HomeMy WebLinkAboutCOR-1993-Fire Flow - �.r
r✓ ANACORTES DEPARTMENT OF ENGINEERING
AND DEVELOPMENT SERVICES
P.O.BOX 547, RNRCORTES,WA 98221
JRMES R. PEMBERTON,DIRECTOR C
,
November 16 , 1993
APEX Services
1225 East Sunset No. 594
Bellingham, WA 98226
Attention: Mr. Bob Marmaduke
Re: Shannon Point Facility Reconstruction -
Fire Flow
Gentlemen:
I have been asked by Mr. Ed Frank, the City' s Building Official,
to review and comment on your letter dated November 11, 1993 to
Mr. Frank and Mr. Harju regarding fire flows to the proposed
Shannon Point facility. Enclosed for your convenience is a copy
of the City' s water extension policy which I think addresses the
City' s position on participating in the costs of extending the
proposed waterlines to loop through Shannon Point to Lovric ' s
Marina and back to Oakes Avenue.
With the exception of separately metered fire systems, all
waterline extensions to the City' s water system become part of
the distribution system. Our responsibility is to assure that
those extensions are constructed to the City ' s standards and in
accord with the adopted extension policies . The applicant is
responsible to provide design engineering and construction and
to bear all costs associated with the extension unless the
system is oversized at the City' s request. When requested, the II
City may elect to pay the difference between what is required by
the developer and what is desired by the City. The
responsibility for acquiring rights-of-way and/or easements for
the utility extension is also the applicant's.
Our ability to quickly process an application for utility
extension and to issue permits for construction are directly
related to the thoroughness of the plan preparation. Our
turnaround is quite reasonable and I would not anticipate any
particular problems with this proposal. We would be happy to
provide you with our design standards and specifications upon
request and will cooperate in your efforts to acquire, easements
from abutting property owners to loop the system.
APEX Services November 16, 1993
Page 2
I do not see any extenuating circumstances that would warrant a
recommendhtion . to the Council to allocate funding to this
project. I would suggest that you contact Mr. Anton Lovric and
investigate the feasibility of working together to accomplish
this project to the mutual benefit of both parties. I have had
conversations with Mr. Lovric in the recent past regarding a
and include for our reference a co
project of this nature a y PY
of a letter I wrote to Mr. Lovric on September 15th in this
regard.
Sincerely,
CITY F ANACORTES
es R. Pemberton
Director of Engineering &,Development Services
(206) 293-1919
JRP:cm
CC: Ed Frank
Doyle Geer
Dean Maxwell
Bill Jackson
Ken Brown
f
RNACO ES DEPARTMENT OF ENGINEER G
9� AND DEVELOPMENT SERVICES
P.O.BOX 547,RNRCORTES,WA 98991
1
JRMES R.PEMBERTON,DIRECTOR
Septe er,15, 1993
i
c
Mr. Anton Lovric i
LOvric's Sea-Craft
3022 Oakes Ave. 1
Anacortes, PIA 98221
Dear Mr. Lovric:
I
I am writing to follow up on our conversation regarding fire
protection to your business establishment located on the
waterfront in the vicinity of Florida Avenue. To provide a
hydrant at the waterfront would require the extension of an 8"
ductile iron water line from the south side of Oakes Avenue at
Florida Avenue, across Oakes, to the waterfront via your access
road. (See attached sketch) Constructing an 8" 'line directly
over the bank to your waterfront would be unacceptable to the
City as it would be difficult to maintain once constructed.
i
Should you wish to pursue this matter, it will be necessary to
complete the attached Utility Extension Application and return
it to my office for processing. Once the application is
approved by the City Council you would be required to engage the
services of a professional engineer to design the water line
extension and provide the City with plans and specifications for
review and approval prior to construction. In addition to the
enclosed application, you will also find a copy of the City's
Fee Schedule for Engineering and Development Services. I've
highlighted the fees that would be applicable for a project of
this nature.
As you consider this matter, I would like to suggest that it may
be appropriate to contact adjacent property owners and determine
if there is any interest in continuing a water line along the
waterfront from your establishment easterly and connect to the
existing 6" dine near Shannon Point Seafoods. This would allow
for the placement of additional fire hydrants along the
waterfront and would improve system reliability, and to some
degree, increase available fire flows in the area.
I hope this information is helpful. If you have any additional
questions please feel free to contact me.
Sincerel ,
G22N�
Pemberton
rector of Engineering & Development Services
JP/jm
i
• �' GEORGIA
r •,
s,
e � r•
• \ •1 a�-^ .y�����¢�y ,`� �+�\u+r1.Z G,:^ r r. rr.ANr,v- -.m•r.. z� u r •�
4 G•:.w ^.^.- '�':"�h� nY?.".�'!PT�" .i.... • u�q'��!II���'t:�l .�'�Ai�Mfrri^rt�.!YJ'M�r+!•Y.9.:F,,.F t ':3