HomeMy WebLinkAbout2010-01-25 City Council Minutes Approved OSS Y Off'
City Council Study Session Minutes—January 25, 2010
At 7:30 p.m. Mayor Maxwell called the regularly scheduled study session of January 25, 2010 to order.
Kevin McKeown, Nick Petrish, Erica Pickett, Brad Adams, Bill Turner, Cynthia Richardson and Brian Geer
were present.
Anacortes Futures Project Update
Mike Trafton, Anacortes Chamber of Commerce President, introduced Chamber Vice President Mark
Bunzel who is facilitating the Anacortes Futures Project Temporary Team. Mr. Bunzel reviewed the work
of the Project since its last presentation to Council in July 2009 and plans for the next year or two. Since
July the Project has presented its initial report to the Port Commission, the School Board, the Hospital
Board and service clubs in addition to City Council and has made its report widely available. The
Temporary Team formed last June to guide the project includes Mayor Dean Maxwell, Planning Director
Ryan Larsen, Port Executive Director Bob Hyde, Port Finance Director Chris Johnson, and Mitch Everton
and Pam Allen from the Chamber of Commerce. The Temporary Team met twice monthly to map out how
to proceed with the opportunity assessment, economic development strategy and strategic plan under the
guidance of a Steering Committee beginning in 2010.
Mayor Maxwell and others have observed that the City has undertaken this type of strategic planning
before, in the fifties and again in the eighties. Mr. Bunzel observed that in each generation the same
topics have arisen including achieving a healthy retail mix, downtown vitality, and access to the
waterfront. Past studies had great ideas but not all of them were able to be implemented. For the current
Project the Temporary Team has chosen a target end date of 2025 to set a timeline that fits within
comprehensive plan cycles; has sketched out a plan for collecting public input and forming Advisory
Committees to focus on various topics during 2010; has drafted an RFP for professional consultants to
facilitate collecting and synthesizing public input and committee analysis; and has established a Steering
Committee to guide that work including Mayor Maxwell, Bob Hyde, Mike Trafton, Mark Bunzel, Duncan
Frazier, Laurie Gere, Stuart Janke, Courtney Orrock, Wallie Funk and an Anacortes High School student.
The Temporary Team estimates a cost of$75K/year for the next two years for a consultant. The Chamber
of Commerce has committed $12,500 to the effort and MJB has committed another$12,500. City and
Port contributions remain to be determined. The Project has planned a joint City Council study session on
February 22, 2010 with the Port Commission and Chamber of Commerce Board. The Temporary Team
hopes to have a consultant recommendation by then. Mr. Bunzel invited questions from Councilors.
Mr. Geer praised the collaborative nature of the effort and urged the City and Port to step up and
participate in funding the next steps. Mr. McKeown asked how the $75K will be spent. Mr. Bunzel said it is
a rough estimate of consultant cost to facilitate the public meetings envisioned by the Temporary
Committee and then review the data and assist the Steering Committee to develop a strategic plan. Mr.
Turner asked if MJB is interested in participating in the process since it owns significant undeveloped
downtown property. Mr. Bunzel said MJB has indicated interest in the project and will also contribute
funding for the consultant but will not be allowed to drive the project. He added that other major
stakeholders such as Bill Wooding and the tribes will need to be involved. Mr. Adams suggested that the
study needs to look beyond just Fidalgo Bay to find the best options for the city as a whole. Mr. Bunzel
said the plan is to look at the SR20 corridor, March Point, the Guemes Channel waterfront, and other
areas but the study will have to focus somewhat. Mrs. Richardson agreed with Mr. Geer that the
cooperative nature of the Project is very hopeful and asked what will be the deliverable for Phase I. Mr.
Bunzel replied that Phase I will arrive at a weighted list of what the community wants to see by 2025.
Phase II will evaluate which of those ideas are feasible and economically viable. Mrs. Richardson asked if
the draft RFP can be circulated to Councilors and Port Commissioners for comment before it goes out on
the street. Mayor Maxwell had requested that also. Mr. Bunzel said he would do so. Mr. Petrish said he
supports the project 100% and recalled previous times when diverse organizations successfully
cooperated to achieve community-wide goals. Mr. Bunzel can be reached for questions via email
(mark.bunzel@burrowsbayassociates.com) or through the Chamber of Commerce. Tonight's presentation
will also be posted on the Chamber of Commerce website (www.anacortes.org).
Anacortes City Council Study Session Minutes January 25, 2010 1
Shoreline Master Program Review
Planning Director Ryan Larsen summarized the history of the current round of SMP revisions which
began in 2006. No comments were received during the 14-day public comment period following the SEPA
threshold determination of non-significance on December 9, 2009. The Department of Commerce public
comment period ends February 2, 2010. City Council will hold a public hearing at its February 1, 2010
regular meeting. Council may take action on the SMP as early as March 1, 2010 after which time it will be
reviewed by Dept. of Ecology with a target of final completion this summer. Mr. Larsen noted that Dan
Nickel from SMP consultant The Watershed Company was present to answer questions.
Mr. Larsen addressed the ten discussion items identified his January 21, 2010 memo to Council.
1. Environmental Designations: Mr. Larsen pointed out the revisions that appear on new Figure 5.1 e
which is a 4th iteration of this map and incorporates Council input from the last round of review.
Mr. Petrish clarified that the color coding for Natural areas has changed between the last revision
and the current map.
2. Shoreline Use and Modification Matrix (Table 5.1, page 65 of the draft SMP): Some minor
changes have been made based on consultant and citizen input. Mr. Larsen suggested Council
provide some direction on this table after the public hearing next week.
3. Development Standards: Shoreline setbacks in Shoreline Residential environments in Skyline
Marina have reverted to the 25' setbacks used in the 2000 SMP.
4. Public Access: Mr. Larsen asked Council to review the new Policy 7.3.7 regarding the threshold
for requiring public access for new subdivisions. The change is intended to resolve a discrepancy
between old Policies 7.3.13 and 5.9.8. The new policy meets the WAC guidelines, which
generally requires public access for subdivisions of four or more lots (stated as nine or more lots
in the 2008 draft). Mrs. Pickett clarified that this change reconciles City rules to State rules. Mr.
McKeown asked how long the SMP will be valid once approved. Mr. Larsen responded until 2019
unless the State legislature extends the period by three years.
5. Shoreline Stabilization: Staff is proposing new text to clarify the definition of and threshold
between "replacement" and "repair." Repairs that involve more than 50% of a property's shoreline
stabilization or more than 25 feet if the foundation is removed would qualify as replacement. Mr.
McKeown asked for an example. Mr. Turner gave the example of a concrete seawall that needs
either repair or replacement; replacement would require new soft armoring techniques whereas
repairing could use the former concrete method. Mrs. Richardson noted the building code
observes the same principle: small repairs allow replacement to the same standard but major
damage (more than 50%) has to be rebuilt to current codes.
6. Pier Dimensional Standards: Based on past rulings by Dept. of Ecology, staff and the consultant
propose adding dimensional standards for piers and docks in Shoreline Residential areas (not in
Urban or Urban Maritime areas). The proposed standards mirror what U.S. Army Corps of
Engineers permits require since applicants will have to get COE permits also. The proposed
language also defines repairs vs. new construction. Mr. Larsen reported that the Planning
Commission is recommending some changes to the proposed language. Mrs. Richardson pointed
out Cap Sante is not allowed to add new residential docks and piers in the current draft; she
asked to keep that issue on the table, at least as a conditional use. Mrs. Pickett asked that it be
discussed at the public hearing. Mrs. Pickett also noted that the correct name of the body of water
at Skyline Marina is Flounder Bay and asked that this be shown correctly in the SMP.
7. Vegetation Conservation. The consultant suggests a new consolidated chapter for this topic
instead of having material distributed throughout the SMP. The WAC also suggests this. The
existing Critical Areas Ordinance language that pertains to marine vegetation has been brought
into the SMP as Appendix A. Mrs. Richardson applauded the former change but asked if the new
Appendix A would require the City to go back to Dept. of Ecology in order to alter the Critical
Anacortes City Council Study Session Minutes January 25, 2010 2
Areas Ordinance. Mr. Larsen said no, the two are separate documents. Mr. Turner noted that the
courts have decided that the SMP, not the CAO, governs in shoreline areas and asked for
verification that the proposed Appendix A doesn't confuse that issue. Mr. Larsen said it does not.
8. Restoration Plan: This former chapter of the SMP will be pulled out and made Appendix B. Mr.
Adams referred to Section 5, Other Agencies and Entities, and asked if the refineries are involved
with shoreline restoration in the City of Anacortes. Mrs. Pickett noted there were fines from
refineries earmarked for shoreline restoration but that the refineries aren't subject to the SMP as
March Point is not inside the City limits. Mr. Larsen said the refineries are in the urban growth
area, not the City limits. Mr. Adams asked Mr. Larsen to look into that further.
9. Exemptions: Exemptions from Substantial Development criteria have been revised to match the
WAC requirements.
10. Critical Areas Ordinance: As discussed earlier, a revised version of the CAO has been added to
the SMP as Appendix A. The revisions include removing exceptions (which are considered
"variances" in the SMP) and including wetland replacement and enhancement ratios per Dept. of
Ecology and U.S. Army Corps of Engineers standards. Mr. Turner asked if the City has to use the
wetland replacement ratios from those other agencies and how appropriate they are for
Anacortes. The consultant said it is not required but it helps to have consistent standards across
jurisdictions. Mrs. Pickett asked how large the ratios are. The consultant said they vary depending
on the wetland category rating. Mr. Larsen said he'd put the ratio table in the Council packet for
the next meeting. Mrs. Richardson asked if the new ratios apply in shoreline areas only, not
throughout the City. The consultant said yes, the ratios are for wetlands in shoreline areas only.
Mrs. Richardson asked if Council then needs to reword the CAO to match. Mr. Larsen said no,
the SMP and the CAO are separate documents. Mrs. Richardson ask how citizens would know
which governs a particular wetland, the CAO or the SMP. She said it is housekeeping but the
documents need to be consistent. Mr. Larsen said he would look at the two documents again to
ensure they are speaking the same language.
Mr. Larsen directed Council's attention to the 11 x17 summary of all public input received to date on the
SMP along with staff and Planning Commission recommendations about each item. Mr. Larsen urged
Councilors to focus on pages 1-11 prior to the public hearing on February 1, 2010;these are the items the
Planning Commission recommends taking action on. Staff will be working on language for some of those
items in the next two weeks. Mrs. Richardson thanked staff for the very useful format. Mr. Larsen thanked
the consultant for developing it. The comment letters supporting the 11 x17 summary will be provided at
the next meeting. Mr. Larsen suggested that the February 1, 2010 public hearing may need to be
continued to allow sufficient time to deal with all issues. He asked Councilors to bring their copies of the
December 2009 draft SMP document to the February 1, 2010 public hearing.
There being no further business, at approximately 8:57p.m. Mayor Maxwell adjourned the regularly
scheduled study session of January 25, 2010.
Anacortes City Council Study Session Minutes January 25, 2010 3