HomeMy WebLinkAboutBLD-2013-0327 - OVER OR IN WATER STRUCTURE G1T-Y 0 :, City of Anacortes Permit#: BLD-2013-0327
\ $ 904 6th Street Issue date: 07/31/2013
`I�•• '_�Ar}i P.O.Box 547 Expire date: 01/29/2015
Anacortes, WA 98221-0547
(360) 293-1901
NCO
Job Address: 1400 4TH ST Permit Type: Commercial Alteration/Repair Permit
ANACORTES WA 98221 Project:
APN: P55673
P55679
P55366
P31513
P31514
P31515
P31516
P31517
P31518
Remarks: Replace deterioated dock bull rail,decking,stringers and pile caps per plans
Owner: TRIDENT SEAFOOD CORP Contractor:
Address: PO BOX 17599 Address:
SEATTLE WA 98127-1269
Phone: (360)293-3133 Phone:
License#:
General Information: Fees:
Building Valuation 120000 Plan Review Deposit 359.37
Building Permit Fee 1,105.75
Plan Review Fee 218.81
State Building Code Fee 4.50
Total Calculated: 1,688.43
Deposits/Receipts: 0.00
Total Due: 1,688.43
(A
m
^: h!
F+
�• CAA
rt
'Il I
m .-
rt
U O
O
O O
O f+
W
4] 4
4J �T
O
M �•
h.7
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OFV-)Fµ
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED,FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED!» YA
HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. AL6-_
PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN`dc---
NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER
STATE AOR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. o
SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUEDISSUED BY�
N CANADA
TIDAL INFORMATION
a U. S. A.
ANACORTES WASHINGTON p, -° BEWNGHAM
LAT. 48' 31' N LONG. 122' 37' W $o
EXTREME HIGH WATER (EHW) = +11.0' PROJECT
MEAN HIGHER HIGH WATER (MHHW)= +8,2'
MEAN HIGH WATER (MHW)= +7.4 ^w,� �Ifp SITE
MEAN LOW WATER (MLW)= +2.5 �111j MOUNT VERNON
MEAN LOWER LOW `WATER (MLLW) = 0.0' e� AcoRiF.s
EXTREME LOW WATER (ELW) _ —4.5'
3 EVERETT
N
N
FS
PROJECT SEATRE
y J SITE PACIFIC OCEAN
ANACORTES LAT 46.5201'N
AIRPORT CfO��" AA TACOMA
VICINITY MAP
rs,0 NO SCALE
CITY OF
ANACORTES
Q $'
...!Aollr I I I
I —Jl
J L—1
LAND
Q,��
0\N0gv ----
-
FIDALGO ISLAND
(SKAGIT COUNTY)
0
ANACORTES AND
FIDALGO ISLAND
0 1 2 1 2 3 MI
PURPOSE: TRIDENT SEAFOODS PROPOSED:
ETIIMBER PIER DECK
REPAIR DETERIORATED TIMBER PIER
ANACORTES PLANT STRINGERS AND PILE CAPS
TIMBER PIER REPAIR IN: GUEMES CHANNEL
DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO.
ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M.
1) TRIDENT SEAFOODS APPLICATION BY:
2) CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY
1400 4TH STREET
ANACORTES, WA 98221 SHEET 1 of 3 DATE: 01/13
APPLICATION:
GUEME.S CHANNEL
N
�p
N
U
PR(7JECT o
SITE
�P
LAT 48.5201' IN
TRIDENT PIER z
P31513
Q ,,.
TRIDENT
SEAFOODS
CD P55673
4TH STREET
0
U
w
5TH STREET
VICINITY MAP
¢... 0 50 100 200. 300 FT.
PURPOSE: PROPOSED:
REPAIR DETERIORATED TIMBER PIER TRIDENT SEAFOODS REPLACE TIMBER PIER DECK
ANACORTES PLANT STRINGERS AND PILE CAPS
TIMBER PIER REPAIR IN: GUEMES CHANNEL
DATUM: M.L.L.W. AT:ANACORTES, WA, SKAGIT CO.
ADJACENT PROPERTY OWNERS: SEC. 13, T35N, R01E, W.M.
1) TRIDENT SEAFOODS APPLICATION BY:
2 CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY
1400 4TH STREET
ANACORTES, WA 98221 SHEET 2 of 3 DATE: 01/13
APPLICATION:
200' 20'
EXISTING PT TIMBER
FENDER PILES TO REMAIN EXISTING SOLID
EXISTING 16' X 200' PIER PT TIMBER DECK EXISTING PIER
TO REMAIN
�{ TO BE REPAIRED
EXISTING
e GRATE PANEL
EXISTING PT TIMBER STRINGERS EXISTING TIMBER DECK TO BE REPLACED
PILE CAPS AND BULLRAIT TO BE TWTH COMBINATION OF NEW PT TIMBER
REPLACED IN KIND DECK AND NEW GALV, STEEL BAR GRATING
(2) 4' WIDE GRATE PANELS FULL LENGTH EXISTING PIER
EL +16.0i —EL +16.0i
EL +6.2 EL +6.2
MHHW MHHW
EL MLLW MLLWO.O
uil ii ii n u n u u u u uu n wi u u u u u u n uu iw n
u iii n u u u u u u un n wi n n u u u n n w
u npI a � n w n uii u u u p u 0 u m nu it u
L L II u I u u III ti u
APPROXIMATE EXISTING EXISTING PT TIMBER PIER
SEAFLOOR (EL —10i) PIER REPAIR AND FENDER PILES TO REMAIN
PLAN & ELEVATION
0 10 20 30 40 60 FL.
16, NEW 4 X 12 PT TIMBER DECK PLANKS
AND (2) 4' WIDE GALV. STEEL GRATE PANELS
2, 4' 4, 4' 2' (60%OPEN) FULL LENGTH OF PIER
NEW 12 X 12 PT TIMBER BULLRAIL
ON PT TIMBER 6 X 12 SUPPORTS
FULL LENGTH, BOTH SIDES OF PIER
TO MATCH EXISTING
EL +is.0i
PIER DECK
EXISTING TIMBER NEW 12 X 14 PT TIMBER PILE CAPS
BRACING PILES FULL LENGTH, BOTH SIDES OF PIER
TO REMAIN TO MATCH EXISTING
EL +6.2
MHHW NEW 4 X 12 PT TIMBER STRINGERS
IV-6' O.C.) FULL LENGTH OF PIER
TO MATCH EXISTING
EXISTING TIMBER PIER AND
FENDER PILES (NOT SHOWN)
EL +DO TO REMAIN
MLLW
PIER SECTION
PURPOSE: PROPOSED:
REPAIR DETERIORATED TIMBER PIER TRIDENT SEAFOODS REPLACE TIMBER PIER DECK
ANACORTES PLANT STRINGERS AND PILE CAPS
TIMBER PIER REPAIR IN: GUEMES CHANNEL
DATUM: M.LL.W. AT:ANACORTES, WA, SKAGIT CO.
ADJACENT PROPERTY OWNERS: SEC. 13, T35N, ROLE, W.M.
1) TRIDENT SEAFOODS APPLICATION BY-
TRIDENT CITY OF ANACORTES TRIDENT SEAFOODS CORPORATION TRIDENT SEAFOODS COMPANY
1400 4TH STREET
ANACORTES, WA 98221 SHEET 3 of 3 DATE: 01/13
APPLICATION:
i.gND ZTlSE
Planning Community&Economic Development,•P.O.Box 547,Anacortes,WA 98221;(360)299-1986
EXEMPTION FROM SHORELINE MANAGEMENT ACT
SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT
Applicant: Trident Seafoods; c/o Jeff Johnson,Facilities Manager; 1400 41h St.,
Anacortes,WA 98221
Contact: Kelly LaFave,P.E., 1004 Commercial Ave.#364, Anacortes, WA 98221
City File No.: SLX-2013-0004
Application Date: April 1,2013
Action: Approved
Date of Action: April 23,2013
1. DESCRIPTION&LOCATION:
Description: Replace approx. 3,200 square feet of deteriorated timber decking with approx.
1,600 square feet timber deck planks and approx. 1,600 square feet of galvanized open steel grate
panels; remove and replace approx. 200 lineal feet of pile caps and bull rail; remove and replace
4 x 12 timber stringers at 18"spacing for the full 200 foot long length of the pier. There is no in-
water work proposed: Work is proposed to occur over a two year period depending on in-water
work windows and budget constraints.
Location: 1400 4 h St.,Anacortes; Guemes Channel
Shoreline Designation: Aquatic
H. FINDINGS & CONCLUSIONS:
1. On April 1,2013 the applicant submitted a shoreline permit exemption application to PLED.
2. As conditioned, the proposal will be consistent with the policies and provisions of the
Shoreline Management Act and the 2010 Anacortes Shoreline Master Plan(ASMP).
3. The project is exempt from the requirement to obtain a shoreline substantial development
permit pursuant to WAC 173-27-040(2)(b) and ASMP Section 2.4.E2.
4. The lead SEPA agency for the action (City of Anacortes) determined that the project is
categorically exempt from SEPA review pursuant to WAC 197-11-800(3).
HL DECISION: APPROVED
1 of2
IV. CONDITIONS
1. All applicable local, state and federal permits and authorizations shall be secured _
prior to work beginning on the site. Copies of said approval documents shall be
provided to the Planning, Community & Economic Development Department
(PCED)prior to issuance of a building permit.
2. A building permit shall be secured from the Building Department prior to
commencement of site work,
3. Materials used in repair/replacement shall comply with federal and state regulations.
Where treated wood is used, BMPs/conditions in one of the following documents
shall be specified and met:
• BMPs for the Use of Treated Woad in Aquatic and Sensitive Environments,
Western Wood Preservers Institute/Wood Preservation Canada/Southern
Pressure Treaters' Association/Timber Piling Council,
• An Agreement Concerning the Use of Treated Wood in Aquatic Areas between
Ecology and Department of Fish & Wildlife dated August, 1995,
4. All removed materials shall be disposed of at an approved upland location.
5. Best Management Practices shall be observed at all times.
6. Existing fire protection systems shall remain in service at all times unless authorized
by the Fire Department.
7. This exemption shall be valid for a period of two years from the date of approval.No
extension of this time period will be granted.
8. The applicant shall adhere to the applicable policies and development regulations
contained in the City of Anacortes 2010 Shoreline Master Program including but not . .
limited to those in: Section 5.6 Aquatic, Chapter 6 Environmental Protection General
Regulations and Chapter 9 Specific Shoreline Modification Policies and Development
Regulations.
Approved by:
April23,2013
Ryan C. Larsen Date
Shoreline Administrator
2 of 2
2st7
Washington HYDRAULIC PROJECT APPROVAL North Puget sound
Department of 16018 Mill Creek Boulevard
FISH and RCW 77.55.021 -See appeal process at end of HPA Mill Creek,WA 98012-1296
WILDLIFE (425)775-1311
Issue Date: May 10,2013 Control Number: 130503-1
Project Expiration Date: March 14,2016 FPA/Public Notice#: N/A
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Trident Seafoods Corporation Marine Structures Engineering Inc
ATTENTION:Jeff Johnson ATTENTION: Kelly LaFave
1400 4th Street 1004 Commercial Ave No 364
Anacortes,WA 98221 Anacortes, WA 98221
360-299-7000 360-466-8627
Fax:360-230-2310
Project Name: Trident Seafoods-Timber Pier Repair
Project Description: Maintenance and repair of existing timber pier will remove 3,200 square feet
of deteriorated timber decking and replace with 1,600 square feet of pressure
treated deck panels and 1,600 square feet of galvanized open steel grate
panels. Remove and replace 200 lineal feet of pile caps and bull rail, and
remove and replace 4 x 12 inch timber stringers at 18-inch spacing for full
200 foot length of pier. All work will be done above MHHW, no in-water work
repairs.
PROVISIONS
1. The project may begin June 15, 2013 and shall be completed by March 14, 2016.
2. Work below the ordinary high water line shall not occur from March 15 through June 14 of any
year for the protection of migrating juvenile salmonids.
3. Work shall be accomplished per plans and specifications submitted with the JARPA and
approved by the Washington Department of Fish and Wildlife, entitled "TRIDENT SEAFOODS
ANACORTES PLANT TIMBER PIER REPAIR", sheets 1-3 of 3, dated January 2013, except as
modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during
construction.
4. This approval is for replacement of the existing pier decking and associated support structures
and shall not result in expansion of the structure.
5. The existing timber decking, stringers, and pile caps shall be removed using a barge mounted
crane and disposed of upland such that they do not re-enter such waters.
6. Sawdust, drillings, and trimmings from treated wood shall be contained with tarps or other
impervious materials and prevented from contact with the beach, bed or waters of the state.
7. New timber decking along the length of the 200 foot long by 16 foot wide rectangular shaped pier
shall contain 50 percent grated area with steel grating running the length of the pier that has 60
percent open area, approved by WDFW. The grated area shall not be used for storage purposes.
Page 1 of 4
Washington HYDRAULIC PROJECT.APPROVAL North Puget Sound
Department of 16018 Mill Creek Boulevard
FISH and RCW 77.55.021-See appeal process at end of HPA Mill Creek,WA 98012-1296
WILDLIFE (425)776-1311
Issue Date: May 10,2013 Control Number: 130503-1
Project Expiration Date: March 14,2016 FPA/Public Notice.#: N/A
8. All lumber to be used for the project shall meet or exceed the standards established in the most
recent version of'Best Management Practices For the Use of Treated Wood in Aquatic and
Wetland Environments' developed by the Western Wood Preservers Institute, Wood Preservation
Canada, Southern Pressure Treaters' Association, and Southern Forest Products Association. As
of January, 2012, the latest version is dated November 1, 2011.
9. Eelgrass and kelp shall not be adversely impacted due to any project activities (e.g., barge shall
not ground, equipment shall not operate, and other project activities shall not occur in eelgrass and
kelp).
10. Project activities shall be conducted to minimize siltation of the beach area and bed.
11. All debris or deleterious material resulting from construction shall be removed from the beach
area and bed and prevented from entering waters of the state.
12. No petroleum products or other deleterious materials shall enter surface waters.
13. Project activities shall not degrade water quality to the detriment of fish life.
14. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or
water quality problems develop (including equipment leaks or spills), immediate notification shall be
made to the Washington Military Department's Emergency Management Division at 1-800-258-
5990, and to the Area Habitat Biologist listed below.
PROJECT LOCATIONS
Location #1 Trident Seafoods
WORK START: June 15, 2013 IWORK END: March 14, 2016
_
WRIA Waterbody Tributary to:
03.9070 Wria 03 Marine Puget Sound
114 SEC: Section: Township: Range: Latitude: Longitude: County:,
All �13 135 N 01 E N 48.52009 W 122.61891 Skagit
Location#1 Driving Directions
From Interstate 5,take Exit#230 and follow SR 20 west toward Anacortes. Go through the SR 20 Spur light and turn
right at the roundabout and follow Commercial Avenue past the SR20 Spur Intersection for eight blocks,turn left on
8h Street to the Trident Seafoods building at 1400 4u,Avenue on the south side of Guemes Channel
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be
Page 2 of 4
Nort
und
Washington HYDRAULIC PROJECT APPROVAL 1601 Puget illCreek
Department of - 16018 MIII Creek Boulevard
FISH and RCW 77.55.021-See appeal process at end of HPA Mill,Creek,WA 96012-1296
WILDLIFE (425)775-1311
Issue Date: May 10,2013 Control Number: 130503-1
Project Expiration Date: March 14,2016 FPA/Public Notice#: N/A
necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying
for and obtaining any additional authorization from other public agencies(local, state and/or federal)that may be
necessary for this project.
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the
persons)to whom this Hydraulic Project Approval is issued and operator(s)performing the work.
This Hydraulic Project Approval does not authorize trespass.
The person(s)to whomthis Hydraulic Project Approval is issued end operetor(s)performing the work maybe heTd
liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this
Hydraulic Project Approval.
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one
hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment.
All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions,condifions,or
revocation if the Department of Fish and Wildlife determines that changed conditions require such action.The
person(s)to whom this Hydraulic Project Approval is issued has the right to appeal those decisions.Procedures for
filing appeals are listed below.
MINOR MODIFICATIONS TO THIS HPA:You may request approval of minor modifications to the required work timing
or to the plans and specifications approved in this HPA.A minor modification to the required work timing means up to a
one-week deviation from the timing window in the HPA when there are no spawning or incubating fish present within
the vicinity of the project.You may request subsequent minor modifications to the required work timing. A minor
modification of the plans and specifications means any changes in the materials,characteristics or construction of your
project that does not alter the project's impact to fish life or habitat and does not require a change in the provisions of
the HPA to mitigate the impacts of the modification. Minor modifications do not require you to pay additional application
fees or be issued a new HPA.To request a minor modification to your HPA, submit a written request that clearly
indicates you are requesting a minor'modification to an existing HPA. Include the HPA number and a description of the
requested change and send by mail to:Washington Department of Fish and Wildlife, PO Box 43234, Olympia,
Washington 98504-3234,or by email to HPAapplications@dfw.wa.gov. Do not include payment with your request. You
should allow up to 45 days for the department to process your request.
MAJOR MODIFICATIONS TO THIS HPA:You may request approval of major modifications to any aspect of your HPA.
Any approved change other than a minor modification to your HPA will require issuance of a new HPA. If you paid an
application fee for your original HPA you must include payment of$150 with your written request or request billing to an
account previously established with the department. If you did not pay an application fee for the original HPA,no fee is
required for a change to it. To request a major modification to your HPA, submit a written request that clearly indicates
you are requesting a major modification to an existing HPA. Include the HPA number, check number or billing account
number,and a description of the requested change.Send your written request and payment, if applicable, by mail to:
Washington Department of Fish and Wildlife, PO Box 43234, Olympia,Washington 98504-3234. If you are charging the
fee to a billing account number or you are not subject to the fee,you may email your request to
HPAapplications@dfw.wa.gov.You should allow up to 45 days for the department to process your request.
APPEALS INFORMATION
If you wish to appeal the issuance,denial, conditioning,or modification of a Hydraulic Project Approval(HPA),
Washington Department of Fish and Wildlife(WDFW)recommends that you first contact the department employee who
issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for
further appeal action. If you proceed with an appeal,you may request an informal or formal appeal.WDFW encourages
you to take advantage of the informal appeal process before initiating a formal appeal.The informal appeal process
includes a review by department management of the HPA or denial and often resolves issues faster and with less legal
Page 3 of 4
Washington HYDRAULIC PROJECT APPROVAL No�Puget Sound
Department of - 16018 Mill Creek Boulevard
FISH and RCW 77.55,021-See appeal process at end of HPA Mill Creek,WA 98012-1296,
WILDLIFE (425)775-1311
Issue Date: May 10,2013 Control Number: 130503-1
Project Expiration Date: March 14,2016 FPA/Public Notice#: N/A
complexity than the formal appeal process. If the informal appeal process does not resolve your concerns,you may
advance your appeal to the formal process.You may contact the HPA Appeals Coordinator at(360)902-2534 for more
information.
A. INFORMAL APPEALS:WAC 220-110-340 is the rule describing how to request an informal appeal of WDFW
actions taken under Chapter 77.55 RCW.Please refer to that rule for complete informal appeal procedures.The
following information summarizes that rule.
A person who is aggrieved by the issuance,denial,conditioning,or modification of an HPA may request an informal
appeal of that action.You must send your request to WDFW by mail to the Washington Department of Fish and Wildlife
HPA Appeals Coordinator, 600 Capitol Way North,Olympia,Washington 98501-1091;e-mail to
HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Natural Resources Building, 1111
Washington St SE,Habitat Program, Fifth floor.WDFW must receive your request within 30 days from the date you
receive notice of the decision. If you agree,and you applied for the HPA,resolution of the appeal may be facilitated
through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution
is not reached through the informal conference, or you are not the person who applied for the HPA,the HPA Appeals
Coordinator or designee will conduct an informal hearing and recommend a decision to the Director or designee. If you
are not satisfied with the results of the informal appeal,you may file a request for a formal appeal.
B. FORMAL APPEALS:WAC 220-110-350 is the rule describing how to request a formal appeal of WDFW actions
taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures.The following
information summarizes that rule.
A person who is aggrieved by the issuance,denial,conditioning,or modification of an HPA may request a formal
appeal of that action.You must send your request for a formal appeal to the clerk of the Pollution Control Hearings
Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision.You may serve
WDFW by mail to the Washington Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North,
Olympia,Washington 98501-1091;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to
the Natural Resources Building, 1111 Washington St SE, Habitat Program,Fifth floor.The time period for requesting a
formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,you
may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in
response to the informal appeal.
C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal,the
WDFW action shall befifial and unappealable
ENFORCEMENT: Sergeant Phillips (27) P3
Habitat Biologist Q ,� for Director
Doug Thompson 360-466-4345 ' `-� WDFW
CC:
Page 4 of 4
I..
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT,CORPS OF ENGINEERS
P.O.BOX 37S5
SEATTLE,WASHINGTON 981243765
REPLY To
AMNTIONOF JUL 0 8 2013
Re&ulatory branch
Mr_Jeff Johnson
Trident Seafoods Corporation
1400 fourth Street
Anacortes, Washington 98221
Reference: NWS-2012-01112
"trident Seafoods
Dear Mr.Johnson:
We have reviewed your application to perform pier maintenance on the West Pier at the
Anacortes Plant in Guemes Channel at Anacortes in Skagit County, Washington. There Will be
no in-water work.Based on the information you provided to us,Nationwide Permit(NWP)a,
Maintenance(Federal Register February 21, 2012,Vol. 77,No. 34), authorizes your proposal as
depicted on the enclosed drawings,dated January 2013.
In order for this authorization to be valid,you must ensure the work is performed in
accordance with the enclosed 1 IfT 3, Terms and Conditions and the fallowing special condition:
a. No residue from construction activity shall be allowed to enter waters of the United
States. The pernuttee must install and maintain debris and spill collection measurers until all
project operations are complete.
We have reviewed your project pursuant to the requirements of the Endangered Species Act,
the Magnuson-Stevens fishery Conservation and Management Act and the National Historic
Preservation Act. We have determined this project complies with the requirements of these laws
provided you comply with all of the permit general and special conditions.
The authorized work complies with the Washington State Department of Ecology's
(Ecology)Water Quality Certification and the Coastal Zone Management Act requirements for
this NWP. No further coordination with Ecology is required.
Guemes Channel is a water of the United States. If you believe this is inaccurate,you may
request a preliminary or approved jurisdictional.determination(JD). If one is requested,please
be aware that we may require the submittal of additional information to complete the JD and
work.authorized in this letter may not occur until the JD has been completed.
-2
Our verification of this NWP authorization is valid until March 18,2017 unless the NWP is
modified,reissued,or revoked prior to that date. If the authorized work has not been completed
by that date and you have commenced or are under contract to commence this activity before
March 18,2017,you will have until March 18,2018 to complete the activity under the enclosed
terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP
verification invalidates this authorization and could result in a violation of Section 404 of the
Olean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all
State and local permits that apply to this project.
Upon completing the authorized work,you must fill out and return the enclosed Certificate
of Compliance u4th Departratenf of the Army Perri!form. Thank you for your cooperation
during,the permitting process. We are interested in your experience with our Regulatory
Program and encourage you to complete a customer service survey form. This form and
information about our program is available on our website at www,nws.-osace.anny.mil select
"Regulatory Branch,Permit Information"and then "Contact Us." A copy of this letter with
enclosures will be furnished to Mr. Kelly Larave; Marine Structures Engineering,Inc.,
1004 Commercial Avenue,9364; Anacortes, Washington 98221. if you have any questions,
please contact me at crin.I.le-gge@usace.,,ti-my.mil usace.airny.mil or(206)764-6695.
Sincerely,
Tin i-ebg e, Proj t tanager
Regulatory Branch
Enclosures
�
MARINE STRUCTURES ENGINEERING, INC.
1004 Commercial Avenue,4364 Anacortes, WA 98221 (360) 466-8627 Fix: (360) 230-2310
TRIDENT SEAFOODS CORPORATION
16' X 200' WEST PIER
STRUCTURAL CALCULATIONS
JULY 2013
�,� o' L
AS r L
g!(?�AT
J
For:
Trident Seafoods Corporation
Anacortes Plant
1400 4d Street
Anacortes, WA 98221
Quality Frigineeruln for - NA mufactU.rers � Fnn;neers • (. on'tractor
Timber Beam Check-Uniform Loads
12 x 12 Pile Caps
Span 12.0 ft.
Tributary Width 8.0 ft.
Member Dead Load 100 Ibs/ft. (12 x 12 Bull ail+ 12 x 12 Member)
Uniform Dead Load 25 psf (4 x 12 Deck+4 x 12 Stringers @ 16" OC)
Uniform Live Load 150 psf
Maximum Shear 9000 Ibs.
Maximum Moment 324000 Ibs.-in.
Timber Grade No. 1 Douglas- Fir(Beams and Stringers)(WCLIB)
Table Duration Size Wet Flat Allow
Shear Stress 170 1 1 1 1 170 psi
Bending Stress 1350 1 1 1 1 1350 psi
Modulus of Elasticity 1600000 1 1 1 1 1600000 psi
Proposed Timber Width 11.5 in.
Proposed Timber Depth 11.5 in.
Member Area 132.3 in.A2
Member Moment of Inertia 1457.5 in.A4
Member Section Modulus 253.5 in.A3
Maximum Shear Stress 102.08 psi
Maximum Bending Stress 1278.21 psi
Maximum Deflection 0.30 in.
Shear Check 1.67 (allowable/maximum) OK
Bending Check 1.06 (allowable/maximum) OK
Deflection Check 480 (L/ratio) OK
Timber Beam Check-Uniform Loads
12 x 12 Pile Caps
Span 12.0 ft.
Tributary Width 8.00 ft. (L-a)/2
Distance Between Loads 4.00 ft. 4.00 ft.
Member Dead Load 100 Ibs/ft. (12 x 12 Bullrail + 12 x 12 Member)
Uniform Dead Load 25 psf (4 x 12 Deck+4 x 12 Stringers @ 16" OC)
Point Load 2500 Ibs.
Maximum Shear 4900 Ibs.
Maximum Moment 184800 Ibs:in.
Timber Grade No. 1 Douglas- Fir(Beams and Stringers)(WCUB)
Table Duration Size Wet Flat Allow
Shear Stress 170 1 1 1 1 170 psi
Bending Stress 1350 1 1 1 1 1350 psi
Modulus of Elasticity 1600000 1 1 1 1 1600000 psi
Number of Members 1
Proposed Timber Width 11.5 in.
Proposed Timber Depth 11.5 in.
Member Area 132.3 in.A2
Member Moment of Inertia 1457.5 in.A4
Member Section Modulus 253.5 in.A3
Maximum Shear Stress 55.58 psi
Maximum Bending Stress 729.05 psi
Maximum Deflection 0.17 in.
Shear Check 3.06 (allowable/maximum) OK
Bending Check 1.85 (allowable/maximum) OK ✓
Deflection Check 829 (L/ratio) OK
Timber Beam Check-Uniform Loads
4 x 12 Stringers
Span 16.0 ft.
Tributary Width 1.33 ft.
Member Dead Load 13 Ibs/ft. (4 x 12 Member)
Uniform Dead Load 15 psf (4 x 12 Deck)
Uniform Live Load 150 psf
Maximum Shear 1859.6 lbs.
Maximum Moment 89260.8 Ibs.-in.
Timber Grade No. 1 Douglas- Fir(2-4"thick)(WCLIB) ✓
Table Duration Size Wet Repetitive Allow
Shear Stress 180 1 1 0.97 1 174.6 psi
Bending Stress 1000 1 1.1 1 1.15 1265 psi
Modulus of Elasticity 1700000 1 1 0.9 1 1530000 psi
Proposed Timber Width 3.5 in.
Proposed Timber Depth 11.5 in.
Member Area 40.3 in.A2
Member Moment of Inertia 443.6 in.A4
Member Section Modulus 77.1 in.A3
Maximum Shear Stress 69.30 psi
Maximum Bending Stress 1157.04 psi
Maximum Deflection 0.51 in.
Shear Check 2.52 (allowable/maximum) OK
Bending Check 1.09 (allowable/maximum) OK
Deflection Check 380 (L/ratio) OK
Timber Beam Check-2 Equal Point Loads r
4 x 12 Stringers /LgJI
Span 16.0 ft.
Tributary Width 1.33 ft. (L-a)/2
Distance Between Loads 4.00 ft. 6.00 ft.
Member Dead Load 13.5 lbs/ft. (4 x 12 Member)
Uniform Dead Load 14.5 psf (4 x 12 Deck)
Point Load 2500 lbs.
Maximum Shear 2762.28 lbs.
Maximum Moment 192589.4 lbs.-in.
Timber Grade No. 1 Douglas-Fir(2-4"thick)(WCLIB)
Table Duration Size Wet Repetitive Allow
Shear Stress 180 1 1 0.97 1 174.6 psi
Bending Stress 1000 1 1.1 1 1.15 1265 psi
Modulus of Elasticity 1700000 1 1 0.9 1 1530000 psi
Number of Members 2
Proposed Timber Width 3.5 in.
Proposed Timber Depth 11.5 in.
Member Area 80.5 in.A2
Member Moment of Inertia 887.2 in.A4
Member Section Modulus 154.3 in A3
Maximum Shear Stress 51.47 psi
Maximum Bending Stress 1248.22 psi
Maximum Deflection 0.53 in.
Shear Check 3.39 (allowable/maximum) OK
Bending Check 1.01 (allowable/maximum) OK
Deflection Check 361 (L/ratio) OK
13
Tindent
TRIDENT SEAFOODS CORPORATION
SEAFOODs
1400 4'"St`PO Box 954.Anacortes WA 98221
oxpa (360)293-7701 - Fax (360)293-0185
January 28, 2013
Ms. Libby Grage,Senior Planner
Planning, Community, and Economic Development
City of Anacortes
P.O. Box 547
Anacortes,WA 98221-547
Re: Agent-of-Record for Trident Seafoods—Anacortes Plant—Timber Pier Repairs, City of Anacortes
Dear Ms. Grage:
Kelly D. LaFave, P.E. of Marine Structures Engineering, Inc. is hereby designated as the Agent-of-Record for
the Timber Pier Repairs at the Trident Seafoods - Anacortes Plant. All questions, correspondence and
requests should be directed to him until further notice. Kelly can be reached at (360) 466-8627, by mail at
1004 Commercial Avenue#364,Anacortes, WA 98221, or by Email at KDI-aFave'"amsn.com.
Sincerely yours.
�H 4cyl��
Jeff Johnson, Faci t�ies Manager
Trident Seafoods Corporation
cc Kelly D. LaFave, P.E., Marine Structures Engineering, Inc.
(360) 253-7701 TRvnmencvn Cpanecttvn
`' Trident5eafoods,com
G`^'E °/ES CHANNEL EXISTING TIMBER
PIER TO REMAIN
r"_� Nv EXISTING TIMBER
PIER TO REMAIN \
EXISTING WEST PIER
TO BE REPAIRED
LAT 48.5201 N --
TRIDENT PIER
P31513
v
Y
TRIDENT SEAFOODS
P55673
1400 4TH STREET
0
F
w
a
d
w
a
Zp
FJ
NN 5TH STREET
z
EXISTING PT TIMBER zoo' o'
FENDER PILES TO REMAIN EXISTING SOLID PT TIMBER
EXISTING 16' X 200' PIER DECK TO BE REPLACED WITH EXISTING PIER
COMBINATION OF TIMBER AND TO REMAIN
�I TO BE REPAIRED STEEL BAR GRATE
EXISTING
GRATE PANEL
EXISTING PT TIMBER STRINGERS EXISTING TIMBER DECK TO BE REPLACED
PILE CAPS AND BULLRAILS TO BE WITH COMBINATION OF NEW PT TIMBER
REPLACED IN KIND DECK AND NEW GALV. STEEL BAR GRATING
(2) 4' WIDE GRATE PANELS FULL LENGTH EXISTING PIER
EL. +16.03 —EL. +16.02
EL +B,2 EL. +8.2
MHHW MHHW
EL +0.0 V EL. +,0.0
MLLW7T F - TI
APPROXIMATE EXISTING EXISTING PT TIMBER PIER
SEAFLOOR (EL. -10t) AND FENDER PILES TO REMAIN
PIER PLAN AND ELEVATION
STRUCTURAL STEEL:
STEEL SHAPES, BARS AND PLATES SHALL
16, WELDING:
RETL 4 X 12 PT 11MBER DECK PLINKS
WITH M(2)3'-0'WDE AND ONE(1) ALL STEEL WELDING SHALL CONFORM TO
2' 3' 2' 2' 2' 3' 2' 2'-0"WIDE GALV STEEL MATE PANELS
GRATE ,RAJ AND SHALL BE PERFORMED BY AWS DUAL
GRATE
REW.12 X 12 PT UMBER BULLRAIL PROCEDURES. ALL ALUMINUM WELDING Sh
R1u LENGTH,BOTH SIDES OF PIER STRUCTURAL WELDING CODE.
EL+16.w GALVANIZING:
APPROX.
PIER DECK
ALL MILD STEEL COMPONENTS SHALL BE I
A
ASTM A123 OR A153 AS APPLICABLE F11
NEW 12 X 14 PT TIMBER PILE CAPS
FULL LENGTH, BOTH SIDES OF PIER COATING REPAIR:
TO MATCH EXISTING
EL+8.2 ALL DAMAGED GALVANIZING OR G USING
MHHW EXISnNG nMBER NEW 4 X 12 Pi TIMBER STRINGERS IN ACCORDANCE YATU ASTM AZBO USING
(9 BATTER TER PIUM (1'-6" D.C.) FULL LENGTH OF PIER COAT. MINIMUM THICKNESS OF REPAIR CI
3 TO MATCH EXISTING GALV-VIZ AS MANUFACTURED BY AMERICI
o SHALL BE MELTED AND EVENLY WIRE BRU
FBOLTS AND HARDWARE:
E EXISTING TIMBER PIER AND ALL CONNECTING BOLTS FOR STEEL-TO-S
EL MU-W FENDER PILES (NOT SHOWN) WASHERS AND NUTS. ALL CARBON STE.EI
a TO REMAIN DIPPED GALVANIZED. ALL CONNECTIONS
STEEL AND SHALL INCLUDE SPRING LOCK
Q
a SAWN TIMBER
w
rc EXISTING GROUND VARIES
ALL SAWN LUMBER, INCLUDING FLOAT DEC
rc EL -10 TO -12
w ALL SAWN LUMBER SHALL BE INCISED ANI
a // /\/\\ //\ ACCORDANCE WITH ASHA STANDARD UL
zAp \\\�\\ \\\�\\\\ �\\�\/i\\ �\ i\/�\ \\� OTHER FABRICATION SHALL BE PERFORMS
,\ / \ \\\ \/\ /\\ \,!\ TREATING. ANY FIELDDRILLING OR OTHEI
ILI
FIELD REPAIRED USING
TWO HEAVY COATS
r AWPA M4.
PIER SECTION
NN
4'-0" 4'-G" T- 4'-[
6" 6`
II NEW 4 X 12 X 2'-0° PT TIMBER LAG STRINGERS TO EW 4 X 12 X 1'
II SCUPPER BLOCK ®SPLICES II BLOCKING, T1P. II SCUPPER BLOCK,
II II II
II II II
II II � II
II II II
II II II
® I II II
II II II
NEW 3/4"0 MACH. BOLT ® Fes'3/4°0 ECON. BOLT OR NEW 12 X 12 PT TIMBER BLOCKING
W/ 2 FW &N. TYP. ALL THREAD W/PW& N, TYP. BETWEEN STRINGERS AT ALL
ADJUST SPACING TO AVOID SCUPPER BLOCK LOCATIONS, TYP.
CONFLICT W/STRINGERS
d€.W.STEEL TEE CONNECTOR
NM 3/4"0 MACH. BOLT AT PILE CAP SPLICES 9A 3/4"0 GALV. MACH. BOLT
W/ 2 FW& N, TYP. W/ 2 FW& N, TYP. \
EXISTING TIMBER PILE
TO REMAIN
VARIES (11'-0" MAX.)
PIER REPA
PARTIAL ELEV,
16'-0"
14'-1" INSIDE CLEAR
NEW(2) 1/2°0 X 6° GALV. LAG BOLTS NEPL 4 X 12 DECK ATTACHED TO
INTO 12 X 12 BLOCKING AT SCUPPER STRINGERS W/ (2) B` SPIKES EAI
Till
BLOCK LOCATIONS, TYP. END AND EACH CROSSING, T1P.
3._O.±
I
N 11
3 * N11
o M 11
cl I
0 ^ T
NEW 2 X 4 PT TIMBER SPACERS Nam'
io II UNDER GRATE AT ALL STRINGERS SERR
W 1-S/
a ATTA
rc _
yEy(3/4"0 MACH. BOLT 11MB1
a W/2 FW& N. TYP. GALV
W ----
rc
w NEW GALV. STEEL TEE OR BAR CONNECTOR NEW 3J4°0 MACH. BOLT
EACH SIDE OF PILE. BEND OR SHIM CONNECTORS /
a USING GALV. PLATE WASHERS AS REQUIRED TO W 2 FW & N, TYP.
zo MATCH PILE AND PILE CAP THICKNESS PIER REPAIR
o" SECTION
�r
r� o s^ 1 z 3Fr.
n�
�W
NN
g IIIIIIIIIIIIIIIIIIIIII HIIIIl HIM lllllllll Illl H llnlIl'MIM
x
PIER STANDF
FITTER/USTI
,.uirsrumPenni
z aiasxasevureP
s.w..srumnreww
a ui.mnxwroaw
e.uiaxaovmcow
e..,,ixu+mxa,woew
t.,errwwm..«.s
STANDPIPE CONNECTION DETAIL
HANGER'SB' EQ BRACE'T EQBRAC
xaVaSR�awD SPRiN.�M _ _ neen�nnONS s MBOL�GwD _
f�
Al1iHORI1Y W1Vl