Loading...
HomeMy WebLinkAboutStorm Water 1-5 BLD-2018-0108 1610 Latitude Circle • • to r z2 4-8 MaPPbkgAdds:PO Box 547 �{,�,ci ,7j �j{``8221T op�p, �, 0 9� 9 AY'NJ66D Pham:36a2 9.B�'Tr9Fm>360,293.P938 SQormwaQer reguBPemenb are based on the 2012 SQoPrawateP Management Manual for Wester nWashington(SWMMUM.A lank Ps provided or the CiW of Aoacortes wegos6Qea under PPannawg®cpaPQneng,S4®PwatQP aeguPatPongo as well as under The Engineering Divisionof lic Residential construction is exemptfrom additional sQOPanwaQeP provisions it Involves no expansio n ffReed surfaces,no use oiid hat previouslyo � and results in no significant adveashydro/Jaskol��O6GpacQo &aging permit applications for Pots That are part of a subdivision That was recorded years prior to The data off the complete building corded no more than Il® codes in effect at the time the subdivision application�perrir�iQ application may continue to���the�¢oa�a�aQ�P the subdivision/plat lewd Of construction has not awed as of 2© �9a�submitted, if SQoP��^7�Qar�a�addressed at the 2012/2014 manual. o ��,the site ill( subject to Off your project adds Pegg than 2, i®sq.ft.of new plus replaced hard surface Pegs than 7,000 square feet of land,you most consider all 13€ lements of Pollution Plan QSWI�pp FIIP out The SW PPP QhecPrli tQ and explain Rio area,AM which disturbs describe Poe site conditions render tho elementC gist and the tints are inn toe U considered, describegQ aed. eon ndi ion need to continue u gnPs t�Q mpti of are hteemen or and The exemption from that element P� document. Off your project adds 2D000 sq. ft.or more M^�, Of y . ff new plus replaced hard surface area,OR wh tidisturbs fft.or more of land LNinir�arrn RequiremenW Il0�W O@ MRNAGv�dUAY apply,an continue with this document. if adding SAO so. or ewe off new hard soovace4 0 sq. or more of vegetation to lawn or Ba�d�ca�Qdl area/®a converting d ®�can se ft. n Qo .ft converting 32,670 naive Pasture 6�vdinlr ciun f ega�irrremcnt 24 o apply. Minimum �o or More of waQi�� requirements Il-9 apply,please gee the Lar� of 4(�Q g���'JP�����appl�a Off G�iinirn�rn requlrenr`gr tints. �e Smile Storm oofor Filoo Checklist for additional subr 6QQaB ®'IWOQ fi19i��g YJ Site�iQe AddPQgsB. I 9 j f°3��ff Description of the project, Pre Developed Conditions Wulff off The Reg March 22,2017 Page 2 off