Loading...
HomeMy WebLinkAboutCOR-2002-Permit Request - T CONSTRUCTION COMMERCIAL GENERAL 'CONTRACTOR May 9,2002 City of Anacortes Building Department P.O. Box 571 Anacortes, WA 98221 Attn: Don Measamer Plans Examiner Dear Don, We are submitting for permit on behalf of the North Cascade Ear,Nose,&Throat Clinic for tenant improvements at an existing location. The address for the proposed construction is 1019 24m Street, Suite B in Anacortes. This building is the current location for Bill Bethards D.D.S. dental practice,which is located in the adjacent suite.The building's original construction date was somewhere around 1990. I have included a scaled existing floor plan,plan drawings for the new tenant improvement,and an HVAC layout for the new rooms. • Wall Construction: 2x4 wood frame walls or 25 ga.metal stud with sound batt insulation,5/8" GWB on all walls • Ceilings: The existing space has suspended acoustic grid ceilings with recessed light troffers Some ceiling areas will be removed to accommodate new rooms. The new finished ceiling will be similar. • Plumbing: New sink areas as per plan. An accessible bathroom is presently located in the building.A new bathroom will also be added at the front reception area as indicated,with sheet vinyl floors and p- lain wainscot to 48"in height. Both bathrooms will be unisex. A backflow prevention device will be added to the water supply in the crawl space. • Mechanical: The existing fumace/heat pump combination that is currently provided to the space will be retained. The plan calls for a rezoning of the space into 3 zones,a supply in each room and transfer grills for the air movement. • Electrical: The existing lighting,troffers,parabolics,etc. will be retained and used in the new locations. Due to no change in the HVAC there will be no electrical required to those areas. • Cabinets/Casework: New cabinets and casework per plan. The reception desk is existing and will more than likely be retained. If you have any questions regarding this permit application,please contact me at(360)445-4521 or directly on my cell phone at(360)661-0837. The new tenants are anxious to commence the project as soon as a permit is issued. Sincerely, /� ! \ QQ 14hChI` ED Thomas J.Toepfer,Pres. MAY 9 2002 Tower Pacific Construction Inc. BUILDING Utlri: (360) 445-4521 OFFICE s? (360) 445-4531 FAX 19550 CONwAY HILL ROAD -? MOUN'C VERNON,WA 98274 FROM—TOWER-PRC IFIC CONSTROC-LION INC FAX NO-. 360-445-4531 - May. 28 2002 03:32PM P2 TOWER C I CONSTRUCTION May 28;2002 t Don Measamer Plans Examiner City of Anacortc:s P.O Box 547 Anacortes, WA Ref: 3019 24� Street Nortb Cascade E.N.T. Anacorws,WA Dcar Don, In response to your letter of May 22'(attached) I have addressed each of your concerns individually: 1. Copy of current Washington State Contractor's License aaaehed r 2. We would prefer to reduce the occupant load by considering the waiting area as an accessory use of the Office space. If that is not fc asiblo we can delete the accordion door from the improvements. 3. Signage directing clients to the barrier free restroom will be installed on the hallway wall to the left side of the scope room pocket door.This location provides easy visibility for clients at the reception or waiting room, 4. As discussed,we will be installing lever set door hardware at all locations and barrier free hardware at the pocket doors. 5. We wilt be installing a reduced pressure backflow assy-in the crawl space at the water source for the tenant space. Commercial Plumbing Inc. will be the installation contractor. 6. I am attaching a cut sheet which shows the actual weight of the manufactured audio booth. This will be one of the last items to be installed in the space and the architect will be verifying the existing structure. 7_ The new restroom floor will be commercial sbeet vinyl and the vinyl will continue up the wall for a minimum of 5"with heat welded seams. If you have any further questions or concerns,pl=e contact me at(360)4454521. Sincerely�C Thomas J- Toei/lifter Tower Pacific Construction Inc. cc Steve Story Stephen Story Architects III V.' -. ..