Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COR-1994-Seawall Retrofit Plan -
APEX Services an AquaTec of Wa hinsmn Company LETTER Of TRANSMITTAL TO: Tom Durkan REP: SAMSUNG Washington Shannon Point Seafoods Shannon Point Facility Reconstruction c/o POB 759 Anacortes, WA Anacortes, WA 98226 CUSTOMER P.O. PHONE: 206-466-5101 DATE: February 2, 1994 BY: Bob Marmaduke Enclosed: (no-scale) Plan Sheet "Seawall Retrofit Plan" Letter from Wedge Engineers recommending seawall repair WA DOF Hydraulic Permit for "Concrete Bulkhead Repair" Narrative detailing Seawall History Note: Dan Schwartz (Contractor) has hand-carried this document to City of Anacortes to secure a building permit. Recommend hand-carrying document to each permitting agency to avoid additional administrative delay(s). Permit(s) must be posted on site. cc: Brian Williams, WA DOF Jim Greene, US ACOE James Isdell, WA DNR Ed Frank, Anacortes B&C AquaTec of Washington, Inc 1225 E. Sunset#594 Bellingham, WA 98226 (206) 738-0854 FAX 738-4358 APEX Services an AquaTec of Washington Company February 2, 1994 Tom Durkan Shannon Point Seafoods RE: Shannon Point Facility Reconstruction- Seawall Retrofit Narrative Tom: This letter will serve to describe the historical development of the seawall repair program for the various permitting agencies and insurance underwriters: In September of 1991, APEX Services performed a visual inspection of the dock understructure for Shannon Point Seafoods to satisfy WA DNR regarding the dock condition. At that time, it was recommended that rip-rap be placed along the entire face of the seawall up to mean high tide level in order to support the seawall against wave action, undercutting and protect its face from deterioration. 4 In June of 1993, the Shannon Point facility, including the dock, was destroyed by fire. i In November of 1993, APEX Services performed (sub to WEDGE Engineers, Auburn) a structural inspection of the surviving (CMU block) freezer building and seawall structure. Their recommendation was to demolish the building and repair the seawall face. At the same time, Geo Engineers was contracted by the Owner to perform soils logging, in order to determine the feasibility of supporting a replacement processing building on piling. Geo's report showed the soils immediately behind the seawall to be poorly consolidated sand and silt backfill, unsuitable for pile support until reaching native soils at -15'. A subsequent site visit was made by APEX on January 6, 1994. Using a backbone to "pothole" behind the seawall, it was determined there was insufficient mass for the seawall to be considered stable as a gravity structure. A structural review of WEDGE's inspection report showed the seawall may be prevented from overturning by reinforcing bar ties between the freezer foundation and the top of seawall. APEX met with Geo Engineers to discuss the possibility of stabilizing the seawall using H-piling,cribbing and either rock or concrete backfill. WEDGE's recommendation was to use reinforced concrete backfill, in order to construct a replacement seawall as a new stable foundation structure. Following demolition of the freezer building, a large crack was noticed developing at the corner of the seawall, which substantiated that the seawall was tied back into the freezer foundation for stability. A site visit by APEX surveyor determined the NE survey monument (on the seawall) has moved outward somewhat less than one inch. WEDGE issued a stop-work recommendation on further demolition January 25th, and plans for the retrofit of the seawall were then completed on a fast-track basis. It is our recommendation that work to retrofit the seawall be completed with the utmost urgency, in order 4 to prevent possible se all overturning and collapse during the storms of February-March. Sincerely, j APEX Servij f Bob Marmaduke PE !/ AquaTec of Washington, Inc 1225 E. Sunset#594 Bellingham, WA 98226 (206) 738-0854 FAX 738-4358 __ i i HYDRAULIC PROJECT APPROVAL R.C.A. 75 .20. 100 DEPARTMENT OF FISHERIES - Genera( Administration Bldg. R.C.A. 75.20. 103 Olympia, Washington M04 © January 25, 1994 (206) 753-6650 DEPARTMENT OF FISHERIES (applicant should refer to this data in all ewrespa deree) PAGE I OF 3 PAGES t0 LAST NAME FIRST IB TACT PHONE IS) CONTROL NUMBER Shannon Point Seafoods (206) 738-0854 00-61956-01 19 STREET OR RURAL ROUTE 7 ® q� VR[A '�.. c/o APEX Services, 1225 E. Sunset #594 03 .MARI c�tr Benin ham7TE 21v 98226 a tT 2�7ATER T IBUTARJ TO it TYPE 0P PROJEC Guemes Channel Strait of Juan de Fuca Concrete Bu�khead TER SECTION TOWNSHIP RANGE(E-W) COUNTY ———— — SECTION 23 35N 01E Skagit Repair i i TIMS LIldITATIOHB S THIS PROJECT MAY BEGIN ©AND MUST BE COMPLETED BY Immediatel December 31 1994 THIS A.Pmm(NAL IS TO BE AVAILABLE ON THE JOB SITE AT ALL TIMES AND ITS PROVISIONS FOLLOWED By THE PERMITTEE AND OPERATOR PERFORMING THE WORK. i Srr IMPORTANT CKNERAL PRO SIGNS ON REVERSE.SIDE OF APPROVAL I NOTE: Washington Department of Fisheries (WDF) reviewed your plans received on December 27, 1993 . 1. This pro ect is approved, as illustrated in your application, subject �o the following provisions. 2 . The applicant or contractor shall notify the Regional Habitat Manager listed below by phone prior to the start of construction activities. 3 . Work below the ordinary high waterline shall not occur from March 15 through June 14 of any year for the protection of migrating juvenile salmonids. 4 . The existing concrete bulkhead shall be repaired as illustrated in the project design dated 1/18/94 . The waterward face of the re aired concrete bulkhead shall be located no further than two (2� feet waterward of the existing concrete bulkhead footing. 5. Under no circumstances shall the bulkhead be located waterward of the approved location. I { SEPA: DNS, City of Anacortes12/3/93 R WilliamsW REGIONAL HABITAT IIANrGf - Brian (206) 428-1053 PATROL - Trimble (3] APPLICANT - WILDLIFE - READER - PATROL - HAB. MG GRR. - WRIA DEPARTMENT OF FISHERIES R J DIRECTOR f C HYDRAIILIC PROJECT ,. APPROVAL R.C.W. 75.20. 100 DEPARTMENT OF FISHERIES R.C.W. 75.20. 103 Gwwral Administration Bldg. Myopia, Washington 98504 DEPARTIEIIT OF FISHERIES F January 25, 1994 (206) 753-6650 (applicant should refer to this date in all correepondenee) PAGE ZOF 3 PAGES 10 LAST KANE TACT PH011E(S) CONTROL KINSER Shannon Point Seafoods 18 (206) 738-0854 T 00-61956-01 12 WATERG y]WRIA uemes Channel 03.MARI 6. The concrete structure shall be poured at low tide when the area is dewatered and shall be allowed a minimum curing time of two (2) hours prior to coming in contact with state waters. Wet concrete shall be prevented from entering waters of the state. Forms for any concrete structure shall be constructed to prevent leaching of wet concrete. Impervious materials shall be placed over any exposed concrete not lined with the forms that will come in contact with state waters. Forms and impervious materials shall remain in place until the concrete is cured. 7 . Use of heavy motorized equipment shall not be permitted on the beach. 8 . Installation of the H- ile supports and pre-cast concrete panels shall be accomplished from the landward side of the existing concrete bulkhead or from a barge. 9 . Under no circumstances shall the barge used for project construction be permitted to ground out on the beach. i 10. Bed material waterward of the bulkhead footing excavation shall not be utilized for project construction or fill. 11. Footing excavation for the new concrete bulkhead face shall be accomplished with hand tools only. 12 . Excavated materials shall not be stockpiled on the beach. 13 . All trenches depressions, or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. 14 . Project activities shall be conducted to minimize siltation of beach areas and bed materials. 15. If a fish kill occurs or fish are observed in distress, the project activity shall immediate) cease and WDF Habitat Flanagement Division shall be notified immediately. 16. Debris or deleterious material resulting from construction shall be removed from the beach area and project site and shall not be allowed to enter waters of the state. 17 . Water quality is not to be degraded to the detriment of fish life as a result of this project. j REV 10/16/88 HYDRAULIC PROJECT APP ROVAL DEP ARTHIM OF FISHERIES ��et 0 0 `F R.C.W. 75.20 . 1 Garonl Administration Bldg. R.C.W. 75.20.103 Olympia, Washington 98504 (] January 25, 1994 (206) 753-6650 DEPARTMENT OF FISHERIES (applicant should refer to this dots in all corresponde'¢e) PACE3 OF 3 PAM 10 LAST NAME 18 CONTACT PMONE(S) CONTROL HUGER Shannon Point Seafoods (206) 738-0854 1 00-61956-01 12 NATE W RIA RGuemes Channel 03 .MARI 18 . The applicant shall be required to replace the productive functions of the beach habitat that are lost due to the proposed repair of the existing concrete bulkhead. The applicant will be required to enhance 132 square feet of existing beach through placement of cobble materials 8 to 12 inches in diameter over loot of the enhanced area. The enhanced. area shall occur between the face of the new wharf structure and the 0. 00 tide elevation (MLLW = 0. 00) or between the -8.0 and -10.0 tide elevations (MLLW = 0. 00) Under no circumstances shall the cobble enhancement materials be placed between the 0. 00 and -8. 0 tide elevations for protection of eelgrass habitat. The cobble enhancement materials shall be placed within six (6) months following the construction of the pier and wharf structures. If ou have any questions or need additional information, please conact Brian Williams, Regional Habitat Manager, at (206) 428-1053 . LOCATION: 1050 Dakota Avenue, Anacortes lt:64 : 1 i REV 10/16/88 4 l i Engineering Report APEX Services 1225 E. Sunset, No. 594 Bellingham, WA 98226 Attn: Robert Marmaduke, P.E. i I I Shannon Point Seafoods i Freezer Building Evaluation i January, 1993 Project No. d9312-10e I Wedge Engineering dba P.O. Box 1892 Aubum, WA 98071-1892 k (206) 833-7132 FAX (206) 833-2461 i ; MINI t5T ..._ _. - - - - --1-;3t-y4 ;12: 5rii ;M(.MIUC CONSIKUCIION� M7380854;s 2/ 2 Facsimile Cover Sheet To: Robert Mermaduke / Dan I Schwartz Company: APEX/ McBride Construction I Phone: 783-0845 Fax: 7834358 From: Chuck Weaver Company: Wedge Engineering Phone: 833-7132 Fax: 833.2461 Date: 01/25/94 Pages Including this cover page: 1 comments: SPS " Seawall Failure" Gretttlemen_ This memo is to inform you of our concern about potential failw of the existing seawall located at the SPS Freeze-Building site. As noted in ow report~ the seawall is an " unCahle crructurr " and should be removed or repaired prior to Unite construction or demolition of other structures, We believe the Reawall is anchored to the building,foundations and removal of same could cause a Utire of the wall. i • i 1 APEX Services: SPS Freezer Bldg. January, 1993 Page 13 SEA WALL Wedge Engineering performed an analysis of the stability of the sea wall assuming that the anchoring foundations were removed. The sea wall is unstable unless it has a sizable heel, is anchored, possesses a key, or is founded on piles. It is strongly recommended that the back of the wall be further examined to determine if any of these conditions exist. Without restraint, the wall may fail once the existing foundations have been removed. In fact, a new crack appears to have developed at the corner where the north facing wall meets the west facing wall. Demolition crews have recently removed the old foundation in this area. µ' The wall appears to be most sensitive to sliding at the base. The installation of a key would reduce the potential of this type of failure. In addition, the wall would require re-anchoring or additional mass to resist overturning forces. However, a design for repair of the sea wall is difficult without full knowledge of the original design intent and construction. Inadequate repair of the wall would lead to failure either during the vibration and loads from construction and pile driving or after construction which could seriously damage the new piles. Since the new construction does not appear to rely upon the existence of the sea wall, the option of removing the wall entirely should be considered. l UNUTATIONS The analyses, conclusions and recommendations contained in this report are based on site j conditions as they existed at the time of our investigation and further assume that the inspections are representative of the conditions of the Freezer Building and the Sea Wall. If different conditions are observed during construction, Wedge Engineering should be promptly notified for review and reconsideration of our recommendations. Wedge Engineering recommends that we be given the opportunity to review those portions of the plans and specifications which pertain to rehabilitation of the Freezer Building and Sea Wall to determine if they are consistent with our recommendations. This report was prepared for the exclusive use of the owner, architect, and engineer for evaluating the condition of the structures. It should be made available to prospective contractors for information on factual data only. Our investigation was performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. 4 Wedge Engineering dba i C 80 I I I - ^��OI I m T—Z: 4N N.8m NT TVp°T,... .im m TmAr A m C) 1— T r O o e A � H Z N o A O m ^ m !n N N O Z N T 0 O A ol OA Fc ° C\BIN\Sp5_C'rOA CDR 'T o m v A N O � C T r m r o 50 gg�9 Tnr ; m9 Sr�r 2 I m O sa m iPz yy y gym✓ cry-i H4. '.. mn o 8 $n : m o .-... 8� m A m n3 a n m T � A r 3rA a o 00 o oz �c m v z r " 'm N r. mm -� -- ...1.. u Uzi Or<poo D D spy r 9 H mmz TN N N<yZ D O = T � Tmy - z a N o I ra �- 1, NORTH ELEVATION WEST ELEVATION 0 0 0 0 0 a m SOUTH ELEVATION I, ��tl EAST ELEVATION SHANNON POINT FACILITY EMERGENCY RECONSTRUCTION EAEVATIONS COPYWRITE APEX SERVICES, 1993.DRAWING MAY NOT BE A O OCEO WITHOUT WRITTEN PERMISSION REV DATE DWN CKD DESCRIPTION "!+" ELEVATIONS ' 0 ¢e y� SCALE GATE OWN CKD JOB NO DWG NO REV U 'Q AS NOTED I 1026/3 RAM RAM SPSt0263 C-OOB 0 APEX Services SAMSU NG WASHINGTON z EMERGENCY RECONSTRUCTION ' Bellingham,WA SHANNON POINT FACILITY u (208)]83-0854 gnacortes, WA .- M m x nz Zu m . 0 � FZ M % x MI!Z2 >1 Ott u M N NO oD 5 z 60, IkA xz 0. ........ Nay m:, : M . : m i M N, 1 x CABIMSPSCIOACM & 0 0 0 m 0 m 0 0 0 m w Z Flo I-- 0 - z Ell -0 k- 0- om M-0 Po z G) zm3 a >z ozo 10 0 0 0 0 -M I 24 gop ----m FC 0 =i 0 >z 0 0 0000000000000 NORTH ELEVATION g ii y I"I.t!a.� Laik..3Pi 'W..r.- v �'. 4 "u Lt itt. tfr:�`�`-`!�•` �"ttl ti i t ��:Y WEST ELEVATION ! Lj 0 0 0 0 SOUTH ELEVATION Is EAST ELEVATION 860 (ALTERNATE) BUILDING ELEVATIgNS COPYWAITE APEX SERVICES, 1993, DRAWING ML PRODUCED WITHOUT WRITTEN PERMISSION rc REV DATE OWN CKD DESCRIPTION "43 ELEVATIONS U, ¢o SCALE GATE OWN I CKO I JOB NO DWG NO REV (j AS NOTED ID/28,83 RA I RAM L SPS10263 C _ APEX Services SAMSU NA WASHINGTON Bellingham,WA EMERGENCY RECONSTRUCTION (208)783-0854 SHANNON POINT FACILI TY ti Anacortes, WA