HomeMy WebLinkAboutBLD-2012-0286 - COMMERCIAL TENANT IMPROVEMENT s P i.t y'Ir ^t t.+^. ..8 8.s i •i•1 g.:.i'113.0yi
City of Anacortes Permit#: BLD-2012-0286
904 6th Street Issue date: 08/03/2012
P.O.Box 547
Expire date: 02/01/2014
to Anacortes, WA 98221-0547
(360) 293-1901
Job Address: 1400 4TH ST Permit Type: Commercial Alteration/Repair Permit
ANACORTES WA 98221 Project:
APN: P55673
P55679
P55366
P31513
P31514
P31515
P31516
P31517
P31518
Remarks: Installation of prepackaged storm valut per plans.
Owner: TRIDENT SEAFOOD CORP Contractor:
Address: PO BOX 17599 Address:
SEATTLE WA 98127-1269
Phone: (360)293-3133 Phone:
License#:
General Information: Fees:
Building Valuation 78000 Plan Review Deposit 272.92
Building Permit Fee 839.75
Plan Review Fee 167.91
State Building Code Fee 4.50
Total Calculated: 1,285.08
Deposits/Receipts: 0.00
Total Due: 1,285.08
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I
HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR
NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER
STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
I
IGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY
1
Y�`�
- 1
`-�9,�',0tl���
Planning,Conununity c&Economic Development; P,O,Box 547,Aiiacortes,WA 98221;(360)299-1986
EXEMPTION FROM SHORELINE MANAGEMENT ACT
SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT
Applicant: Trident Seafoods, 1400 0' Street,Anacortes,WA 98221
City File No.: SLX-2012-0009
Application Date: June 19,2012
Action: Approved
Date of Action: August 1,2012
I. DESCRIPTION &LOCATION:
Description: Install above-ground filtration system to remove zinc prior to discharging
stormwater to.Puget Sound.
Location: 1400 4th Street.
Shoreline Designation: Urban Maritime.
II. FINDINGS& CONCLUSIONS:
1. On July 19, 2012'the applicant submitted a shoreline perinit exemption application to PCED.
2. The proposal is consistent with the policies and provisions of the Shoreline Management Act
the Anacortes Shoreline Master Plan.
3. The project is exempt from the requirement to obtain a shoreline substantial development
permit pursuant to WAG 173-27-040(2)(b).
4. The lead SEPA agency for the action (City of Anacortes) determined that the project is
categorically exempt from SEPA review.
111. DECISION: APPROVED
IV. CONDITIONS
1. All applicable local, state and federal permits shall be secured prior to work
beginning on the site. Copies of said approval documents shall be provided to the
Planning,Community&Economic Development Department(PLED).
2, Installation of the system shall comply with Department of Ecology standards.
1 of 2
3. The;applicant shall adhere to the applicable policies and development regulations
contained in the City of Anac:ortes 2010 Shoreline Master Program including but not
limited to those in. Section 5.11 Urban Marifinze and Chapter 6 Environmental
Protecfion General Regulations
Approved by_
Ryan .Larsen. Date
Shoreline Administrator
2 of 2
stormwateR&x,
Reclairrft the world'swater.
www.stormwaterx,cornn
122 Southeast 271"Avenue
Portland,OR 97214
(800)680-3 43
September 20, 2011
Mr. Brett VanSandt
Trident Seafoods
1400 4th Street
Anacortes, WA 98221
RE: Stormwater Treatment System Recommendation—Trident Seafoods,
Anacortes
Dear Brett`
Thank you for your time to discuss your stormwater needs with Mike Peters.
Based on the desire to reduce copper and zinc at the Trident Seafoods
Anacortes facility we recommend an Aquip®enhanced filtration system. Two
options for treating Outfalls Al and T1 are proposed. To incorporate the a
treatment system at either outfall slight modifications to the existing system will
be required. These modifications are summarized below.
Optionl —Outfall Al Treatment:
• Treatment Pump & Bypass System— install a treatment pump & bypass
system between the existing catch basin and discharge point to the city
storm drain line. This will house the pump to divert the treatment flow rate
to the above ground filtration system. The system includes an internal
bypass weir to route peak storm events around the treatment system.
• Aquip Enhanced Filtration System— Install an Aquip 50SBE near the
existing building. Based on the Washington DOE Western Washington
Hydrology Model (WWHM), the Aquip 50SBE is sized to treat the 91%
storm volume for the estimated total drainage area of 1.5 acres, which is
50 gpm. The outlet from the Aquip would discharge to the outlet side of
the new Treatment Pump & Bypass System.
-4*N— E
cn
T
U)
U) a
o
d
` c
IL cu
a
Q F-
0
Z
Lij
cu LU
x
A4 40
If i
r
o
> LL
w p
p z
Q
z
z w
O
W J
} LL 0 Z D N
p
I LL
Z p aLLI
Q 5
vi
W Z� W,
a
� oIL
g
p Q
_ z
F-
_ U H
r Z
4
N Q
N U
LL
co
*DX
W r+
y � �
oil,
� N
z J
?Q
5)r
w O Z J
X r
w O
w
a
ar
5w
o,
Qz
lit
a
1 z
€ � a
w a
F
o y_
i
w
CIE
a
W
S
�
w U o
a Z \ w
w O a / �Q 3
Z m Q
a X
4 a U
W
............
-----------------
ON\
a , cy
;Zw 3a=
ala N 00 r m U �71
U'co IL
w � ww
¢ crigm '.uay as
rw a w> z>O am0
�a a zm z
o¢m. c�
'i Ua c7 m
ww Z a U �o
r mZ N ? a mcr
zz_ a w w w
z
zFz l
am mw
wQUQ Oa
U N�
Zw
r
N
X
w
ABOVE-GROUND AQUIP® FILTRATION SYSTEM SHEET
WITH TREATMENT PUMP & BYPASS SYSTEM
cR, INSTALLATION SCHEMATIC
stormwateRxDATE: SCALE: FILE NAME: DRAWN: CHECKED:
www.stormwaterx.com .w...r.. 10/06/10 NTS AQUIP PUMP&BYPASS SCHEMATIC I ARG CPN 1 OF 1
GENERAL NOTES
1. AQUIPO FILTRATION SYSTEM BY STORMWATERX LLC-PORTLAND,OREGON- 800.680.3543 (PATENT PENDING).
2. PRETREATMENT AND FILTER MEDIA COMBINATION DEPENDENT ON POLLUTANT REMOVAL REQUIREMENTS. MODELS:SBE:
BUFFERING&INERT/SORPTIVE MEDIA,SXI:SETTLING PRETREATMENT&INERT MEDIA,SOB:COALESCING&INERT/SORPTIVE
MEDIA,SCI:COALESCING&INERT MEDIA.
3. INTERNAL APPURTENANCES BY STORMWATERX INCLUDE INLET/OUTLET SAMPLE PORTS,INLET FLOW CONTROL&CHECK
VALVES, INLET DISTRIBUTOR,UNDERDRAIN SYSTEM, EMERGENCY OVERFLOW AND ADJUSTABLE HEAD CONTROL.
4. SYSTEM REQUIRES A REINFORCED CONCRETE LEVEL PAD WITH A MINIMUM FOOTPRINT OF 9.5'W X 13.5'L AND LOAD
BEARING CAPACITY OF 35,000 LBS.
5. INLET AND OUTLET PIPING CONNECTIONS TO BE SPECIFIED BY THE ENGINEER AND PROVIDED BY OTHERS.CENTER INLET
STANDARD.OPTIONAL LEFT OR RIGHT OUTLET(LEFT OUTLET SHOWN).
6. PERMANENT POOL DEPTH IS 4 FEET ABOVE THE BOTTOM OF STRUCTURE.THE OPERATING WATER SURFACE HEIGHT IS 6
FEET ABOVE BOTTOM OF STRUCTURE.
.._.... _ ,. ,_ _____... __ ._ _.._ _ 4"OUTLET PIPE
EXTERNAL ACCESS LADDER I,6„ CONNECTION
(SEE NOTE 5)
PASSIVE
OVERFLOW
INDICATOR
FLOW CONTROL VALVE
(SEE NOTE 5)
6'-8" I���` ADJUSTABLE
HEAD CONTROL
7 (SEE NOTE 3)
I
INLET SAMPLE PORT A
OUTLET SAMPLE
PORT
---- - -- --- - -- INTERNAL/EXTERNAL
PRETREATMENT MEDIA ACCESS LADDER
(SEE NOTE 2)
INLET DISTRIBUTOR
TOP VIEW 1 (SEE NOTE 3)
1
EMERGENCY OVERFLOW
_ (SEE NOTE 3)
It
H E
7, i � i ADJUSTABLE
�a HEAD CONTROL
6' (SEE NOTE 3)
(SEE 17-
NOTE 6) 4' f
(SEE i )
NOTE 6)
_ r
$ l,-3„
2"INLET PIPE
CONNECTION FILTRATION MEDIA REINFORCED CONCRETE
(SEE NOTE 5) (SEE NOTE 2) LEVEL PAD
FORKLIFT POCKETS (SEE NOTE 4)
(48"ON CENTER)
SECTION VIEW Aaqui
1
AQUIP MODEL 50S SHEET
STORMWATER FILTRATION SYSTEM
stormwateRx
STANDARD DETAIL
i
www.stormwaterx.com DATE: SCALE: FILE NAME: DRAWN: CHECKED:
05-06-09 NTS ISRX-AQUIP-50S-DTL LCO ARG 1 OF 1
Stormwater Treatment System R
Quotation - Option 1 It
stormwateRx0l
Rada'mirl the miftwateP,
Date: September 20, 2011 Revision No. 0
Quote Expire Date: October 31, 2011
Prepared for: Brett Van Sandt
Project: Trident Anacortes
Site Address: 1400 4th Street, Anacortes,WA, 98221
Prepared By: Ayn Generes, StormwateRx LLC, 122 Southeast 27th Avenue, Portland OR 97214
800.680.3543,fax 800.407.2914, ayng@stormwaterx.com
System Design/Application Notes:
1. Site Design Parameters:
a. Drainage Area: 1.5 acres(Outfall Al)
b. Design Treatment Flow: 50 gpm (Outfall A1)
c. Pollutants of Concern: Total suspended solids, heavy metals (zinc, copper, lead)
2. Achieving the benchmarks consistently requires rigorous implementation of BMPs including source control, structural
and treatment BMPs. Treatment BMPs are not designed to operate in the absence of other BMPs.
3. Maintenance to restore system capacity includes periodic removal of caked solids on the filter surface, raking the
surface filter sand to restore porosity, and eventually replacing the media to restore metals original pollutant removal
capacity. Media longevity depends on frequency of routine maintenance and the pollutant loading rate to the Aquip.
TMns;, DO 8 t 1
� 0
1 Aquip@ Aquip Enhanced Stormwater Filtration System with an operating $50,200 $50,200
Enhanced rate of 50 gpm at 1 gpm/sf and system footprint of 7'x 15'x 7'
Model includes:
050SBE •6.7'x11.5'x7' high 12 gage steel, water tight structure with forklift
(Outfall Al) pockets, inside/outside access ladder, sandblasted/painted
RxBlue
• Pretreatment buffering media and support trays
• Layered inert and sorptive filtration media, 21 inch depth and
underdrain gravel
• Internal flow distribution piping, underdrain manifold with
cleanouts, internal emergency overflow, adjustable head control
and passive overflow level indicator
• Inlet/inline totalizing flow meter and flow control valve
• Inlet and outlet sample ports
• Filter maintenance shovel and custom bed rake
• Standard detail of level reinforced concrete pad for Aquip
1 Standard Standard Treatment Pump&Bypass System includes: $6,300 $6,300
Treatment ■41x6'concrete vault with internal bypass weir less than 8' deep
Pump &Bypass and 30-in access frame&cover
System for • 0.5HP(115V/1 Ph/14.5A) 50 gpm pump at less than 25 ft total
Aquip 050SBE dynamic head
• Double piggyback float switch
2 inch flow control valve
•A control panel is not required and is not included
StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC1 of 2
k p ( �s rep 9 %'tlir"ity- NO
1 Startup&Training (Included) (Included)
• On-site assembly and installation oversight by factory technician
(2 man-days maximum)
•Operation and Maintenance Manual and training
Note: Equipment assembly, installation and training must be
completed during same visit.
• One courtesy scheduled post-startup site visit is included (not to
exceed 4 onsite hours).Any subsequent StormwateRx LLC
representative visit charged at$75/hr plus expenses.
� p 7I3=_ y <` ip"-N k :s #. �� i 'r�i'�7 �� �''r` I' r r -� 44'
a5 f2 — i
i
—+ €d 0-1- d� �1.
T- t� m ,r-
• Site preparation including, but not limited to providing level concrete pad for Aquip 050SBE, min
dimensions 9.5'x12.5'
•Vertical equipment clearance of 14'or greater above concrete pad for installation and
maintenance
• Receiving, unloading and storing the equipment; equipment to be kept clean of trash &debris
until installation
• Placement of equipment, provide operator and forklift with 48 inch spacing on center capable of
4000 Ibs pick
• Provide onsite labor(8-10 hours)for assembly of the Aquip 050SBE
• Provide and install all piping and appurtenances not otherwise provided for by Section 1 (i.e. all
inlet plumbing up to flow meter and outlet plumbing from outlet tee to discharge point)
• Provide and install seismic anchors, if required
• Installation of electrical and plumbing components in conformance with applicable codes, if
required
• Provide inlet(untreated) and outlet(treated)stormwater monitoring results to StormwateRx for
system tuning, if required
•Water testing labor and lab fees, if required
• Obtaining all city, county, state, federal government and/or other permits for the site
construction and operation of proposed system
Equipment Total: $56,500
Total: $66,600
Deposit $28,260
Terms: • FOB Jobsite(freight included), unless otherwise indicated
• State and local taxes not included
Read and initial attached Terms&Conditions
Payment Terms: • 50%deposit required with confirming order
• 50%and taxes (if any) due upon shipment
• 50% restocking fee applies for all cancelled orders
Delivery/Lead Time: . Normal =6-8 weeks from drawing approval.
• Delivery within 6 months or order subject to price increase (with 30 days notice) at time
of drawing approval.
Authorizing Person (Print):
Authorizing Signature:
Date:
Billing Contact Email
StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC2 of 2
o -
RecWming the warld's water. ..,�......
www.storrnwaterx.com
122 southeast 2714 Avenue
Portland,OR 97214
(600)680.3543
September 20, 2011
Mr. Brett VanSandt
Trident Seafoods
1400 4th Street
Anacortes, WA 98221
RE: Stormwater Treatment System Recommendation—Trident Seafoods,
Anacortes
Dear Brett:
Thank you for your time to discuss your stormwater needs with Mike Peters.
Based on the desire to reduce copper and zinc at the Trident Seafoods
Anacortes facility we recommend an Aquip@ enhanced filtration system. Two
options for treating Outfalls Al and T1 are proposed. To incorporate the a
treatment system at either outfall slight modifications to the existing system will
be required. These modifications are summarized below.
Optionl -Outfall Al Treatment:
• Treatment Pump & Bypass System— install a treatment pump & bypass
system between the existing catch basin and discharge point to the city
storm drain line. This will house the pump to divert the treatment flow rate
to the above ground filtration system. The system includes an internal
bypass weir to route peak storm events around the treatment system.
• Aquip Enhanced Filtration System — Install an Aquip 50SBE near the
existing building. Based on the Washington DOE Western Washington
Hydrology Model (WWHM), the Aquip 50SBE is sized to treat the 91%
storm volume for the estimated total drainage area of 1.5 acres, which is
50 gpm. The outlet from the Aquip would discharge to the outlet side of
the new Treatment Pump & Bypass System.
to „,
N
m
-I n
tor
Aimi
C� +
G
m F
o O 22zi
co M p z
0 � m m _ m
D
fA � I -Di
m m D m _ J
i o D 0 (h
m
Om O Z r M t
., - .i.
D Q
n C
m
T <
� O
X z +
h m 3 m
g -a
CD Xi:
m r_
B
(D
v
3
o
3 :3
v cn
c
� m
3 �N�
Z J
Z Q
F LL
(n F-
W 0 Z J
-<
N F
7
W 0
a
—r
°z
J
j w E "�1 ✓..w,r �
a EEC o. o
z z
w3 a o
aI
$ O O r O
0 I.I.I z 14'"'"—0 J O
cp7� w J w ow xa
- a 0 d l; o w x m LLl
ho J
y
I-------------
`
f o
zw X�w
za
00 s r'w oww
wo w ra 05� a aj¢
2w a 3a z¢0 a � o
3. N. uwp
=J wF w a d w
z z vs w
Q x
w
c z
z n
a_
w0 Oa
r w
u z�
r
p
U
x
w
+ ABOVE-GROUND AQUIP® FILTRATION SYSTEM SHEET
' WITH TREATMENT PUMP & BYPASS SYSTEM
INSTALLATION SCHEMATIC
stormwate DATE: SCALE:. FILE NAME: DRAWN: CHECKED: 1 OF 1
www.stormwaterx.com 10/06/10 NTS AQUIP PUMPBBYPASS SCHEMATIC I ARG CPN
GENERAL NOTES
1. AQUIP®FILTRATION SYSTEM BY STORMWATERX LLC-PORTLAND,OREGON- 800.680.3543 (PATENT PENDING).
2. PRETREATMENT AND FILTER MEDIA COMBINATION DEPENDENT ON POLLUTANT REMOVAL REQUIREMENTS. MODELS:SBE:
BUFFERING&INERT/SORPTIVE MEDIA,SXI:SETTLING PRETREATMENT&INERT MEDIA,SOB:COALESCING&INERT/SORPTIVE
MEDIA,SCI:COALESCING&INERT MEDIA.
3. INTERNAL APPURTENANCES BY STORMWATERX INCLUDE INLET/OUTLET SAMPLE PORTS,INLET FLOW CONTROL&CHECK
VALVES, INLET DISTRIBUTOR,UNDERDRAIN SYSTEM,EMERGENCY OVERFLOW AND ADJUSTABLE HEAD CONTROL.
4. SYSTEM REQUIRES A REINFORCED CONCRETE LEVEL PAD WITH A MINIMUM FOOTPRINT OF 9.5'W X 13.5'L AND LOAD
BEARING CAPACITY OF 35,000 LBS.
5. INLET AND OUTLET PIPING CONNECTIONS TO BE SPECIFIED BY THE ENGINEER AND PROVIDED BY OTHERS.CENTER INLET
STANDARD.OPTIONAL LEFT OR RIGHT OUTLET(LEFT OUTLET SHOWN).
6. PERMANENT POOL DEPTH IS 4 FEET ABOVE THE BOTTOM OF STRUCTURE.THE OPERATING WATER SURFACE HEIGHT IS 6
FEET ABOVE BOTTOM OF STRUCTURE.
4"OUTLET PIPE
EXTERNAL ACCESS LADDER 11'6 CONNECTION
�(SEENOTES)
_ PASSIVE
OVERFLOW
i INDICATOR
1 '
FLOW CONTROL VALVE a
(SEE NOTE 5)
t �
ri �A ADJUSTABLE
HEAD CONTROL _.
j� (SEE NOTE 3)
INLET SAMPLE PORT
a A
— -- OUTLET SAMPLE
PORT
INTERNAUEXTERNAL
s ACCESSLADDER
PRETREATMENT MEDIA
(SEE NOTE 2) INLET DISTRIBUTOR
TOP VIEW 1 (SEE NOTE 3)
1
EMERGENCY OVERFLOW
(SEE NOTE 3)
ADJUSTABLE
7' g a I HEAD CONTROL
+ (SEE NOTE 3)
6'
(SEE
NOTE 6)
(SEE j
NOTE 6) � I
2' L L � 1 3„
2"INLET PIPE /
CONNECTION FILTRATION MEDIA / REINFORCED CONCRETE
(SEE NOTE 5) (SEE NOTE 2)JJJ LEVEL PAD
FORKLIFT POCKETS (SEE NOTE 4)
(48"ON CENTER)
,�Z
SECTION VIEW A
1
AQUIP MODEL 50S SHEET
STORMWATER FILTRATION SYSTEM
_ `a STANDARD DETAIL
storm _ l DATE: SCALE: FILE NAME: DRAWN: CHECKED:
www.stormwaterx.com 05-06-09 NTS SRX-AQUIP-50S-DTL I LC, ARG 1 OF 1
Stormwater Treatment System I
Quotation - 6 r - {
Red,wi q thewrldswater.l �.�
Date: September 20, 2011 Revision No. 0
Quote Expire Date: October 31, 2011
Prepared for: Brett Van Sandt
Project: Trident Anacortes
Site Address: 1400 4th Street,Anacortes,WA, 98221
Prepared By: Ayn Generes, StormwateRx LLC, 122 Southeast 27th Avenue, Portland OR 97214
800.680.3543,fax 800.407.2914, ayng@stormwaterx.com
System Design/Application Notes:
1. Site Design Parameters:
a. Drainage Area: 1.5 acres (Outfall Al)
b. Design Treatment Flow: 50 gpm (Outfall Al)
c. Pollutants of Concern: Total suspended solids, heavy metals (zinc, copper, lead)
2. Achieving the benchmarks consistently requires rigorous implementation of BMPs including source control, structural
and treatment BMPs. Treatment BMPs are not designed to operate in the absence of other BMPs.
3. Maintenance to restore system capacity includes periodic removal of caked solids on the filter surface, raking the
surface filter sand to restore porosity, and eventually replacing the media to restore metals original pollutant removal
capacity. Media longevity depends on frequency of routine maintenance and the pollutant loading rate to the Aquip.
Seclt01 Stormwater Re"clarnaton System
QTY; .Part Number,. Desni ,tron pf Goods401rice Exferidetl
1 Aquip@ Aquip Enhanced Stormwater Filtration System with an operating $50,200 $50,200
Enhanced rate of 50 gpm at 1 gpm/sf and system footprint of 7'x 15'x 7'
Model includes:
050SBE •6.7'x11.5'x7' high 12 gage steel,water tight structure with forklift
(Outfall Al) pockets, inside/outside access ladder, sandblasted/painted
RxBlue
• Pretreatment buffering media and support trays
• Layered inert and sorptive filtration media, 21 inch depth and
underdrain gravel
• Internal flow distribution piping, underdrain manifold with
cleanouts, internal emergency overflow, adjustable head control
and passive overflow level indicator
• Inlet/inline totalizing flow meter and flow control valve
Inlet and outlet sample ports
• Filter maintenance shovel and custom bed rake
• Standard detail of level reinforced concrete pad for Aquip
1 Standard Standard Treatment Pump&Bypass System includes: $6,300 $6,300
Treatment •4'x6'concrete vault with internal bypass weir less than 8'deep
Pump &Bypass and 30-in access frame&cover
System for • 0.5HP (115V/1 Ph/14.5A) 50 gpm pump at less than 25 ft total
Aquip 050SBE dynamic head
• Double piggyback float switch
2 inch flow control valve
•A control panel is not required and is not included
StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC1 of 2
a
QTY Part Number Description of Goods Unit Price Extended
1 Startup&Training: (Included) (Included)
• On-site assembly and installation oversight by factory technician
(2 man-days maximum)
• Operation and Maintenance Manual and training
Note: Equipment assembly, installation and training must be
completed during same visit.
•One courtesy scheduled post-startup site visit is included (not to
exceed 4 onsite hours).Any subsequent StormwateRx LLC
representative visit charged at$75/hr plus expenses.
Section 2) Customer IZesponsibilities
• Site preparation including, but not limited to providing level concrete pad for Aquip 050SBE, min
dimensions 9.5'x12.5'
Vertical equipment clearance of 14'or greater above concrete pad for installation and
maintenance
• Receiving, unloading and storing the equipment; equipment to be kept clean of trash &debris
until installation
• Placement of equipment, provide operator and forklift with 48 inch spacing on center capable of
4000 Ibs pick
• Provide onsite labor(8-10 hours)for assembly of the Aquip 050SBE
• Provide and install all piping and appurtenances not otherwise provided for by Section 1 (i.e. all
inlet plumbing up to flow meter and outlet plumbing from outlet tee to discharge point)
• Provide and install seismic anchors,if required
• Installation of electrical and plumbing components in conformance with applicable codes, if
required
• Provide inlet(untreated) and outlet(treated)stormwater monitoring results to StormwateRx for
system tuning, if required
•Water testing labor and lab fees, if required
• Obtaining all city, county, state, federal government and/or other permits for the site
construction and operation of proposed system
Equipment Total: $56,500
Total: $56,600
Deposit $28,260
Terms: • FOB Jobsite(freight included),unless otherwise indicated
• State and local taxes not included
• Read and initial attached Terms&Conditions
Payment Terms: • 50% deposit required with confirming order
• 50% and taxes (if any)due upon shipment
50% restocking fee applies for all cancelled orders
Delivery/Lead Time: • Normal =6-8 weeks from drawing approval
• Delivery within 6 months or order subject to price increase (with 30 days notice) at time
of drawing approval.
Authorizing Person (Print):
Authorizing Signature:
Date:
Billing Contact Email
StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC2 of 2