Management Plan for BMP T5.13 Note: Document is provided under Minimum Requirement 5 in this document it Version Date: February 20, 2019 s..)eorr. vm>.k., PROJECT INFORMATION "Model Soil Management Plan for BMP T5.13" age #_1 of_1 pages Complete all information on page 1; only site address and permit number on additional pages. Site Address /Lot No.: 817 37ti1 St Permit Type: Single Family Residence Permit Number: Permit Holder: Philip Steffen Phone: 360-853-6500 Mailing Address:_1314 27th St Anacortes, WA 98221 Contact Person: Philip Steffen Phone: 360-853-6500 Plan Prepared By: Philip Steffen ATTACHMENTS REQUIRED (Check off required items that are attached to this plan) x Site Plan showing, to scale: _x_Areas of undisturbed native vegetation (no amendment required) x_ New planting beds and turf areas (amendment required) Type of soil improvement proposed for each area Soil test results (required if proposing custom amendment rates) Product test results for proposed amendments (should match Area # on Site Plan) # 1 PLANTING TYPE Turf _x_Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: _8180_ square feet • SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Topsoil import = cu. yards per 1,000 sq. ft. Amend with compost X ,000s sq.ft. in this area Stockpile and amend _ = cubic yards of amendment -> -> -> -> -> QUANTITY: CU. YDS. ( cu. yds. stockpiled) (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil & compost lift X 3_1 Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu. yds. stockpiled) = cubic yards of amendment --> -> — —* --> QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch -> -* -> -> -> -> QUANTITY: CU. YDS. AREA# 2 (should match Area # on Site Plan) PLANTING TYPE _x Turf Undisturbed native vegetation Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: _1000 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED _3^inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Mulch mix topsoil from Topsoil import _9_ = cu. yards per 1,000 sq. ft. Sunland x Amend with compost X _1 ,000s sq.ft. in this area Stockpile and amend 9_ = cubic yards of amendment -> --> --> --; QUANTITY: 9 CU. YDS. ( cu. yds. stockpiled) (needed to cover this area to designated depth) Version Date: February 20, 2019 CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil & compost lift X 3_1 Amend = cu. yards/ 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu. yds. stockpiled) = cubic yards of amendment --- -> -÷ QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch -> — -} -> — QUANTITY: CU. YDS. AREA # 3 (should match Area # on Site Plan) PLANTING TYPE Turf Undisturbed native vegetation x_Planting Beds Other: SQUARE FOOTAGE OF THIS AREA: 400 square feet SCARIFICATION inches (depth) of scarification needed to achieve finished total 12" loosened depth. Subsoil will be scarified PRE-APPROVED _4_inches of compost or imported topsoil applied AMENDMENT METHOD: X 3.1 (conversion factor, inches to cubic yards) PRODUCT: Three way mix topsoil from x_Topsoil import _12.4 = cu. yards per 1,000 sq. ft. Sunland Amend with compost X 400s sq.ft. in this area Stockpile and amend _4.9_ = cubic yards of amendment -> -* — — ( cu. yds. stockpiled) -+ - QUANTITY: 4.9 CU. YDS. (needed to cover this area to designated depth) CUSTOM AMENDMENT Attach test results and calculations. Topsoil import inches organic matter or topsoil import PRODUCT: Topsoil & compost lift X 3_1 Amend = cu. yards / 1,000 sq. ft. Stockpile and amend X ,000s sq.ft. in this area ( cu. yds. stockpiled) = cubic yards of amendment —+ -> —* -y —* QUANTITY: CU. YDS. MULCH ,000 sq.ft. PRODUCT: X 6.2 (conversion, to give 2 inch mulch depth) = cubic yards of mulch —p -* —p — -> -' QUANTITY: CU. YDS. TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS (complete on page 1 only, totaling all areas/pages in this Plan) ❑ Product #1: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or <35:1 for native plants) "stable" (yes/no) ❑ Product #2: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or<35:1 for native plants) "stable" (yes/no) ❑ Product #3: ❑ Quantity: cu. yds. ❑ Test Results: % organic matter C:N ratio <25:1 (except mulch, or<35:1 for native plants) "stable" (yes/no) Date: Inspector: Approved: Revisions Required: Date: Inspector: Approved: Revisions Required: Version Date: February 20, 2019 APPENDIX 4— Determining Construction Site Sediment Damage Potential (Appendix 7— NPDES Phase II Permit) Note: See attached Version Date: February 20, 2019 Western Washington Phase II Stormwater Permit APPEK 7 ]X 77 = Determining Construction Site Sediment Damage Potential The following rating system allows objective evaluation of a particular development site's potential to discharge sediment. Permittees may use the rating system below or develop alternative process designed to identify site-specific features which indicate that the site must be inspected prior to clearing and construction. Any alternative evaluation process must be documented and provide for equivalent environmental review. Step one is to determine if there is a sediment/erosion sensitive feature downstream of the development site. If there is such a site downstream complete step two, assessment of hydraulic nearness. If there is a sediment/erosion sensitive feature and it is hydraulically near the site then go to step three to determine the construction site sediment transport potential. STEP 1 —Sediment/Erosion Sensitive Feature Identification Sediment/erosion sensitive features are areas subject to significant degradation due to the effect of sediment deposition or erosion. Special protection must be provided to protect them. Sediment/erosion sensitive features include but are not limited to: i. Salmonid bearing fresh water streams and their tributaries or freshwater streams that would be Salmonid bearing if not for anthropogenic barriers; ii. Lakes; iii. Category I, II, and III wetlands; iv. Marine near-shore habitat; v. Sites containing contaminated soils where erosion could cause dispersal of contaminants; and vi. Steep slopes (25% or greater)associated with one of the above features. Identify any sediment/erosion sensitive features, and proceed to step two. If there are none the assessment is complete. i. STEP 2— Hydraulic Nearness Assessment Sites are hydraulically near a feature if the pollutant load and peak quantity of runoff from the site will not be naturally attenuated before entering the feature. The conditions that render a site hydraulically near to a feature include, but are not limited to, the following: i. The feature or a buffer to protect the feature is within 200 feet downstream of the site. ii. Runoff from the site is tight-lined to the feature or flows to the feature through a channel or ditch. >,115Uo- ;kit(-)rri ;ocirr DUI �i l� r,rt�:r�1c Version Date: February 20, 2019 A site is not hydraulically near a feature if one of the following takes place to provide attenuation before runoff from the site enters the feature: iv. Sheet flow through a vegetated area with dense ground cover v. Flow through a wetland not included as a sensitive feature vi. Flow through a significant shallow or adverse slope, not in a conveyance channel, between the site and the sensitive feature. Identify any of the sediment/erosion sensitive features from step one that are hydraulically near the site, and proceed to step three. If none of the sediment/erosion sensitive features are hydraulically near the site, the assessment is complete. vii. STEP 3—Construction Site Sediment Transoort Potential Using the worksheet below, determine the total points for each development site. Assign points based on the most critical condition that affects 10% or more of the site. If soil testing has been performed on site, the results should be used to determine the predominant soil type on the site. Otherwise, soil information should be obtained from the county soil survey to determine Hydrologic Soil Group(Table of Engineering Index Properties for step 1.D) and Erosion Potential (Table of Water Features for step 1.E) When using the county soil survey, the dominant soil type may be in question, particularly when the site falls on a boundary between two soil types or when one of two soil types may be present on a site. In this case, the soil type resulting in the most points on the rating system will be assumed unless site soil tests indicate that another soil type dominates the site. Use the point score from Step 3 to determine whether the development site has a high potential for sediment transport off of the site. Total Score Transport Rating <100 Low ❑100 High A high transport rating indicates a higher risk that the site will generate sediment contaminated runoff. i. let ekt 1: C rfistruucfoor Site Sedhilant Transport ' o nfl S WorkS' heet Tvti a 4 it._ Gov * & A . Existin slo e of site averse wei hted b aerial extent : Points 2 % or less 0 > 2-5% 5. > 5- 10 % 15 > 10- 15 % 30 > 15 % 50 B . Site Area to be cleared and/or graded : 7 , sq. ft 5 , 000 sq . ft. -i- 1 acre 30 > 1 acres 50 C . Quantity of cut and/or fill on site : < 500 cubic yards p 500 5 , 000 cubic yards 5 > 5 , 000 — 10 , 000 cubic yards 10 > 10 , 000 — 20 , 000 cubic yards 25 >20 , 000 cubic yards 40 D . Runoff potential of predominant soils ( Natural Resources Conservation Service ) : Hydrologic soil group A 0 Hydrologic soil group B 10 Hydrologic soil group C 20 Hydrologic soii _ grou� . . . . , . . . . � . , . 40 E . Erosion Potential of predominant soils ( Unified Classification System ) : GW , GP , SW , SP soils 0 Dual classifications ( GW-GM , GP- GM , GW-GC , P- S111/- lvl , SW- SC , SP- SM P-SC 10 GM , ro1s . j 20 ML, CL , MH , CH soils 40 F . Surface or Groundwater entering site identified and intercepted 1 . Yes 0 the No sous usinig G . Depth of cut or height of fill > 10 feet : Yes 25 No 0 H . Clearing and grading will occur in the wet season October 1 — ljy 1 ) : Yes 50 No 0 TOTAL POGNIS 70-90 If no surface or groundwater enters site , give 0 points . g APPENDIX 5— Site Plan with all applicable information (Minimum Size 11x17 at a legible scale) See Attached - k I i APPENDIX 6 — documented Site Photos (Show all directions of the site , including frontage) i 1 I 'f .t y - i '1 '' t 'i I:: i 1 a11') "•' . . r ( . .M • w4, .i. . 11 . Utll 1 . •F' :� --.t i'.� - • • • • i -<. „ . : . 't •f ` r _ \ r ' r r f 1• ' - r •'r 1 ^,.t. _7 . j ' L fi •' •l • r ' . • 'r • . . I t`ti'r':, •. -, ,I-. - , ' irf'. . .. i yr• .',- , - Pn , I . , . .,t,_ 4 f ' !•'{,. --I I? • .\' F. r� '•Yj: -� . , ri. � . : .i :y. 1 - � �• I-I- ; ' . f ' 1 ",, •I ,1 . 1 _ rrr • ' . �11. _ •. , • - -• .j. '• . ).'. , • Irytrt . ' 7 _.,^ • _ .r • ' ' „- T '.0 z pp'' - %P= • _ - JI ' , .t-.1 . •'t! �A}... '1 ✓ , f i .f:.-•-- t' - 'Jl_1 ♦♦ �. 11• .Stil.J ). r t `,T.. t.'.' _' •L •,. - t .. � �t.• p. ,y' Y 'J',-r �. �ifk'> �. ( Z . f� � _ '� 1 . ..Li • -".Y 7 -"l _ _ �•!"f}� ;'• Y .j.' . ' �r7l,' '_ l .1. r tom- \ _ 4,•- _ ( {al' `11 ` .Y/II GF :y, •. 7- j . 'i . f, r r. • • . : 'S. r'').•. .t •..:.r: .:-:: . •: ". . • , ) _• .. _ . _. ri\ t ..L^.ice �}- ta • i . ' / l7�y.'• . .I y .. - ) r` - , I ' Pr.!l:,d' • f , - I A, I. 7. ,,, y 1 ; ;.fi • S '•• Ii .) � r _ fili' S •t .i a r J`-3 �• . . .. ai�ai '�.�T•'s _ ' I ` - r - tt ///yyy���)))(���µµµ7x - 4 J! IJ•, . ,7 ` 1 .�if j 'T .• - . . . ' , a - * .CIF: I ,•p , I r - 1 al"`T .:� - • t • .L ' • 1 , • 1` y. ,< E ' • i. i • • r -1 low • L. ' tl r Lr 1 , r i r " r.. • ■ 4 Tt r{ • `�1� , • 1 • r. / ' �� 7 ICI .tl1� srnptt(i t } 4• !�y • ` fJ , , ? r r' � - )'. f t :1✓�rZ1L .ilrf 'S 1 •• r- �..t • r • r r 1 ' '�f1� r S. l'i :1111.:‘::1111:::;t. ' r•• i1 '• - _ • 1 tii . a , , ,. \ )I p r I I 1 • • • �jY� Y •to • • , '.LS. -tiv�1 r '• .tt . - �' ' Za _• - �� II ' x. Lt •_ 1' I •• a tf, y,vl r . i-4 y z : _ _l i.. < t r� a r ' .r ti7 • ( �. b Y � v. i•, {t c' 1 I , � •� ' - , •1 .. ; l" . ♦ ,r`}Z. - .. ' .l .a n=, Q^t tl.T!'.). ,� • , , t} r 't<4• [ `.1i}P si 1 a • t♦ n.• a u c lt �,•tJ. 1!- .' R�avJi.I,' ,3.{R v • . a. ..a 1.b alt Cr 2 Tr‘'VOL .tttg f•Ct .r2 1 1 'Ilk i• 1L l 1 t • ?r i 'i .• ) ; �re°1i• { �ltTal.�.I� 1 ` '12.� 1f\?` -, `t . - -f!:` Lt,• � . firii.: : 1 " . i 2� ' • f ' .Ik' ,. rJ' 'a-t• RR r ` �5l +'Mlf.y; i �(� ' • • SF,}•_)/tt-` 1 , t, .tei 1- t: ,� . ,. • 1 , Jt.- t e• 1 ' 4 7s : 1' f !! •t•tie t T04: • •• . 411,. I _ • • . ', 7 , . - . �. .,. , El. '1• •a 1 • .at S �i • .l- . •J Yiv } .': !!) '} F;3_ f. , . tiet :tit .!t )4i• le1! b. ti � ,9 /.(r •••• ' �.,'' 1( �� S•, ` "'T ' iiikl f.I . 4. , • 7 . t •s1 , 121 . F rv, Il • . .,a_,•L. 1 r . ri • `s- f' .#�a1 li a. . r.. • r:.:• 7}- • '' t r<. It . _•' .1 11�( f hl l -"sit, ,. " '{ �• N+ it• . '. .r • �: I, • r i F` - at• . • ' I di S• '. t •• j�,t t'= '? . ' : I T• 3'..•+-.•r."�b.}''♦ t.a-:. a<`+IH'r •!` S" _ . • ` • 5 S • .n. • s �p 1' a{ � 1, _ {..r a ,t j tI ' i Sr - • 7 .. :4" .:* 1 4 4' +F. f,3 a + , • Y ' I t .P t L• } •SS �*_ 10~ .. 'r R I t :,� • • . ... it ; . 4 . • 2 • • . • . 1t,t..... ., . t . i 1 . . I " • .. -!7 . ) _ ' , . :I , qq I,, tr. 1C . - � I .22...•••yydy+��������•t�$$(y++�'+y''''''��•.c.���rr'',�,�,� - - • .• t 1 ai4 . I- 't v I p "yf. x ai YI,• ' 1 t' ] 1 _ 7 C :1) 41 •r 4 - •'• • t tilt Q 7 ' 1 it -' C-t•,i� /} r ;- r �,t{ r a ,1• i? • • ~T .f - i i - , i - _j /♦ 1^-. rV 1 , y� 0 7 • f 11.1. Q.'I' i f P a - 1 ., • • L • i'. .1;• y , c) - ± �f j,.' t .J. / Y _ IY = ru. ' i tfi• i.R' . S ' r, •Ifra.. 1 _ ▪Yy• A • , <rtic , r ` • • !! 'i • r • .)i — At < , t } ,< ' R� r n_, •.1"!`1 �1 ]' fr>;•!i ' ,a .a +, l • I. . ' r I ,.1 . _ i l ` ! . l. <. • T, .y t ,L(f T\ {) " ,.. l r ,I • .. . I .`. I- 1 1 L`"" 4-; Z •1y , ' . . 1lR ,' •.. • '' , r •Z• (t' F • it , c ��r ). +• rh ' . , n - {52 r . l _ • I{ - .c.c. y�.•i•, 4. ,1:^J •' K- • '• • r T t�-,milti:re, (<• ��-ryry,,• �•�`� •, ,t 1 J'` f :L It. M ddd ` it1;12 1 r • R__ ) is t t7 " S —_ I �" :C: r I • L -) : `` �'N _ . q � t t _A' - . (. ;. '� 1�{, • . ! 1.5(. 4J, 7 [ ir .� , �ryce -;' •tff rr Y ;L/Ji , 1 _ _ -1 ` _. •� t. +F - , f }� I• • , f:r _ t I ' fh�aY yMft• �:y.: i slir .f :X91 '}•�1� rn .'r .lT,fr J• • Tr� ] ji:.-II f'-1 1 i - 't �- • 4 ,• •. ' � •{a } 1`[ 1 I - ♦ a Ic _ 17. Slat,:'4`I„C i, 'l ,ti S r.f ire!04 4iTpr'11' * Ff{,�� K • • . - 1 Z% _ - • L5 J rr •� I _ - - . ! I - r '___ `. 'F.•n E)t }i;JL ,�.. - .El`-lcc�:" :• ' _ L_�. ..__ _.s ya , .'R9Y tea- _ - _ ' 1 . - , t . ,, .r i s {7 -5� ♦ r _r �.� _ ' r I . y _ F i _ rII'�.c�+C F1 ' I t '' f • 1 Q [�� d r_ I . ' • Ia:� r .. • IY."t`. '( 2'J' 1 r •IX` �_ Il tt • • ,i. IL � , , i •r 'e3 t,.4 .•` j)S rt"S•f —t '' t J%t I�� a > ' - '. t1' r F' a :•rl}..1�',t�.Rl lTt'. s f n. • }^r•su' t i u • . 7 .t:i; .ar$J test` .`••• •WiLY(=u-••••••:,fib:/,1`' 7 1 Location : 8- Pi / 37th St : c� i �� �� oon oar thepgioff0U Arioll ? hot° 'photo taken by SGkagolt County i i APPENDIX 6 — Documented Site Photos t. .. __ - _�- i f_ ' ea '...... r. leli I.'s:. 4. ..-.:'.17.:-. : 1: , .mp•-•'- Iri ... 6 -1.:;•• a - -..4•::,_11 ::1111k. r ,--- , , , , ___...._ ... . . , __ J "..- 1 �il{ \' . .... . , , , - -tom/ -• ,c i i • I ram _ -� • 4 r, l • 1 r ' l� `xl •; p_ .. ` /'l�,if I � - , .n"a •. • • ,,, tit ! � `�s. �h y , - . _ ' es- "�Y t�.i,..t k I �.` • • r. ` f--y - ' - , . ✓•� ,/dy ;-",.•.>_.���. , ^ t+r -' - C, r- +•i�� �: C" 2 I • 741' �, L {- •�� t } ae f41 l.:j� It I li 1. • ` �� Jl#Ili . y /sitam 1 _'= 47 • lrt�1 .1 ft [.Ylii t '� .r.- . 1 ��• r- J 11 � - - K i I • • •_ t . s -- ra• _ „� •. . . . . e+.. — • - - -. _ ' • ,-'n . tell aw r- . I ,i _... ' . ' • a / 0.. 1• ' ♦ . ; ' - ' ` • _ 1 te .( - -✓ • 1 • .l. \ • , rr� , • • t �: •I"' J v. a� 1 ♦' J• �{ ' 1 --I 1 �J 1.1 1 J 'Ix tL di 7 ) 1 . . r' f' J . • _ - _ _ , -! • 1 .✓yi iw�. r 'iT r 1' _ 1 . , ' , .i� a ' l 'i'y • •I, a t. • t. '" • - .yf✓ _ �Q M'a 1 • ,ram w.-•- - --�' - 1,•; _ . -.. :1 , - - ..�a;-:r:. - ..•' - -•� h .< i• 1• f • I . I } S t r e . s , I • - •-.Ms„•F!��++��.-: .. .- ... ♦rf lrc � . ♦• i:N. •�JI . li _FY a_, � f. ..-y •i 1 l t1 ? • l.n ' 1 ,r: 4.5.- I� ,. _- - ' '� .. A•1 .._ ..i... •h' wG '.Yr .�• • •t.�.•..a' • l •< 1 ! - 1 '•1 • 1 -.a,. :.r �. s 1 , _c 'te.: t ( . • . . • _Jt . JLVIV7 -• •O. _ - • � •_ t• i1 'LLL • '< _ LI3 �' _� _ • • _ _ _ _ _ 1 _ .. _ _ _ 2Fri _ —a - - • • • - _ r - l: • ' C' ' (_A 'I,",•• r� (' ( '. •. 1 ' •S - - • • .-Iv . ..-Ill /. , • - • ,a • a. di • • - - - .�• .per J . ! - iJ•• , j J � 1, .• 1 •a - - •, . . • 'I _ . _ ' - • 1 • • rI,-• f Ilf I1 sJ t ^I f _ - _ . - - i 1 • _ h a ' - - . i J 5 •J ' _ Locau, flort : 817 37t " St r) rr � pta © n © t �� photo . Front9 riloU 'the st VoU llle u Facang Sou t '11W05Ilt Photo taken by : Phillip Steffen I I I APPENDIX 6 - Documented Site Photos •a r a tV'r l 1 (/` / t -it I‘: 1 1.%. . a•1 f T 5,P / L . 1 ill- 44,. / _ !,} 1 k • it. - .444. ----•... 1.1.4‘. 1 ior ••• A •4,41:41.11114, • oili/.111111,„;,11r441frel jot ct • ;,./st- i •• J Y I A9 ih‘T . \ 1k ( ' A 1 /{ / .• • L • r ` f••a•` '' ' ' / ofui Al ,,4. *1 , q , * 4 tell, 94, • 'lc - 1 •1 . .(} t . . - ii Ta,,,,S- • 1. 4 in 1 1 � ,Jr(� il{ar ', .Z ,./ �i .i j,' 71 a a t\\\11 ti C . • I. r^ • ., ' .ii;l�,,<,a .. - _� _ -�_ __ _�- -.--r ~ a.. - ; ,• • `j.41 , r,. A, ..ii1.'2 a _ • • II f L ifi•I' ' .t'� � J�f.<�,•1 t.1: )/� .r�y� r r ' •., 'a' ' - - v-- _ _ J �� 'a / ) . .\ 1 : (\11, {} +( ) t 1 {. I Ij1. 1 'f w 7 .! I - 1 )- f ,l(�, a1 t• �<,'`a, •.ir,J ; • 1 ,�l ` • .L \ t ' �.4T , 1 '. •1�1/; • l � 1 ' - ,34 ? " •' ( .. ' ' J S! ' A • 1 , • Lr L �` \ 1 / �, • � 1r0 � ". / 1 a<:S{! I. \ti.‘4• r • i S, IS �.ii) i" S<l. a jG • �) '� -+ l :I,, _ f ,, '! l ' II, t:i • t ,a_ i- • •_ • • u •J I ` r�1, 2.�. 'J^a �: f� i , is� 1 I )� I�� rl3 tf ^" {,,{l c. 't��,(y,��yjKpi/1 -.a �)• _ f tT 1w•y_• •4402-7 1 .�. a5 j { vrY;lx, - f/�( ♦ .1 t'• ' y I, r f(r�.�f, N. f � f ; -/<.a� S. .� , :ije4: . f ',3 I t y 'aGi r +'S� tr' S( a .ir i. 'r l ' �. I . • I I t' -c. may. ' l k- - - • -Alert �,Ir i; •_r +1 \11 ` 1y/'/f ), L f , • , t J' , M V r' ' / ' 1 ,•a' •• ,(r { rei • l } , �_ •Ja �' a�C?. +• ^,. -r • -kpr " '� a �'` * ` T f• �irfi�' � ..F �t � • � 1 "nil • Yitr 7� . � . . ! r , •tyrT,ry� i • f ,, 'a r � � ,--a.i} '• 2 • ' 4 1A c 'l' - . �* �.' _ A - w ."Il /Li,:} 1 .4 'a J.,� :a4' ,f r f f- I . r •tt. , . r,f,'• -.1 J J _ • •• f• 7 ►} r,yiy,, �f`'L rr . _ .` .. , ' 1t {,�/.�/�4 P� ,/ , .. t�� .'t ' r r '4 ^7• 4•fly i �r ,• t - • '.3.T. t�: �•'!_� V 1. /,i;/ I .. t i!. !, �L .�, tL 'q+ ,f. y . {:� ; ••ii In I�.•, , ; r .:�. L i- _ J ' J'it7 . . . • 1 ; i < T • •�]j Ll ,. 1 a ry _ , .\',. 5'i t,''', 1` • , tr tt . rr 1 , /1r. • •-r . : • •4 i , f •. a. /' r - f - �-•vft• ai• __. Jr •Y . y. � ' r. I , ., ./ li ' � ... • J. Jh \ I '. !la 2= ' ' L. e Y .,.n. . + t�^ ''a #.f_ Jr S. a a,. t 1� ._.a� , IL! • IF • f"nVr' • - r ._ r ' If, .. • ;,..1 } � l '' '',� •_- . 'y t• t . •lg.'� l { {y t t - d�' I / = . i7- , y iY' �l =F / • •lslr • Y.. _-1 _t.;... _ 1 J � Jr� ' t • • , � t.t Jtj .: r'S� { a f a a : .( ► . J' . , .1'rr .q. ' 'tl.'-ll • 1. .At "_"• a :'� . T1 . " , , li ',. ' 1 71;,,i, -aa -rS ! J �.L+y •�3T 4 _ •' '4. _1 : , rs1 , 'll"- •-• - __ i _ _ • �, - -Y - - - - , 1. r 3ft'� .l f R'4.-n': L • { c ' =it -,Y+ i .�!. ' 11. . . . pfices, .I� '•a t 1 . ' - ' py a . 5 rk a. -_ f �.5�• �i•If M _ ~•, • ' . 1, , � ' • 'i•VO• e't- • .• 'y ,ti ', 7 �'� a ri l. l •- r• �• r.f P .r .1 ' •� ` S ._ _ 7• c•. . 1. I - 1 •' I , ffi‘ } yy l r . ' f rl - • .,;. r ..t.64 r + .f , 1 . 1w• • }. / •, / r ma - - �f • • , , � r ILy 1 f, f 1 . • ,l ♦ ( ,i 40 a. r, •:�. . ; ' , -r rn .n lY'-�•tir� : .r '4 • 4• .1 �$l . �[• :. �c•l_5t. :1- ', •G51,1,4.eh , 1 1 l ] ♦I •'15. .e •• S - •a`. •.• r �))di • � r l J;L.):t: •.. .. . ; . . .O L• 't+... :'• i � I'� I r , t ! , 1. • .iL �. }•. tf- `` •.11 l, a .ldli►• a�p .:. 1- r.j> 11 •,�• _'j� • ll :l'i 1 a..a ��t a."r..i a a:f. Q •..c. 1 . 1 J .�. r.. i1 t. r ! ' ` a Il"t . -1 ''1 • -'y \� ./ 'Vi 1. 7g'/•.r.r-��s ). • .1 iY�lr 1 • . . ..G' .Il 4�.7. . ,.jr ] 4 . W �t. ; I '.�..::L . Y ........ �. ,' it • 't �,. •�� . `f ••••`•f 'f. 1 Y.. a.�•F•a `t • i�i_ L "` - •\ ' t%• I - 1 S -_ _(F•..•X T } ,. <. •It .� A. • :<'.J aY. , i_ I rI J• •p / •+� K 4(: fl L� ' rr Z . J � , iµ-• t • •' • et • 'rt€ .7 a se)) - ' - --ryry�� .�. -1 i-1 • r �� }.r6 , . lf-\fir �. .a ' ,./,'. .- -n(,J, � ' ! 1 a' 1 t`'?. j ' F. t . t � 4.i u • r. J •* - 11 c/:_111R1• a_, _. VI.! . ausc-•.1 '4 \ -.t. - •~ ..... y u ' rI 1 . r• .3 > „ �`' p a rr k ,:.' :.(,,k .j. , .';•7fj•M / _ �>.,Y : G ' - ' 1 - t• . ;} 1 it.,: c .' ' tr' •31�•! -3 rI 0r ;•. • - 1, •- }, ;T G , {. }" ,`1: - }3(i '� �,ttQr�a1• •i , :t • '1 --if,/i ,�.'•'^� _ �� .>�'. . .[,. a • , t 1, .r 4 :a'S` 1. • - 't • et` EV� 1' V :1�� tlji J ,/\R;Y}�."•►►"" )-. _ r . •_ l �i •' .' a , . .. • , . },,�� _ S• __� �t .x�.aF..,• . tJ•I ,f a -01` i r 1 lat ai• ). „+ < .24,- fr 7 ! - ' . ;• r '. . YL•• -' ` i . •i ?i ., !-"C�tf)s .-: .•t•J r - .. . , � tI . L . . f j$• W a ' }3. .' f{'rt . 1 1 i. - It.. •, _ TI 1 1:,•- ,- a�i• _ .i .r } a /,✓t.• < ` t ? 511r _ . �r, 1 J(!s` i • f : • • af!' y ':11 `-, , ' , r1. • _ tA.ta--bir ._ .r. ar 1 r. :''Pti'•_ .i •' . lt C' • - .`•XSW . ,r ,a �aj'{pw: _ f ►- •: - 1 . . �: ' L, •.a".'- . _, . . ...'�'c_ ..�_-f.J ,, ;a ' 1:f_/i'a: .-tiTrei �. '.•. .t- - • (/y/_+'�'I �)TI`rt I r •••• t ••r.•11 , il.,C•VV". • -a. 0c••• •• t' . 1 •• i J 1 , �, _ _ . .iM�+f',^;.tjelt �tTiY ia• . .^ ' '7 -�i� -' •f �• / i S \`�♦ :. .._ f Y a • '1; T ry'•ar',J14t1.:: ' h%rr. St 14:� 15 7.� i a 1 .1, • 1 • • • i. r..•-i " `�/a?73?-4 LII!i,1":ti.tet -ea "a} r, t ••' : • J Q/ ` n t �i.��.' '' 1 • _ `� R`F•`A1•'�f•f,�`t.! •a. t51) ' r 4.2 aJi� - t a. ^ . .� - . •.ter, ...i i.r-':. a.,y,� • P,:_ - N: � ... . [1t .a_..' •,..J.'c..- - _. ,/ li •1 t r t • 651 �', r. .ay• - a - J - ,-' ra, •'Y-.a-•.. Jc., � a•:L43 ., . . f tu..,1} w. . - ., ...• .t.... _� .. .�. : . . .J - C. f���. �' „=• •• • - 7f.yf}` ! ii .�.r�t�t� •' tS7� ' , a .t♦ r -- • 1 } '7•^e , 17ri,41-__:1- :::. ..:_it-i,tertilli$::.1110.011,184, • ! "'J te' 1� : 'yt ` • 1' • , .-S ' I. .�•• - _,t 7 - J .. .,... . r U . . r. .. t• ' tt((yy•Z�, - - - - � 1 r 1 J3 'ES It a•• . '.) 1 1 irk= , % 1 . r _.. 1 I _ I • �•. - r , . (..Y. ct. . - .r #14 ';i l MM r� nsit. • t. �/t . tv..• J - r -, :,� • i. 1 '. t.�• f�� ' Y r Y �{Ssl' �.fl3[:4S:Jh M • Cr ` t ( at1a:a<-: 47s•. t \ r. ! . r t .. ,;[��` -. . . _..-•+t. . ... .;�,_.fW, ,1J .,aa.l �'K•i�r [ , . ✓1_ _ _ _ • •1 J. i•1 q • a II _ JJ x` 1' " T+ 'f�l.. j _ :f , -- , _t •.li. .i do •Ya. - ~•:Ic =:r , - • ' ,/ .�ir (.., [�1,�t . 1 '� ' •- �• ' JI Y Lr • :f . r• '. „ �. ' :7i l4 - • rL,fi '"�_» v. r '� r,tdel • • '!•' t_ ...,_L-� :.1; ,.. ,-.r • a,, r •1•'. 1 _ _ , al' - 'te , •1 -Ja1 i ;`Y• .5:1 art �f 1 / �• .. • _ .• _ • • : ?'4 r` _- '�'�.. *` .f 'Ft ,J.�If: .y't:ai:• •'. /"-,• 1 ..' • • -I'���TTT __ _ - .=-: . - •�,r *- t• =4 . r� �1� 1r.T'�••. 1e.. 6".C• �T+ "J: •j 1tij' _:I `.1,3 "1_I ••• 1' _ {'s _. - • a _ • _ +.r._ .. • . . ' 7rr- - . l� ^ N. i/ a-,. �•s�yar.<.• • • • �'1A' �-.• it • •1 {ici:' • .t}rF =f r•: a 1 _ C - \.: ( r" - • �L • l , ` � ` .l • a�:; ./`:(� t r1'• ii . ' �f i :e1~. � " c -. ` . . ' r , .a I ,.. . .• '•.-.(„1ia _4 ;j..ygJr f.li. a� �•• . �ti .r F� J . ,y - - •- - fin -• U� <!: 1 '.rryl6{.�1 . ..,. a Ma •`S: a'ih�ssJ•�(.� .'< / .:,,, et -�.IS i i ili •/[yf'i -.l P. - t � : I - I. t . t _ : ..( -1 _•r . Gi,IJ1 . ' f�' .;.'_ate, f I =< 1l +.V. -• ♦ • a , _ _ fir. :)_ 'll , J 7 ��, .:. ... ;_• .nLIr1- a •. _ 1 L ) - 1 .✓_a,_: Y j .I. '. _ a*il tee-• :i _ _ t ' .m _1 . r, ram ,. � : -- 1 . . - - •".'L4- t• • ';� . _ �.-.-. • 1 1Yr. O 4(rF 'r ,f i • t(, _ , - ' , ., rl •. � , , ? r V�- ' ♦ r,a{., `Y'• ' .z?t 141 :i 3•jai?rain fr Q;i iil ' l r - ` _ r - _ r - '. . _ - r ,,a - •t Y- ' a4 . r 1 � , • l l__ _ ,, - , ;L 1r c . . - ...,, " . �'3'• Fs ,_.",�V••t-- • r rL ` � . �� t a ' 111...��� • t .ic - • • _ t '. is-lirJ- 'i r1, .fr.• --3 1 a ' ' l '} .t a,' ,•r, ,. - 1Y 1, .. frd. 't •1ic • �'� t�`.,.1� Vic• - )r� . • 1� ,, _ a i • - '. a ' � I -1: trl t _ . 1,' tG. • • • i Lo • .1 'f i rt t { �a Y"tA •� • .-1.-:-. ...... f' • . 1• i. •,r .n� i+•. -J A' � ♦• .. • .r 1 1• r LJ p . ` • r L. . _ .. .Tr � •+I a s• - Iti �'3 '• i • ,(f P • _ • 't:-'. _ r-r 3 E: t Aar ' �� �'�� •)- , 1l 4 t- . Y � ;- ' n .1 rrt '1`�l ' • .,. ` j7 { f�. f, J t^ - '•a L '�` . .q` 1 / a :1t i•L} . t aim ipp' _ L . . il-. 1. - � fto gtiya • r :,t4Jo, Is. '" :;:�w � _F, , I t / rim .•!�. :j' 4 '•� . . '', i L.. ►S. '�. ,f} - tr,P E:.i n• y . t ,ate t. VJ� !i�tµ•-,, _ - I . • • .• . _ _ �w��''[[ - ' •"'•M 1 3.l • I 3f'4 •i- it• { -C r • 'rt,a:. ,.�. - h • a 4•� • :!�' ,+a1.' JrnvSJ �. • . , . C t 5 ... _ �) 'r`:Yi2' t . y i . 1[1t ` \ Y 1 �i C.. +•!iL}Ci '4 !'t. .y H , a' 1. eb- a. . , ;: _1 ,2- •SYt•_•_ • •,ty`--•t•A�) . r' , 7 . -r a•1 - - • b. - ^ f _ 1. ,tL_..a..i►.�}� ^L .:7t 7i . •• !! 'm f+.-h U3 rk; /li'r , !i , :f•"/ i � ...t�YI J{50./ -__i .� 1C •,i,!.. �> =:Z d.. '1 i • t 'r al�lr/•ii .� ', . '.a ; • r [. 1•� - _ _ _ _ r - l1 . . J � � � _ i �:AYar�' x�.'R•=F' IC il.t: a-,� e ' LC . of.�..,_ial r:..l _a i-- .- _ ==� - _ 1z. te^ T� _.[ua�_ __ .., .[,aa:a'. _ � :---1 l:tL..F: • • :1-:�c-, rat-_ '--.`- _P---._. ., •sue •t ,G ",t•C . Vic^ ^__t.,_._ •tr__ 'asiA _YS'� -- .-1 yi . r. •'"r_-,: --- -t j - �- _-.�-r- .ram.. a r . . • r Y 'S^t'.[: r `�+a Yit As • � i' -�--t^ "•)'i- -_JC fir.` l__ ! -r • I r - r. ,r •-i a .t Sl.:"-1 _ 1 .}. 7,f•4Y�. r.`.�free ..l `a_. a '�p�� i 3 - _ •:� ._ _ _ "� Y......--- : � t' -r-7 _ . a•r" -:; ;s S • . _ :. • .,srJa ..ra1.:1'a3-1` .Y ts i':'"t- +: }r �r rya" r..'.aa' i).s.L. _ i1'� ._-'-�;5!'Y4' .,:' - �-•- _ _ >' .- J-I33 _ r Y -� f' ..,1 3:.� +i'L' ,w` F.):a:. tm • ail IL - ! _ - � Z T T _ --- -t--- -r •ift�`r:.' � r. - ^�.. ;te ! -•a -a P't=71�"��_.t �•�R'v. . ,i�-d .a? - . . • t•: ' r ",7 ^TT__'. '•.u,.,t_�'•�r_-z74.`r'�,TS i , • a:�^, �''Iy•l IT , 9 .fT' i::�- 1� r _ _ _ - _ _- _ __ _�i-- r 't('�-n 1 ;, .�,i -zc-7>(hc .�tn r-it:.,.- ft�rt�� a, a . 1 ' tT'- . ,• ).�_.: :�"': ' S _ ), r , a • • ♦ • i' 1 i ., "l.t. r i'� i -.a ' 1 -/ Y - r • - - - ;< .'.7.272_3'S•r ,: i.ly , itl q. {-K=i' .- 1.-0. ' tor.A 014-41'•• '.• p _ar.' a, -•' ,� i� t'•-, , 1 '1 t_t './' 'l.•. S. • �.__ :,J' �77,." ,r i� e, •O i �Jt• a: "_••• VI r t � f L �dit y -r_ Y 11r:rtes 'r'.J ..,ie A r- .•rR I _ • ;tl , - • . , $ . t * , . =�: ... t)-T�, . L L• • 1 c 2 'Y•t c! Jra M- :5-'•. . o= -.J . , ;? i t •• t. _ .Y ter . ri i}E lof . - .rr �f i'.. l. �. 71 ,R 1 Zi • , ., 1:,..•T'.L'4�.ur 1'{. \ . >.. �. .�•a , • `' . . t .•� I. ,-'4 s:.tlrs,t., :^ ##C: .t. ti •nn j .tea.'. 7 .j' r:. i::v. al=': J':' I a f-t w. y.: I 1 �• f J5 .r r n r sf • .I ,J i 5 t ! (. . _ .:4'. :,- Ta . t1=' .J� ,I�,},t f,a refill. { . • 'v wr] a .� 'i . ris. r;y, r.-, ,y ' 'rrr. e..,t• .-`.3 7� .-f-e4 .• ' YJI � ...; L C ... ;:. �' ` • : v ill J .1 ' , ' JJ.�a-•$•„ V4. 'Y i` :\ +,y�r ���! 5�. r' t5 • � r r 1 . 7•�. • 'Y t a `4 f- _ �'f ,{: •x T' r - • Ir. , t•- I �i. . J _rl< r,, / .r t_. cJ, , 3. a . lf1 •'1 £t- i X,•c, . la . / I SQ 4. . -1 :/ t t� , • i• . ' ♦ , n�1u .41 l.P ' a.' 1t1' � _ ,1 • . •'pi�,: ,� c ', J : �1 r '3 ,_ . r rl •. I ate t . . , L,ar., rL , :;:, • t L. '4; r :', ,- s ,. rr.a ��.• [�ta�t . h T G J . : :i � . r fir{ ./ a:; 3 F ,_ is a :L .:-t, t is � 'I II It, . . _ a i .y _ .1.:1' 1 }. y Ve li :. ,� .rt • - t -• 4-4 ♦ e- i. 1 JY ,. rl ` iYj O r f 1 J. ) %i' ^Y.JJ + f' • • ¢ _ , Lct i a ••t �ry , '1- • , i 1 _ ♦ f '.•5� •Sr.> ,• w 'i i• _r. •• a , ! :Y j 'r' . .� -- l � i • •'1' , ,,. . .� y Ia •" , v 'S n, 7J t. �y�V ,f 4' •j {IFr,{�f[R • r {} iJ) _ 51r• :r t t : ♦ . 1• •i.y . l�, �yl;i r. ron'1 i •. _ - 1 , _ ' '. j a• •.i^ .�'1•1 1� i v ' .��; 1 tgY1 • s * .`.:,�.� : 1 �,' •ice . Tyrr a• r, ` ••`^jJ�r J :a • ."'r - _ Ili. .R; , C -, - ‘..-. .i. _ • _ ! 1 '. ,, • i Y - T , ��:? •_ r <YS `" 5S i' ��L . ,. "' i -'t � , 1 .. i ' - a ' � ' �/ • _ ` Cl r N-1 f ' • .. J . yl ' r ( rr _ ' . •a r - s J wC1 ri .7r i y F/" i ' r . t r ,. t :S'. _ ., Li •i.. •r 2 '; 1'• , r7, C .•. :p . ..a `a' i t�`7e-t' 1:' l y lrt • IrY• L. - ,L. _an f L ti , `. i . ,,� r • �• Jr ,r. �` - .y� T tGY a�,, 4 �j, • ry ,}.4?..' i r f t: �i }x P .a. . . f . .1 ..�_ i. _ , t' II • I , sd. .f *„. AttZ •); r •• + .. I Jeta -lilt: �Jt:!-+ St - Jn LY 7blht • w Js 't.� r \r :'l rT�,,l).tt rri�'t` 'i•Ft r r t,--: • 2 y i , T J• - y �A 1.,<0 ;. • n'. a ` J i S �t t W �:.,_ • •If• .�,) • 7 ;.•rr •l..\f}T1�TCt� l4♦+ .i%1y 'j rjr . t�a ' y �y lLY1 , •. r . .: , ._) 1 7YA . 4Y11 .. .'i R3 fee "t .. ,1r! ,L•'��.� 1 J 1 '•� )� i-• is t. 7l 1 a2• ,r • • : 1• t� j>'S .• F.1. r L.C3�' , Ij •Y•"� -{ '",`tsar .F' <�.j- ....4. , ir• 41;fli'e, ' ,7 . .e i`a tl •�- �tfg/ a7r,t' t '' ' t ,^ . fir -' t•^ - i ( v , • •i a.'.: ew. • l• .t .. ( i'' f `< Pt •l• •/' !'-•, r- ., Carr .1 -i i NI rill i• • �i ll.aL r (irl\ • f 'i'a ':,•eT'' _J,. . -1'.)' •� �7 `. -a•.1- ,• ♦ ; �. PI! F.'- ? p�! 'a. t�� - ) •f' ♦ Lli.: 'a ♦. r.J. 1 1 •' '� , t , , ?'-'I .a 'N F' . - L _, •••• 71S^ =�,t � rwriS '-r1�V• ' - � •1 - -1 •5'i/l �4,t ,yrf. J . :1 �1 }.• ► • 1. . •, '_, r W. F • ,}. - xti , ,.. r' t f t .: .,. I t1 �•�. _ j _ .l ,,•. Sya•.. '4 .(a � ��Y`:~"V- •l li�<!.a, �: v t ' I,t X• I ' I •w�(� {' '•,, <xl J.• ( �, f . . _ 17 ' Yr 'Jt • 1 t1 ' J. A< •.) tJ - e t Y. 'JI: • J h•, • N- .ct b•.S„SaI�tS .r, r. -•t:a _ T = 1 t . .`G't f•:.t: :,., a : [ A• .t 'i .t _ _ a is j1 It -�• f�`5 't tY I, �i. L. i "F.tS 97 IT�n _•fib �4 �'S�t.}•, #'•r•ot 1t tT� '7 C .t•_ .,1 ♦ tt •-1 -t! ' t..1 ±. • 1' .\ jr. .F- , . a,' ', , .j ` I. _, . 1 ' t $ y ! 1 'let i„4) A L- } r r .• a • a -.f •i •r y • 11_II' i ) {r-% , t 1 O . „ '�'"Y ji'i {, f� truly , t . w " F, / ..?• :2-, ' + ✓ {' ,• '!• ' '! j :�� `' 1 [ , 7 Kt v7"' v1>.1 ��[`♦ (.. }• •'•Ts T •�' • !! .: .�lt }• Y' �!1- fq1� }I.17' I..�M. �- 4.. 4 -' •�'` .1 i � • ;i.� el • ' �.� )tl1 :, �.. V2r''� 'a.� 'L st � r , t1'L. . 71 wR }, a�.�t- �� i:a ,r {- • 1.� t r , �, _ ♦ 1 .r G' � C {.li :. , ' : S} 1� -t f' >l`. J'.�croF'<' _ f, w- •a �} . . {ice,•' . ar,:"_ :U1 �r :t'• �' (./ ly(t 4• ,i C"' •'t�• . �yfn IE I� 55� al > t.t .• _ <. ^! f } i' 11 a • `,a f. S Y - ' :. - I ,�it fa. `t �t.S-1 ) (•t {. [ ' .1 ' I ,1 • .. • 59 i1Ji i ,4 . t- -:iy . , .r. f ;.' ..1! IF,'st! la •, D •(41, fl ).0 '" (. i -I A4 r ..� �;, L'{!- v` r'1J:Y': 14 f'.. . f'i i� f , `. &no( l . • . ) ,t �' .t. . !` � lJ - rtA' :t! ♦ t i , :a t � _ it. i r,. L i 1 yp, ♦ I a -ra ,a'•1 / - .t: ra �. <:i. !Y -,Y f a :!' f : iJ t' [r 11`'• ' .:ii •Q. i y J �• �"" - { ' . to ' g, • • 1 1 • :. itl 3 Y .. , \ }• Yf It- 11 .�• .� lr•- `(�:�r �:tt�l_a rr"t!•rrr• � _ t '�t/ryy;,♦ ''' t'tr' iT}" ' t� 1 _ mot : ; � ' , � - ' '.' „ ¢y�yyam� f j �i 1.y(y .. a) ". C8 7i) T . 1.:: :1(,, t ,i 1( _' .:r'� :iP,' y '_ V•. tt . .� r. 1 t '• ' 1.i, I • J}a^ ):1- /�J� y{ '/ -1C .ft�,5\ _.i.•-r.,} -�,~•�al'l ♦ .. •,]t. _a 1 :Yn, _ )) t #' . � l• . Ski- y ( at -„ i t: .} _ r r I. , -11•'' r. ' .II ' t ♦ _ .- ' , • I�' ♦ , , . , ,.1 T • a ,/ • al jy.1 A } !- tt t•1 7. a. TH.,j 1I ,♦ 1l I J; n trl . Y, • .J'•. _eSt( a .�}, 1 • - • r , • t 't, t: - .l., a L t rJ ' F. .t •73r' . of ,t s . _ :Sti :('i' : rX . f-a' • - �. ., ° ,. - 1f :r: ,'t , 3 , < 1 - , ' :d It . 1 ! t. , , C • l r 1 ,. . �1, 1 . ,. y .' L`,a . :: 1 , i1 a . i', 'r'J /t t '. " F • ♦ ; ,-•i: r. r , . •': • 't .<- . : 8: 1• 4 .• '• C Lt t'J .:' ! 1:. �. 'IJ i1i. 1 _ . - . . _ _____'f4 • •f i r < -_ f ! . , _ _ ii L- - �.r --- - - --- - . I - _ st ' t7 ( � _ti. •i1GIi- w l▪ • • td u by t Location ; 0 c 7 l( 1 tl St Description of h ephoton �1ront9 northeast corner facing) west Photo taken byn Phfflllp Steffen APPENDIX 6 — Documented Site Photos 4 _ $ . I . V . } - 10 i e• ft I !I . ,, .r J ts . . .I.1 ale -. • N. ` } fir„ „isir. w ;}' , ( I.'� •w 1 L k I ..al ALL fl. , ,)� . i ! .� \• i a 1, / ) 1 • 'i'� -� !. • 1 .c l \ I ), f% 41 I i • •> . _l.^i� f �,.a ♦..: ,r.�.._.�. `i } ir • , r. . ; U,• �+ / ,.a 1 I • i" A • l , r .1!„s • .1 .. • _ / . a ' 1 . f ' `y-i�}Y ,t I \ I . 1jj :: fr , r104 f'�' 7 t •♦ .r. _ ;Id�•7+ r �.--.�._�_-� I ` ` •. i I \ 1i . ._ `• s1i{ .�, - CIA(..-.•� C -.1 ' . _ - - ,�- ) . - `v : . = _ ' , • IIIF '- ' !>r;•." - �•I ; : -- ' il . • r , )^ '>5� 3 i l� ,11� f ifWs7 l -1r . ze-, , ' 1 ' ' TI. }f c II I '-r I • ,' r .�1 �l' •) 4 : / J r, b-4 {' f• _.)!:I t �' 1\ _ _ r J .Y \ f . .�1� ' ._. • 4. • ' r' 1 . 1 o -ta:'b riyw4iRwi' sI / yl„ . I. -2M'� �,•M.+�. r I -. -. - ,. •• -s . - ( r 'I . . II a `4 1-'• S - ,�1w♦dreetr a• r.ti,P ti _ s�! > jY . _ .�..+ �•�.: ^ . `7 ;r ! ` !rM .-' i i -,J-• > A'i R: \. ] `_ i.i.�r..w. ..%'4:•T 10'. '•'Si.•. .et_' "L- - ._ -i'• ^•.1•V.-.-'i 4 '�l '.r'. "/.,_ I , I. - '� - I • Myr • _ 'CI'. t-r L _..siF •R?14 a.• s '�i ♦ . ^ -ti��•" SC1 yr W.=_lt • ' a. \ i )� i illit Y! ' a' wf - .. a. '-t }Yy. - .T•s\ y >' t ': _ '1 I' = (ri : I I 1 I , • Mi '. . ...I.- - t _ r. {- - . 'r ' i:� f rl � ti lr id ..lf -� -!• - ♦ - ♦ orr. .,:�. , , . I • to ( , - �a , - i ._ - - �'- • .--F.' 1•\r wa..r' JI rfl -+7' t - _ • • i1 t .- .• - :1-i i - .- , • „ - ' - ' L.arH: •> L ' : J•.f `d . '1 - -•I r:. _ •~{ .r . .. „ - r: . r - , - I1 . - - > . I JJ it 'i! .M f ' r/ _ l : • 1_. - . . , ,, , . . r; /, • r ;. _ •I , , _ fr, i. , . . .. I . . . . • . . . . _-I , -I r . 1. S d i . • . , . /. - , t { i• ' / - ' i. .I I .t . l I _ r' I / - _ , I f1 ' • . . I 4 - • J • y . . -v--P - • ..♦ '/ • I_ •,%. • .y. ' _ .r f' _ 1 •r \ J i p - - � . . • �Il; ' 'Y". ..j7,` /Ilt. I • , . . . _ - i - • y 1 ,) • ,� VT. a .. • y / • \ - \ . '• \ - 1i , , ' • �.: - • ( , 1 l +1 1 • - ' , \. • _ ' '/ I r, , _ , . . . , ILA V _ ' i ` i• •r .11 r ' I' I 1 t • (�i! • • _ i:1�. - 1.' _ • - • .i_ • • r.• • I ' .i .I . /".� 1 I'' i r. . y i`t '• - . . • .e. 1 5 , ' II( 1 Y, t• Location : 817 37th St o vcri Descrp, uon ©I tr photo : rear, nort wee corner allrig north/ nt) rt yeas Photo taken by : Phillip Steffen , r I • • APPENDIX 6 — Documented Site Photos • • • • • • • 11 I f yl Z ! t• fHi 2 , 3T !• ` { L ^,' c • \ I{I - . • ai n • •Ld4t[ t , i v• 4,, ci` a. _ t • , . ! 1 { ! J '1' ti •• 1 r it: hilt . t er. n••r•/^ SBttir.�NI / ) M �S�,•y�.(�p.+. f I' - i - .t.: •- ; 1 . I • Zlt N•A� �V.H1,,T.JCi \ Y S 1 • } Ii • 'r . •;. • • 1 1 I II LI. `-* ? �L `�jt I s t ., ! -�f i 1] , I {r1 � , •. 1; I •�1Pa i1 r 1 / • •.. ,� •� • ,' it tn ; ,♦ l • / n 1 • Ky� 1 , 1 ti • � - Y.. • 5� f e. it II t }. •.. k I . I ,. .• .11 1 ♦ .1 ♦1\' • ! • • lr lL _ • 1 • t %1 Y • It - - •- , t 1 �/— - , ! I � ! I'1 'f _ 1 .r. .. ' I 1- �-I I ! _ _ ._ _ _ l _ _ _. . _ -1 - _ . _ _ -__ __ . ._ _ \ r r r' • . - . , . 1, � , S ; 1 .- I -.T• • I • - • I �•��l• 1 \ ' .. • . 1 I • • • 4 $ , I ' - 1 . . ;' . r . 1 •_� I . „ 1 - ` • �_ , , � •yt'• tt - 1' t Z. • I . • / - : 1 , t 11 ' • 1 r 1. .-IIIM • , • , . I , • _ (' IIr -, S. • j . • — t I •r • :1 . ri !n - •• . .. 1 • \ vs _ yy�am...,� •- �; I :.� .,ibs•�� ' L I =1 : •1 fit f. .v-+ • .:I . . • .:!( �,rlf µ y{: L, .i._ I �I. •1.4 r.. •I^ ] I' a1 + Ml• . • + t • —• ,,...7P`�. \ � •.11., %I .•it • • d. . I1 •4/ Y . t 0— ./1't 2 - 'i r r, ! . r .Rilf.. 2iLtil' - -'e{ .. ;AI.i ri• • I• l'•4•,J 4 _ .�1! 'Slv>•. . , . �_ • • ". 1 • -14 Ito1- - :1 ,•, 1t A .•lei. -1:_tt ♦ .{ -•r • • . rj t. .li . 1l.-. 1 . • 'c - 1-. '_7 f`!Y t. • ..1, !'. . .7 • t . . I . , I i . • Ir r - iZ ,S ' _ .�, • l 4. i 1, — • �,r{•,t'}� I t1 •r- - _ I , . IC '! • + • • • • t r ^ • I I I • • - • • I • • 1' ^ 'fri ^ram r 'T.� _ _ .� M_�R"♦�A'- —Z:'7.31. 0.. uaal'.i"r-Zi.]fin 44+...���� �--�//�� --.. -_. . —... __-_ . ._. . __ :� .-.._. . ..__ __. _ r-. •. -_ - - — _" . . -.-. �rrJlc $e - - - /��'�2mx�. '. r)�tj�f-.Z f —_ n — =T-•--� jf � . '-.Th 1 n I • I • • • • • , . . .. • '1 1 _ 1 . '1 •I - .1 ,\ . 1 . r I , • _ 1 _ . / - ram- , . • - , _ ocation : 817 37th St nescrIPti ® '' avt •she Photo : From, novt .fiviest cornerp iacong sou rieasL CIn _Photo• 'taken by ; Philip Stem.fen APPENDIX 7 — Drainage BMP Facility Maintenance Covenant Note: To be recorded prior to: 1)Temporary Certificate of Occupancy; 2) Final Certificate of Occupancy, and or; 3) Final Acceptance of the project. The attached document is in draft form.The applicant should work with the the City of Anacortes Engineering on obtaining a final copy before recording. Return Address: City of Anacortes Planning and Community Development 904 6th Street Post Office Box 547 Anacortes, WA 98221 Drainage B M P Facility Maintenance Covenant Grantor(s) hereinafter referred to as Grantor: 1. 2. 3. Grantee: City of Anacortes, hereinafter referred to as the City,a Political Subdivision under the Laws of the State of Washington. Legal Description of property encumbered by covenant: Abbreviated: Common Name of the Development of the property encumbered by covenant: (if applicable, insert lot, Block, Plat Name), and/or as described in II typically Exhibit(s) 11 Exhibit A). Located in qtr.I qtr. Sec. Twp. N., Rge. E.,W.M. Reference Number(s) of documents assigned, released,or modified: Assessor's Property Tax Parcel/Account Number(s)of property(s) encumbered by the drainage covenant: Page 1 Grantor's Initials— Grantor has a record interest in the property encumbered by the covenant and agrees that the obligations of Grantor shall inure to the benefit of and be binding upon the heirs, successors,and assigns. Grantor agrees that this covenant touches and concerns the land described in Exhibit and shall run with the land. Grantor by execution of this covenant acknowledges that the benefits of this covenant inure to Grantor,downstream property owners,and the general public,and that the City as third- party beneficiary of this covenant has the right, but not the obligation,to enforce this covenant on behalf of downstream property owners and the general public. The City requires this covenant to protect private and public property,private and public drainage infrastructure, and natural resources of downstream property owners and the general public. Grantor in consideration of the approval of the City development permit No. , relating to the real property described in Exhibit and in consideration of other valuable consideration, receipt and sufficiency of which is hereby acknowledged, hereby covenants to perform regular inspections upon the drainage facilities installed, or to be installed, upon Grantor's property. These inspections shall compare the facility/BMP device to the standards described in the current Stormwater Management Manual for Western Washington in use by the City of Anacortes (herein referred to as "the Manual")for all elements of the stormwater drainage system. For any BMP facility approved by the City but not included in the Manual; maintenance standards shall be as described in the manufacturer's operation and maintenance manual; which shall also be referred to as the Manual. As applicable, the system shall include the stormwater conveyance pipes,ditches,swales,and catch basins;stormwater flow regulation system detention ponds,vaults, pipes, retention ponds,flow regulation and control structures; infiltration systems and all other stormwater quality or flow control system. The inspections conducted on all facility/BMPs shall be performed by qualified personnel who have received professional training in the aspects of stormwater management for which they are responsible to inspect. For example a person qualified to perform an inspection on a detention pond must demonstrate that they have received professional training specifically on detention pond maintenance and compliance with standards. The City shall request a record of the inspection annually. The Grantor shall provide to the City a written record of the inspection performed and the condition of the facility/BMP upon request. The record shall provide an explanation of each maintenance component and potential defect identified in the maintenance standards in the Manual for each specific BMP/facility. Where measurements must be taken to (trash or debris exceeds 60% of the sump...)the actual field measurements must be included on the report. Pictures of each BMP facility shall be included, and the date(s)of the inspections must be clearly identified. Page 12 Grantor's Initials — • — The scope of this covenant and right of entry shall be adequate to provide for the access, inspection,and maintenance of the stormwater drainage system, and shall be subject to the following terms and conditions: 1. The City shall have the perpetual right of entry across adjacent lands of the Grantor for purposes of inspecting, auditing, or conducting required maintenance of the drainage BMP facility. 2. The facility specific maintenance standards contained in the Manual are intended to be conditions for determining if maintenance actions are required. The standards are not intended to be a measure of the facility's required condition at all times. Discovery through inspection that a facility's condition is in exceedance of a standard does not constitute a violation of this agreement. 3. Should a facility be discovered in a condition that constitutes an exceedance of any described standard, maintenance shall be performed on the following schedule: a. Within nine months for typical maintenance of facilities, except catch basins. b. Within three months for catch basins. c. Within eighteen months for any maintenance that requires capital construction or expenditure over$25,000 4. In the event that Grantor fails to complete the required maintenance within the identified time period, the City shall have the right to immediately and without further notice perform or contract with others to perform all maintenance necessary to return the facility/BMP to compliance with the standard. This work shall be performed at the sole expense of the Grantor. 5. If the City in its sole discretion determines that an imminent or present danger exists, that any condition exists that could constitute a threat to human health, welfare or the environment, or any condition exists that could cause the City to be found in violation of the Western Washington Phase II Municipal Stormwater NPDES permit issued to the City of Anacortes, or any other environmental permit, the City may take any action required including beginning maintenance or repairs immediately at Grantor's expense without prior notice to Grantor. In such event, the City shall provide Grantor with a written statement and accounting of all work-performed and the fees, charges, and expenses incurred in making such repairs. Grantor shall agree to reimburse the City or pay the City's vendors directly for all reasonable fees, charges, and expenses identified in the City's statement. 6. If the City is required to act as a result of Grantor's failure to comply with this covenant, the City may remove any obstructions and/or interferences that in the sole opinion of the City impair the operation of the drainage BMP facility or the maintenance thereof. Grantor agrees to hold the City, its officers, employees, and agents harmless from any and all claims, actions, suits, Page 13 Grantor's Initials — • — liability, loss, expenses, damages and judgments of any nature whatsoever, including costs and attorney's fees, incurred by the removal of vegetation or physical interference from the drainage BMP facility. 7. When exercising the maintenance provisions of the covenant,in the event of nonpayment, the City may bring suit to recover such costs, including attorney's fees, and upon obtaining ajudgment, such amount shall become a lien against the property of Granter as provided in RCW 4.56.190. 8. Grantor covenants that the owners of the property described herein are the person or persons identified on page 1 of this covenant as Grantors, that they have the right to grant this covenant on the property, and that the title to the property is free and clear of any encumbrances which would interfere with the ability to grant this covenant. Executed this day of 1. Grantors: Signature(s): Printed Name(s): Title of Authorized Representative(s): (if signing on behalf of a corporation) Page 14 Grantor's Initials — • — f I� Drainage B M P Facility Maintenance Covenant PFN Additional Signatures (if needed): Note:Signature(s) of Grantor(s)must be acknowledged by appropriate Notary Form. Accepted and approved for the City of Anacortes: Date: — Director City of Anacortes Department of Planning and Community Development Services Page 15 g Grantor's Initials — • — CONSENT TO AND APPROVAL OF DRAINAGE B M P FACILITY MAINTENANCE COVENANT (lender), the current Beneficiary of a Deed of Trust recorded underAFN ,records of City of Anacortes,which deed of trust encumbers the real estate described in Exhibit of the attached Drainage BMP Facility Maintenance Covenant, does hereby consent to the establishment of said covenant Signed: _ Title: Date: REPRESENTATIVE ACKNOWLEDGMENT STATE OF WASHINGTON ) SS City of Anacortes ) I certify that I know or have satisfactory evidence that isthe person who appeared before me,and said person acknowledged that(he/she/they) signed this instrument,on oath stated that(he/she/they)was/were authorized to execute the instrument and acknowledged it as the of to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated: Signature: (print name) (Seal or stamp) _ NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON My appointment expires Page 5 Grantor's Initials 2. 3 . INDIVIDUAL ACKNOWLEDGMENT STATE OF WASHINGTON ) SS City of Anacortes ) I certify that I know or have satisfactory evidence that is/are the person(s)who appeared before me,and said person(s)acknowledged that(he/she/they) signed this instrument and acknowledged it to be (his/her/their) free and voluntary act for the uses and purposes mentioned in the instrument. Dated: Signature: (print name) (Seal or stamp) NOTARY PUBLIC INAND FOR THE STATE OF WASHINGTON My appointment expires 4 . REPRESENTATIVE ACKNOWLEDGMENT STATE OF WASHINGTON ) ss City of Anacortes ) I certify that I know or have satisfactory evidence that is the person who appeared before me,and said person acknowledged that(he/she/they) signed this instrument,on oath stated that(he/she/they)was/were authorized to execute the instrument and acknowledged it as the of to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated: Signature: _ (print name) (Seal or stamp) Page6 Grantor's Initials NOTARY PUBLIC INAND FOR THE STATE OF WASHINGTON My appointment expires ib C I 1 I I I I I I I GENERAL CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN LAND USE INFORMATION: LOT SIZE: 11,903 5Q.FT.(021 AC.) •• Purpose: To prevent the discharge of sediment and other pollutants to z l� �-��. the minimum extent practicable from small construction projects. JURISDICTION: CITY OF ANACORTES HOUSE FOOTPRINT: 1,524 SQ.FT. O NC_A GARAGE FOOTPRINT: 195 SQ.FT. Design 4 Installation: Plan and implement proper clearing and grading ADDRE5S: 511 31th Street. COVERED DECK/PORCH: 51 5Q.FT. -E of the site. It is most Important only to clear the area needed,keeping Anacortes,Washington PATIO/WALK/DRIVEWAY: 504 SQ.FT. cb D E 5 1 G N exposed areas to a minimum.Phase clearing so that only those areasEXISTING HOUSE (ADU): 3SQ.FT. that are actively being worked are uncovered. PARCEL NUMBER: P33118 °" EXISTING SHOP/GARAGE: (s2d 5Q,FT. Q) Note: Clearing limits shall be flagged on the lot or project area priorCs to Initiating clearing. ZONING: Residential 2 TOTAL: 115106Q.FT. Brett Van Andel 'rett@anc-des ign.ccm • From October ! through April 30,no soils shall remain exposed and a 4 www.anc-design.ccm unworked For more than two days.From May I to September 30,no �1 0 31TH ST (30.00' ROUJ) ® t\IJ — soils shall remain exposed and unworked for more than seven days. ���H Q) 360.815.1117(I') • Soil shall be managed in a manner that does not permanently e., �o C(,�G �d^5rt�- S89°56 29 E 360.933.7g79(F) „.., compact or deteriorate the final soil and landscape system. If 'V, 130.02' disturbance and/or compaction occur the impact must be 0 corrected at the end of the construction activity.This shall include .._ �- --- ---�S*v -"'"`` 100.04' 29.98' L 16593 McLean Rd restoration of soil depth,soil quality,permeability,and percent _ � cry Mount Vernon,WA 982.73 organic matter.Construction practices must not cause damage to CE `� @ 'O 6_ t - :I I W�1,���� i t— or compromise the design of permanent landscape or infiltration �� @5 to areas. �+ `tJIL T G't� Sib THIS DOCUMENT Is TO BE USED SOLELY BY ANC DESIGN(ANC),ANUS CLIENTS)AND/OR • Locate anysoilpiles awayfrom drainage systems.Soilpiles should .� 1 FENCE GoNSULTANT(5) AND CONTRACTOR(s) FOR g y DRIVEWAY �, THIS SPECIFIC PROJECT ONLY. REUSE Is be tarped or mulched until the soil is either used or removed.Piles PROHIBITED WITHOUT WRITTEN APPROVAL should be situated so that sediment does not run into the street or _ �� I FROM ANC.ANY USE Gf THIS DOCUMENT IN A Backfill foundation walls as soon aspossible and roughgrade the adjoining yards. R Y c I IUTY, • p, I WHETHER DIRECTLY OR INDIRECTLY,TO ANC, g OR ANc's CLIENT(5) oR GONsuLTANT(S) Is lot.This will eliminate large soil mounds,which are highly erodable, I I_ STRICTLY PROHIBITED. L _ I — l- and prepares the lot for temporary cover,which will further reduce E 11 ANC AND ANUS CONSULTANTS ARE NOT erosion potential, RESIDENCE RESPONSIBLE FOR SAFETY PROGRAMS, — • Remove excess soil front he site as soon aspossible after I EXISTING METHODS,AND PROCEDURES OF OPERATIONS I EXIS IN� OR THE CCNSTRJGTION CF THE DESIGN backfilling.This will eliminate any sediment loss from surplus fill. ,_ U 0)" JI IL HOUSE/ADU �,- z sNO • The construction entrance shall be stabilized where traffic will be i Lf) N (L/ I l I I i O �-I.1 CONTRACTORS) AND SUPPLIERS SHALL leaving the construction site and traveling on paved roads or 10 .<[ _., ! i t I vERIFY AND BE RESPONSIBLE FOR ALL other paved surfaces. P +`j j�j N DIMENSIONS AND CONDITIONS ON AND OF THE • Provide for periodic street cleaning to remove any sediment that LLII.� JOB. ANC Is To BE NOTIFIED c+ ANY mayhave been tracked out.Sediment should be removed byO O 1� VARIATIONS FROM THE DIMENSIONS AND Z I Z q Z CONDITIONS SHOU.N ON, OR DISCREPANCIES shoveling or sweeping and carefully removed to a suitable I ' I LLl FOUND WITHIN, THE DOCW`1ENTS. SHOP — disposal area where it will not be re-eroded. 10' 0" ` �1 DRAWINGS, SUBMITTALS, ETC., ARE TO BE / - ` REVIEW l�l t FABRIICA ION AND/OR IED TO ANC NSTALLATION PRIOR 70 EASEMI q) JOB: I9-001 Wa ° EXISTING v� PREPARED BY: By ' a GARAGE/SHOP \�O\°`\ DATA: 3-21-19 el — ;o; r1w•aw° OX `' �r1-%� �w►a�r 100.03 , 29.98' I O\ ,S4PNLE See P Plan 118 ;'s 1 589°49 42 W 0 ., I G.r -- 1 1 ,YDRAUJINCx TITLE _fie 1 130.01 ' I I 5 f PLAN W wI .*>t ? ppi 1" = 20'-On Site Plan.� 004 .QoQ v,,.,,o;,.,;�. ��o��o��������\�� ��\\�����' NOTES: U ! `i�i,�i,�ii�i,` `•.�i�i,\`i,\`i,�`i,-i>```"'�`� I. NO SURVEY HAS SEEN PROVIDED.OWNER 4 CONTRACTOR TO ASSUME ALL RESPONSIBILITY FOR LOCATING EXISTING 9n 0 &s,.>`i,�o44, • COPYRIGHT 2019 ANC Deel WV 1�i�0;�i�° UTILITIES,ADAPTING STRUCTURE TO EXISTING TOPOGRAPHY,AND ENSURING THAT PROPER SETBACKS ARE MAINTAINED. DRAUJIN& tb.�' 4. `A,.A>'\` � 8 2. SHOWN SITE INFORMATION HAS SEEN GATHERED FROM THE CLIENT,THE CLIENT'S CONSULTANTS,AND THE COUNTY'S ll MAR 2 2019 ASSESSOR WEBSITE ONLY,AND MUST SE VERIFIED ON SITE PRIOR TO CONSTRUCTION. U SILT FENCE 3. NOTIFY ANC DESIGN OF ANY DISCREPANCIES BETWEEN THiS SITE PLAN AND ACTUAL CONDITIONS,WHICH MAY IMPACT THE CITY OF ANACORTESOVERALL DESIGN OR FUNCTIONALITY OF THE PROJECT. 41 . I I I I I I I I I I I i I I I I i GENERAL CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN 4iE-A �ii. Purpose: To prevent the discharge of sediment and other pollutants to the minimum extent practicable from small construction projects. s I G x 31TIN ST(30.00' ROW) ANT Design I Installation: Plan and implement proper clearing and grading F:;RE' D1 ;' are « x-iss, of the site. It is most important only to clear the area needed,keeping 120' r: ' IRcct�`i;re.A'.an -n �; S89 56'29.'E , i rme._ac•at , exposed areas to a minimum. Phase clearing so that only those areas 1356'2' ! i zn 6 that are actively being worked are uncovered. STABILIZED CONSTRUCTION __ C8 s:",n°1�Y y ENTRANCE(SEE DEiAILI 1 100.04' .y3?q g(Fl Note: Clearing limits shall be flagged on the lot or project area prior 11/� 5UTF 1 \ o ,�5, ;,,x,cmKA to initiating clearing. ;1 j Ir ATE a i , ) Exl°tom 4'tun VCr•-4 W 9b213EN / < W45FT-OUT AREA p i SILT FENS • From October 1 through April 30, no soils shall remain exposed and "°°mamam t°E• �EtT°r 9 p p :3 C' TIGHTI.ite A!C oE6rx(AM/ 6��,� unworked for more than two days. From May I to September 30, no STOT�11 To ` Ed:Um iz `Q^""`aAr RE 15 a � PRGFLT off T. REUSE PERDNIAL 7 DOUtdSPCtJTs0 R i ,c PROfAnm uz�u( aRtTei AeP+e°✓x soils shall remain exposed and unworked For more than seven days. I DRivEWAY / 1 PLANTRNG\ - L i �+* �+� ►+• • Soil shall be managed in a manner that does not permanently (Law) ExisTNG -NICdt1 SIBILII7 .5 + - ""°E* "+'T ""' c t �*• YtT6[MSc-MT441HA 01[CAM Air-8 A`G g -.-_=_s - _- = y PEI�E7ER t� E CIm3 F.t OR ANCy GLOM)oR ca+ncuwrra 16 compact or deteriorate the Final soil and landscape system. If w Fifties' p p y DRA A•vo Aro ARM Ka4�Tktt6 ARE wT disturbance and/or compaction occur the impact must be 1 • �_ vT_ — �`'����" i Re6PaeKtE rcaTM i .mum,ao PPM:M RU.CF°PERATI°WS corrected at the end of the construction activity. This shall include ill �, ��Q �""°c"�' "E ° ' restoration of soil depth,soil quality,permeability, and percent -- 1. �7 ,�1„ ,-- army* . organic matter. Construction practices must not cause damage to - Mtn' AVAM siElfsCHEELEcf I Axi AFC a ro EA IatF� of ANY Tse or compromise the design of permanent landscape or infiltration tee.e %wPArw+ "E ov81� A"6 =Maim anal l Gl oR°ICP®ANCE6 RESIDENCE < Rim nE DO°t' * areas. ' C A^ p � owls:FM fterrTA,.°, VC.ARE To BE • Locate any soil piles away from drainage systems. Soil piles should l t 1 `. I �r ��nv®n AF MEW C Foe be Carped or mulched until the soil is either used or removed. Piles 1 EXISTING should be situated so that sediment does not run into the street or V. 1 HOUSE/ADO adjoining yards. I (LAN 1 • Backfill foundation walls as soon as possible and rough grade the 5)2• , 7 L- - ) < < n;� lot. This will eliminate large soil mounds, which are highly erodable, Urn i v �� --- and prepares the lot for temporary cover, which will further reduce z z erosion potential. d i ki • Remove excess soil Fromt he site as soon as possible after q i? 1 - LAND USE 1 ° '°T ICN backfilling. This will eliminate any sediment loss from surplus fill. I - h•. Elevation120' JURISDICTION CITY CfM4CORTES • The construction entrance shall be stabilized where traffic will be 1 - " — —T �— _-_- �j x ADDRESS: 8n 31Ih street. leaving the construction site and traveling on paved roads or F — - - - r _ v y v _ _ v V - �� 1; _, MEW 4 cortes Washington LLl Other paved surfaces. AMERICAN PARCEL WISER: P33118 0 • Provide For periodic street cleaning to remove any sediment that AszeoRVITAe, 'TYPICAL ZONING: Residential 2 may have been tracked out. Sediment should be removed by �W�Wvr516alir m 0 K shoveling or sweeping and carefully removed to a suitable FENCE Cl 3 11 LOT SIZE: ,872 SO.Fr.(,25 AW 0 _ disposal area where it will not be re-eroded. SE g �- . - , NO FOOWPRM: 1,524 5QFT. g C ) m .° '.k EXISTING I GARAGE FOOTPRINT: 798 SQ Ft t g Elevation 125' s ( COVEREDDECK/PCRCH: 51 SO.FT. s LA H GARS E/SHOP 1 PAiIOAUAL KORIYELIA7: 804 SO.FT. j 1 J EXISTIrA HOUSE(AMA 804 5G FT. EL EXI&1I45 SNOPft ARAGE: 620 561 Fi. r . i , I TOTAL: 4,590 SO.FT. —5 ill ;„ mar 100.03' S89'49'42"W H FRUIT x W mar TiEE 130.01' TiE F 1 ti SITE PLAN K NOTES: / . , Cs NO SURVEY WAS BEEN PROVIDED.CiLNER t CCNTR4CIOR TO ASSIJ E ALL RESPCNSEHLITY FOR LOCATING EXI5111Ya - _ . Cs UTILITIES,ADAPT14a STRUCTURE TO EXISTING TOPOGRAPHY,MD ENSURt TWAT PROPER SETBACKS ARE MANTA NED. / ...', R 2. SHaiN SITE INFOm-IATION WAS BEEN GATHERED PROM TI-E CLIENT,1NE CLIENT'S CONSULTANTS,MD 1NE COIMYS / n�dl ASSESSOR ILEBSITE GNLY,AND MUST SE vERPED CN SITE PRIOR 70 CONSlRUClICN • - — c� - t�ti l•Ce 3. NOTIFY ANC DESYN Cf ANY DISCREPANCIES BEIQ EEN THIS SITE PLAN MD ACTUAL CC7 ITICN9,UM1C11 MAY IMPACT II-1E / i 4%r- OVERALL DESIGN CR FRNCTI0N4LITY Cf TWE PRGIECT. / �w '- w • ( \ s;' w�aua'E mow / io�,dami-r���no,l s "ftr°'fir04 5 — s'' IiOiMDO1l�Flt01 a0.0'd s'me$' r.016 IP -------- '�'' 9' L' '�Rf 1'� d�� ,w w w w w PREPARED BY: BY t1wM�l111D i / f�w-4. —4 4,00= +�aragret sivve�vattavotedi+�otas ivAtaoav4 a ay.t ..: v 1 t :tf �.e �r� s�.A• �� 1� s l� ��e u / �7�i' 4�' gQ!' '� �'� � bo PATE: 4-19-19 ». � �: i,�a Ve 770,NS.::::::1007:: t1` SCALE: See Plan • .- fv.\10 \Off\\\\ Aj• �vi-�0i�,. �4l �go�� 04' AN: P33118 1�\, i r..,,,...,......., •• - ..4� ob T DRAWR�Cs TITLE 11 i"..S�j�� 4I CROW HOCK OR OMR $14b0. Site m e...,y.k:›4'....;I:,si<41..,:,,, MIN Plan 51LT FENCE STABILIZED CONSTRUCTION ENTRANCE DRAWING ALl I I I I I 1 I I I tond 5 c qpe__ ectiy.1 1 1 I I I I I I I_ GENERAL CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN LAND USE INFORMATION: LOT SiZE: 11,903 SQ.FT.(021 AC.) " ,+, ,• Purpose: To prevent the discharge of'sediment and other pollutants to z,_, w the minimum extent practicable from small construction projects. JURISDICTION: CITY OF ANACORTES HOUSE FOOTPRINT: 1,524 SQ.FT. 0 , 11 Design 4 Installation: Plan and implement proper clearingand gradingN C..A. GARAGE FOOTPRINT: 198 SQ.FT. gp p p ADDRESS: 81l 3lth Street. COVERED DECK/PORCH: 51 5Q.FT. z D E 5 1 G N of'the site. It is most important only to clear the area needed,keeping Anacortes,Washington PATIO/WALK/DRIVEWAY: 804 SQ.FT. rq exposed areas to a minimum.Phase clearing so that only those areas EXISTING HOUSE (ADU): 3 SQ.FT. that are actively being worked are uncovered. PARCEL NUMBER: P33118 "' EXISTING SHOP/GARAGE: (0v.) SQ.FT. Q) Q) Note: Clearing limits shall be flagged on the lot or project area prior 0 to initiating clearing. ZONING: Residential 2 TOTAL: 45g6 SQ.FT, U Brett Van Andel r bret er t@anc-design.cn • From October I through April 30,no soils shall remain exposed and per'I 'ct www.anc-de5ign.ccm unworked for more than two days.From May I to September 30,no 311N ROW St (30.001 . soils shall remain exposed and unworked For more than seven days. • 360.815.1117(F) • Soil shall be managed in a manner that does not permanently 589°56'29"E s, L. 360.933.7,179(E) compact or deteriorate the final soil and landscape system. If 130.02' disturbance and/or compaction occur the impact must be \ T corrected at the end of the construction activity.This shall include \-1\ Y 100.04' I 29.98 t— 16593 McLean Rd 73 restoration of soil depth,soil quality,permeability,and percent SILT c Mount Vernon,WA 982.73 or anic matter.Constructionpractices must not cause damage to g g FENCE � p or compromise the design of permanent landscape or infiltration @ cjILT THIS DOCIVENT IS TO BE USED SOLELY BY areas. '� FENCE ANC DESIGN(ANC),ANUS CLIENT(S)AND/OR • Locate anysoilpiles awayfrom drainage systems,Soilpiles shouldI CCNSULTANT(S), AND CONTRACTORS) FOR g y DRIVEWAY N I THIS SPECIFIC PROJECT ONLY. REUSE IS be Carped or mulched until the soil is either used or removed.Piles I 4, PROHIBITED WITHOUT WRITTEN APPROVAL should be situated so that sediment does not run into the street orI I FROM ANC.ANY USE OF THIS DOCUMENT IN A adjoining yards. MANNER THAT MAY CAUSE A LIABILITY, J g l t I WHETHER DIRECTLY OR INDIRECTLY,TO ANC, • Backfill foundation walls as soon as possible and rough grade the OR ANC'S CLIENT(S) OR CONSULTANT(S) IS lot.This will eliminate large soil mounds,which are highly erodable, I STRICTLY PROHIBITED. and prepares the lot for temporary cover,which will further reduce p�� Axc AND ANcs coNsuLTANrs ARE Nor erosion potential. �ESI,DENCE - RESPONSIBLE FOR SAFETY PROGRAMS, — • 1! i t METHODS,AND PROCEDURES OF OPERATIONS Remove excess soil fromt he site as soon as possible after II 1J-I 11 I pis EXISTING (3 OR THE CONSTRUCTION OF THE DESIGN backfilling.This will eliminate any sediment loss from surplus fill. I 'J I i >` ��v U sHouN 0) , HOUSE/ADU - z • The construction entrance shall be stabilized where traffic will be (v I. I f 1 Lgneiscat -- lO CONTRACTORS) AND SUPPLIERS SHALL leaving the construction site and traveling on paved roads or JP i • Q 1i�i In • Q VERIFY AND BE RESPONSIBLE FOR ALL other paved surfaces. I l� LI I l i X _I ' ct) DIMENSIONS AND CONDITIONS ON AND OF THE • Provide forperiodic street cleaningto remove anysediment that 11L4 JOB. ANC IS TO BE NOTIFIED of ANY O VARIATIONS FROM THE DIMENSIONS AND may have been tracked out.Sediment should be removed by Z I ir X Z Z CCNDITICNS SHOEN CN, OR DISCREPANCIES disposal area where it willdnoer removed to a suitable FOUND witSU THE Doc., ARs. SHOP — shoveling r sweepingr carefully I W DRAWINGS, SUBMITTALS, ETC., ARE TO BE p 1 K SUBMITTED TO ANC FOR REVIEW PRIOR TO /10'-0"�� ` — 9( )e K W FABRICATION AND/OR INSTALLATION. EASEMT. ti) — OPINIIII NI JOB: 19-007 "r C9 m EXISTING PREPARED BY: By '" N GARAGE/SHOP \� ,,, it' @ \\��o\ DATE: 3-21-I9 W.a I - 0��' '� V..IY .fM 100.03' 1 '9.98' SCALE: See Plan s%l 889°49'42"W w '�r� z° \ck APN: P3311S r , 130.01 ' ,}r a-� DRAWING TITLE >� xW -19' I SIB PLAN >>;x,s :5 ,� L_et vi�sc I" i n ,°,,�°,°°,°, Site Plan yyy �•��<O��O �OOO����Qp�pO. `'i���G�10��i�� 1• /ip�i�ppii�ii��// ///�/o/////'. _ ig !� NOTES: �` 4 '%i��'��' �� lb II V L I. NO SURVEY HAS SEEN PROVIDED.OWNER 4 CONTRACTOR TO ASSUME ALL RESPONSIBILITY FOR LOCATING EXISTING u 9r 11 ,4M4)I �i/�i/��i/�>��'/'�,:•�ri > � � COPYRIGHT 20i9 ANC Desi `�`i/`i/``i) I`i/�ii�`/i��° UTILITIES,ADAPTING STRUCTURE TO EXISTING TOPOGRAPHY,AND ENSURING THAT PROPER SETBACKS ARE MAINTAINED. DR,QUING `i/��i`i�li�\ '\`i/`\i/o *//;,,�;,, „ro�„ 2.8 2019 2. SHOWN SITE INFORMATION HAS SEEN GATHERED FROM THE CLIENT,THE CLIENT'S CONSULTANTS,AND THE COUNTY'S U MAR ASSESSOR WEBSITE ONLY,AND MUST BE VERIFIED ON SITE PRIOR TO CONSTRUCTION. 41 .1 3. NOTIFY ANC DESIGN OF ANY DISCREPANCIES BETWEEN THIS SITE PLAN AND ACTUAL CONDITIONS,WHICH MAY IMPACT THE SILT FENCE CITY OF ANACORTESOVERALL DESIGN OR FUNCTIONALITY OF THE PROJECT. • I I I I I I I I I _I I I I I I I I I_ FUEL APPLIANCE NOTES IBC Mi1011 COMBUSTION AIR TO BE PROVIDE13 FER APPLIANCE I'1AN IPACTwR'S NSTRUCTIOIS 4 OUTDOOR AIR FER iu'G 24016. ! DESIGN IBC G2406 PWI EO APPLIANCES SHALL NOT BELEE LOCATED N SPM R00115,BATHROOMS, N. TOILET ROOMS,STORAGE CLOSETS OR SURGICAL ; ROOM,OR N A SPACE THAT OPENS ONLY INTO I SUCH ROOMS OR SPACES,EXCEPT ILHERE THE Q 5r": NSTALLATFCN CC=riIE5 um AN EXCEPTION PATIO ZO1 V LI5TW N BC G24062 A 8 .'•'v:: - n no , noL SOURCE OF IGNITION ON EQUIPMENT AND CONC. i :' C:F.,APPLIANCES N GARAGES,AND OTHER IS'HAZARDOUS LOCATIONS TO BE A PIN/nil ABOVE THE FLOOR(IBC G24082) 0 / 3 / @-0, / i fRGNT CLEARANCE PER 1MANIFAG111RERS b NSTRJCTIONS,TO SUFFICIENT FOR SERYICIN*THE % 5l'-0' / �� OF ANACORTES /'�/��/`7�"U��o« FUR/ACE MO G2410) �JAPPLIANCES LOCATED N PRIVATE GARAGES TO y'�n 9'-oj' 9'-b}' 6'-10' I Tf° I >�' 1'-bj' 4'•5}' 5'-9�° b'_1ti' nmretr .To ee LE WaELYS)AFD BYeR / / / / / / / / / / / At DEArilCOEUtT4HT r% Ai Aga CLEWS)ao CR O) FOR BE PROTECTED FROM MOTOR VEHICLES,OR Q�,y� 4 new r` �RUE is INSTALLED A M IMI 6 FEET ABOVE FLOOR J LEVEL(IBC G24283) of t � cr ME It4 �N � 3"b' - .� wk NAT MAT niT CAE uANO-4; HOT WATER PIPE NSUL4TiON SHALL HAVE A 4 3' H.Y. 2'3"CSC ii. b C, 4`"4"'HY ' $. ctenErs clear CR wt�LY,to Ara~ MNIUM R-4 THERMAL RESISTANCE. \ N. I ' I N. � " :. L .. \ \ OR ei'MORTb rE OR CGRISLU7IT(!) 15 8'8: DOUBLE 0 I I AC Alt Ate mat CalEMTANT6 ARE WI f-,1/ 1Eee�anauF FOR 4aFETY PRICERA% SfGD. r.\ - OVEN :WALL j \ 1� . P . , \ O CiM \�-0" 3. 6:. ; oR 11* �PTRICTal OF 71-E7+AT - STRUCTURAL SYSTEMS NOTE; e - 8D- San s APPLIANCE SW (' aaaR►aoweT At AUFF1.r SALL ` OUT:ER/CONTRACTOR TO HOMY ANC DESIGN CF > _ GARAGE KITCHEN X 2 b` JCS MO crag etE FOR ALL ANY DISCREPANCIES BETUEEN ARCHTECTURAL Y 160 x II& ' > n ro BE iatsaCaDIT1Ctei CHc��w AHD STRUCTURAL DRAMS IMMEDIATELY, a DINING cat.W/ •v t MUDRM. vA¢An26 r rs nE otleasaa )ry PLEASE REFER TO STRUCTURAL PLANS AND tr 112 x 113 RADIANT HT. ~0 • \ GARAGE NOOK C`Ta""'t errT Le `R nlrA FRCP To N ENGMEERNCS CALCULATIONS FOR BEAM SIZES \ UV SHLYS. 100 x 5WT ES x b.0 DRAW" ncsm c ETC.,reatEla to AND LOCATIONS DURING CONSTRUCTION. RADIANT HT. \ ,'` g CONC.W/ CONC. Fu T aaax rya x�LArsa to 9p I 4' in RADIANT HT. T , - MECHANICAL SYSTEMS: 'a, e d 2''6 PRELIMINARY WA STATE ENERGY CODE R403: ISLAND . \ , SH!Vb. in /�- NOT FOR l L AT LEAST ON,E THERMOSTAT SHALL BE , VONCJ' I {�UV I IOI`4 al PROVIDED FOR EACH SEPARATE FEATRGs AND -0- \ COOLING SYSTEM. it zr. 15 I E ,�,� zn 7 6'-04+ / �,-0„ / 4'-4' 2'-0' / 3 2,DUCTWORK TO 13E INSULATED TO A MINIM 1 OF ' cc • __ R-8. • 6 le ° n FD 3"b FR7R «- 3-=TS,AIR HANDLERS,AND FILTER BOXES \ bC. i WALL BE SEALED I LEAK TESTED N . . h BEAN ABv. ` ACCORDANCE WITH WSU R9 33,USRY Tit ( oG ` SHELVES U: ; Q MAxii l•1 DUCT LEAKAGE RATES SPECIFIED. ' C� 2"6' 11 AA a i;, 1 45'd 2 6' PNTRY• I L BOILER > 52.1 111 4.eUILDItb FRAMING CAYITIEES SHALL NOT BE i i 92 x 62 ELECTRICAL ' 0 W USED A5 DUCTS OR PLE}AMS.DUCTS N CoIY WV__ • dd EXTERIOR WALLS FLOORS OR CEILPG5 SHALL \ \ RADIANT HT. PANEL Z NOT DISPLACE REQUIRED ENVELOPE NSULATICtL _0 5'-5' b'-81' l'-4�' 2'-51" b'-Vl' 3'-b° 12'-6' \. 0 5.CIRCULATING HOT WATER SYSTEMS SHALL BE `r d / / / • / 11' 1 1 ' z 'r �j ('� O FRONDED WITH AN AUTOMATIC OR READILY ", SHELVES �' Al w�-A1 v ACCESSIBLE MANUAL 6UtTCH THAT CAN EMT CFF 'n : (n V J - i1-E FLPIP IU-EN NOT N USE. \ 2..6:. BATH `.4 3`, ;; e- T . A b.THE BUILDING WALL PE PROVIDED WITH i26 x 655 S�•R' U rVENTILATION THAT i'EE'S TI Ec REQUII2 NTS ofCCNC.W! C M THE IRS OR P IC,OR WITH OTHER APPROVED RADIANT HT. GARAGE Z O MEANS OF VENTILATION 240 x 240 eT5- m + DECORATIVE tK eh.Aev. 80 CFM • ` CONC. N 4_I1 , i � (:: ® I\ R1b m OAR ON MONOXIDE 4 SMOKE ALARM MOTEL X at 1 CLOSETi Ill SMOKE ALARMS SHALL BE PIGTAILEDN EACH Ili LIVING RM. F.SLEEPPGS ROOM,AND OUTSIDE EACH SLEEPING * ma x 210 ENTRY 1 2 6 'h ROCM N THE irrstL)IATE VICINITY Cf TI-E in CONC.UV v! BEDROCtMS CONE ON OFFER LEVEL FOR SPLIT RADIANT HT. 5e X 80 0 3''6` 0 I LEVELS)). cat.Uv 120 v. RADiANT HT. totco PRA'1ARY AMER FROM BUILDING FURRY \ OK 4EV CONNELiw TO COMMERCIAL SOURCE UANH ® WA STATE Et�RsY CODE CREDITS: BATTERY BACI'W,OR BATTERY ALCtE WEN NO ,.eJ II0 V. GUEST g COMMERCIAL SOURCE AYALABLE. '3S z 2,- I01 x 110 2A REDUCE TESTED AIR LEAKAGE TO 0.5 rn r, \ CONC.Ilk :? 3.0 AIR CHANGES PER HOUR MAX.4 CREDITS tIli - St1GKE ALARM DEVICES TO BE IME�ONECTED N 1---- 6-. RADIANT HT, >' UNCLE MOUSE VENTILATION HIGH QN SUCH A AT4I PR THAT THE ACTUATION Of Cliff EFFICIE)CY FAN MOT NTERLOCKED We 0 aALAR1 WILL ACTIVATE ALL OF THE ALARaMS IN \ . t. T1rt INDIVIDUAL UNIT_ ' FURNACE FAIT),MAX 035 WATTS/CM. AN APPROVED CARBON MoNtoXIDE ALARti `�' 9' 8' / 5: 10' 3A: ,PRIGH EFFICIENCY L.FIHVA DE BOILER TS10 - SHA L SE INSTALLED OUTSIDE OF EACH OHD / / OHD GAS,PROPANE OR OIL•FIRcD BOILER CREDITS SEPARATE 9LEEPRE AREA UTSI N THE IMMEDIATE P PORCH UA7H MINI171M ARff Gf 92R.VICINITY GF THE BEDROCt19Ul-LIE REL•PIR1?D - 90 x TO > 5A: ALL S EF'RI-EAD 4 OR LESS SPEC 05 APPLIANCES ARE INSTALLED N THE DWELLPGG, \ \ ( - - . I \ CCNC. = - ` \ NZ FAUCETS RATED LT5 GPM OR 1E65. GR£DI15 AMOR GARAGES ARE ATTACHED TO THE 6 5' HY. 6-5'.I-1Y. y 4yh / LAY.FAUCETS 10 GPM OR LESS, O DUELLING. 9'•0' YL die, a3 / / O9a� `T<S' 5C:EFFICIENi WATER FEATPGG.GAS L5 1>�.� V 8'-3° 8'-3' y. 2'-6' 2•-6" 5'-6" 5'-6° 6'-6° 12'-0' T 6,-es PROPANE OR OIL WATER 1-EATER WITH CREDITS lK g / / / / / / / / / A MNIMJM EF OF 0.31 VA STATE ENEF*Y GORE cctfl IANGE: \ r TOTAL CREDITS, 35 CREDITS Z RE I.RBEbTRATION U-FACTOR: 030 / -- - 161.6° / 5'-0' / 3.5'-6° / JOG: IS-00' W 2.SKYLIGHT U•FACTOR, 0E0 / 51.0' / PREPARED BY: By 3.CEILRY R-VALUE: 49/38(RPM/JOIST VLT} DATE: 3-22-19 v 4.CEILWOOD FRAME WALL R-VALUE: 21 BUILDING INFORMATION SCALE: 1/4" r 1'-0° 5.MASS WALL R-VALUE: 2V21 - MAN FLOOR: 1,524 SF. AI:14: P33118 b.FLOOR R-VALUE, 30 FLOOR PLAN NOTES: - SECOND FLOOR 1.655 SP. I.ALL FLOORR OM ER TO BE YERIFED BY OER TOTAL: 3209 bF. DRAWING TITLE m T.BELOW-GRADE WALL R-VALUE: Oren'it .TB MAIN FLOOR PLAN O.SLAB R-VALUE,DEPTH: L0,2FI \ • = 2.CABINET DESIGN BY OIFERS.DYENSION9 TO GARAraE: 195 BF. V4 1'-0' BE VERFIED AFTER PRATING N SPECFIC AREA Main ‘Nt R-38 OR R•30 CAN BE USED IN PLACE OP R-49 NOTES IS COMPLETE. OR R-38(RESPECTIVELY)WHEN THE CE L HEKGFRi I EXTERIOR DIMENSIONS ARE TO EXTERIOR FACE Of FRAMINGFRAMING1 3.WINDOVY DRAIN AS VINYL-FRAMED.ROUGH EXTERIOR (COVERED): 51 SF. Floor CR THE OLIf p NSULAT(UN EXTENDS STEM WALL (SEE FOUNDATION PLAN FOR STEM WALL LOCATIONS). Plan ucc010RE55ED ABOVE THE TOP PLATE AT THE 2. NO1FY ANC Cf ANY DISCREPANCIES i3ETWEEN ARCHITECTURAL MD STRJC'iIRAL A ERD BE VE LT TAT vE6 Ale USED. OATH HANiFAGTURc�Fi F EXTERIOR (UNCOVERED): 144 5F. EAVES TOTALt 155 SF. 4.SEE STRUCTURAL DRA01 5 4 CALCULATIONS 9.ACCESS DOORS FROM CONDITIONED SPACE4 TO UNCONDITIONED SPACE(ATTIC,CRAW ?SHALL FOR LOCATIONS GF HOMERS-. INS SHEAR WALLS, BATHRO .18: 5 BE UEATHERSTRIFPED AND INSULATED TO A FV+>�DWW€ AND FASTENERS. BATHROOMS: 5 - LEVELLEVEL TII EIYALENT OT TI-E NSULATICN at TFE 1/2: I ca•nctstl,.p a.5 NDPIG 6FFAGES, 5.PLEASE RC T ANC DESKdd OF ANY JCli 4Lb MADE t, ARCVERE UP.AL RD14A1Z 511a1CTUR4l FUL 2 DR4UJIr\G 10.DOORS PER MC R303)3(2) DRAI)1FYG5 TO VERFY COOT DNATICN UV REMANNG 5YSTFM5. - FULL: 2 42 ,1 I I I I i I i i I _I I I I I I I I I_ RJEL APPLIANCE 1401E5 4-Nia6S(211•41/4... f . BC MFtaLI ONCE 11. IOH AIR TO S FRDcWfD PER APPLIANCE t14NLFACTI ER"S NSTR JC1fGN5 +OUTDOOR AIR PER ISC 2401b. IBC G2406 RILED APPLIANCES SHALL NOT BE - - E 6 i G N LOCATED N£LEEPNG ROOMS,DATFROCt•1S, TOILET ROOMS,STORAGE CLOSETS OR SURGICAL ROOMS,CR N A SPAN TWIT OPENS ONLY INTO r (OROWil SUCH ROOMS OR SPACES,EXCEPT 4NEPE TIE >• :.:o INSTALLATION COMPLIES WITH AN FY+•FPTION LISTED NIR3GG24062tiAR • 2, 8 ` (' 1n _. , SOURCE OF IGNITION ON EQUIPI EHT AND V y ;:. APPLIANCES N GARAGES,AND OTHER {{» HAZARDOUS LOCATIONS TOM A M IMI IR' ABOVE THE FLOOR(IBC G24002) FRONT CLEARANCE PER MAT ERERS � OF �9 tldr7('®��� INSTRUCTIONS,TO SUFFICIENT FOR SERVICNG 11;E FURNACE(EC G2410) / 46'-0" / — '� Tfa6 DO:71'ERT 6 TO EE USED ECt tY BY APPLIANCES LOCATED N PRIVATE GARAGES TO 8'•01' 1'-10j' b'•0' 6'-3" 5'•6' 6'-0" 6'-31' t1G tta (AC),eres mesciCLENT /AFDA7it BE PROTECTED FROM MOTOR YEHICI.ES,CR / / / r / / 1146 6FECPI N ma CT Cat Ti F01+ s / 6FECEiC fidC1EGT [aLY. R9kc is INSTALLED A MNIV M 6 FEET ABOVE FLOOR LEVEL(ISO G24083) FRO/WED Mainai'I NiC.MT KA OF llt6AK D A LUI N A 5`"4 HY. 5 4 N.Y, 5-4' ay. WEBER DVEo1LyCR►CI cite-to at. HOT WATER PIPE INSULATION SHALL HAVE A Mint/R•4 THERMAL RESISTANCE. _ — 66iFICCnY6 0.HIED OR K116 LrlMr6> II AIL Al) AL'6 CCt1YJLTart6 ARE NOT F£EPO1eeLE FOR SAFETY PROZRU%, 2'6- tencoG.Alm FR�CE D.E6 CP CPERATLR16 CR Ile contio4 CP BE DEEM STRUCTURAL SYSTEMS NOTE: ', 6MOM AO OLIFIFLER5 MULL OWNER/CONTRACTOR TO NOTFY MC DESIGN OF Y 53 x 53 • VE CatIPACTORBE ALL ANTDISCREPANCIES SEMEN ARCHITECTURAL > DdETB ta° gFE'HOTTED D JC15. MCAND STRUCTURAL DRAWINGS IneIATELY. -+ OFFICE r BOY'SYARATICH6 Rai TIE n►tealaa At. PLEASE DEFER TO STT31CTU24L PLANS AND t 152 x I3 GIRL'S ROOM R+s = asy IS SIM CH,P VAT& HCFW ROOM ENGNEERPY CALCULATIONS FOR BEAM SIZES \ CONC.UV 120 x 149 \ 119 x 149 ^ RAM . t*e TIE =JI NW AND LOCATIONS DURING CONSTRICTION. GONG.UV Rl9 GONG.W/ \ a` ED TO t FOP/REY F t ARE 70 o RADIANT Ni. RADIAN I1T. RADIANT I-IT. FAElRff.4TIRT AIDKR TCIALLATIOta _ Z? WIC PRELIMINARY A 1/ MECHANICAL SYSTEMS: in 53 x 63 •— NOT FOR WA STATE E 2 6NERGY CODE R403: - 2' 6` II `� is I.AT LEAST CNE THERMOSTAT SHALL BE \ PROVING 57OR EACH SEPARATE HEATING AND \ 5'-51 / 6-N31' / 3'-10" 12'-3' / 2'- ' /_...1'-9° /1'-14'/ I01-6=[ 1 , CONSTRUCTION 2.DUCTWORK TO DE INSULATED TO A TiP1I1 M OF n Vi WALL • ' � R S. ' / 42'AFL 1YD 2: 6 ` ?: 6 1® RI 3.DUCTS,AIR HANDLERS,AND FILTER BOXES \O 0i1 ggr - - } BATH \ SHALL BE SEALED +LEA:TESTED N Ui z M T2 6'` �� R ACCORDANCE WITH UW RS-33,MG THE j +]At Se x 102 MAXIM.11 DUCT LEAKK:E RATES SPECIFIED. I. AA ,' . ( & • d, u0 . R4D,CONC. - \ 52A -1- N ,i,AN dI N m evxv (eati T/S Y - 0 4.BUILDING FRAMING CAVITIES SHALL NOT DE I\"/I yL USED AS DUCTS OR ME/VMS S DUCTS N - - - — EXTERIOR WALLS,FLOORS OR CEILINGS SHALL - ' NOT DISPLACE REQUIRED ENVELOPE NSULATION m \ \ R+S ,� �' e' "0' I WC) I a ^ 6 Ili K it n'•11' 3'-10° 2' 0' 91-44' 4'-0' 4'-0" I 1 : n \ •`t w 5.cIRCULATNG I�OT'LATER SYSTEMS SHALL BE / /• / / / / 07 LJ �' ri PROVIDE')WITH AN AUTCR'IATIC OR READILY T^ ;n ' WIC �- -r Y o c O? ACCESSIBLE MANJAL SWITCH THAT CAN TUN OFR ;t, S1 x 65 1 I11 m T-. q to — 1FE AMP W EH NOT N USIL \ p 5'6: W ccNc.W/ 2 6., 110 V. BATH Gt�f : Q. \ N ") `� 6.THE BUILDING SHALL BE FRC7VIDEP WTH RADIANT HT. 50 x Im? V w �yVENTILATION THAT MEETS TIE REQUIT�1t NTS Cc 2' 6` CONC.1V `2 6' '* tO m "' TIE ARC OR MC,OR WITH OTHER AF'PROrED SHELVES RAD.HT. / � T" G- FAMILY RM. FLAT y p MEANS CF VENTILATION. .7 x f36 vNLTED\ — \ 1L t'O ro F N. CONC.UV LAUNDRY N -=--` .X RADIANT HT. 2 6 143 x 13 CARBON MONOXIDE + SMOKE ALARM NOTE: M. BEDRY. RAD.Pt 11.1 in x 15m x 416 SMOKE AL AR�'IS SHALL BE INSTALLED N EACH \ CONC.11V .n 1'-a1' O 70 CFI 3'-61' 3'-1° N - \ i SLEEPING ROOM,AND OUTSIDE EACH SLEEPING T RADIANT HT / Co F ROC'I I TIE riftwIATE VICINITY CV TIE VAULTED LINEN SHELVES UTILITY BEDROOMS(ONE CH UPPER LEVEL FOR SPLIT A. SING 4T ,� LEVELS). :t \ - - f2I PRIMARY F'OUER FROM BUILDING MU* L' M U 01 CONNECTED TO CC ERCIAL SOURCE WTH \- \ 1 - VAULT- i 4 \ BAJ JkrCY BACKUP,OR BATTERY ALONE WI EN NO I 5'S"'HY. 5'5'H.V.1 "1 ,Ti�, Y. BATHRM. t E CLi4�E}2CIAL SOURCE AVAILABLE. m ii, 2' 6 i4C x Os 2" b`' !lam Tn 9 SMOKE ALARM'DEVICES TO BE INTERCONNECTED �WDD inR RAD.HT. Q N SUCH A MAKER THAT THE ACTUATION CV CNE ALARM WILL ACTIVATE ALL OF THE ALARMS N :p \ I \ - !�CR L J \ e. n 1IE INDIVIDUAL UNIT. MI m . Zv o TUB TILE . . ' (se _ 9 rin) SHue , . p (0-) AN APPROvED CARBON MONOXIDE ALARM m — SHALL ESE INSTALLED OUTRIDE OF EACH I / 5-�" i,- - _5%. _ -._. / I Iin SEPARATE SLEEPING AREA N THE IMMEDIATE VICINITY CF THE BEDROOMS WEf�E FUEL-FIRED APPLIANCES ARE NSTALLED N T1-E DWELLN3, \ \ I Q 1 \ 1 r \ N. z AND/OR GARAGES ARE ATTACHED TO THE 5'5-ay. 5 5`HY.' S'4 HY. O DUELLNG. , cN T — 51-11' W-3' 51-11" 5'-0 5'-3. 5'-21' 2:-II" S'-2. 3:•1' t2> o {� WA STATE ENERGY CODE COMFL.IANCE: . ' / 46'-0' / O Z I.FENESTRATION U-FACTOR: 030 JOB: 19-001 III 2.SKYLIGHT U-FACTOR: 050 PREPARED BY: BY I CELMY R•VALUE; 4S/35(RFTR/JOIST VLT), DATE: 3-22-19 'mot 4.WOOD FRAME WALL R vaL1)E. 21 BUILDING INFORMATION SCALE: U4" = 1'-0" 5.MASS WALL R-VALUE: 2V2I MAN FLOOR: 1,524 SF. AM P33118 FLOOR PLM NOTES: SECOND FLOOR: L685 5P, b.FLOOR TOTAL: 3,209 SF. DRAtUING TITLE in Y \ p I ALL FLOORING TO eE VERSED BY CURER 1.Mall-GRADE WALL R-VALUE: I9/e/1N fit +TB SECOND FLOOR FLAN 2.CABINET DESIGN,BY OTHERS.DI EN51CN5 TO GARAGE: �� SF' Second S.SLAB R-VALUE,DEPTH: 10,2ft \� \ � I/4' = 1'-0' BUECOMPLE E YERFIED At- FRAMM N SPECFIC AREA "R-3S OR R-30 CAN BE USED N PLACE OF R-49 � NOTES:EXTERIOR DIMENSIONS ARE TO EXTERIOR FACE OF FRAMING + Floor OR R-38(RESPECTIVELY)UHE1N THE FILL HEIGHT 3.WINDOWS DRAIN AS YNYL-FRO-ED.ROUGH EMERIOR (COVERED): 51 SF. OF THE REQUIRED ISOLATION EXTENDS, STEM WALL(SEE Fr:GO NCH FLAN FOR MI WALL LOCATIONS). N UNICOMPI SSE)ABOVE THE TOP PLATE AT THE 2. NOTIFY ANC OF ANY DISCREPANCES BETWEEN ARCHITECTURAL AND STRUCTURAL. OFTE RIATNGS TO A VERSED WITH MANFAGTURER>F TOTAL, !UNCOVERED}- 195 5F Plan EAVES ALTERNATIYEs ARE USED. TOTAL: 195 SF. 4.SEE STf .X RRAL DRAINING£ N CALCULATIONS S.ACCESS DOORS FROM CONDITIONED SPACE TO LPNCOSDITI0ED SPACE(ATTIC,CRAW-)SHALL FORWARE LOCATIONS F 1EFE-DOUt ,SHEAR WALLS, BATHR O1`1S: 4 HARDWARE AND FASTENERS. BATHROOMS; 5 SE I.LEATNERSTRIFfSD AND INSULATED TO A carmaraceA"LD to LEVEL ECUIVALENf OT THE N5U-A11CN ON TIE 1/2: I = SO O(WH SURFACES MADE PLEASE 10 41T ANC DESIGN O ANY CHANGES 70 At2G+11TEGTtA2AL AND/OR STRUCTURAL 3/4: 2 DRAIllIUG DRNUN/G5 TO VE MS. GOOtCNATICN UV PULL: 2 - 42 .2I0. PER C iZ43 2) RFM4PING SYSTEMS. 1 I I 1 1 1 1 1 I � � - I p ps i � � � a 1 i �. r � 28 'my ti °� G 2° " 53 I ji. tt ''i el RED REMILS1 In / , r CA 1_, -1-CIS / ,a 7/t .41 _ATV Or �` � � �i (mow_ pexul ccL 'A ' ®TA/E wCST UD rECT Or T7e/C EA 7- 44.0 Frr flit-- 771A7- EC/eT/Or1/ L\J Cr 77/C roLLOW//ENG nF.-cce/aril', / feel CT t_KW G LSO077-/ Or TI-JE j SO U -h'T L //1VC C)F . � S 7 ' I Tr CCT A. --A 5 CS 7SLJSiA/rr/7 /A/ / fr/E C / 7-3/ Or ,4NACL�RTES : Cto IF CO/v7/v1E11/C /JVG AT 77/E SOU 77•/PVC ST C'7-72/I/E,ie or 60l2�,eN/YlE/VT / ..7-) 7- 2 cO SE CT/O/V . a"7 7EA/A(5;41/� . 3.5 Ace / / ,e is ' a a-As 7; 6f/. tl 1 THE /VLE OAST 6527n. S J LC 77 TMC•/V CE NQe7-.4r' halo . S Ecc i l C J i TNC 7-if UC PQ//V T Or SCG//A//V/A/G• 7-/IC/U " C_ /1/O/C. T71 2S0 . &o f'T TNCAJCC. EA . FCC -. N/ CA/CC SU OT�r' &SO. , Fr, 77 Z.,� f3 / 71D . /. P. //V PAIar�VT I .SCALC V A • -_ ' T7WE/Ul� /r' PIC_LS EAST-.t - S?SS?n . S/7. S err-7- ' /CJ / AC �/A/T Or ...�rcr9/N/V/A/G_ ' D I PA / CCL "L " -=37 1AT PDleT-/ON OF GO1lce iv/v - NT / 7->7` 2' ,_a,``r' 77/C1'V r Tr) /0140USWAir I _S- /V0/E7-i1 .G4/Vr-,r a 14X /frj drS /C/2SF17 AS FOL. Lbws : .£G//V/V/NC AT A i /NT SCO. C Err 7- LEAST OF 77/C • 7 UT1/i4/fST F/ 7,eAIcie Cr SA/Q / r) r a • 77-/CNC'E NOI€ / N fa/(a . S FF-r 7-; T i1./CC CA S T A O /.S 771NC`E C)r iEtED Aa I ICJ 7w TieL/ r0,0)//V7- .Cr BEG /NN/!UG • TNENCC r'YIN T//V UC F AST A _ OJS 774 /VCC Or thin I r A- T / XE//Ve E UTN 740 e . S FCC' /0 77YC ..SZJU / H L. /NE O SA/.CJ / OT e • -THENCE' 1/YES / ALONG SA/U SOL/7-7/ L//VC A Q/ S774/VCfr Clic' rr r'> AC ! / 0 A iRD/A/ - 1> Ua oS 7L/ T// Cr / NC I T.QUC AC/M-T- OF /C -�/Nit//illy'. TNEACE /V0.C/ N >ChCo . 0 A- IA' 7- TO I / C I A'.(/C /aO /AJ T QF A V-S/iVA/ //V Ca - , 6 - `' Lam) / r, l� — r ., , I . F 4 'eec C ®T!,/C (lYfST S F-FFT Or THE rbt CObf///1/G fF:SC,'/2F'/7 / /e4C T: I S89 °5(a ' 2 "E^ E 7-f/A T �77-T/ON O rr r 71/L_-R/V44017 - / C17` 2 SEC T/O/V ."In ) / 0GU/LL5'H//G 1 EAST LINE C4 ST,2F—r 35 /V,0/2TN) RANI:Zs— a F'Ak5 / - /I< /vli !l'SH,e/SE'O AS FZJLLOLw/S . P,CCUEC7L'D -. SF� 4 .F. #' (03 E NOIL 9, S�°SCo Z- - .� /IVIVNVG AT- 4 �//VT ST>7. .5 FEET CAS T C C T,4'C SOU77-'b!/C.S• ! - - - - - r3J. C)Z i .. w _ . . — =VE NEE CIE SA/.0 �-+�) 1/EENME MT / CT 7 751E JVCC AAORTf✓✓ !� i 7`f1E i !Q . C� 4 - - gg CC / it le /A/C 0 F T/C AG / Y EA- TE-/V/]E/c YYES 7- F/s?L7/J/I SCC��C 93 '� j V "r 4LE 'S 41/419( .c - Cefl1c AO0/ T/O/V / C_) 7-1/C C/ Tom/ 0r AN.4 �n.e7-CS „ M AS PER PL,Q 7T £CCoe` `jn /N lfrL U'U7C a aF A 1A TS PAr- 1S .P.cr'/zen5 : f: I 1 • OF sr.,4G/ T /'/X,GV73' 1-VA.5'///NLa / U1/ • / NNCNCC CAST .4 / /J,il/G S,4 /L7 CEiV7-,4 m cr�sr. L /NE SPn. 5 f C r T / NONCE ' • �OI�TA/ /v A 'CC/Air A-ALS'/ _ 'Tb1 E II � .v 11 i , kiwi TRUE Rn//VT CI- •rc/N/V/A/G . CA'CEP7- 7-A/C J4 a5-7 1str) f-ET TNE, _247F N , ; 5 a WC2a LLc4.R.-1 s / T UA TC /A/ I NC l'n UN /Y Q r SPCA G / T / ATE CIF- kV-4S 4///VG / T 1 /V. a W°49' , M ' . ', rAYO�ENFP�9L ` i S °,Sfo 'PJ 'E et ! el LI 7F1Et34414/E rn sa i - - • ALLEY PROD- C / b..C1 Q U o FELY11 5LDCA' 13 "/` .,4a:.C 'S . i i / 4PLTh'E Cry C�F A/ /t • tip. • \ ; kij "1 le ki , S ; b, ' Li • 0 - - .- v • P NSr XE - ' • FAIC. .3",( nC.0N. /VIMN. Ne `�49 '�r^E AU® / / f crr2' i ig, / arc `_ • ', W/ S EASS /L!A/L a. 00 / `7 / ��� 1 •, F'/L ,C L] Aci RECO.PJ7 77VAS OA9 CF 6- >.9 9 . 4 / ' t r O ' SAS EMENT 177e ,POW 2/6f{T OF WAY !N �0/C OF SUR 1/E- YS .4T F'A/-at a✓ `�' .4T 7 fP �QUr� S 7' .+� J ._. � ' EESE2YLD 8Y &4 /L £ 'J 1/C7- CEO.SS1 / n /«S N. 2 �7U,4 . / . , '•, . €fa.„..m...„, SFE A. F. # to /(�� ANO A. F.' �4-1(� 3 i, + , (Y N 7_Y A LIED / / C ,C o Pu7- Az/oy 770,C. ' • •• 1 ' et sUIC r - fe7-/F/C4 7r 1. P4'QC'�L 'A " /S OESCEJ/ -O / Rel/ T/V ) O/SSi/1/!/L AZ LEGALS . ,4 F. a r8MCo3 TN/S 444P CL1e_2'TLY rt'Eo, 44Nr-2 V AS A S C/CI'E'Ann' /Yl4QE S/ MC Cafe UN�� 44Y /-V-tSc,e (Rits 771E EA ST L. /!VE OF PA ,2CEL ''A „ A S mSA'OM/A/ ,4/C..EC//V Bs' A L]/.eECT/Q/L/ //V CQJVFQRiYI.4NCF_ 0'77 7✓ Tfr� /P�t:�///,CC4' NTu�" �- 7 LSY/.P vc .v _ L. - . T 4 T-' TiVF- A it Q Ld T G:F . L�.•4 C-s/B23C.I/1/S . LJAS L] "A/AS A . iffjw2,e-icE E N AN 10 1/�.ES I AKFI E F O A . F. _ 1. /'� ct/ E3 - / r - 7 9 A4 2CF Or CV//S .�1. ' 's/_ e U,4 O4Tr- • '7,'E F7 /7!(//NG /5 Tf✓E l FGA/ d�C2/PT7 (/ A.5 P �Ta PO CO CE,e T/F/CA = A40. Ida 24- /N A. F. 3Beg0CY_103 . ./71rG/AJN/A/G ON TINE. L50 077/ L. /NL- OF ._5 7 .5 /,eft/ /N INC C/ Tom' (fir - A/1/ACLi £ TF `i' SA2S / - CD OAT / Y, WAS/1//C/G7LZV PW/ERE 111E S/l tC , lti7� �, `re / S vr//T�-1 T�vE CAST L /M aF- CaA V' N/_ �eocuc� � • ® ��' � � /-/ !lam 77YENCE SO UT�1 ./ U A AO /NT- 7(010. S FEETT N0,eT-1 OF 7- VE LSD O / 1 L /,V E , • _ Of- CO Va A14/JCA.rr / 777- z SFr' TJO�V 3O� 1P/1/a eT �U' E . f . Ass .L'�' o I/Cf a / r �5 UR, f1 i/n/E6 //'/Co & 01sT w /14. • / N�VC . NC's7T 1 /- -r L O A A a / Aac ' SOLIT7J LINES r7F 37 / eF�T 77,ENCEI EAST 7T� / NE P�7/NT OF : ; t� 4' � C� � t / 8F�//1J/tI /NS / /7 CA -Tr/--) MI SC647 Tin Al �3C) ITC) Yi A4.__S'H/� �5' Nd.P / H EAN _ ,•- o E. lc AS T IA/. /1/1. • x r , d e . PARCEL B / >-SA DF, 2 / ITT/ON CPC .4 / f �5 �4 /�/ O!/EE'Ld P dF FFFT �„Cr5 i �'�� ' If���� �y� ®!/U/i/. � Y. ' �/3 T �� ND . (Ni / PARCEL "A " ./?` Sff VA'. AeC / "B „ HAS EJ�1 `�/ AKEL� vy OEP/ CTJNG CUNtMDN QDLl�tlD 4 ,e /ES 6E ! 11/ ill �'A 2CF�' . S "A " "L3" . 4 ` + g`v few attec .• � .S P cig P cN,ca cs.c.• Ishi 77 • r _._ -_ PI - -- -- - - r?f !`1 ti Address:817 37th St Parcel#P33118 Owner: Philip Steffen,360-853-6500 MAR 2-8 2019 Floor plan for use with ADU application CITY OF ANACORTES ♦ • 33ft 10ft Bedroom2 Bathroom Bedrooml DECKMt' -� [Area5ft21 ,- [Area : 150 ft2] (.71 IOft Living Room Kitchen 30:t GwP Free ; 28 ftl itt i I I I I I I\vill c _ 'V �m� T� S3 PrL �1k5- GENERAL CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN Z. /�1JJ� iv P �� ....� r • !�\cal 4 UIS• P L 017 Purpose: To prevent the discharge of sediment and other pollutants toS.1\i Q• v,� , ' �Z�3 c E s I oil the minimum extent practicable From small construction projects- �, `�� xLre n`9 31TH ST (30.00' ROW) �� 1 a' ' r * SF ct.'1/4 YC' Design 4 Installation: Plan and implement proper clearing and grading �2R4 HYDRANT V ��/11- � -,`e, v� � � , ^ 1F, c1S4 ? of the site. It is most important only to clear the area needed, keeping �'� s89'Ss'29" v� etc�an desl n I / 17 41 br g exposed areas to a minimum. Phase clearing so that only those areas g �� fl` 120 �' ♦' Q�oS�`T'DV www.encdesign.cxn p ) - __.. _ ` 130.02' — �j� IS / � ,Gil4� ' W e. 21 360.515.1117 (P) that are actively being worked are uncovered. c STABILIZED CONSTRUCTION - -Writ04' 29.98' N.. h�_( j�7 t 360.833.74 9(F) " if ENTRANCE (SEE DETAIL) * I"- W C I7� M Note: Clearing limits shall be flagged on the lot or project area prior /� 1 SILT PENCE Y \i uTl�l+� � 7, 1 -�� iE593[r1cLean P.d / ` Mount Vernon,W A 95273 to initiating clearing. ; � / I<I CONCBMP C54 RETE m / \ 41 h EXISTING JS� ` _ / < WASH-OUT AREA 1 U'JG/ I N 0 N , SILT FENCE • From October 1 through April 30, no soils shall remain exposed and �, ,,,,,(1' D lZ THIS D�RETdRIBTD � USED SOLELYBY 4t A ,{ TIGHTLINE ANC DESIGN(M1IS OANC'See CLIEHttO MD/OR ftt JECT acr REUSE B unworked for more than two days. From May 1 to September 30, noSroR ro sir` PROHIBITEDCONEULTANU HOU G WRITTEN An FOR r) as k tPERENNI DOWF 9POUT5 (/ TH1. E SPECar>c nc USE B water M a � ��l`' \�r� PROHIBITED WITHOUT uaITTFN APPROVAL irik soils shall remain exposed and unworked for more than seven days. ' DRIVEWAY ,- - 7-PLANTING S FX Sr NG HIGH VISIBILITY N\ HAVER THAT MAY CAUSE A LIABILITY • Soil shall be managed in a manner that does not permanently > LAWN _ _ ._ _. -.__. _t FENCECI03 Y WEnERDIRECTLYORIwDIRECTL..TOANC- ` ! PERIMETER OR ANUS CLEWS) OR c• Ft mice) la compact or deteriorate the Final soil and landscape system. IF .. - DRAIN STRICTLY PROHIBITED. — — 2 2 1 .3. � 1 —_ r_=f -..::,i331 PNC MID M1C'S CONSULTArtB ARE NOT disturbance and/or compaction occur the impact must be OR TH CC FOR sAETr TIE Ewg. - I METHODS,AND PROCEDURES OF OPERATIONS _ corrected at the end of the construction activity. This shall include ' I OR THE COJSTRICTION of TIE DESIGN SHGIH I restoration of soil depth, soil quality, permeability, and percent CONTRACTORISI AD SUPPLIERS SHALL l VERFY AND BE FESPONBIBLE FOR ALL f�_ __.__ f I DIMENSIONS AND CONDITIONS ON AND OF THE organic matter. Construction practices must not cause damage to ► e "'D B T° "°`F'E° °F "" Or compromise the design of permanent landscape or infiltration VARIATIONS FROM THE DR£JSIONB AND D �pA FCgr0N8 SHOW Q♦ oR DISCREEPADIEe ,YJ wwD WrH11 NECK Doa»rts. sHOP RESIDENCE i ' > < DR4WII s, LellnA.B, ETC, .aRE TO Se areas. I y ' WITTED TO ANC FOR R�EVIEUI PRIOR TO II ( FABRICATION A D/CR INSTALLATION • Locate any soil piles away from drainage systems. Soil piles should li_._ C I i APR2t2019 be tarped or mulched until the soil is either used or removed. Piles 5 EXISTING w J 5 NOUSE/ADU 4 should be situated so that sediment does not run into the street or , j IIl CITY OF ANACORTES adjoining yards. °;N I ltl , (L ) � • Backfill foundation walls as soon as possible and rough grade the �, �, •�? Q lot. This will eliminate large soil mounds, which are highly erodable, o 0 .t 1 j P ( i 0 and prepares the lot for temporary cover, which will further reduce z ""I I `-�- z a erosion potential idLAND USE INFORMATION: • Remove excess soil fromt he site as soon as possible after backfilling. This will eliminate any sediment loss from surplus fill. ! I Elevation l2o' JURISDICTION: CITY OF ANACORTES • The construction entrance shall be stabilized where traffic will be loco" �. � �;j` `I { ADDRESS: Sn3lashinth ton leaving the construction site and traveling on paved roads or I _ AnacOriee,Waenm tan other paved surfaces. EASEMT. ) I NEUJ AMERICAN PARCEL NUMBER: P331I8 y • Forperiodic street cleaningto remove anysediment that ) > x x ' ARBORVITAE, L Provide 1 TYPICAL ZONING: Residential 2 11.1 may have been tracked out. Sediment should be removed by �HICsH VISIBILTY ` --/ t3_ _ shoveling or sweeping and carefully removed to a suitable Y oTSIZE: 11,a7zsaFr.r.zsAc.i Q n FENCE CI03 L ^ wvLH HOUSE 00TFRINT: 1,524 SQ FT. C)! n disposal area where it will not be re-eroded. GARAr� FOOTF'RMT: ,52 S FF. t ) 11Q r EXISTING f COVERED DECK/PORCH: 5150.FT. E n,0,9 Elevation125' o Oa !.L hGARAGE/SHOPLAWN PATIONALK DRIVEWAY: 804 SQ FT. p- MQ)I EXISTING HOUSE (ADU) 793 5Q.FT. r EXISTING SHOP/GARAGE: 620 50.FT. � Z ILI oTOTAL: 4,590 5a FT.�. ® DI OWI NEW FRUIT 100.03' S89`49'42"W��NEWFRUIT 29.98' 7 (7 TREE 130.01 ' TREE ail"' i— APR2t2019 ` cf) 'lam Ivy' ` 1 SF CITY OF ANACORTES l ,Cr \\\ 1 .I gD �9 N SITE PLAN E fg � I" _ 10'_O" / W a' z -4-4NOTES: a I. NO SURVEY HAS BEEN PROVIDED. OWNER t CONTRACTOR TO ASSUME ALL RESPONSIBILITY FOR LOCATING EXISTING ING / a UTILITIES,ADAPTING STRICTURE TO EXISTING TOPOGRAPHY,AND ENSUR THAT PROPER SETBACKS ARE MAINTAINED. '•; sown WMM 2. SHOU.N SITE INFORMATION HAS BEEN GATHERED FROM THE CLIENT, THE CLIENT'S CONSULTANTS,AND THE COUNTY'S - — _ roan OM ASSESSOR WEBSITE ONLY, AND MUST BE VERIFIED CN SITE PRIOR TO CONSTRUCTION. P� 'PILL a 3. NOTIFY ANC DESIGN OF ANY DISCREPANCIES BETWEEN THIS SITE PLAN AND ACTUAL CONDITIONS,WHICH MAY IMPACT THE •e• OVERALL DESIGN OR FUNCTIONALITY OF THE PROJECT. •� ie 1 e� ' ' � z N 00, PAM04!llaL•os / $11` Ado,�aa io�alenedirel - it b. �► I • 4 r4es� s e�v Aire. r ci �,�, �� / r•�iaobi 4 �. �ea. tea. a a. �. . �, / -Altaw d e i ia eaefi Aso .-r .• ° �a � a‘.-4.*-e��irpiaa y�� It ��Ol a@a���g�s� cos: ig-om� isar h% ,. F ♦Art � ! e 0 � ! � A � e olelue® .-. 0abie �►®0 +0 o e NIAA ll o®� PREPARED BY: BV 9 ooalu�e'a 4 L / �� i . a i r e �� DATE: 4-IS-I9 Mara et �y� a. \ I�� i_'��� +5�.� @'� �"�AA�- ►moo f ' ' R■ 25 MIL ®�•1-:- -'±�� , ,ar � rr. a'r" oa r • �. s�- e�Vot de SCALE: See Plan �(0 OO `',) O4.4 �e tt a APN: P33118 � ��'9'El MK , l DRAWING TITLE r. a■-e■ n ROCK aR otltR ���em Site' ,i9-W4ce, N✓ % .` `: CLEAN NON-601.,t04441'D Ma1ERIAL6 I/,. .�``4 /er,II•I,. 1'Jl^M� GloSr `T lLl2� GiwS�KAIU ) tt?sSYp>sGe/��l S N brae )�,-51� \ ww � F I,.,Z Plan STABILIZED CONSTRUCTION ENTRANCE ta f` . SILT FENCE 'APR 2 t 2019 esfiv ih RTES L ` DRAWING IQ-_-06,,i (Drvlecep-Thm _,L.H5S--lo ‘`) ALlI I I I I I I I GENERAL CONSTRUCTION STORM UJATER POLLUTION PREVENTION PLAN Purpose: to prevent the discharge of sediment and other pollutants to C N AL the minimum extent practicable from small construction projects. DES I G x 31114 51 (3000' ROW) FIRE HYDRANT Design 4 Installation: Plan and implement proper clearing and grading /—•24, of the site. It is most important only to clear the area needed, keeping I �� 120' \ Brett Van ign.ce l exposed areas to a minimum. Phase clearing so that only those areas s89'S6'29''E brwww.nnc-design.c,xn STABILIZED GONSTFd1GTI0N \ 130.02' 100:04' WWI✓enc-design.can that are actively being worked are uncovered. cis STABILIZED ,_ _x_ _s_� I 29.98" 6°5'S.''" (F) X -x K- X x- X- X--X- X- X- k-- X---X- ..X-.- '� ENTRANCE (SEE DETAIL) \ \ 3 0.933.74�9(F) Note: Clearing limits shall be flagged on the lot or project area prior / �SILTFENCE h / \ 6593 McLean Rd h �BMP GI54 �MountVerner,WA 95273 to initiating clearing. / I ' coNcRETAREA b @ m / .� �ExIsrING — c _ N P, N I SILT FENCE y • THIS DO ktffNT 16 TO ea USED SOLELY BY From October 1 through April 30, no soils shall remain exposed and e TIGHTL NE ANC DESIGN(ANC),ANCE CLIENT(8)Ate OR unworked for more than two days. From May Ito September 30, no > 4 I STIR ro `NC T""`a, `� CONTRACTORS) F IS OR J I- l) x DOUNSFKxJT$ Thle reBiTED WITHOUT MITEN Ac►RVALL soiIs shaII remain ex osed and unworked for more than seven days. DRIVEWAY �--� inFEIETNINNGIAt ��� tiNG FROH AND ANY USE CF THIS DOCUSHT N A Ham• Soil shall be managed in a manner that does not permanently > (LAU.N) 1) FxlsMET `�FENCE CIBILITY IICRR THAT MAT � CNRPAP A LIABILITY, compact or deteriorate the final soil and landscape system. IF > _ :_�". ' _� „ PERIMETER FENCE GI®3 STRICTLY PROHIBITED. CONSULTANTBJ IS ,. Y•E'THER DIRECTLY OR IW�IRECTLT,TO ANC, D __1 2 2 — --1:. ' - _>_r__2. „t,-;t OR M1C'8 CLIEM(S, CR J ANC AND ANUS CONSULTANTS ARE NOT p impact X RESPONSIBLE FOR SAFETY PROGRAMS disturbance and/or compaction occur the Im act must be 1 AdOD ,�11 NET I11-E ANDFid PROCEDURES GO OFf DESIGN corrected at the end of the construction activity. This shall include ' ATIONS OR T1€ DGDPROCTION THE DESIGN restoration of soil depth, soil quality, permeability, and percent I X S DONTR _ X CONTRACTOR'S) AND 8UF'PUEFffi SHALL organic matter. Construction practices must not cause damage to I YERFY AND BE RESPONSIBLE FOR ALL ---I_ LirRow" Joe. ONS AND CONDITIONS CN AND OF THE or compromise the design of permanent landscape or infiltration �I VAR ANC Is TO BE MOWED Of am p VARIATIONS F%R'1 N, DR)SCR N8 AND RESIDENCE ; ( y F TI°NS 514ClIN SI `� DOC OR U-E S.area5. ' EPANCES I 1 ? ?MIR °D NIINGS,TTED SUBMITTALS, IAITTALS,NC ETC,REV AIRE TOR TO • Locate any soil piles away From drainage systems. Soil piles should 1i C I' `I FABRICATION Al0 OR INSTALLATION be tarped or mulched until the soil is either used or removed. Piles EXISTING CITY OFANM( (srR-rFQ S 1-10U5E/ADU 1 should be situated so that sediment does not run into the street or ►u ;i / X adjoining yards. m N � � � • L ��,T j `LAWN SX m • Backfill foundation walls as soon as possible and rough grade the In, o ? 2 � lot. This will eliminate large soil mounds, which are highly erodable, o & > II! i I l I j X n m a and prepares the lot for temporary cover, which will further reduce z I —._ Li z q erosion potential, ? • Remove excess soil fromt he site as soon as possible after ? 1 I II ! LAND USE INFORMATION,_ E backfilling. This will eliminate any sediment loss From surplus fill. j I S --Y�---E/evation120' JURISDICTION: CITY OF ANACORTE5 P leavingthe construction site and travelingon paved roads or A ' i 1 w _______I �J �I I ADDraESS: 8n 3TasHngtet. • The construction entrance shall be stabilized where traffic will be 5 _ _ SX IfD-0 7 Anacorlee,Washington j,j I p other paved surfaces. EASEMT. %1 ( ARE (Si• Provide For periodic street cleaning to remove any sediment that f - x ARBORVITAE, PARCEL NUMBER: P33118 4 x NEW X X X may have been tracked out. Sediment should be removed b ^��� ITYPICALIoITAE, ZONING: Residential 11.1 �, y X \—HIGH VISIBILITY I P LOT Si :ZE 11,872 SGL FT. (.25 AC.! Q shoveling or sweeping and carefully removed to a suitable I FENCEGIm3 R _ ., �, W disposal area where it will not be re-eroded. " HOUSE FOOTPRMT: 1,524 5Q FT. U s IS R. EXISTING I ,j GARACCE FOOTFRMT: 798 SQ.FT. ._. >Lu Elevation 125' ( GARAGE/SHOP COVERED DEGK/PORCH: 51 50.FT. QE`1 -c W P. LAWN) II PATIOAUALK DRIYEW4T: 804 5Q FT. T— Q� m EXISTING HCl15E (ADO: 793 5a.Fr. `� N 12 EXISTING SHOP GARAGE: 620 SQ FT. Z V ', I ( 9 E ��� T 1 TOTAL: 4,590 sQ FT. 8 ii APR.? t2019 S89'49'42"'W--\� 29.98' x NEW FRUIT 100.03' NEw FRUIT i _/ TREE 130.01' TREE CI)Y lJe-ANACORTES ,h Q r O N t SITE PLAN NOTES: / . ,. .. Q I. NO SURVEY HAS BEEN PROVIDED. OWNER 4 CONTRACTOR TO ASSUME ALL RESPONSIBILITY FOR LOCATING EXISTING / • LL UTILITIES,ADAPTING STRICTURE TO EXISTING TOPOGRAPHY, MD ENSURING THAT PROPER SETBACKS ARE MAINTAINED. 4"• c PILWAIIPIC 2. SHOWN SITE INFORMATION HAS BEEN GATHERED FROM THE CLIENT, THE CLIENT'S CONSULTANTS,AND THE COUNTY'S / ASSESSOR II.EBSITE ONLY, MD MUST BE vERIFIED ON SITE PRIOR TO CONSTRUCTION. �� Y9a1l�lAi 3. NOTIFY ANC DESIGN OF ANY DISCREPANCIES BETWEEN THIS SITE PLAN AND ACTUAL CONDITIONS,WHICH MAY IMPACT THE - 0 OVERALL DESIGN OR FUNCTIONALITY OF THE PROJECT, / dia y u�L � a d � Ifr /riP s4Er. o : 0111 I; • ' / _a10"41 POVVIONoytP '_ad�►��:t��i o ' 19-Oml�0 � � � aai � ' � / .- W��" � "® - � ��i_��!" h JOB: " �Oas�09 '%00,1eTi� inre 9 aiti ��90® 1 ' � _ .0� 4 � PREPARED BY: BV W I •. ® " �i DATE: 4- 9-190 o t ! rsri' - 0 �i9 �!� �� '�� ft SCALE: See Plan y �J'J v I flyers. .j �i • �• e'�:wsg� I �Ira,ms..- er N - .O, aw1�-5ng \ ��oG���� ' MK • ►F�i d D APN: P33118 }� ���pip, ,. ���o�yQ����- ����� se�9�, �+� DRAWING TITLE 4'-1Y CRA ED ROCK OR OMER ��•O " CLEAN Hal-SOS.,NON-6MC MAT9F 1 S— Site a \A � �Sj�` le P I9 :I" SILT FENCE STABILIZED CONSTRUCTION ENTRANCE APR2t2019 CITY OF ANACORTES COPYRIGHT 2tI MC Deel9, DRAWING 41 .1 1 1 1 1 1 1 1 rPii \v7r �•�,CE\ERAL CO\STRUCTIO\ STORM uuATER OLLU�IO\ NCA P EVENTIOV FL, i\ 1 2 2019 DESIGN CITY OF ANACORTES Purpose: To prevent the d scharge of sediment and Brett Van Andel brettr anc-design.com other pollutants to the minimum extent oracticaole www.anc-design.com from small construction projects. 360.615.1117(F) 360.933.7479(F) 20'-0" MAX WIPTI-I FOR DRIVEWAY ACCESS.NO DIRECT DISCHARGE 16593 McLean Rd OF DRIVEWAY WATER TO SWEET. Mount Vernon,WA 98273 Design 4 Installation: Plan ano Implement proper NEEDS TO BE COLLECTED 4 3711-1 5T (30.00' ROW) CONVERTED (AMC 19.1b) c l e a r l n o and o r a o i n c of the site. It is most important [*241 FIRE HYDRANT / / PERFORATED STUB THIS DOCJl1ENT IS TO BE USED SOLELY BY a ® OUT CONNECTION EXISTING WATER ANC DESIGN(ANC),ANC'S CLIENTS)AND/OR only to clear the area fleeced, keeoinc exposed SEE DETAIL) METER THI�OHIBITED PROJECT TEN CONTRACTOR(8) PROVAE L 120' STORM DRAINAGE NIB 8I PROHIBITED WITHOUT WRITTEN APPROVAL S89°56'29"E INLET PROTECTION EXISTING SEWER FROM ANC.MY USE Cf THIS DOCUMENT IN A 200' 130.02' PER BMP C220 STUB MANNER THAT MAY CAUSE A LIABILITY, areas to a minimum. Phase clearino so that only those 122'-4" WHETHER CLIETMAY CAUif$CTLY,TOANIS OR ANC'S CLIENTS) OR CONSULTANT(5 IS STABILIZED CONSTRUCTION / 29.98' KEY: STRICTLY PROHIBITED. x- --x-- x-fTPNCE areas that are actively pelno worked are ,Uir / ENTRANCE (SEE DETAIL) // �; �°�DUITFORsic. x14' 22'-9" WATER LINE ■ MC AND ANc's CONSULTANTS a� NOT / SILT FENCE - BMP C233 // • RESPONSIBLE FOR SAFETY FRC:GR MS, Un o v r o. II' BMP GI54 // ,ni X METHODS, CONSTRUCTION PROCEDURES Of OPERATIONS 4" PVG 3034 SILT FENCE BMP G223 OR THE CONS Po CTICN OF NE DESIGN / ,� CONCRETE ////// t, ^ SEWER LINE --vEXISTING!&k. e& I 2I X OOTRAcrows) AND SUPPLIERS P G233 X - E MENS NSD BE RESPONSIBLE FOR ALL DMENSIONN AND CONDITIONS ON L AND OF THE dote: Clearing limits shall be floe ed on the lot or /// // / /// TIGH7LINE JOB MC I6 TO BE NOTIFIED OF ANY 23'-3" // / / t HIGH VISIBILITY FENCE BMP CI03 VARIATIONS FROM THE DIMENSIONS AND gio g // / /// / rc STOM TO X COtITIONS SHOWN CH OR DISCfa'£PMCIES PERENNI fO D unrSN THE DocuMENTa. sproject area prior to initiatinc clear"no " ., j%/jMPGIms /j/_/�jfr_ nDuOUTs 1 '�A E FOR REVIEW IOR TO e ® / / ,, / ■� NEXISTING /X FHIGH ENCE ICI03 ITY FARICASUBMITTEO TOND/OR INSTALLATIO—giaMitathi I ERIMETER BMP TS 13 POST CONSTRUCTION SOILSLA - A ,� /> DRAIN • From October 1 throUoh Apr" I 30, no so Is shaII 123-1' ` / � xremaIn eXposeo ono unworkeo for more tf Ian t�o23-5 123' 4" I23_4" ' 6" 2'- 12i x I \ 1I RESIDENCE /m I ( , I X �� BMP cLS4 U Days" =torn May 1 to September 30, no soils shall 1 /� _ ti — I X � _, EXISTING remain exposed and unworked For more than 23' ) w uPSrR z J' ACCESS 3 o p .�Air X (ADU ACCESS FROM 31TH 5TJ N Seven days. / / m /.� I 1� 2" CONDUIT FOR • So" I shall be manageo in a manner that Does noter DATA UPSTR I �� �° 3" CONDUIT FOR I permanently compact or deteriorate the final 24 j /' I I �����I�I� • ELECTRICAL rn en �!!�_IIV X '� rn II U soil ano Ianosca oe system. IF o i sturoance �No . __� .....„ z ano/or compaction occur the imoact rust be 'in I �, I" x -•• , , o ; �, w correcteo at the eno of tie construction z X z 124'-4" N LAND USE INFORMATION: 'b ya activity. -his shall incluoe restoration of soil "'""`"" MUDR11.-7 �5 I ..... ' < _ Q V J \ KITCHEN IS / 3"- JURISDICTION: CITY OF ANACORTES in vn 3 "W1 oeot� soil cuality, oermeaoility, ano percent S' \ X ADDRESS: 81131thStreet. g Q1 r € ra iii 124'-1' ' A,124'-l" 124'-9 124'-1" 124'-3" 124-2" 123-9" 123-3 Xti. or anic matter" Construction practices must not - i JS Anacortes,Washington 27 Z v i �i g DRAIN FOR STORMWATER I' NEW " , --R PARCEL NUMBER: P33115 �- cause damaoe to or compromise the desicn of FILWIDE,2' DEEPGRAVEL PV AMERICAN R „ FILLED W/PVC PERF.PIPE ARBORVITAE, ZONING: Residential 2 el li- E AR. •��1� ���/// TYPICAL x Permanent landscape or infiltration areas. 125.0' HIGH VISIBILITY LOT SIZE: 11812 SQ.FT.(025AC.) r • Locate any soil piles away From drainage FENGEc103 I �\ HOUSE FOOTPRINT: 1,524 SQ.FT. _ " F GARAGE FOOTPRINT: 198 5Q FT. EXISTING COVERED DECK./PORCH: 51 Sa.FT. w. sLstems. Soil oiles should oe tarpeo or mu chap in j 4s or GARAGE/SHOP PxsONGLKJDR EWAY: 504SQ.FT. o unt' l tie soil is either used or removeo. Files e X EXISTING SHOP/GARAGE: 620 SQ.FT. shoulo be s"tuateo so that seoiment does not E f X TOTAL: 4,590 SQ.FT. run into the street or ao joinino yaros. ` a • 5ackfill founoation walls as soon as oossiole iii ". NEW FRUIT 100.03' S89°49'42"W� NEW FRUIT 29.98' \TREE 130.01 ' TREE and rough °rape the lot. This will eliminate taros ''._ soil mounos, which are hichly erodable, and a oreoares the lot For temporary cover, which will oin Further reouce erosion potential. 4 • Remove excess soil Fromt ie site as soon s W possible after backfillino . This will eliminate any ci \�,•\ seoiment loss From surplus Ell.I. JOB: 19IDID1 ill PREPARED BY: eV z • The construction entrance shall be stabiliz SITE PLAN DATE: 61219 0 I" = 10'-0" where traffic will be eaving the constructs n Z \ NOTES: SCALE: See Plan site and traveling on oa ved roa o s or oth r NO SURVEY HAS BEEN PROVIDED. OWNER 4 CONTRACTOR TO ASSUME ALL RESPONSIBILITY FOR LOCATING EXISTING APN: P33118 to in UTILITIES, ADAPTING STRUCTURE TO EXISTING TOPOGRAPHY, AND ENSURING THAT PROPER SETBACKS ARE MAINTAINED. L) paved surfaces. ASSESSOR WEBSITE ONLY, AND MUST BE VERIFIED ON SITE PRIOR TO CONSTRUCTION. 2. SHOWN SITE INFORMATION HAS BEEN GATHERED FROM THE CLIENT, THE CLIENT'S CONSULTANTS, AND THE COUNTY'S DRAWING TITLE K, 3. NOTIFY ANC DESIGN OF ANY DISCREPANCIES BETWEEN THIS SITE PLAN AND ACTUAL CONDITIONS,WHICH MAY IMPACT THE °�•M.IS Site — • Frovioe for periodic street cleaning to OVERALL DESIGN OR FUNCTIONALITY OFTNEPROJECT. N UNDER SLAB SEWER LINES NOT TO SCALE.MAY ONLY NEED (ll FOR UPSTAIRS l7BD PER OWNER) (.Y,e d 1c3 �a n.14*Ca� t us remove any seoiment that may have been Plan " fez" BUBBLE WRAP AROUND ALL CONCRETE PENETRATIONS trackeo out. Sediment should be removeo by Ted Q#. shoveling or sweeoing ano carefully removed 2L- to a suitaole oisposal area where it will no , be L COPYRIGHT 20I9 ANC Design re-eroced. DRAWING P 41 .1 1 1 1 1 1