Loading...
HomeMy WebLinkAboutK2852 / 2013-133B(2) Contract Modification 2015-002B (2) ENERGY SERVICES AUTHORIZATION NO. 2015-002 B (2) Solar Photovoltaic System City of Anacortes February 20, 2015 MASTER ENERGY SERVICES AGREEMENT NO. 2013-133 B (2) The Owner and the Energy Services Company(ESCO)named below do hereby enter into this Authorization under terms described in the following sections: Authorization to Proceed Project Conditions Compensation for Energy Services I. AUTHORIZATION TO PROCEED: Energy Services Company: Owner: Ameresco, Inc. City of Anacortes 222 Williams Avenue South acting through the Suite 100 Department of Enterprise Services, Renton, WA 98057 Facilities Division, Telephone No. (206) 522-4270 Engineering and Architectural Services Fax No. (425) 687-3173 PO Box 41476 E-Mail Address gthorsland@ameresco.com Olympia, WA 98504-1476 Telephone No. (360) 902-7272 By 411 By /49 Name Name Roger igfield E. Title Ron HaXton Title Energy Program Manager NW Rejion Director y 3/s. State of Washington Contractor's License No. AMEREI*004PZ State of Washington Revenue Registration No. 602 062 980 Federal Tax Identification No. 04-3512838 MWBE Certification No. H. COMPENSATION FOR ENERGY SERVICES: Basic Services COMPENSATION Energy Audit and Energy Services Proposal $ 0.00 Design $ 12,442.00 Construction Management $ 7,465.00 Overhead and Profit $ 22,395.00 Measurement and Verification—Year 1 $ 527.00 Grand Total(plus WSST as applicable) $ 42,829.00 Authorization No.2015-002 B (2) Page 1 of 2 III. PROJECT CONDITIONS: The Project Conditions contained in the Master Energy Services Agreement will be used unless specifically changed herein. IV. SCOPE OF WORK: Energy efficiency measures under Contract No. 2015-002 G(2-1)will include installation of a solar photovoltaic system, including any and all necessary ancillary equipment. The ESCO will perform a detailed engineering design as needed to obtain Owner review and approval of the proposed systems and to obtain bids as required. The ESCO will provide construction management, as-built drawings, and O&M manuals. All work is per the City of Anacortes Energy Services Proposal dated September 15, 2014. V. SCHEDULE FOR COMPLETION Final completion, including 1st year M&V, within 785 calendar days after Authorization to Proceed. 2015002Bauthem 3 Authorization No. 2015-002 B (2) Page 2 of 2