Loading...
HomeMy WebLinkAboutDOC-2010-Framing Plans - SMALL DOCUMENTS FreeDoc 9 Cal e lie gJ6 2x6 brg wall g 7 g g 2x4 brg wall 1p 11 i2 see B/A4 for 13 14 Y see A/A16 Q see B/A16 Q floor framing I at Connection 2x4 brg wall 2x4 brg wall 2x6 brg wall 2x4 brg wall 2x6 brg wall -�see B/A16 see B/A16 see A/A16 see B/A16 see A/A16 2x4 brg wail Beam 1! " see B/A16 - Schedule _ o ® a No. Qty Nominal Size Dressed Size Grade to io A 6x8 5 1 2 x 7 1 4 DFL #2 B 3 i 2 x 9 1 L2 some 2.0 E PSL C 5 1 4 x 9 1 2 some 2.0 E PSL •o n D 4x8 3 1 2 x 7 1 4 DFL 2 ° E 3 1 4 x 11 7 8 same 2.0 E PSL 4x4 6- ❑❑ 0 •oo F 5 1 4 x 11 7 8 some 2.0 E PSL G 5 1 4 x 9 1 2 some 2.0 E PSL ® o W 634 x13.5 same 1.8EDF FGLB 4x4 5f'x5i 1=7Z Notes: FSL co o o ia s Q _0 6x6 AM 1) provide (2) layers 5/8" type X GWB wrap all beams ,- to �_ 2) no wrap required at door and window heads ® ® x 3) provide posts or gang studs as indicated with a, all 0 �� LJ continuous blocking providing full bearing between floor, N i a "'gyp ; 4) provide simpson CS16 strap each end where any ;o ;o o ;`a ;o beams are installed without a continuous top plate v ® ® L c0 0 QB7 © L ® O c �} 0 0 6x6 04XIS ° 4x 4x6 i . ® r3 0 o a r r 6x6 ® 3/4" PWD floor () r � r structural � 4x6 4x6 t~ bracket - r = r 8 o r (2) layers 5/8" T type X GWB 11l" TJI 110 ® 111, TJl 110 all sides joists ® 16"oc joists 0 16"oc fire tape only • �--i a� continuous wall v' 2x6 LSL studs 0 16"oc a r; see Floor Plans for extent of rated wall 4x4 hatch indicates 1 hr fire rated 8" � 0 o00 see E/A16 for detail joist cavity for dryer exhaust (2) layers 5/8" type X GWB 4' . 1' � ❑ 4x4 PT 4x6 see C/A3 3 4 APA rated T&G subflr-finflr, glue and nail w/ 8d common nails w PB4fi continuous 1 x4 g 6"oc diaphragm boundaries, 6"oc panel edges & 12'oc field lay--out as indicated per IBC case 1 & 3 --� each side oo � , (unblocked diaphragm) except as directed by joist mfr (typical at all wood floors) 16" 5/8" GWB Second Floor Framing Plan � PSL co! Rated Cavity �_ 1� 8 stipple indicates AS I stipple indicates -C 1/8 =1 8" concrete wall 118 8" concrete wall 3/4'=1�-�' see D/A2 similar IL resident s0rage see D/A2 similar (non—insulated) 540 sf semi—heated i ldental use ,s (non—insulated) All Exterior Walls (fire separation distance > 5 ) E w/ automatic fire—extin fishing system a ,tea A8 1 hour rated from inside only per IBC 704 A8 oL=3 0 200s occ •�. waterproofing membrane prescriptive detail Table 720.1(2) Item 16-1.3 i '®I- 5 °x5 " �j ' metal flashing 4"/2"f4" "Z" 1 2 3 4 5 6 7 8 9 1 D 11 1112 PSL col 13 14 N (dk brnz or galy) w 11'-61111 15'—D" 13'-D" 13'-0" 15'-0" 15'-0" 10'-0" 12'—D" 15'--011 IN-0 of 13'-0" 15'--0' 10'-0" topsoil sidewalk or grass 'L1 f " " " 1 " " ! " /1 1 I! 1 11 f 1 1 " f " f " ' 8 -9 66)� 43� 5'-9" 8 5 -9 43� 8 -g 81(6 10 13 -9 6 -7 5 -9 4 9 5 -9 3 —7 2 6'-6} " 8'-5X"` stipple indicates 8 " 15" 20Y4" ur 8" concrete wall fire ratedI field dashed line E 5 " 5 " 3 -211 see D/A2 bearing wall 20 '• verify indicates A Id extent of siol se arar ion adhere 2' rigid insulation " ® 20Y4 5 x5 59 SJ"x51" P e adhere rigid vinyl or t o a o a a o o a 02 " " J' PSL col detail D/A3 g PSL col � alv sheet metal face B drain rack in filter fabric low wall 4x4 ® to 36"aff 125E nonrated drain o extend drain mat one bedroom Type B one bedroom Type A two bedroom Type A 125 Storage shaft ICJ corner apartment 25 corridor 0s � � " 23 � interior apartment interior apartment 34 O 112 sf •�: � • ' ` v 10 -0 see C/A13 sim � see A/A14 see B/A14 116 „ IL resident 18s � concrete 141 2s 143 145 electrical A PSL col assemble 65am � e*"� Solt room I y 8 sf PT 2x4 stud wall tD Separation plinth o 4x4 32 accessory floor area)Y '; ❑ � 117 a, w/ R-13 insul CS! electrical OL-44 0 15sf occ stipple le indi indicates West Wall 4x4 4x4at entry 241, 2 w/d w Panels (far exiting from room) 125A 8"p concrete wall D 4x4 4x4 10 6x6 IL resident see D/A2 �� •_ ,�•� i 5J"x5J" low wall therapist office 3/4 1 " " 200 sf (2) layers 0# 38 24 30 3 n 33 ADA ADA PSL COI to 36 aff 01 22 31 w toilet DF iaa felt at con rete 28 119 5J"x5J" 53Y2 entry slab 4x6 11 PSL col 12 6x6 ,87 -� Wall Type Legend 4� /� recessed 3�" 57}�" Corridor Walls 6x6 4x6 Walls Separating 6x6 4x6 4x6 6x6 4x6 � Vertical O rescue A cn t9P fir mat 1 hour rated Dwelling Units corridor � � a Exit Enclosure 13 q ® exterior wall elevator shaft ^ LO D stair � n I Fire Partitions I� II 1 hour rated I I 367 sf � 00 I 1 hour rated r II I I � 11 hour rated ® stair see Typical Wall Section C/A11 ,l,..� t9� 100 0a F c 6x6 4x6 Fire Partitions 6x6 111 4x6 °o fi Fire Barrier .6x6 4x6 6x6 Fire Barrier 115 c see D A15 � � 1 hour fire-rated Fire Partition x6 20 see D/A16 - I 4x6 1e 16 15 14 10 E ICC 708.4 exception 5 from floor to underside of 1 hour � 4s 43 elevators 6x6 o �--I trash yssenKrupp mech I �lity laundry ci fire-rated fllor/ceiling or U �• 51 45 floor 113 AMEE 40 i. incidental use 124 roof/ceiling assembly above l forced air 0 120 1s w automatic N O II , elevator a O / IL resident 6x6 See Detail A/A16 r furnace xtinguis 'ng ❑ 54 53 47 48 ❑ ❑ 21 114 TV-room IICL w�a w/o 112 8'-0" 7'-2" washer sys em stair 1 hour fire-rated structural wall assembly 653 sf from floor to underside of 1 hour exterior wall 122 a1 accessar occu anc ` mechanical shaft c Y P Y of exit —_ —_ __ _ _ �] II fire--rated floor/ceiling assembly above O ❑ 1 hour rated (< 10 floor area) See Detail B/A16 enclosure hr from crosshatch O 36 wA� Fire Barrier dryer '° aL=44 0 15sf/occ Lo inside except indicates B 4 co (far exiting from room) PT 2x4 stud wall A p one bedroom Type B one bedroom Type B 4o 39 mechanical as indicated Vertical corner apartment 121 II w -13 insul _ ® non-rated nonbearing o P 50 4.4 interior apartment 0 boiler room staff lockers / interior partition wall i Exit Enclosure see C/A13 52 46 see A A13 sim 4x4 incidental use 17 6x6 p N 2 hour rated / ❑ by Owner (NIC) ICC TBL 601 r Fire Barrier 142 w/ automatic ! See Detail C/A16 see E A16 144 — 4x4 4x6 fire-extinguishing future showe PT A� — W— system (rough-in o ly) 59 4 x 6 d. �0r 1 hour fire-rated (4 stories) 4x6 37 housekeeping ` J Fire Barrier & Shaft Enclosure Date: > 4x4 storage G ICC 706.5 & 707.5 Continuous from 41 g fum a closet floor to underside of floor above IFC two bedroom Type B 123 � ao d hed ! e See Detail A16 corner apartment d 02/01110 39 '..•:.........::......•...•...• • •::::::-::::::-,::•:::•,::•:::•:::•:::•: i dicatesin revise � D/ 01/15/10 see D/A13 extent of W WVAC � 2 hour fire-rated aj 146 condenser stipple indicates siol separar ion o revised 02/26/10 A 4x4 8" concrete wall detail D/A3 I Fire Barrier & Shaft Enclosure gas meter 0 ICC 706.5 & 707.5 Continuous from see D/A2 floor to underside of floor above AC� QA AO See Detail E/A16 2 hour fire-rated Fire Wall Sheet: 82" 15" 8 " Separating Buildings 8'-9" 66X" 43Y" 5'-9" 71 3" 5'-9" 43V 8'-9" 5'-0" 8'-9" 7'-8" 5'-9" 4'-9" 5'-9" 03 11 ICC 705.5 to noncombustible siding ICC 705.6.1 from floor to underside �� 11'-02" 15'-0" 13'-0" 73'-D" 15'--0" 37'-0" 15'-0" 13'-011 13'-0" 151-091 10'�--0" of 1 hour fire-rated roof assembly See Detail F/A16 Note: Entrance Security System by Owner under separate contract rB C First Floor Plan p rE F Coordinate Size, Type, and Location Coordinate with Shear Wall Types Contractor to coordinate work. A � of Fire Extinguishers with Local Fire Chief See Structural Drawings 1/8 _1�_0 Room Finish Schedule MmW» 21hK "tones. & cebentry oap water seer rarww dabkd Existingonatlo number name floor walls ceiling be0°=` c" dh se t s Building chr rail F •� 4 material undrlaymnt base material finish crwn trim material wal Install Existing Corridor 2pF� , 100 stair carpet glue dwn 1x4 wd GWB PT GWB/GWB/resit channels hour GIMB wrap �c. screen 111 corridor carpet glue dwn 1x4 wd GWB PT yes GWB/GWB/resil channels 1 t�I4 bean p dc.t B into MP wd1 A2 fV A2 112 furnace sht vinyl APA PWD vinyl cove GWB PT GWB/GWB/resil channels 113 trash sht vinyl APA PWD vinyl cove GWB PT GWB/GWB/resil channels a A2 a concrete slab-on-grade �y- io�y , concrete stemwall 114 elevator concrete pit GWB tape by w wo plumbing fv fV O t me & oobmtry 115 stair carpet glue dwn ix4 wd GWB PT GWB/GWB/resil channels _ oop wars a Mwr virical 116 corridor carpet glue dwn 1 x4 wd GWB PT yes GWB/GWB/resit channels ave was b.olrs rsxa � + hose PT ledger secure to cons f how "110I' y't° 'q°g � °i w/ Simpson Titten HD 5/8"x6" 117 electrical room concrete vinyl cove GWB PT GWB/GWB/resil channels � i 0 16"oc stagger Bag Q our i1 —eoBttlrsg wall 1 hour rebel secure post to cane wall 118 unheated storage concrete PT GWB/GWB/resit channels bars poekat P 1 Into M wall w/ 5/8" x 8'" Men HD 0 16"oc 11 119 ADA toilet sht vinyl APA PWD vinyl cove WR GWB PT GWB/GWB/resil channels a-"' ad lino ti 5 1/4 x 9 1/2 PSL beam 120 elevator mach concrete vinyl cove GWB PT GWB/GWB/resil channels Corridor Int.rtor halls to rmwAd LSL rim joist at intermediate bearing �0 ti tch mg ac�;and° W provide continuous LSL 121 mechanical/boiler concrete vinyl cove GWB PT GWB/GWB/resil channels hour PT sill plate on blocking between joists 122 facility laundry concrete vinyl cove GWB PT GWB/GWB/resit cionnels .odg concrete stemwall 11 7 8" TJI 110 havr �at.d storage / Existing Building 123 housekeeping concrete vinyl cove GWB PT GWB/GWB/resil channels � ® below Dfloar joists m 16"oc '®5 7'-8�4 9'-4Y4" 9 9 �..� 6x6 MM 124 resident rec-room carpet glue dwn 1x4 wd GWB PT GWB/GWB/re- channels A2 q2 125 resident storage concrete vinyl cove GWB PT GWB/GWB/resit channels LSL rim joist 6x6 6x6 w/ 200 stair carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels 1 hour V PT sill plate on Corridor wrap 211 corridor carpet glue dwn 1x4 wd GWB PT yes GWB/GWB/resil channels 3/4" APA rated T&G subflr-finflr concrete stemwall below 221 212 furnace sht vinyl APA PWD GWB PT GWB/GWB/resil channels Remodel of glue and nail w/ ad common nails existing walls 213 trash sht vinyl APA PWD vinyl cave GWB PT GWB/GWB/resil channels 0 6"oc diaphragm boundaries 1 hour ratedT � secure post to cone Apartment 6 oc panel edges & 12 oc field � " � It 214 elevator GWB tape wall w/ 5/8 x 8 existing ceiling ao lay-out as indicated Independent 1 hour N Titen HD 0 1 fi oc 1 hour rated � cn 215 stair carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels per IBC case 1 & 3 Living Lobby 5a infill 0, at Connection (field verify) Storage r , 4 216 lobby carpet glue dwn 1x4 wd GWB PT yes GWB/GWB/resit channels �` ." Second Floor 17�sfC e- e r existing wall 217 corridor carpet glue dwn 1x4 wd GWB PT yes GWB/GWB/resit channels 1/8 1 -� » 1 hour rated Incidental use ��. rT� ' tA 218 ADA toilet sht vinyl APA PWD vinyl cove WR GWB PT GWB/GWB/resil channels '► r1 I�I'1 Plan work int I-�-!V� exg window ' mb 48 23-11 2Zp work poi t ►fit ai o � 219 connection carpet glue dwn 1x4 wd GWB PT GWB/GWB/resit channels F (fv) � exg wind w jamb � � r� 220 storage remodel carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels a t Connection 57 16 pq b a 221 corridor remodel carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels a = o 00 Cn 222 dining see A/17 carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels Note: IBC 705.5.2 Exception 3 9� _ -0 300 stair carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels For combustible root overhangs within 4 feet of the tiro volt with concealed spacxts, tins fire Separate Buildings ° O m wall shall extend through the concealed space to the outer edges of the overhang. 0 2 hour rated Fire Wall n 311 corridor carpet glue dwn ix4 wd GWB PT yes GWB/GWB/resil channels to the underside of SOLID WALL INDICATES per 18C 705.5.1 where the fire wall intersects the exterior walls the © 1 hour roof assembly d 312 furnace sht vinyl APA PWD vinyl cove GWB PT GWB/GWB/resit channels exterior walls an both sides of the fire wall shall have a 1 hour fire resistance rating extending a y minimum of 4 feet on each side of the intersection of the nrewdl. � install wall per UL exterior No. U301 r O continue through exterior wall and � � 313 trash sht vinyl APA PWD vinyl cove GWB PT GWB/GWB/resil channels Nate: Install wall per UL Design No. U305 I B roof framing to exterior sheathing B 1 ■ a provide at concealed roof overhang 4x4 = ao FRAMING- 2x4 studs minimum O le oc maximum. � p g N 314 elevator GWB tape GWB/GWB/resit Channels INSIDE FACE— 5/8" type C USG Gypsum panels naffed to all framing O roe w/ ad cement r s BO Q cedar r 315 stair carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels coated nails 1-7/8" long, 0.0915 shank diameter. and 15/64 diameter heads. Connection 6 p aUTSIDE FACE— 5/8" type SHX USG Gypsum sheathing panels nailed to all framing O roc w/ = 843 of Assembly .-. 316 balcony paint It wt cone paint GWB PT GWB/GWB/resil channels ad esment coated naffs 1-71W long, 0.0915" shank diameter, 15/1W diameter heads. lV op � Accessory occupancy 06 Moor area) 400 viewing carpet glue dwn 1x4 wd GWB PT GWB/GWB/resil channels 0L-1211 0 7ef ow ® M N All Exterior Walls (fire separation distance > 5) �� exiting �r.�,l I A8 1 hour rated from Inside only per IBC 704 prescriptive detail Table 720.1(2) Item 16-1.3 A8 ° d 219 \Wtg a r� r = � 1 T T T T T T T 9 10 � � � °' i 3fi" 11'-fi} " 15-0" 13'-0" 13'-0" 15'-0" 15'-0" 10°-0" 12'-0" 15'-0" io Corridor Walls " ed 15" 0 nre Partitioons V 66V 43V 5'-9" 8 " 5'-9" 43V 8°-9" 817f6 8'-9" 6'-7 5'-9" 4' 9" 5'-9" 43JJ" 5'-0" 8'-9" 43)C 5'-9'p 32" bunt-in storage 60}�" 'Ll q O ® 1 s O O ( ') screen 6' p (fV) � A r 60 ADA 33' _ A B s a d LO toil et SOL B 6x6 4x6 4x4 seat 4x6 `n one bedroom Type B 67 73 one bedroom Type B two bedroom Type B one bedroom Type B 86 1 c Cd • r"'l iv » comer apartment B5 71 interior apartment Interior apartment interior apartment S corridor 4x6 alo 71 p P 9'-9Y" iN r r■°+ see C A13 sim see A/A13 see B/A13 see A/A13 sim 217 r■+ 241 243 245 81 247 {yra Independent ❑ 4x4 77 sided Living Lobby concrete o fireplace constucted as plinth p 1 hour rated I extent of 4x4 F/A14 a ; a rated wall �° wID 10 per IBC ❑ 6 O 5 rr/b corridor entry ' ❑ 350 sf se 74 4x4 22%" I �I is r 216 38» o l i `� 1020,1.4 66 72 r ^ , � a �`J LV Wall Type Legend entry r N o below O 64 70 O O � � � 4x6 8xte or wall 76 O mall 1 hr from insi a r� O O p wfi 0 tiJ half wall boxes o4 exca t as Inds ated ® exterior wall 4x6 36 off p see Typical Wall Section C/A11 rescue 4x6 6x6 4xfi _ QD Q � Corridor Walls Walls Separating fix6 4x6 4x6 6x6 4x6 6x6 Vertical ecesse �' 1 hour rated Dwelling Units I _ A as t9 corridor = o Exit Enclosure 61Cd ® 1 hour fire-rated Fire Partition in ® N 1 a stair �� �- II Fire Partitions I I 1 hour rated 3fi7 sf �� a, II elevator shaft I I! II 1 I, 1 hour rated stair t9 A ICC 708,4 exception 5 m 'n D �' I 1 hour rated from floor to underside of 1 hour a 20Q ' t" Fire Partitions 211 1` Fire Barrier we g 0 4x6 6x6 4xfi 6x6 4x6 °0 Fire Barrier 6x6 4x6 6x6 215 dtg fire-rated fllor/ceiling or xfi 62 see D/A16 9 roof/ceiling assembly above 0Z5 see D/A16 E m Z5IE See Detail A/Ai6 exterior wall O 114 1D8 0 floor senlCru 0 95 �5 88 0 +� N ,� of exit trash ys pp , ® 1 hour fire-rated structural wall co enclosure 116 110 forced air II AMEE 40 97 r from floor to underside of 1 hour I 1 hr from furnace 213 5 elevator 91 N Inside except 118 112 r fire--rated floor/ceiling assembly above � as indicated ❑ 11 � w� � � 1 3 212 � 214 1 99 93 4 lit See Detail B/A16 ❑ [w/al FwAl mechanical shaft o non-rated nonbearing F — — 0L. ,ya �ui�t"= F crosshatch ' 0101 Fire Barrier soli wall Interior partition wall Indicates � B one bedroom Type 8 one bedroom Type B ICC TBL 601 I YP 1 105 103 see D/A16 AV indi ates See Detail C A16 Vertical comer apartment interior apartment / b Exit Encosure 115 109 a 1 2 hour rated see C/A13 O see A/A13 sim one bedroom Type B 96 � one bedroom Type B Vert cal Exit b q 117 111 244 4x4 interior apartment 98 92 comer apartment Encl sure 1 � 1 hour fire-rated � Fire barrier = � 242 0 see A/A13 sim see C A13 sim � 1 hour rated N Date: Fire Barrier & Shaft Enclosure see E/A1S i) ICC 706.5 & 707.5 Continuous from {4 stories} °0 1n _ _ 4x4 4x6 24t3 250 Fire Barrier floor to underside of floor above See Detail D/A16 G 4x6 102 Q see D/A16 01/15/10 Q 0 D two bedroom Type B 4x4 108 49 0 Q Q G revised 02/01/10 2 hour fire-rated corner apartment Fire Barrier & Shaft Enclosure H @ a see D/A13 104 H ICC 706.5 & 707.5 Continuous from o A A 246 ® Q (A floor to underside of floor above I o See Detail E/A16 �e1 4x4 a I 'fe � io 2 hour fire-rated Fire Wall J Uq- J Sheet: Separating Buildings 8J�" 15" ICC 705.5 to noncombustible siding ICC 705.6.1 from floor to underside 8'-9" 66V 43W 5'-9" 7° 3" 5'-9" 43V 8'-9" 5'-0" 8°-9' 7'-8" 5'-9" 4'-9" 5°-9" 43 " 5°-0" 8'-9" 43) 5'-9" 7' 3" 5'-9" 43W 66 8'--g" 8 " Coordinate Size, Type, of 1 hour fire-rated roof assembly " and Location of �. See Detail F A16 11'-6 " " " " 15 " / Xz 15 -0 13 -0 13 -0 15-0 37 -0 15 -0 13 -0 13 -0 15-0 log—onFire Extinguishers Ll Second Floor Plan with Local Fire Chief Codinate with Shear Wall Types 11 12 (13) 14 ' See Structural Drawings B C A D E F Entrance Security System by Owner under separate contr 118'�i�--A' Contractor to coordinate work, r A8 -- rN . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 r '_ " '_ " 1 '_0' 13'-0" 13'-0" 15'-0" 10'-0" 36" 10 0 12 0 5 15-0 13-0 13 Q 15 -0 15 -0 8'-9" 66 43 " 5'-9" 8 5�-9" 43}Z" 8'-9" 81�e 8'-9" 05,39(e 5'-9" 1 » 5'-9" 8' 7�' 8'®9" 43V 5'-9" 7'-3" 5'-9" 43l¢" 66Xz" 8'-9" 15" ,. 81r�" 15" I Exterior Wall s (fire se pa ation distance > 5') 2LX2 1 hour rated from nsi a only per IBC' 704 - A prescriptive d tail Tabla 20.1(2) Item 1 -1.3 0 40 it O d A A 000 � C � O fireplace flue O 1 hour rated guard rail 4x4 Eire Barrier = = i one bedroom Type B 148 152 one bedroom Type B c> Elostomer c A one bedroom Type B two bedroom Type B 1 Li uid Flooring o one bedroom Type B 127 133 interior apartment interior apartment interior apartment corner apartment extent of N q g comer apartment P P 139 144 15Q r r 6'-6" 10'--0" see C/A13 sim 125 131 se A/A13 see B/A13 see A/A13 sim see C/A13 sim rated C all 341 343 345 4x4 137 141 347 349 1020.1.4 _E�60'" diameter Clock Face — National time & signal HMR 360 Illuminated 4x4 entry g WA VA below Through-Wall Mounted Round Clock 1 "�D w� 1 style AR markers w M01 hands extent of--- 14lI 147 153 1 _ yl / Balcony rated wall 12B 134 4x4 25Y4 U install per mfr (typ of 3) 186 sf per IBC 128 132 14p 138 145 I � 1 = O 1 151 33" ext. rior II 0 31 1020.1.4 O 143 1" O } fro Inside •�.� O O 13g ex pt a indicated provide stairway 1 r N 07 IS 130 w/b 00 O ! 1 2 r number signs ns 12®0 = floo g o " per IBC 1020.1.6 _I T7---- rescue _ 11'-0" P 6x6 4x6 4x6 elevator shaft 6x6 4xfi 6x6 = 4x6 121 a D C �' � �- rescue Z 4x6 Corridor Walls 6x6 4x6 Walls Separating 1 hour rated O to = A attic ventilation 22"x36" A = C D 2 hour 1 hour rated o Dwellin Units corridor = II I ® o, N 6' 35 '4" 60 35)4 6 2 hour rated 1 = °' rated ® li (I 1 I g I 367 sf II I Fire Barrier I I II k I I II stair o to 5 diameter louvered 1 stair ceiling Fire Partitions ^ 1 hour rated I terminate at 315 teD C tJ] d• access door o sO ;D Fire Partitions 311 I vent w/ bug screen w/ ladder N C D 300 120 4x6 6x6 4x6 6x6 0 4x6 6 rated ceiling 6x6 4x6 6x6 4x6 g — Q___3 x6 122 see E/A8 E • 00 a- --C metal viewing O 161 1:55 N Q� ' unheated flashing 70 of net exterior wall O 1B0 174 O floor struct trash yssenKrupp O N attic o below of 400 of exit tB2 176 forced air beam 313 II AMEE 40 163 137 rT� 122 sf I I ifl enclosure 36" furnace elevator i�1 0 00 0 G `ol 1 hr cep g 1 1B4 178 312 123 3i4 1ss 165 159 1 stair o = 2 hour Inside Fwol ep 1 9 [VID e/o rated � ceiling � � 77 E E o Ig7 A soli wall indicates r Vertical = one bedroom Type B one bedroom Type B 60) r 37Jt�" m B one bedroom Type B one bedroom Type B 1 YP Ve cal it Enclosure Exit Enclosure 37X 5'_gr interior apartment P " 2 hour rated = Vertical 0 comer apartment 181 175 interior apartment 171 169 p 162 156 corner a 13 sirnt 1 h r rated 35�4 20 35�'4 r o Exit Enclosure O O / 4x4 / Fire Barrier 12_0 I see C/A13 see A A13 sim see A A13 sim see C/A13 sim Fire Barr r I (4 stories) N 2 hour rated = 342 183 177 344 348 164 158 350 Fire Barrier Q, Q see D/A 6 (4 stories) � I 4x4 4x6 Maintenance Fourth Floor "' o 16a A A A 4x6 4x4 172 � d Q Attic Framing = O � two bedroom Type B � C A camer se D/A13ent CEO O � 00 o �j ��A 341; 4x4 t m � N O O SA G cc 15" 8 d 2 31XN �» 66�' 431�" 5'-9" 7' 3" 5'-9" 43�" 8'-9= 51 -0" 8'-9" 661k" 5'-9" 5'-9" 43�" 5'®0" 8'-9" 43�" 5'-9" 7'-3" 5'-9" 43�" 66)J" 8'-9" 11 11'-6 " 15'-0" 13�-Or 13'-0" 15'-0" 15'-0" 25 z 10'-0" 12'-0" 15'-0" 15" 26'-0" 15'-0" 10'-0" 36" � �C ( ocktower Floor Plan CThird Floor PlanD E F B C 1/88=10-00 1/80=1'-08 2x6 brg wall 2x4 brg wall 11 12 13 14 ;.N4 1 2 3 4 see A/A16 T 68se B/A16 T Beam Schedule 2x4 brgwall 2x4 brg wall 2x6 brg wall 2x4 brg wall 2x6 brg wall �4 see B/A16 see B/A1fi see A/A16 see B/A16 seee A/A16 Na Qty Nominal Size Dressed Size Grade 0 T� B V1 A 6x8 5 1 x 7 1 4 DF1 =`V- B 3 1 2 x 9 1 some 2.D E PSL _J 0 C 5 1 4 x 9 1 same 20 E PSL -� °�' 16 D 4x8 3 1 2 x 7 1 4 DFL ® hatch indicates 1 hr fire rated �rrl E 3 1 4 x 11 7 same 20 E PSL rn.� joist cavity for fireplace flue v F 5 1 4 x 11 7 same 2.0 E PSL -o° e 2.0 E PSL (2) layers 5 8 type X GWB G 5 1 4 x 9 1 2 sera see C/A3 H 634 x13.5 same OF/Dr1.8E MQ __@ 11 L o � N O{BSA 0 1) provide (2) layers 5/8" type X GWB wrap all beams1 -74 ~.0 2) no wrap required at door and window heads o 3) provide posts or gang studs as Indicated with m � W co in between floors r � � continuous blocking providing full bearing 4 provide simpson CS16 strap each and where any o ) beams are installed without a continuous top plate _0 �, 1 T2. �,2 �12'-O" 12'-0" to L c o L `o a shear framing for wall above E — _ o o o o Ll r r 11 J" TJI 110 11 i" TJI 110 � P 4x6 4x6 a floor joists 24"oc o floor joists ® 16"oc Awn_ _ r r 22"x36" 1 ® r Date: IV A 2 hr fire rated access door IFC w/ ladder & 01/15/10 -- — — — — revised 02/01/10 continuous wall Maintenance Fourth Floor 2x6 LSL studs 0 16"0c see Floor Plans for extent of rated wall Attic Framing se E/A16 for detail ❑ ❑ Sheet: 3/4" APA rated T&G subflr-finflr. glue and nail w/ 8d common nails 0 6"oc diaphragm boundaries. 6"oc panel edges & 12'oc field G lay-out as indicated per IBC case 1 & 3 (unblocked diaphragm) except as directed by joist mfr 2x4 brg wall 1 5 (typical at all wood floors) see B/A16 CLocktower Framin Third Floor Framing Plan - 9 1/8 -i 0 3 2'-5' 3• t metal cap above dark bronze ftnish 7T or paint black uti r 1 r� I (12) 6' diameter its 1 I v 11 ale � y drip flash drip flash metal gutter metal utter from kitchen hoods g 2 12 rake rakeLU 2 12 b roof mfr / b roof mfr ��� Y Y Pon draft et drip flash align over croft dW helg�r p metal utter metal utter rake metal utter metal utter 9 9 gutter 9 — drip edge drip edge PWD sheathing w/ w flashing w flushing I buldinpaperw/ flashing / ashing / g w/ flashing 000 over 2x ming ridge o I ��� ap�prwdmate dimensions indicated shingle over — " mechanical contractor drip flash F ridge vent 6/12 shingle over to coordinate metal cap verify manufacturer's standard rake 2 ridge vent metal cap sizes coordinate to I 6/12 6/12 6/12 6/12 adjust dimensions + 2' in each direction metal gutter Satz w/ flashing I fireplace fireplace I provide screen as previously N flues VTR flues VTR I metal gutter directed by engineer 6 —6 valley valley valley 20'x24 relief air to chimney w/ valley chimney w/ valley valley w/ flashing saddle saddleIF to room 312 shingle over n ridge vent metal cap 9 r — dark bronze finish N N Fiberglass—Reinforced Shingles or paint black I I 9 sloe NOTE. a class A, high definition, laminated fireplace flue VTR sheet metal cap by N P mechanical subcontractor - I N I Coordinate the location of all roof vents 1i w/ 30 year min. warranty fire rated shaft drip 9 with the Architect to avoid locations on (typical roof) to underside of ede south facing roof suited for the roof sheathing I .1// 1x4 over 1xa trim I utire installation of solar panels. 1x4 comer k boss trim 0 8�`a.. paint white N 8 —0 6 (12) kitchen exhaust kitchen exhaust Hardie Panel siding \ kitchen exhaust paint to match 3rd floor I shingle over ridge vent corridor relief air kitchen exhaust metal sub foshTng ` I Lfi chimney chimney chimney chimney ® ® ® it flashing not Indicated coordinate flashing I I • C 00 w/ roofing contractor N NOTE: combine plumbing vents o II � � \ with unit accross the hall I I r 1 N2tG 16/12 IIand vent through the north roof a F i:h Install on ridge of gNdline B edge 6/12(12 kitchen vents) r mechanical h I fin (1 Corridor Relief Air Duct) N I room below valley I dri 1 1 finial ` eel I` °J 0 �1r'h.. Chimney Detail �; �_ i I174) (typical of 1) gutter — intake air — o ashing chimney 0 ashing I valley valley valley valley valley metal gutter or wallshingleI w/ flashing aver 3' 2'-$. 3' I 6/12 6/12 flues fireplace ridg vent fireplaceues 6/12 6/12 metal cap above drip flash chimneyw • 1'-10" dark bronze flnlah P / chimney w/ _ 6/12 6/12 saddle shingle over or paint black rake — shingle e en over saddle /,,,—PWD sheathing w/ bulding paper g — ridge vent — over 2x4 framing (3, 4, or B) B" diameter Ymrts �OO from kitchen hoods metal gutter metal metal metal gutter w/ flashing gutter utter tip g w/ flashing approximate dimensions indicated 000 I mechanical contractor drip flash I drip flash „' to coordinate metal cap rake downspout P „ - verify manufacturers standard t0 storm �J rake M metal cap sizes coordinate to drain adjust dimensions + 2' In each direction WIN metal gap drip flash provide screen as previously dark bronze finish directed by engineer or paint blade rake sheet metal cap by 1 5 6 7 $ 9 10 11 12 13 1 mechanical subcontractor B C D E F . 1X4 over 1xa trim 1x4 comer & base trim point white 1 Hardie Panel Siding Note: paint to match 3rd floor Roof Plan See Mechanical for Roof Penetrations metal sub t Indicated g A ^ flooring not indicated •� /� N `f+3+/J! coordinate flashing w/ rooflng contractor !� s Rahs }� Install on ridge 9' +/— west of grldline 2 12 v t In kitchen vents) b Install on ridge west side of gridllne 9 �i Chimney Detall (4 kitchen vents) install on kitchen�e W +/— east of grldline 13D V1 tom) W .► ^ l 1/8'=1'-0' (typical of 3) .rim top r---� SIII kitchen exhaust corridor kitchen exhaust kitchen exhaust kitchen exhaust and corridor relief air chimney (see D/A19) chimney see D A19 rl 2'-„• filar chimney (see C/A19) Y ( / ) chimney (see D/A19) �--ii 3" 2'-5' 3 metal gap above o o o � dark bronze finish �� 1•_ia• �• or paint black intake air chimney 12 PWD sheathing w/ buldtng paper (F Al ;,, � — over 2x4 framing . 20"x24" intake air or to room 31 WNW relief air to 12ULU 1 2 IIII III III III I n n WIN p oximate dimensions indicated 6 nnh it I mechanical contractor It I-11 III III III III to coordinate metal cap LA Q I I verify manufacturer's standard metal cap sizes coordinate to adjust dimensions + 2" In each direction metal cap dark bronze Wish l or paint black provide screen as prevtauslyITM directed by engineer sheet metal cap by E mechanical subcontractor E Date: supplemental saddle or flashing 1X4 over 1x8 trim coordinate with 1x4 corner & base trim instructions roofin contractor o g point white D2/10/10 ' N Hardie Panel siding paint to match 3rd floor metal subt Indicated Work alai: FFE = 27.90' 1x12 Or brick HardiePla flashing not indicated coordinate flashing t® match existin facilit water table sidle Sheet. w/ roofing contractor 9 Y 9 A19 ChimneyDetail I�IlntakeAlrlO' awayhomExhaustAir North Elevation E 1/8•=1'-0• (typical ical Of i) B i/s•=1'-0• 1 12" 2 a. on }- £�} 6x6 block to foundation � 11 exterior wall of exit enclosure endwall TF hanger 1 hr from inside at 4th floor framing g 6x6 block to foundation except as indicated 4 CF E E 11 viewing N � bearing wall to foundation tg t9 C4 viewing Unheated attic CJ $ Ir I » » �p � DN 82 sf net headroom > 3 0 R 11 7/8 joists COD 16 oc to 0 access required _ windo OI w/ TF hanger ea end _v 400 "N `° seat �� B 1�/ � relocate exg stairLM r stair not I 11 7/8" LSL ledger to 4th fir 22" x30" min. B indicated I w/ 5/8" lag screw A9 - A9 � � DN to widths self clos ngd , e 4 g i to rim 0 8 oc (stagger) F r o �LL attic access 13 � Ti window to seat r 4th f loor Framing4th f loor Stair Plan E � ties it 1/4'=1'-0" 1/4'=1'-0' 7 ❑ F E D C _ 8'-6" 10'-6" V� ^, N OC Section revises A / A8OC 12 � � kri LILLLIULAIL] LLLJ 11_1�p pqo i i I ' belt band provide (6) additional I to attic see C/A10 window type E j 00 Locate exg tempered L° glass windows at window framing 4th floor landing provide double i (see elevations) king studs each side of trimmer uninstalled trusses from double top plate vented lower bearing to 8'-1 i" aff to sole plate below flashin delete 2 window type C 12" overhang window sill - dbl op lot ( } this rake only - -� 6x w/ (2) S16 12 str Per IBC 1020.1.4 ligh well vented 5'4 � 2 hour fire rated wall alig shear blk'g may be required due to 00 n clock tower window E I o+� consult bulding official iN fix w/ (2) S16 0 12 prior to installation str s each nd �- 15•4 of cement siding I ol - vented to to O 'E shear blk'g g1055 SS I tg -I tg o . _ m co � � � 46.40 CNI2x8 ;� highest floor level " , N 3 clg joist of public asccess 00 1COI _yy�y M H ii U LO CD (O : ( c° fire he loc handrail 7%11 PSL 8x8 PT N _ blkg w/ eas d edges Balcony post Aso J - 36' ab e tread o -PCs Guard Rail _� o see C/A9 �• .I -If 1 1 I 2x he ba ust I Q� �0 4" maxi u cle t i i -aai (o bet ee N f p r k � � 2x6 spacer w L . er i along wall I :I uillingr f I � o) L stringer fire 4 m ewe st °CN 7,�x ., post/beam/post blkg with ��--x+f" c r PSL conneectio GA File No. WP 8410 s cur to bee ith fi by engineer 3 4 hru 1 s a secure to E fromo r-- rim joist w/ Sx8 PT to und4side of00 5/8" bolts post to a� I staggered discuss 0 12"oc detail on n minimum thursdam � lid y= i ® head room - - �, 80 above o 9 N a� tread nose L CO c j` UL Design No. U302 blkg brick to supplemental GA File No. WP 8410 ,� o - i below grade instructions at brick veneer w/ - CO v �- r-eted PWD shth i I °Q CB88 Q2/261tQ in lieu of non—rated `� •�' rvoo 1" bev ed osi w (® 17.8 gypsum shth `� visua con cast elevation of GeoGrid CAD lowest level of � Fire Department ire Vehicle Access -�77CM U N Sheet: ' k » PT 2x6 kicker » 10 —6 20 —6 11 -6Y2 48 x48 ftg = * from 2x12 (4)#5 ea way 2 hour fire rated wall 2 hour fire rated wall between building and exit stair 2 hour fire rated wall 4'-8Y4. 6'-5" carriage a w 2Y�°° 14�r4°° �0 A20per IBC 1020.1.4 per IBC 1020.1.4 landing 7 treads eq. spaced (contractor to verify) cone @ 11"each 0 12"oc max. plinth East Elevation North Elevation Stair Section revises B / A9 D ._ ._ ' ' ' C Bi/4'=1'-0' MU d 13 14 10'-0" clock face w/ 4 for from 2x12 cedar trim 1 hr rated wall flash top Hrn' x lohrn rated of entry ceiling PT M raise framed roof 12 D LSL ledger w/ 5/8 lagsstaggered at "oc belt band in line infill orch w/ floor framing p �� 2 1//16 x 11 7/8 PSL at third fI00r D C w t° w/ mitered corner for Sun room ee �� bACE6 connector r (4) SIDS 1/4 x 6 LY Lill III : . 0 floor joists ® 16�oc � D / TF hanger each end '' '� 4}z" rescue 5'_2n extent of rated wall floor joists ® 1fi�oc i per IBC 1020.1.4 w/ ITT TF hanger ea end . I stair rovide 3 4 PWD web at third floor P / � 3 55 stiffener at Ledger FT1 FF1provide SD$ x 1.25 L� to siffener and leger N i o each side of joist rn LSL ledger w/ 5/8" lags staggered at 8"oc ❑ cyote: w I bail or screw PWD subflr LLLLto rim and ledger 0 4"oc I t Cd pQ THIRD FLOOR PLAN 1 hour rated ceiling � � � (2) layers 5/8" type X 00 n C14 board offit VILEST ELEVATION crosshatch indicates SOUTH ELEVATION 1x6ST&Gscedar finish soil separation see detail D/A3 Provide R-30 min floor insulation work with architect to coordinate venting with fire rating West Elevation South Elevation Third Floor Plan Third Floor Framing C ' ' ' D " ' " A " ' ' B CCU 0 J. Date: supplemental instructions 02/10/10 Sheet: A21 i I i MECHANICAL UNITS i MIN. EXT. COOLING HEATING EQUIP MANUFACTURER & MODEL LOCATION SUPPLY D.A. ELECTRICAL S.P. CAPACITY CAPACITY THERMOSTAT & CONTROLS NOTES R N0. CFM CONTROL AIR (IN. (BTU/HR.) (BTU/HR.) SEQUENQE OF OPERATIONS, VENTILATION W.G.) FC112 FAN COIL -FIRST CO. RM 112 1070 150 a.3 - 47,000 0 120V/1 MODEL 36XHBXB-HW THERMOSTAT: HONEYWELL, COMM. VISIONPRO $000 CONTRACTOR O VERIFY CONTROL BOILER SCHEDULE 4 GPM & ECONOMIZER CONTROL MODULE: HONEYWELL MODEL SPECIFICATIONS WITH SUPPLIER. SET UP W721A1D1. ACTUATOR: BELIMO MODEL BL-LF24-SR, DCA WITH 100% OSA ECONOMIZER FEATURE. MARK SERVICE INPUT OUTPUT EEC VENT ELECTRIGII- MANUFACTURER/MODEL DESCRIPTION AIR HANDLER OFF:FOR ANY REASON, ANY AIR HANDLER IS SHUT OFF, THE OUTSIDE AIR (OSA) 160E 2-10VDC, 35# SPRING SET. TEMP SENSORS: DRY BULB, PROVIDE LINE SETS, PLENUM, AND MBH MBH SIZE VOLT/PH 1F DAMPERS AND RELIEF AIR DAMPERS SHALL BE CLOSED. RETURN AIR HONEYWELL C7046A1004, DISCHARGE SENSOR, CONDUIT TO ADD AC AT LATER DATE B-1 RADIANT HOT 300 282 94% 4"0 120/1 MOD CON 300 HEAT TRANSFER PRODUCTS MODCON-300 HIGH EFFICIENCY CONDENSING GAS FIRED DAMPERS (RA) SHALL BE FULLY OPEN. HONEYWELL-TBB22OU1003. DAMPERS FOR ECONOMIZERS, WATER BOILER. 94% PEAK EFFICIENCY. ASME RATED, 150 PSI WORKING PRESSURE, DIGITAL SELECTED BY CONTRACTOR. DISPLAY WITH LED INDICATORS, FULLY MODULATING BURNER WITH 5:1 TURNDOWN RATIO, OCCUPIED HEATING MODE: LOW NOx OPERATION, STAINLESS STEEL HEAT EXCHANGER, HIGH & LOW GAS PRESSURE OSA DAMPERS SHALL OPEN TO A MINIMUM SET POINT. RA DAMPERS SHALL SWITCHES, UL/CSD-1 COMPLIANT, 12OV/60 HZ/1 BE SET TO RETURN THE SPECIFIED AMOUNT OF RETURN AIR. RELIEF MOD'S FC212 FAN COIL, FIRST CO. RM-212 1070 150 0.3 - 47,000 ® 120V/1 SAME AS FC112 SET UP WITH i0091; OSA ECONOMIZER PHASE. SHALL BE SET FULLY CLOSED: MODEL 36XHBXB-HW 4 GPM & FEATURE. PROVIDE LINE SETS, PLENUM, PROVIDE WITH MANUAL RESET HIGH LIMIT & WELL, FLOW SWITCH KIT, AND CONDENSATE DURING OCCUPIED MODE, THE FAN WILL OPERATE CONTINUOUSLY AND THE 16OF AND CONDUIT TO ADD AC AT LATER DATE NEUTRALIZER. HOT WATER VALVE FOR THE HEATING COIL FOR EACH UNIT WILL OPEN AND CLOSE AS NECESSARY TO PROVIDE SPACE HEAT. FC312 FAN COIL, FIRST CO. RM-312 1070 150 0.3 - 47,000 0 120V/1 SAME AS FC112 SET UP WITH 100% OSA ECONOMIZER MODEL 36XHBXB-HW MODULATING BOILER WITH 5 TO 1 TURN DOWN. FAN ASSISTED SEALED COMBUSTION; 4 GPM & FEATURE. PROVIDE LINE SETS, PLENUM, CONDENSING HOT WATER BOILER SHALL BEAR ASME "H" STAMP AND BE RATED FOR THE PROPOSED HOT WATER SYSTEM DOES NOT HAVE ANY FREEZE PROTECTIVE 160E AND CONDUIT TO ADD AC AT LATER DATE WORKING PRESSURE OF 160 PSI. GLYCOL. THE CONTRACTOR SHALL ENSURE THAT THE AIR HANDLERS CANNOT OPEN BEYOND THE MINIMUM OUTSIDE AIR SETTINGS DURING HEATING MODE SO FC124 FAN COIL, FIRST CO. RM-124 780 100 0.3 - 39.200 0 120V/1 SAME AS FC112 SET UP WITH 100% OSA ECONOMIZER THAT THE COIL CAN NEVER FREEZE. MODEL 30XHBXB-HW 4 GPM & FEATURE. PROVIDE LINE SETS AND ON BOARD BOILER CONTROL SHALL INCLUDE LEAD/LAG FUNCTION, OUTDOOR RESET, AND PILOT DUTY START CONTACTS FOR BOILER PUMPS. 16QF PLENUM TO ADD AC AT LATER DATE SUMMER OPERATIONS (OSA TEMPERATURE ABOVE 40'F)BOILERS AND BOILER PUMPS SHALL HAVE SEPARATE POWER STRIKES. ECONOMIZER COOLING: FAC121 2.5 TON FAN/AC-COIL. RM-120 1000 1000 -- 30,000 _ 208-230V HONEYWELL VISIONPRO 8000, SELECTION TWO STAGE THERMOSTAT. STAGE 1, FAN BLOWER - GOODMAN MBR120OM-1 RM-121 1 PH AND PROGRAMMING BY CONTRACTOR ONLY, STAGE TWO, AC. MAINTAIN LESS PROVIDE CLEARANCES TO COMBUSTIBLES AS REQUIRED BY APPLICABLE CODES AND WHEN ROOM TEMPERATURE IS ABOVE THE OSA TEMPERATURE, OSA DAMPERS AC - GOODMAN GSX130301 25 AMPS THAN 79'F IN ROOM. IF LESS THAN MANUFACTURER'S RECOMMENDATION. SHALL MODULATE OPEN AND THE RA DAMPERS SHALL MODULATE TO THE COIL - GOODMAN CAPF303006 MAX. 77F, FAN TO TURN OFF. CLOSED POSITION, MOD'S IN RELIEF VENTS SHALL BE FULLY OPEN, FOR 100% EXP. VALVE KIT - GOODMAN TX3N4 AVAILABLE THROUGH MATT OF JOHNSTONE COMBUSTION AIR INTAKE MATERIAL: PVC OR CPVC. OSA OPERATION. FANS SHALL OPERATE AT FULL CAPACITY. PAD - GOODMAN UC3030-3 SUPPLY - BOTHELL. BOILER GAS PRESSURE: 3.5" W.C. MIN, 14" W.C. MAX. WHEN OSA TEMPERATURE IS ABOVE INSIDE AIR TEMPERATURE, MOD'S WILL FC219 FAN COIL, FIRST CO. ROOM 267 100 4.3 MODULATE TO THE HEATING MODE POSITION DESCRIBED ABOVE, - 47,000 0 12OV/1 SAME AS FC112 SET UP WITH 100% OSA ECONOMIZER MODEL 36XHBXB-NW 118 4 GPM & FEATURE. PROVIDE LINE SETS, PLENUM, 16OF AND CONDUIT TO ADD AC AT LATER DATE B-2 RADIANT HOT 500 470 94% 4"o 120/1 MOD CON 500 HEAT TRANSFER PRODUCTS MODCON-500 HIGH EFFICIENCY CONDENSING GAS FIRED SEQUENCE-.SSE OPERATIONS. VENTILATION AIR CONTROL RBH RADIANT BASEBOARD TYP. - _ _ " 450BTU/LF ® 1 GPM AND 160F, WATER BOILER. 94% PEAK EFFICIENCY. ASME RATED, 150 PSI WORKING PRESSURE, DIGITAL APPLIES TO FC21 Q HEATER, SLANT/FIN - SEE NOTES - DANFOSS RA 2000 48O gIy/� 4 GPM AND 160F. SEE DISPLAY WITH LED INDICATORS, FULLY MODULATING BURNER WITH 5:1 TURNDOWN RATIO, FINE/LINE 30 PLANS FOR LENGTH OF EACH UNIT.FINE LOW NOx OPERATION, STAINLESS STEEL HEAT EXCHANGER, HIGH & LOW GAS PRESSURE AIR HANDLER OFF: CONTRACTOR TO SELECT STYLE OF VALVE. SWITCHES, UL/CSD-1 COMPLIANT, 120V/60 HZ/i IF FOR ANY REASON, ANY AIR HANDLER IS SHUT OFF, THE OUTSIDE AIR (OSA) REMOTE MOUNT TSTAT NEXT TO DOOR. PHASE. DAMPER SHALL BE CLOSED. RETURN AIR DAMPER (RA) SHALL BE FULLY OPEN. FP1 EXTRODINAIR SPACE SEE - -- - - 120V/1 REMOTE CONTROL 20.5 MBH INPUT, 15.7 MBH OUTPUT PROVIDE WITH MANUAL RESET HIGH LIMIT & WELL, FLOW SWITCH KIT, AND CONDENSATE SAVER GAS FIREPLACE, PLANS NEUTRALIZER. OCCUPIED HEATING MODE: MODEL FPX 564 OSA DAMPERS SHALL OPEN TO A MINIMUM SET POINT. RA DAMPERS SHALL MODULATING BOILER WITH 5 TO 1 TURN DOWN. FAN ASSISTED SEALED COMBUSTION, BE SET TO RETURN THE SPECIFIED AMOUNT OF RETURN AIR. FP2 HEAT & GLO, SEE ROOM REMOTE CONTROL CONDENSING HOT WATER BOILER SHALL BEAR ASME "H" STAMP AND BE RATED FOR THROUGH GAS FIREPLACE, 216/217 120V/1 26-37 MBH INPUT, VARIABLE. WORKING PRESSURE OF 160 PSI. DURING OCCUPIED MODE, THE FAN WILL OPERATE CONTINUOUSLY AND THE MODEL ST-36 HOT WATER VALVE FOR THE HEATING COIL FOR EACH UNIT WILL OPEN AND ON BOARD BOILER CONTROL SHALL INCLUDE LEAD/LAG FUNCTION, OUTDOOR RESET, AND CLOSE AS NECESSARY TO PROVIDE SPACE HEAT. RTU1 5-TON ROOFTOP GAS DINING 1950 300 - 59.500 90,000 20OV/1 HONEYWELL VISIONPRO 8000, SELECTION AND PROVIDE COMPLETE SYSTEM WITH PILOT DUTY START CONTACTS FOR BOILER PUMPS. PACK THE PROPOSED HOT WATER SYSTEM DOES NOT HAVE ANY FREEZE PROTECTIVE ECONOMIZER. AREA BTUH PROGRAMMING BY CONTRACTOR MOTORIZED DAMPERS FOR 0-100% BOILERS AND BOILER PUMPS SHALL HAVE SEPARATE POWER STRIKES. GLYCOL. THE CONTRACTOR SHALL ENSURE THAT THE MOTORIZED DAMPERS GOODMAN MODEL INPUT ECONOMIZER AND BAROMETRIC RELIEF. CANNOT OPEN BEYOND THE MINIMUM OUTSIDE AIR SETTINGS DURING HEATING CPGO600901DAJX AVAILABLE THROUGH MATT OF JOHNSTONE PROVIDE CLEARANCES TO COMBUSTIBLES AS REQUIRED BY APPLICABLE CODES AND MADE SO THAT THE COIL CAN NEVER FREEZE. SUPPLY - BOTHELL. MANUFACTURER'S RECOMMENDATION. SUMMER OPERATIONS (OSA TEMPERATURE ABOVE 40'F) HP2 EXISTING HEAT PUMP. DINING - - - - -COMBUSTION AIR INTAKE MATERIAL: PVC OR CPVC. ECONOMIZER CODLING: AREA RELOCATE HEAT PUMP. SEE SHEET M10. WHEN ROOM TEMPERATURE IS ABOVE THE OSA TEMPERATURE, OSA DAMPERS BOILER GAS PRESSURE: 3.5" W.C. MIN, 14" W.C. MAX. SHALL MODULATE OPEN AND THE RA DAMPERS SHALL MODULATE TO THE CLOSED POSITION. FOR 100% OSA OPERATION. FANS SHALL OPERATE AT FULL MUA1 EXISTING MAKE UP AIR DINING - - - - - RELOCATE EXISTING, SEE M10. DOMESTIC HOT 199 - - 6"� 120/1 HEAT TRANSFER PRODUCTS PHOENIX CONDENSING GAS FIRED WATER HEATER. 119 CAPACITY. IT IS UNDERSTOOD THIS ZONE WILL PRESSURIZE DURING UNIT. AREA - - WH1 WATER PHOENIX MODEL PH199-1195 GALLON FAN POWERED GAS FIRED WATER HEATER. 199MBH INPUT. 2" SCH. 40 PVC ECONOMIZER COOLING MODE. MUA2 EXISTING MAKE UP AIR DINING AIR INTAKE, 3" SCH 40 PVC EXHAUST. 96.1% PEAK EFFICIENCY. WHEN OSA TEMPERATURE IS ABOVE INSIDE AIR TEMPERATURE, MOD'S WILL UNIT. AREA - - - - - RELOCATE EXISTING, SEE M10. 1 DOMESTIC HOT 199 - - 6"o 120/ HEAT TRANSFER PRODUCTS PHOENIX CONDENSING GAS FIRED WATER HEATER. 119 MODULATE TO THE HEATING MODE POSITION DESCRIBED ABOVE. WH2 WATER PHOENIX MODEL PH199-1195 GALLON FAN POWERED GAS FIRED WATER HEATER. 199MBH INPUT. 2" SCH. 40 PVC RAH314 RELIEFGREEN VENTILATOR GRAVITYECK VENTILA OR OOD ROOF AIR INTAKE, 3" SCH 40 PVC EXHAUST. 96.1% PEAK EFFICIENCY. SEQUENCE QF OPERATIONS. VENTILATION AIR CONTROL MODEL FGR. 30" X 36" BOILER ROOM EQUIPMENT SCHEDULE APPLIES TO FAC121 AIR HANDLER OFF: MANUFACTURER/ IF FOR ANY REASON, ANY AIR HANDLER IS SHUT OFF, THE OUTSIDE FC125 FAN COIL, FIRST CO. RM-125 78p 100 n.3 - 39,2n0 120V/1 SAME AS FC112 SET UP WITH 100% OSA ECONOMIZER MARK EQUIPMENT VOLT/pH MODEL REMARKS AIR (OSA) DAMPERS SHALL BE CLOSED. MODEL 30XHBXB-HW 4 GPM & FEATURE. PROVIDE LINE SETS AND Bpi BOILER CIRC,PUMP OCCUPIED MODE: i20V/1PH ARMSTRONG E22 HP, 3300 RPM, INCLUDE COMPANION FLANGES 160E PLENUM TO ADD AC AT LATER DATE FAC121 SHALL BE SET UP FOR TWO STAGE COOLING. PRIMARY COOLING BP2 BOILER CIRC. 12DV/1 PH ARMSTRONG E24 HP, 3300 RPM, INCLUDE COMPANION FLANGES SHALL BE 100% OSA ONLY. IF THE ROOM TEMPERATURE RISES ABOVE 85'F, AIR TERMINAL SCHEDULE DUMP THE DX COOLING SHALL OPERATE AS NECESSARY TO KEEP THE ROOM TEMPERATURE AT OR BELOW B5'F. SYMBOL ITEM MFG MODEL SIZE CFM MATERIAL MOUNT FINISH HLP1 HYDRONIC LOOP 208-230V/3PH ARMSTRONG 2 HP, '1800 RPM, 85 GPM AT 33' OF HEAD, 2" DIA. INLET/OUTLET, 6.18" DIA. IMPELLER. IF THE ROOM TEMPERATURE FALLS BELOW 7TF, THE FAN IN FAC121 SHALL 2-WAY SUPPLY DIFFUSER PUMP ARMSTRONG SERIES 4300. PROVIDE ON/OF SWITCH. ON CONTINUOUSLY DURING HEATING SEASON. SHUT OFF. SG1 W/OBD SHOEMAKER 902-0 10" X i0" PLANS ALUMINUM GWB CEILING SOFT WHITE SEQUENCE OF OPERATIONS FOR RTU1 SEE GALV. BLADES, j SG2 4-WAY SUPPLY DIFFUSER SHOEMAKER MA 0 10" X 10" PLANS ALUMINUM FRAME GWB CEILING SOFT WHITE HWC1 DOMESTIC HOT WATER 115 1 ARMSTRONG E7B IN-LINE 12 GPM 023 FT. HEAD, 1/6 HP, 208 1 PH. PROVIDE WITH IF FOR ANY REASON, THE UNIT IS SHUT OFF, THE OUTSIDE AIR W/OBD CIRCULATOR PUMP PUMP FLANGE X THREAD AND THREAD X SOLDER ADAPTERS. (OSA) DAMPERS SHALL BE CLOSED. SG3 2-WAY SUPPLY DIFFUSER SHOEMAKER 902-0 24" X 4" SEE ALUMINUM MOUNT TO SOFT WHITE OCCUPIED MODE: W/OBD PLANS EXPOSED DUCT BV-1 BOILER _ ARMSTRONG 50 GPM FLOW AT A LOW Cv, IPT CONNECTION. RTU1 FAN SHALL OPERATE CONTINUOUSLY AND THE HEATER OR AIR BALANCING VALVE CBV-2T CONDITIONER SHALL OPERATE AS NECESSARY TO HEAT OR COOL THE SPACE BOILER ARMSTRONG SG4 2-WAY FLOOR REGISTER SHOEMAKER AFP SERIES 8" X 14" SEE ALUMINUM FLOOR SATIN SCANS ANODIZED BV-2 - 3a GPM FLOW AT A LOW Cv, IPT CONNECTION. AS REQUIRED. BALANCING VALVE CBV-2T NIGHTTIME MODE: SG5 1-WAY DIFFUSER SHOEMAKER 950 8" X 14" PSEE LANS ALUMINUM DUCT MOUNT SOFT WHITE ET1 EXPANSION TANK, ARMSTRONG TANK VOLUME 22.0 GAL, ACCEPTANCE 14.9 GAL, MAX. OPERATING PRESS. 150 PSI, WEIGHT 88 THE FAN SHALL OPERATE ONLY WHEN THE TEMPERATURE IN THE SPACE IS DOMESTIC HW MODEL AST-42 LB, 16"0, 1" CONNECTION. OUTSIDE OF THE SET POINT. THE HEATER, ECONOMIZER, OR AIR CONDITIONER SHALL OPERATE AS NECESSARY TO CONDITION THE SPACE. SG6 1-WAY DIFFUSER SHOEMAKER 950 1D" X 12" SEE STEEL �p� DRIFTWOOD ET2 EXPANSION TANK, PLANS ARMSTRONG TANK VOLUME 34 GAL, ACCEPTANCE 12.5 GAL, MAX. OPERATING PRESS. 150 PSI, WEIGHT 111 COOLING MODE, STAGE 1:_ MODEL AX-60V A16"0, 1" CONNECTION. TAN HEATING HW THE ECONOMIZER SHALT_ MODULATE WHEN: SG7 2-WAY SIDEWALL DIFFUSER SHOEMAKER 950-0 8" X 4" SEE STEEL DUCT SOFT WHITE A. THE OUTSIDE AIR TEMPERATURE IS LESS THAN WF (ADJUSTABLE) PLANS HV1 TEMPERING VALVE - HOLBY, 2-4" 120'F MIXING VALVE. HOLBY VALVE AVAILABLE FROM MECHANICAL SALES, SEATTLE. NO B. THE FAN IS ON SUBSTITUTIONS ALLOWED WITHOUT ENGINEERS APPROVAL. 3WV THREE WAY VALVE - BELlMO MODEL 3-WAY VALVE AND ACTUATOR. VALVE SIZED FOR 85 GPM AT 3.5 PS! DROP WITH A Cv OF 46. COOLING MODE, STAGE 2: SG8 1-WAY SIDEWALL DIFFUSER SHOEMAKER 950--0 12" X 6" SEE STEEL DUCT SOFT WHITE WHEN THE OUTSIDE AIR TEMPERATURE 15 ABOVE 66'F (ADJUSTABLE) AND THE PLANS B349 FARB24-SR ACTUATOR CONTROLLED BY BMS. ZONE IS CALLING FOR COOLING, THE THERMOSTAT SHALL INITIATE THE 2ND SG9 1-WAY SIDEWALL DIFFUSER SHOEMAKER 906 12" X 6" SEE ALUMINUM DUCT SOFT WHITE ADS1 AIR/DIRT - 2-1/2" CALEFFEI, MODEL PLUMB DRAIN TO FLOOR DRAIN WITH 1"0 TYPE M COPPER STAGE COOLING AND THE AIR CONDITIONER SHALL OPERATE AS NECESSARY. PLANS SEPARATOR NA546, FLG X FLG. DURING STAGE 2 COOLING, THE OUTSIDE AIR DAMPERS SHALL RETURN TO BMS THEIR MINIMUM OPEN POSITION.BOILER ATS SYSTEM WAS DESIGNED ASSUMING ALERTON COMPONENTS. CONTACT KEN DUNCAN AT TG1 1-WAY SIDEWALL DIFFUSER SHOEMAKER 905 10" X 6" PLANS ALUMINUM WALL SOFT WHITE MANAGEMENT 360-707--5800 OF ATS FOR QUOTE. ALTERNATIVE BMS CONTROLS MAY BE ALLOWED IF APPROVED I NT/FIN RADIATORS;SYSTEM BY THE ENGINEER. �I" NCE OF OPERATION SLA RG1 RETURN GRILLE SHOEMAKER 908-0 14' X 14" SEE ALUMINUM GWB CEILING SOFT WHITE THE DANFOSS THERMOSTATIC CONTROL VALVE SHALL, OPEN AND CLOSE AS DIP DIFFERENTIAL - ATS VERIS FIELD SELECTABLE DIFFERENTIAL PRESSURE TRANSDUCER. USE 4-20 mA OUTPUT, SPECIFIED NECESSARY TO HEAT THE SPACE. NO PROVISION FOR COOLING IS PROVIDED. RG2 RETURN GRILLE SHOEMAKER 1600 14" X 24" SE PRESSURE BY CONSTROLS CONTRACTOR. E STEEL CARPET DRIFTWOOD TRANSDUCER PLANS TAN F RG3 RETURN GRILLE SHOEMAKER 600 14" X 14" PLANS AL WALL SOFT WHITE THE TWIN BOILERS. SHALL OPERATE IN A PRIMARY SECONDARY ARRANGEMENT RG4 RETURN GRILLE SHOEMAKER 60Q 16" X i 6" SEE AL WALL SOFT WHITE FAN SCHEDULE WITH THE 300 MBH BOILER SET AS THE PRIMARY. FIRE AND SMOKE DAMPERS OL7 OUTSIDE AIR LOUVER SHOEMAKER 4500-IS 28"X24" PLANS AL WALL DRIFTWOOD FAN I.D. CFM S.P. MAKE MODEL FAN TYPE LOCATION VOLTAGE PHASE HP CONTROL NOTES CONTROL NOTES TAN SYMBOL DESCRIPTION BF1 65 .25 BROAN QTRO80 FACE OF BATH 120 1 FRACTIONAL WALL TYPICAL OF EACH RESIDENT ROOM OL2 OUTSIDE AIR LOUVER SHOEMAKER 4500-IS 20"X20" PSEE LANS AL WALL TAN SOFFIT CEILING SWITCH SMOKE DAMPER, RUSKIN, MODEL SDRS25. UL 555S LEAKAGE CLASS 1 CLASSIFIED. OL3 OUTSIDE AIR LOUVER SHOEMAKER 4550-RS 10"X14" SEE AL WALL DRIFTWOOD LF7 50 .1 BROAN OTRO50F FACE OF LAUNDRY 120 1 FRACTIONAL WALL TYPICAL OF EACH RESIDENT ROOM MOUNT WITHIN 2' OF THE DIFFUSER. PLANS TAN SOFFIT CEILING SWITCH RH1 175 - WHIRLPOOL WMH1162XVS RANGE/ KITCHEN 120 1 FRACTIONAL CONTROLLED BY CONSOLE, TYPICAL OF EACH RESIDENT ROOM FIRE DAMPER, RUSKIN, MODEL DIBD2. UL OL4 OUTSIDE AIR LOUVER SHOEMAKER 4550-RS 6"X10" SEE AL WALL DRIFTWOOD MICROWAVE VARIABLE SPEED. 555 LISTED. PLANS TAN EF122 65 .25 BROAN QTR080 CEILING BATH 120 1 FRACTIONAL WALL - OL5 OUTSIDE AIR LOUVER SHOEMAKER 4550-IS 24"X14" PLANS AL WALL IFTWOOD MOUNT CEILING SWITCHTAN COMBINATION FIRE/SMOKE DAMPER, RUSKIN, WL1 WALL LOUVER FAMCO LH 600 SEE PLASTIC WALL WHITE MODEL FSD36. UL 555 AND UL 555S PLANS CLASSIFIED. WL2 WALL LOUVER FAMCO UFH 400 PLANS PLASTIC WALL WHITE F 1/18/10 BP MODIFIED MODEL OF SG4, ADDED SG7 2/10/10 BP ADDED OL5, 5G8, SG9, TG1, FC125, RAH314 APPROVED FOR CONSTRUCTION - DRAWN/DESIGNED BY: CAD FILE NUMBER: 0 CHANDLER'S SQUARE INDEPENDENT LIVING BP/CG VENTILATION DIAGRAMS-o9001 r CHECKED BY: COUNTY: . CG SKAGIT l RR1 S DN EN GIN►EERIN G ANACORTES ■■ A DATE: JOB NUMBER: REVIEWING ENGINEER DATE 31;81' ! IFC 01/15/10OP 7 SCALE: 09001 MECHANICAL SCHEDULES HORIZONTAL SEE PLANS 1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707--5656 FAX (360) 707-5858 No• DATE INIT. RLV€SIGN APPROVALS 13at� Sig 1 ,f VERTICAL N/A OF i i i II HHWR FROM OTHER RADIANT BASEBOARD HEATERS ATTIC Fp1 PLUMBING SCHEDULE SYMBOL ITEM DESCRIPTION W V CW HW 2J DRYER VENT (DV). P1 WATER CLOSET VITREOUS CHINA FLOOR MOUNTED, ELONGATED BOWL, SIPHON ACTION BOWL 1.6 GALLON 3" 2" 1/2" TERMINATE METAL FLUSH. ADA APPROVED, 17-1/4" BOWL HEIGHT. AMERICAN STANDARD CADET Ill. DUCT WITHIN 2' OF 3016.016 BOWL, 4021.016 TANK, ORDER WITH AM. STD. SOLID PLASTIC CLOSED FRONT DRYER EXHAUST. SEAT. TYPICAL WEf 3RD FLOOR V W P2 LAVATORY 20" X 17" ADA APPROVED VITREOUS CHINA COUNTERTOP LAVATORY. AMERICAN STANDARD 1-1/2" 1-1/2" 1/2" 1/2" AQUALYN MODEL 0476.028 WITH 3 HOLES AND 4" CENTERS. FAUCET - SINGLE LEVER WITH RANGE HOOD (RH1) DRYER (D1) SEE ARCHITECTURAL PLANS AERATOR AND SPEED CONNECT DRAIN. AMERICAN STANDARD RELIANT 3. MODEL DISHWASHER (DW) UNDRY FAN(LF1) FOR FIREPLACE VENT DETAIL. 7385000.002. WASHER (W1) F,1 ;3 P3 KITCHEN SINK 25" X 22" TWO COMPARTMENT KITCHEN SINK. 20 GAUGE SS, SELF RIMMING 4 HOLE 1-1/2" 1-1/2" 1/2" 1/2" PUNCH WITH CUP STRAINER. ELKAY DSE-12522. SINGLE LEVER COMBINATION FAUCET WITH SWING SPOUT AND AERATOR. AMERICAN STANDARD 1" COPPER FOR HEATING HOT WATER p5 RELIANT+, MODEL 4205.000. PROVIDE LIQUID SOAP DISPENSER, AMERICAN STD. MODEL 4503.115. i FAN (BF1) to�)�' p2 �� P4 UTILITY SINK FN1 FREE STANDING SERVICE 51NK. PROVIDE WITH FLOOR HARDWARE, MODEL 1-1/2" 1-1j2" 1f2" 1/2"2N0 FLOOR / P47573 03 FAUCET: AMERICAN STANDARD LAUNDRY FAUCET WITH METAL HANDLES, MODEL 2j" COPPER SUPPLY FOR HEATING VENT THROUGH p " I P5 SHOWER LASCO ACRYLIC SHOWER STALL., MODEL 4036—BFS USE AMERICAN STANDARD R120 ROUGH HOT WATER 4j 2" 1-1/2" 1/2" 1/2" J L ROOF (VTR} IN VALVE, WITH SINGLE HANDLE TRIM MODEL T675.500. WALL SUPPLY 8888.037, 24" VERTICAL SLIDE BAR MODEL 1660.225, HOSE MODEL 8888.035, SHOWER HEAD MODEL " PEX FfR HEATING HOT WATER RETURN TYPICAL PLUMBING AND MECHANICAL CALLOUTS 1660.500. TYPICAL. PEX FOR HEATING HOT WA PLUMBING AND MECHANICAL CALLOUTS FOR ROOMS 103 AND 105 SCALE: " = 1' SCALE: " = 1 ' P6 ADA SHOWER LASCO ACRYLIC SHOWER STALL, MODEL 3636-BFS W/ADA OPTION. USE AMERICAN 2" 1-1/2" 1/2" 1/2" STANDARD R120 ROUGH IN VALVE, WITH SINGLE HANDLE TRIM MODEL T675.500. WALL SUPPLY 8888.037, 24" VERTICAL SLIDE BAR MODEL 1660.225, HOSE MODEL B888.035, SHOWER HEAD MODEL 1660,500. BALL VALVE FOR HEATING HOT WATER MANUAL SHUT OFF P7 UTILITY SINK ELKAY STAINLESS STEEL SINGLE BOWL 51NK WRH SOAP DISPENSER, MODEL LR2219. 1-1/2' 1-1/2" 1/2" 1/2" 22"X19"X71 . FAUCET: AMERICAN STANDARD KITCHEN FAUCET WITH METAL LEVER HANDLE, NOTE: INSTALL J" BALL VALVE ON THIRD FLOOR BV MODEL 4175.500. LIQUID SOAP DISPENSER MODEL 4305.200.002. THE INLET AND OUTLET OF EACH " BV HOT WATER RETURN HEATER 1ST FLOOR FS1 FLOOR SINK CECO ENAMLED CAST IRON 12"X12"XB" FLOOR SINK. 2" 1-1/2" - - DOMESTIC HOT WATER CO CLEAN OUT CAST IRON CLEAN OUT, JR SMITH #4023-B. MOUNT FLUSH WITH GRADE. USE 6" SDR 35 4" - -FOR DOWN PIPE TO SS. SECTION A—A HYDRONIC HEATER CONNECTION DETAIL HB1 HOSE BIBB FREEZELESS ANTI-SIPHON WALL FAUCET. WOODFORD MODEL 17 OR EQUAL. _ _ 3/4" _ SCALE: = 1' APPLIANCE SCHEDULE 2" SECOND FLOOR SYMBOL ITEM DESCRIPTION W V GW HW BV BV " HOT WATER RETURN W1 RESIDENTIAL WHIRLPOOL 3.4 CUBIC FOOT ENERGY STAR FRONT LOAD WASHER. MODEL WFW8300SW. 2" - 1/2" 1/2" DOMESTIC HOT WATER CLOTHES WASHER W2 COMMERCIAL MILNOR 60 LB. COMMERCIAL CLOTHES WASHER, MODEL 30022 VJ6. 3" — 3/4" .3/4" TYPICAL FIXTURE TAKE—OFFS CLOTHES WASHER 21" D1 RESIDENTIAL WHIRLPOOL SUPER CAPACITY 6.7 CUBIC FOOT ELECTRIC DRYER, MODEL WED8300SB. _ 4" CLOTHES DRYER GOLD WATER SHUT OFF VALVE FIRST FLOOR HOT WATER SHUT OFF VALVE- 0 �" HOT WATER �" COLD WATER 1" 1" D2 COMMERCIAL CLOTHES WASHER MILNOR 75 LB. COMMERCIAL CLOTHES DRYER, MODEL M758V. _ 8" - - 11" WASTE DW DISHWASHER WHIRLPOOL ENERGY STAR DISHWASHER, MODEL DU850SWPS. 1-1/2" 1-1/2" 1/2" 1/2" HOT WATER — _ �" COLD WATER UNIT SHUT OFF VALVE - -O O- UNIT SHUT OFF VALVE AAV PIPING SYMBOLS PIPE INSULATION SCHEDULE SYMBOL DESCRIPTION HOT WATER IN____ �_COLD WATER IN HOLEY VALVE � _ 0"1 120•F HW5 CONSTRUCTION NOTES PIPE MINIMUM INSULATION TEE 1. EACH PLUMBING FIXTURE SHALL BE INDMDUALLY VENTED AND ALL CW }!�" ON RISERS & MAINS r-Il-t UNION 2-1" P VENTS ROUTED IN WALLS, FLOORS, AND CEILINGS TO MAIN VENT �O HOT WATER RETURN 140'F HWS RISER FOR THAT LOCATION. SEE WASTE & VENT RISER DIAGRAMS. HW (1)RUNOUTS 2" AND I GREATER CHECK VALVE 2• PROVIDE FULL PORT BALL VALVE SHUT OFFS AND UNIIONS FOR EACH Up To 2" LESS ITHAN 2" GATE VALVE TYPICAL PLUMBING DETAIL UNDER LAVATORY 1- " (0& — LIVING UNIT PER DETAIL .5" 1" in BALL VALVE SCALE: 1" = 1' 120 F HWR 97 3• SLOPE FOR EACH WASTE PIPE SHALL BE in PER FOOT IF POSSIBLE. HHW -" 1" 1i" CONTROL BALANCING VALVE ALL PIPES WITH LESS SLOPE SHALL BE APPROVED BY THE ENGINEER. HHWR - 1" 1 " 4 THERMOMETER ADA NOTES: 1) IN UNITS 103 AND 105 ONLY, CONCEAL ALL HOT AND COLD WATER PIPING IN WALLS. USE GATE VALVES IN LIEU OF BALL VALVES UT OFFS. EXPOSE HANDLE OF VALVE THROUGH WALL SHALL NOT EXCEED 12 FT. IN LENGTH UNLESS TEMPERATURE & PRESSURE NOTE: (1) RUNOUTS TO INDMDUAL UNITS ;--<—r DIRECTION FOR UNIT SHUT FORE CAULK AT PENETRATION. 2} EXPOSED PIPES TO BE INSULLATED PER ADA REQUIREMENTS. 2" 2" APPROVED BY THE ENGINEER. RELIEF VALVE, 125 PSI, WATTS DR EQUAL Qmv AUTOMATIC AIR VENT, BELL AND GOSSETT, MODEL EASB-JR OR EQUAL. INSTALL WITH A 12"X12"X1" GALVANIZED PAN UNDER VENT TO CATCH ANY DRIPS. ET1 COMMERCIAL G�or�I 0 —G�OI—�1 0 LAUNDRY MACHINE �--I~� REDUCER Q FLOW SWITCH Hj I OHI I I 1 HR EXTERIOR WALL r� `,' -' . THERMOSTAT FLOOR SINK FLOOR SINK . TO DRAIN TO DRAIN RATED CAULK -- 3M CP 25WB+ G G AND FD-150+ OR EQ. WATER HEATER PROCESS AND INSTRUMENTATION DIAGRAM (P&ID) DUCT 4mO FOR LAUNDRY NTS 2006 WASHINGTON STATE ENERGY CODE NOTES 6"18 FOR FAN EXHAUST 1. AS BUILT DRAWINGS AND OPERATIONS MANUALS WILL BE PROVIDED TO BUILDING OWNER IN ACCORDANCE WITH WSEC SECTIONS 1416.1 AND 1416.2, 2. PIPE INSULATION: PER TABLE 5-12 OF THE WASHINGTON STATE ENERGY CODE (WSEC). TYPICAL DUCT/EXHAUST VENT DETAIL NTS DRAWN/DESIGNED BY. CAD FILE NUMBER. 1/18/10 BP P7 ADDED TO PLUMBING SCHEDULE APPROVED FOR CONSTRUCTION VENTILATIOND[AGRAMS-09O01 IS INDEPENDENT LIVING BP/cc CHANDLER Wit CHECKED BY: COUNTY: i !f CG SKAGIT DATE: JOB NUMBER: A]RRISON ENGINEERING IFC 01,15,1 a09001 REVIEWING ENGINEER DATE !^ AN ACORTES WA SCALE: JURISDICTIONAL HORIZONTAL SEE PLANS 1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707-5656 FAX (360) 707-5858 SPECIFICATIONS AND SCHEDULES VERTICAL N/A f V�/�1 OF 1 1 0 No. DATE INIT. REVISION APPROVALS Date Signed 11 1, " �, " 4" " 4 4 [ I I 1 E ROOF ► i ! i ' 2„ I I 1 I 2" 2,. 3" 2„ I ! 3„ 3 12, -- TO RISER 9 i---- TO RISER 10 ---- ----j----� i-----� TO RISER 10 i---- TO RISER 14 i----� TO RISER 15 ----i-----� -- TO RISER 3 TO RISER 4 r- r----� TO RISER 3 �------� TO RISER 4 �----�-----� - �-- � r-___� �-- I ATTIC I 2" 1 2" — 13" 3 j I I 13" 13„ I I I 12,. ! r- --1 F--- i-- i i---i I I I I 1 1 I I I l ! I I ! I I I I I ! I LAV I KS DW I ' KS, DW KS DW I I KS DW I I LAV SERVICE I I LAV KS, DW I I I KS, DW I KS, DW LAV I ; LAV ! 1 W 2 1 12" W W 2"1 12 W I LAV ! ! I I SERVICE w I I 3RD FLOOR 1 I i WC I WC 5 I I S S I I S I WC ! WC 2"I !2„ I ! wC W l wC I I S I I I ! I I I -� j I I LAV I I LAV I I I ! 1 ! 1 LAV LAY I I KS, DW I KS, DW KS, Dw I I KS, DW SERVICE I LAV SERVICE! I LAV KS, DW I I KS, DW I KS, DW I ! 1 1 I I I ! I W 2ND FLOOR 1 I Lj I WC WC S I I S S I I S 1 WC I WG 1 I i ! ti, C w I we ! S � _ I ` -� LAV SERVICE t -� LAV ! KS, DW j I KS DW KS DW I I K5 DW I I I KS, DW 1 KS, DW LAV! 1 LAV I I I I [ I I LAV LAV I ! I I , SERVICE ! I I W I 1 ST FLOOR I wC 1 WC I S S I I S S I 1 WC 1 WC 5 1 WC W I WC 2" 2„ 3" 3„ 3" 3" 3„ 3„ 3" 3„ 2„ 3„ 3„ 2" 6, 6„ 6„ 6"( 6„ 6" 6,> a Q O l�J O Q ® 1 12 WFU 12 WFU 12 WFU 12 WFU 28 WFU 14 WFU 12 WFU 24 WFU 24 WFU 9 WFU 23 WFU 30 WFU 12 WFU 30 WFU 4„ 4" 4" r----� i- -� i----� ROOF ! I I 1 2„ 2" 1 2" 2" 2" 1 2„ 2„ ---�y'-- i----- TO RISER 14 r----� TO RISER 15 ----� TO RISER 22 i------� TO RISER 21 i-----� TO RISER 9 --- �----� �----� TO RISER 21 i- - ---� TO RISER 18 12" 1 I I 1 I 1 2„ 1 I ATTIC ! r----� r __, 1 r--� I F--- 1 I ! I I I I I i I I I I LAV " "1^ I KS, DW 1 KS, DW KS, DW 1 I I LAV LAV I 1 w I 11 w w I I I SERVICE LAV I I 12 { 2" 3RD FLOOR i i s i wG wG s s I I s I WC I 1 we Ll I 1 1 1 I ! 1 1 F ! I 1 ! I I I _ KS, D 1 f ! LAV LAV 1 I I I I I 1 SERVICE Y 1 I I KS, DW 1 ! W 1 I W I I I 1 SERVICEI 2ND FLOOR I 1 S i WC WC I 1 1 S 5 I I S I WC 1 P. WC I 1 1 1 1 1 2„ LAV I I LAUNDRY SINK I KS 1 I I W 3 4" FLOOR DRAIN 1ST FLOOR I I P. WC FROM RISER 25 ----� 3" 3" 2" 3" 2" 2" 2' -- 2" -- TO RISER 15 2. - ---J 4" 4„ 4" 4„ 6„ 6„ 6- 6„ 6„ 6" 6„ 6" 6„ 6„ 14 WFU 13 WFU 13 WFU 15 WFU 20 WFU 6 WFU 12 WFU 8 WFU 9 WFU 4 WFU 4 WFU RISER DIAGRAMS zu NTS pqV AAV CEMENT CONCRETE TG PER PLAN T 1-4" MIN HHWR HHWR 1-4' MIN HHWR 1- " MIN COLLAR CLASS 4028" RING000 T ANDNGOVERNG 0 114 HW PAVED SURFACE 28" SQ FINISHED H GRADE HWC1 RgH Rg RBH RBH RBH RBH RBH RBH RBH CEMENT CONCRETE Eft N _ CWS 'rrr S" GASKETED WH1 B Rgi. 2--�" BH HHW 2- BH RB HHW 2-1" B 2-4„ RB RB HHW 2-�" RB BOILER CONTRACTOR TO DESIGN 12" PVC SPIGOT CAP 2- 2-.1j » HHWR 2-�" HHWR 2-4" AND BUILD PAINTED STEEL SLEEVE OR MECHANICAL 2- " HHWR 2- " HHWR 2- " t HHWR 2- " » " STRUCTURE FOR B-1 SUPPORT A MINIMUM OF 1" ABOVE B-2 TO BEDDING PLUG (WATERTIGHT) BH g BH BH BH BH BH BH B " " REPLACEMENT OF B-2. SHOP GRAVEL - ALLOW FUTURE REMOVAL AND DOMESTIC HW TO FIBER JOINT 45* BEND PIPE ATTACHED TO HOLBY VALVE WING EAST WING OF 2- 2 DRAWINGS ARE REQUIRED TO BE CEILING SYSTEM SYSTEM REVIEWED BY ENGINEER BEFORE PACKING TIE IN HHWR AT BOILER ROOM HHWR CONSTRUCTION, �5 TIE IN HHW AT BOILER ROOM 4 PIPE HHW I ASME RELIEF, 1" FACTORY SET Q DIA. MAX t I TO 125 PSI OR ADS1 SPACING 3WV I MANUFACTURER'S WH2 O O 2 T 2-1/2" HLP1 2 T FROM RECOMMENDATION, PLUMB WITH PLUG TO BE SEALED � BV " �" � O O 45' BEND 2 2" 2-4" SYSTEM 1" TYPE M COPPER TO WITHIN OR WYE IN THE SAME MANNER � PRESSURE GAUGE, LIQUID FILLED, O O � „ AS MAIN SEWER JOINTS WINTERS QB05 OR EQUAL. B VERTICALLY OVER FLOOR ELECTRONIC TLMPERATURE SENSOR P " DRAIN. TO BE SUPPLIED BY THE CONTROLS CW5 " 1» BV - BOILER PUMP BALANCING CONTRACTOR AND INSTALLED BY ��Q O DP VALVE, ARMSTRONG CBV-SF, ELEVATION THE BOILER CONTRACTOR. TO FLOOR TYPICAL. 1/2" 1/2" WIDE, I TRERICE SOLAR POWERED DRAIN O J" HOSE BIBS/DRAIN 1 8 HIGH THERMOMETER, MODEL SX9. SUPPLY - VALVE RAISED WITH 3--4 F2 THERMAL WELL. 2- " 2 " " BORDER R ROOM DETAIL IS DIAGRAMMATIC OIN U UNION 10 B1 B2 CONTRACTOR SHALL FOLLOW ALL EQUIPMENT MANUFACT R ! r III"�i B-1 I 2 BP1 IN THE BOILER ROOM: 8 3 4" A A INSTRUCTIONS DURING INSTALLATION AND TESTING. IF TH I BV CONTRACTOR IS UNSURE ABOUT ANY ELEMENT OF THE �(�K BRONZE FULL PORT BALL 2" INSTALL BALL VALVES ON 6trE 3 p INSTALLATION AND COMMISSIONING PROCESS, SUBMIT A VALVE, APOLLO OR EQUAL ®~ T REMOTE OSA TEMPERATURE HHW AND HHWR SUPPLY SENSOR FOR BOILER AND RETURN FOR ISOLATING p p/ REQUEST FOR INFORMATION (RFI) TO THE ENGINEER FOR7'�'� PRESSURE REGULATING I P T TEMPERATURE RESET. EAST AND WEST SECTIONS 8" BP1 BP2 FURTHER DETAILS. ALSO, SEE BOILER P&ID FOR MORE AILED LOCATED IN OUTSIDE AIR OF BUILDING. ALSO INSTALL INFORMATION. VALVE. J" WATTS, SERIES 2., DUCT IN FAC123. SYSTEM DRAINS ON RETURN 15" 3/4" RAISED U5LP OR EQUAL. IhO O LINES AND CHECK VALVES SQUARES ON HHW RETURN LINES. SECTION A-A DP DIFFERENTIAL PRESSURE TRANSDUCER, INSTALL PLACCARDS THAT 3 4:- APART, 1" T2 SUPPLIED BY CONTROLS CONTRACTOR. 0 IDENTIFY EAST AND WEST A5 APPLICABLE. ELAI�J NOTES 3WV 3 WAY BALANCING VALVE B-2 T 2" BP2 2" 1 CLEAN-OUT PIPE AND FITTINGS CAST IRON RING WITH ACTUATOR, SEE M1 SHALL BE PVC. AND COVER ET2 I 0 2 A SANITARY TEE OR SWEEP MAY BE ADS1 SEE M1 P T 2" INSTALLED IN LIEU OF A WYE AS SHOWN. STRAIGHT TEES ARE NW ACCEPTABLE. I �-�� BUSHING OR BELL REDUCER MHO BMS CLEAN-OUT SHALL CONFORM TO HHWR S SEE M1 WSDOT STANDARD PLAN B-18b P CW5 LL — — HLP I L a 6" SEWER CLEANOUT HHW ADS1 Q Q Q Q HHW OILER ROOM PIPE DIAGRAM BOILER P&ID NTS u La La L� SEE P&ID'S FOR APPURTENANCES NTS 1 5-31-09 CG CHANGED HLP-1 AND BV. APPROVED FOR CONSTRUCTION DRAWN/DESIGNED 13Y: CAD FILE NUMBER: � � CHANDLERS SQUARE INDEPENDENT LIVING BP/CG VENTILATIDNDIAGRAMS-09001 2 1/18/10 BP ADDED SINK TO RISER 22, MODIFIED BOILER P&ID DETAIL. +�. WA CHECKED BY: COUNTY: 3 2/1 1/10 BP 3RD FLOOR HHWR PIPE SIZED CG SKAGIT DATE: JOB NUMBER: l RRISON ENGINEERING ��, �� AFC 01/15/10 REVIEWING ENGINEER DATE '4TER� AN ACORTES, WA 09001 SCALE: JURISDICTION ){j. � HORIZONTAL SEE PLANS (�/� 1997 PARK LANE, BURLING70N, WA 98233 PHONE (360) 707-5656 FAX (360) 707-5858 RISER DIAGRAMS AND DETAILS VERTICAL N/A I V i 3 OF a No. DATE INIT. REVISION APPROVALS Si rr �t J I I LINETYPES WASTE(W) VENT(V) — — — — - COLD WATER(CW) HOT WATER(HW) ----- -- HOT WATER RETURN(HWR) — — — HEATING HOT WATER(HHW) - HEATING HOT WATER RETURN(HHWR) — FUTURE AIR CONDITIONING(AC) — — — — -- SCALE: 3/16"=1' 118 HB1 w TIE INTO EXISTING w GAS GASw GAS GAS GAJr GAS GAS GAS SEWER a r 116 w '7 141 143 145 1 UP TO ° FIREPLACE 12 WFU 4 WFU n n 9 tD 24 FU 28 WFU I 125 3 o / 5 rr 1 pp jF0-1 u 6 WFU V cl12 WFU 11q olb o -L LIL- 18 _Dt SET INVE BELOW Fl SHED ORLi 3 114C Li L — WHEN PIP EXITS 12 WFU 14 WFU 23 WFU 13 WFU 15 WFU 5 WFU 115 BUILDING. 369 WFU 345 WFU 321 WFUT 263 WFU 237 WFU 189 WFU 174 WFU 121 WFU 95 WFU 91 WFU 65 WFU 30 WFU 13 WFU 6" WASTE rn 6" WASTE 6" yrAS� 1 S WFU SET INVERT OF LEANOUT CLEANOUT IN 12 WFU 12 WFU 13 WFU BELQWTFlNISHEO LO PARKING LOT. SEE CIVIL PLANS FOR 1�0 4Zf LEI 71 FLOOR. LOCATION. Fr GO 0 I 0 a 12 WFU 0 6 n ter pp o � dU � obu 0 20 WFU 30 WFU ¢ O O T WATER 1-777 24 FLU 3 � 114 C 12 R UWATER 122 U � 0 w � 2 \ � H 112 GAS GAS G GAS AS GAS GAS GAS 9 WFU 12 WFU a 9 WFU WH1 �I AT CEILING - WFU �-+-J '� � — , 3 HwFu — ° FS1, 2 WFU w �WH2 COLD WATER B1 121 1 4 ��B2 FS1, 2 WFU a 1r IN CEILING OF FI ST FLOOR 2.5 � w 142 144 � AS GAS GAS G s GAS ETAS GAS TTLGAS G S 0 DCDA 123 r I 2" GAS FIRE LINE FROM Ll I HYDRANT, BY OTHERS 146 CDLD WATER SUPPLY, 2jw TYPE L COPPER TO 2' GAS SUEPLY METER FIREPLACE 13 0 20.5 MBH FIREPLACE 1 A 37 MBH WATER HEATER 2 0 199 MBH BOILER 1 0 300 MBH BOILER 1 @ 500 MBH DRYER 1 0 175 MBH TOTAL 1376.5 MBH CHANDLER'S SQUARE INDEPENDENT LIVING DRAWN/DESIGNED BY: CAD FILE NUMBER: APPROVED FOR CONSTRUCTION BP/CG VENTILATIONDIAGRAMS-09C]O1 CHECKED BY: COUNTY: 4 ' CG SKAGIT e DATE: JOB NUMBER: ,� RRISON ENGINEERING- ;�ry�� � f IFC 01/,5/10 09001 REVIEWING ENGINEER DATE ' A N A V O R T E S, W A HORIZONTAL SEE PLANS t.gms '• VA JURISDICTION YS�C3!V�11 1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707-5656 FAX (360) 707-5858 1ST F L. WATER WASTE & VENT DIAGRAMS VERTICAL N/A I V I 0 F V No. DATE INIT. REVISION APPROVALS IDate Signed �f f LINETYPES WASTE(W) VENT(V) — — — — — COLD WATER(CW) HOT WATER(HW) -�- -------- HOT WATER RETURN(HWR) — -- -- HEATING HOT WATER(HHW) - HEATING HOT WATER RETURN(HHWR) — FUTURE AIR CONDITIONING(AC) — — — — — SG7 SG7 4" 45 4" 45 CFM. CFM. I 12"02" 1 USE TURNING ES IN "UP" DIRECTION. SCALE: 3/16"-1' 12"x14" 8"x8". TYPICAL 118 B"x8" ZONE219 5/A 1140 CFM R/A 990 CFM OSA 150 CFM 14'x14' FAC219 RBH-8 RBH-8 SEE ARCHITECTURAL PLANS TG1 TG1 RTN M FOR FIREPLACE VENT DETAIL. 90 CFM M RBH-10 RBH-10 RBH-6 RBH-0 FACII25 RBH-12 SG9 140X14" 150 CFM � 116 41 OW GFM 6"m 6No 143 145 117 AA soccer 8"x20' 0 F-1 6"0 ❑ — ❑ sGB I cFM ❑ ❑ ❑ SG8 n � n n 126 " F -1 — CFM E 4w� 125 sGs 1631 " p . " 163 b 1lG CFM —71 40 o 8'x 12' 8"x16" �1w SG1 SG1 © ° n 267 267 ° SG1 26 11cJ 267 267 B -6 Qw RBH-6 � CFM 1� B"� 8" ° 10"x12" ° 10"x12" ° 8,0 BE 10"x20" 05Q 0 . F=l 6 6 4► N w SG6 fLk � 12 x16 25Q M RE' #IR CFM M SG6 250 1 p INSTALL 4"0 4 L K OUTSIDE,�JR O O CFM 5' AFF 122 —1 12 X16 113 114 0 � 0 1112 INSTALL ❑ IN 5 aFF 7G5 25Q " CFM 6w 6wo ❑ ❑ 4" 8" DRYER SG5 EXHAUST OL3 6" 250 1 n 121 CFM X L---LT d" BF1 4"0 1 4 / G5 MINIMUM OF ❑ u V ZONE 121 50 12" AFF. S/A 1000 CFM FM 14"X8" 142 144 ac/A loon CFM FAC121 0� 195 1995 19S A� a-- M � CFM cFM RBH-12 RBH-10 4alL — HHW HHWR 1�1r r r 123 OL1 FC123 195 OL1 OSA INTAKE. TOP 100 CFM 1000 of DUCT 12" CFM IS RBH-e RBH-e 6"o CFM BELOW CEILING OF TL ROOM 121 OL2 180 CFM ZM 124 COND. S/A 7Qo CFM 146 A SIX CFM05A 1 ao cFM RBH-12 RBH-6 RBH-8 APPROVED FOR HYDRONIC HEATING CONSTRUCTION ONLY 1 1/18/10 BP DUCTING AND AIR HANDLER RELOCATED IN RM 118 APPROVED FOR CONSTRUCTION DRAWN/DESIGNED BY: CAD FILE NUMBER:H.G CHANDLER'S SQUARE INDEPENDENT LIVING BP/CG VENTILATIONDIAGRAMS-09001 1 2/10/10 BP DUCTING AND AIR HANDLER RELOCATED IN RM 125, HYDRONICS ADDED TO FC'S WA 1 CHECKED BY: COUNTY: $ CG SKAGIT ARRISON ENGINEERING— DATE: JOB NUMBER: REVIEWING ENGINEER DATE 3��+�z,�5� � AN ACO RTES �A IFC 01/15/10 09001 JURISDICTION I.ST), �; 1 SCALE: «aA11 ® HORIZONTAL SEE PLANS /�1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707-5656 FAX (360) 707-5858 FIRST FLOOR H VAC N/A IVf No. DATE INIT. REVISION APPROVALS Saned Jd VERTICAL LINEIYP ES WASTE(WV) VTR VENT(V) -- — — — — COLD WATER(CW) HOT WATER(HW) ------- HOT WATER RETURN(HWR HEATING HOT WATER(HHW) - HEATING HOT WATER RETURN(HHWR) --- I FUTURE AIR CONDITIONING(AC) — — — — — I I ❑ I f ❑ I EE I SCALE: 3f 16"=1' ' I I I ❑ II ❑ E I I 4" WASTE I 21�1 I I I I I I I I I I VTR I 218 0. . I I ------------ I I 241 243 245 247 fi I� I. ' 222 I � 4 1 (D 1 "I, 5 ' O I I ' o b — 2 I I ri 5.6 CWFU �O b __-- -- ► W I 3.1 HWFU 17 » I _- O� , p — " ® ' , CWFU _ 1 7740 CWFU , 80 CWFU - CW --- -- '� 1 -- . — . . — . . — . . — . . — . . — . . — . . _ _ _ -WWR- . . ._ . . - . . - . . - . . - . . - . . -. . . - . . - . . - . . - . . - . . - . , - - 31,5 CWF. CW _ _ _ _ 16.7 CWFU_ • 1 -------- - ----_- - ------- ------------ ---- _ _ _ _ _ n22.3 •-HWR- 36.7 CWFU ❑15 WWFU 26.7 HWFU —�- ----11.7 HWFU -- -•-_-- --�-- - -0 WWFU -- - 60 HWFU HW-•�_--.----- " ------ - --------T CWFUFu—_ -- _ " clRculr 0 CWFU 15 HWFU 1a 1 20 C FU i I p17.3 HWFU 2 " ' » " " I� 1 2�1 , ,. 2 SETTER, 3 GPM , 2 7.5 HWF � 10 CWFU " •, 1 "�I 20 CWFU " 1�15 HWFU 4.6 CWFU I - 24.6 CWFU I I 1 1 ' 1.1 CWFU 0 FU -15"HWFU 3i� i 4.6 HWFU -I �----� 19.6 WWFU 2" i �10 CWFi1 ,� 10 CWFU 4 ❑ i ❑ I ' I 2� I I�7M5 HWFU1.1 HWFU M 1p ❑ _ 1 5 HWFU ❑ , _ 0 THIRD FLOOR Zap ' 1 2 " 1 n n 0 .9 HWFU .9 C FU ' .1 CWFU I i 0 co L 1 1.1 HWFU �I{ I o I .. •� I � �o if II I I 1 H�T 1 ' F I I O O 1 UR � I. 1 C _ ' I --- ----- -- 1 -- -- 2 —o -- --- -- WwFu " - ----- -- - ' I 3 CWFU O " O� I COLD WATER i 242LL i 244 I. 283.5 CWFU 0 0 nL p 246 1 1/18/10 BP WASTE AND SUPPLY ADDED TO P7 AT SOUTH END OF RM 219. APPROVED FOR CONSTRUCTION DRAWN/DESIGNED BY: CAD FILE NUMBER: K + CHANDLER'S SQUARE INDEPENDENT LIVING BP/CG VENTILATIONDIAGRAMS-09001 Of CHECKED BY: COUNTY: y CG SKAGIT DATE: JOB NUMBER: RRISON REVIEWING ENGINEER DATE ENGINEERING 31581 IFC 01/15/10 JURISDICTION � �t�" a ANACORTES, WA SCALE: 019001 SEE PLANS 1997 PARK LANE, BURLINGTON; WA 98233 PHONE (360) 707-5656 FAX (360) 707-•-5858 Lexp��E5 HORIZONTAL tl No. DATE INIT. REVISION APPROVALS 2N D FL. WATER, WASTE & VENT DIAGRAMS VERTICAL N/A OF - I L [NFTYPE5 WASTE(W) I VENT(V) COLD WATER(CW) HOT WATER(HW) ------- HOT WATER RETURN HWR -- — — HEATING HOT WATER(HHW) - HEATING HOT WATER RETURN(HHWR) ° ° FUTURE AIR CONDITIONING(AC) SG4 SG4 ® 263 263 ® SCALE: 3/16"=1' CFM CFM ❑ ❑ ❑ `Cy 21q 0 0 ® SG4 SG4 263 263 CFM CFM HHWyHHWR FROM ROOM 143 ❑ ❑ FROM ROOM 141R02 RM FROM ROOM 345 FROM ROOM 147 FROM ROOM 147 219 RTN TD RQO All �� R880 AV 1 FROM THIRD FLOOR � �8 R 80 115 TO ROOM 349 1 � 900 CFM TO ROOM 145 -� JJJ 24 X14 FROM ROOM 145 FROM ROOM 143 RBH-8 I RBH-8 I FROM ROOM 143 FROM THIRD FLOOR FROM ROOM 145 RBH-8 1 218 TO ROOM 141 ' r Tp pp 114433 Tpp FROM ROOM 145 �p ��pp pM 4477 1900 CFM � TO ROOM 3 1 TO R ON 343 TQ R M 1:2 RBH-6 TO R$ TO R OM 47 I 1 I I BF1 -® I I OL5 1 BREEZEWAY ❑"3 �RBH-12 " - RBH-8RBW-10 —HHWIF FP1 —HHWR— TRBH•-6 (� � � �y}wl V i 1 DRYER VENT (DV). L'� 1 i I I i TERMINATE METAL p i 6" 6"0 DUCT WITHIN 2 OF DRYER EXHAUST. f l TYPICAL. FYI I RANGE HOOD (RH1) i DRYER (D1} I 222 ❑ I DISHWASHER (DW) h1 RY FAN(Dl ) VTR IN CHASE, P3 T WASHER (W1) O o BY ARCHITECT FP ❑ ❑ � ❑ ❑ ❑ ❑ � 1 ❑ ❑6 ji- ❑ ❑ 4 J I � TO ROOM 300 I 0E) BATH FAN (BF1) I l 1 � � ❑ P1 P2 I Q ROM 31 FROM ROOM 100 w b I 8 -® o TCL I� 0 - � vENr THROUGH , l 200 I 267 26 ❑ ° ROOF (VTR) I I i ° ° �s� �s� 1 TO ROOM 115 I ❑❑ l CFM CFM I CFM CFM 2 5 ❑❑ - �� " ❑ TO ROOM 00 � 112 . S"1>� I R � 74 - ° 10"x12" ❑ 10"x12" ° ff FROM ROOM 115 6 O ❑❑ J = -T 6" "-10"X20 R 50 I ❑ ❑ I�I� O ❑ ❑ O 6"0 la w INS TED LINE SETS FOR 3 ❑ 12 x16 REL4EF IR TON AC (FUTURE). TERMINATE 214 1 M M 16 x20� INSIl E ROOM AT CEILING. 4"0 4"0 12"x 6"�' O O I l 1 " 4"0 JZ'—OV16-IDE IR C x1s 21 I I ❑ I l � 212 I' i ❑ > I I 0 ❑ - II ❑ Ifl 0-0 - - w " � � p ❑ 4" � -ill I 6 6 0 I^ ❑ I I 6"0 B"0 242 244 i t ❑ ❑ I I I Il ❑ J J/ IllLAI LAJL) I I I ❑8 250 ll wT. ❑ FROM ROOM 142 I FROM ROOM 144 ❑ H II HHWR RBH-12 I i I l I l II RBH-10 I I I RBH-12 Ijuil RBH--10 I l I HH TO ROOM 142 TO ROOM 342 I RBH-8 I I RBH-8 I To RO°OOM 34-44 I 246 I 1 r I I l I � I LINESETS TO RBH-10 RBH-8 TO ROOM 350 TERMINATE AN FROM ROOM 142 FROM ROOM 144 I i I I ROB;D2E10WALL OF J TO ROOM 142 �` TO ROOM 144 I I I I + TO ROOM 342 TO ROOM 348 TO ROOM 350 TO ROOM 344 I CDI TO ROOM 348❑ 1 RBH-12 (A-) I RBH-8 A HEATING NOTE: SEE HYDRDNIC HEATING DETAIL FOR TYPICAL HEATER HOOK FROM ROOM 146 RBH-B FROM ROOM 146 UPS. TO ROOM 146 J TO ROOM 346 TO ROOM 146 APPROVED FOR HYDRDNIC HEATING CONSTRUCTION ONLY TO ROOM 346 ❑ TO ROOM 146 FROM ROOM 14fi q TO ROOM 346 1 1/18/10 BP SG4 MODIFIED AND RG2 ADDED TO RM 219 APPROVED FOR CONSTRUCTION DRAWN/DESIGNED BY: CAD FILE NUMBER: 2 2 1 1 10 BP AC LINES MODIFIED, 2ND HHW PIPE ADDED IN RM 248, HYDRONICS ADDED TO FC'S CHANDLER'S SQUARE INDEPENDENT LIVING BP/CG VE NTI LATIO NDIAG RAMS-09001 VA t CHECKED BY: COUNTY: CG SKAGIT DATE: JOB NUMBER: REVIEWING ENGINEER DATE � RRISON ENGINEERING- 1FC 01/15/10 09001 JURISDICTIONf A N A C O R T E S, WA SCALE: 7£'dA1 'a HORIZONTAL SEE PLANS 1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707-5656 FAX (360) 707-5858 SECOND FLOOR H V A C I V 1 � O � � � I No. DATE [NIT. REVISION APPROVALS ��Sirtc1 !/ VERTICAL N/A LINETYPES WASTE(W) VENT(V) — --- -- -- -- COLD WATER(CW) HOT WATER(HW) ------- HOT WATER RETURN(HWR) — — — HEATING HOT WATER(HHW) - HEATING HOT WATER RETURN(HHWR) — FUTURE AIR CONDITIONING(AC) — — — — — SCALE: 3/16"=l' i I f 341 343 345 347 F"'yl 34q El 3�6 1 — ------ --- -------- ----- -- 9 ------------ - ------- --- ------- ----- --- - - -- ---- ------- - ------ I' -- ---- ------ - ------ - i o� II i 5 Jp p» 0 OO — _ .----- --- » 00 �I » 00 4 Fl�Q 5 HWFU ❑ _ 0' CWFU — ° �� ❑ CW -15 HWFU -------- 30 HWFU -------HW WR -— — — — —_------. . -— — --- 51.9 MWFU--—HWR .- . . — x x 00 r 7.5 HWFU i r -T HW— - - — — HWFU ----- ---- 1 WFU --- -- 30a » i " , " 12.3 CWFU "- 3�J 10 CWFU 10 9.8 HWFU " 7.5 HW 10 CWFU .5 HWFU i 10 CW U 1" 1 " 311 2.3 CWFU-�� ' CIRCUIT 2�I in CI R,U3 GP 1 " �- — " » 10 C 0 0 CWFU '= 7.5 HWFU 10 CWFU in i- - 7.5» HWF 2.3 HWFU i Ir 9.8 HWFU S TER, 3 GPM � 0 1 10 CWFU I i�7 5 W 801 9g CWFU I^-7.5 HWFU ❑ » 4 i 2» -- - rlln Opp � ul jo ECOND'1 ob E do jl II � �I 314 Ij f I o o n � � C L L 2 -- -- -- 312 _- --- � 1 0E = - 0 � . 342 � 344 I' I 348 350 0 0 L")Q p D 346 APPROVED FOR CONSTRUCTION DRAWN/DESIGNED BY: CAD FILE NUMBER: Q CHANDLER'S SQUARE INDEPENDENT LIVING BP/cG VENTILATION DIAGRAMS—09001 CHECKED BY: COUNTY: CG SKAGIT �t RRISON ENGINEERING !FC 01/15/10 DATE: JOB NUMBER: REVIEWING ENGINEER DATE ANACORTES, WA 09001 SCALE: JURISDICTION �JVAi.�' � HORIZONTAL SEE PLANS 1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707-5656 FAX (360) 707-5858 EXPIAES if 3 R D FL. WATER, WASTE & VENT DIAGRAMS VERTICAL /�N/A 1 V 1 8 OF No, DATE INIT. REVISION APPROVALS I i LINETYPES WASTE(W) VENT(V) — — — — — COLD WATER(CW) HOT WATER(HW) --------- HOT WATER RETURN(HWR) --- — --- HEATING HOT WATER(HHW) - HEATING HOT WATER RETURN(HHWR) — FUTURE AIR CONDTTIONING(AC) — — — — — SCALE: 3/16"=1' LI RBH-8 , RBH-8 RBH-8 RBH-8 RBH-6 rt RBH-10 RBH-8 RBH-10 RBH-10 — RBW-12 . — — -- — — — — —RBH-1a — -- — — — — — — - - . � � . - - . — — —HHWR- - . — �- - - . — - - . � — - - — . - - - _ - - -- . - - - - I . I I I 1 341 343 345 I I I 347 n� 349 0 �ni 0 " w 6"0 I - 6 6O I Intel - - © FLUE - SHA FROM 1772 II I 6"0 J ECO D M 316 ❑ a I E FLOOI w 4"0 I f " Vol w w 4 0 O �� o 6 '6-' ❑ ❑ ❑ SGII El RBH-4 — SG1 SG1 ° ° Ill ❑ ❑ SG II 1 267 267 � � _ � , J � cFM cFM 315 30 0 - CFM cFM � � 311 �.� I awl ° 1a"x12" 1a"X2a" 1a~x12~ ° RICO I 8 0 6 ~ INS LATED LINE SECS FOR 3 ;;;;; ❑ 0 L CO) 12 x16" TON AC (FUTURE). TERMINATE RVT ELIEF PAIR INSI E ROOM AT CEILING. E— M 20 x24 314 4"0 400 12"x16" ® c �7 OUTSIDE taw X 24" 4.0 4"0 20"x24" 313 U VENTILATION DU01 [/ n AA ❑ ❑ 312 " w SI OEMA ❑ 4w ❑ --, LESS CH 6 { 6"40 6"0 i " 6"1 6"0 I I II � 350 1 , 342 344 U � � I 348 I . - - . - - . - .-- --. � I RBH-12 RBH-12 I I RBH-10 i I I ° RBH-10 I I I RBH-10 I RBH--8 RBH-8 RBH-8 I 346 6"m 4"o RBH-12 I RBH-8 RBH-6 APPROVED FOR H YDRON I C HEATING CONSTRUCTION ONLY 1 2/1 1/1 O BP AC LINES MODIFIED, AAV ACCESS HATCH RELOCATED TO RM 312 APPROVED FOR CONSTRUCTION CHANDLER'S SQUARE INDEPENDENT LIVING DRAWN/DESIGNED BY: CAD FILE NUMBER: HYDRONS ADDED TO FC'S BP/CG VENTILATlDNDIAGRAMS-49D41 C} CHECKED BY: COUNTY: � CG SKAGIT DATE: JOB NUMBER: RRISON ENGINEERING IFC 01/15/10 A REVIEWING ENGINEER 31' ' ANACORTES WA DATE a9 �a 1 S A JURlSQICTION � IA1 ' HORIZONTAL SEE PLANS 1997 PARK LANE, BURLINGTON, WA 98233 PHONE (360) 707-5656 FAX (360) 707-51358 THIRD FLOOR H V A C M 9 OF -1 0 VERTICAL N/A No. DATE INIT. REVISION APPROVALS ICI