Loading...
HomeMy WebLinkAboutBLD-2012-0286 - COMMERCIAL TENANT IMPROVEMENT s P i.t y'Ir ^t t.+^. ..8 8.s i •i•1 g.:.i'113.0yi City of Anacortes Permit#: BLD-2012-0286 904 6th Street Issue date: 08/03/2012 P.O.Box 547 Expire date: 02/01/2014 to Anacortes, WA 98221-0547 (360) 293-1901 Job Address: 1400 4TH ST Permit Type: Commercial Alteration/Repair Permit ANACORTES WA 98221 Project: APN: P55673 P55679 P55366 P31513 P31514 P31515 P31516 P31517 P31518 Remarks: Installation of prepackaged storm valut per plans. Owner: TRIDENT SEAFOOD CORP Contractor: Address: PO BOX 17599 Address: SEATTLE WA 98127-1269 Phone: (360)293-3133 Phone: License#: General Information: Fees: Building Valuation 78000 Plan Review Deposit 272.92 Building Permit Fee 839.75 Plan Review Fee 167.91 State Building Code Fee 4.50 Total Calculated: 1,285.08 Deposits/Receipts: 0.00 Total Due: 1,285.08 THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. I IGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY 1 Y�`� - 1 `-�9,�',0tl��� Planning,Conununity c&Economic Development; P,O,Box 547,Aiiacortes,WA 98221;(360)299-1986 EXEMPTION FROM SHORELINE MANAGEMENT ACT SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT Applicant: Trident Seafoods, 1400 0' Street,Anacortes,WA 98221 City File No.: SLX-2012-0009 Application Date: June 19,2012 Action: Approved Date of Action: August 1,2012 I. DESCRIPTION &LOCATION: Description: Install above-ground filtration system to remove zinc prior to discharging stormwater to.Puget Sound. Location: 1400 4th Street. Shoreline Designation: Urban Maritime. II. FINDINGS& CONCLUSIONS: 1. On July 19, 2012'the applicant submitted a shoreline perinit exemption application to PCED. 2. The proposal is consistent with the policies and provisions of the Shoreline Management Act the Anacortes Shoreline Master Plan. 3. The project is exempt from the requirement to obtain a shoreline substantial development permit pursuant to WAG 173-27-040(2)(b). 4. The lead SEPA agency for the action (City of Anacortes) determined that the project is categorically exempt from SEPA review. 111. DECISION: APPROVED IV. CONDITIONS 1. All applicable local, state and federal permits shall be secured prior to work beginning on the site. Copies of said approval documents shall be provided to the Planning,Community&Economic Development Department(PLED). 2, Installation of the system shall comply with Department of Ecology standards. 1 of 2 3. The;applicant shall adhere to the applicable policies and development regulations contained in the City of Anac:ortes 2010 Shoreline Master Program including but not limited to those in. Section 5.11 Urban Marifinze and Chapter 6 Environmental Protecfion General Regulations Approved by_ Ryan .Larsen. Date Shoreline Administrator 2 of 2 stormwateR&x, Reclairrft the world'swater. www.stormwaterx,cornn 122 Southeast 271"Avenue Portland,OR 97214 (800)680-3 43 September 20, 2011 Mr. Brett VanSandt Trident Seafoods 1400 4th Street Anacortes, WA 98221 RE: Stormwater Treatment System Recommendation—Trident Seafoods, Anacortes Dear Brett` Thank you for your time to discuss your stormwater needs with Mike Peters. Based on the desire to reduce copper and zinc at the Trident Seafoods Anacortes facility we recommend an Aquip®enhanced filtration system. Two options for treating Outfalls Al and T1 are proposed. To incorporate the a treatment system at either outfall slight modifications to the existing system will be required. These modifications are summarized below. Optionl —Outfall Al Treatment: • Treatment Pump & Bypass System— install a treatment pump & bypass system between the existing catch basin and discharge point to the city storm drain line. This will house the pump to divert the treatment flow rate to the above ground filtration system. The system includes an internal bypass weir to route peak storm events around the treatment system. • Aquip Enhanced Filtration System— Install an Aquip 50SBE near the existing building. Based on the Washington DOE Western Washington Hydrology Model (WWHM), the Aquip 50SBE is sized to treat the 91% storm volume for the estimated total drainage area of 1.5 acres, which is 50 gpm. The outlet from the Aquip would discharge to the outlet side of the new Treatment Pump & Bypass System. -4*N— E cn T U) U) a o d ` c IL cu a Q F- 0 Z Lij cu LU x A4 40 If i r o > LL w p p z Q z z w O W J } LL 0 Z D N p I LL Z p aLLI Q 5 vi W Z� W, a � oIL g p Q _ z F- _ U H r Z 4 N Q N U LL co *DX W r+ y � � oil, � N z J ?Q 5)r w O Z J X r w O w a ar 5w o, Qz lit a 1 z € � a w a F o y_ i w CIE a W S � w U o a Z \ w w O a / �Q 3 Z m Q a X 4 a U W ............ ----------------- ON\ a , cy ;Zw 3a= ala N 00 r m U �71 U'co IL w � ww ¢ crigm '.uay as rw a w> z>O am0 �a a zm z o¢m. c� 'i Ua c7 m ww Z a U �o r mZ N ? a mcr zz_ a w w w z zFz l am mw wQUQ Oa U N� Zw r N X w ABOVE-GROUND AQUIP® FILTRATION SYSTEM SHEET WITH TREATMENT PUMP & BYPASS SYSTEM cR, INSTALLATION SCHEMATIC stormwateRxDATE: SCALE: FILE NAME: DRAWN: CHECKED: www.stormwaterx.com .w...r.. 10/06/10 NTS AQUIP PUMP&BYPASS SCHEMATIC I ARG CPN 1 OF 1 GENERAL NOTES 1. AQUIPO FILTRATION SYSTEM BY STORMWATERX LLC-PORTLAND,OREGON- 800.680.3543 (PATENT PENDING). 2. PRETREATMENT AND FILTER MEDIA COMBINATION DEPENDENT ON POLLUTANT REMOVAL REQUIREMENTS. MODELS:SBE: BUFFERING&INERT/SORPTIVE MEDIA,SXI:SETTLING PRETREATMENT&INERT MEDIA,SOB:COALESCING&INERT/SORPTIVE MEDIA,SCI:COALESCING&INERT MEDIA. 3. INTERNAL APPURTENANCES BY STORMWATERX INCLUDE INLET/OUTLET SAMPLE PORTS,INLET FLOW CONTROL&CHECK VALVES, INLET DISTRIBUTOR,UNDERDRAIN SYSTEM, EMERGENCY OVERFLOW AND ADJUSTABLE HEAD CONTROL. 4. SYSTEM REQUIRES A REINFORCED CONCRETE LEVEL PAD WITH A MINIMUM FOOTPRINT OF 9.5'W X 13.5'L AND LOAD BEARING CAPACITY OF 35,000 LBS. 5. INLET AND OUTLET PIPING CONNECTIONS TO BE SPECIFIED BY THE ENGINEER AND PROVIDED BY OTHERS.CENTER INLET STANDARD.OPTIONAL LEFT OR RIGHT OUTLET(LEFT OUTLET SHOWN). 6. PERMANENT POOL DEPTH IS 4 FEET ABOVE THE BOTTOM OF STRUCTURE.THE OPERATING WATER SURFACE HEIGHT IS 6 FEET ABOVE BOTTOM OF STRUCTURE. .._.... _ ,. ,_ _____... __ ._ _.._ _ 4"OUTLET PIPE EXTERNAL ACCESS LADDER I,6„ CONNECTION (SEE NOTE 5) PASSIVE OVERFLOW INDICATOR FLOW CONTROL VALVE (SEE NOTE 5) 6'-8" I���` ADJUSTABLE HEAD CONTROL 7 (SEE NOTE 3) I INLET SAMPLE PORT A OUTLET SAMPLE PORT ---- - -- --- - -- INTERNAL/EXTERNAL PRETREATMENT MEDIA ACCESS LADDER (SEE NOTE 2) INLET DISTRIBUTOR TOP VIEW 1 (SEE NOTE 3) 1 EMERGENCY OVERFLOW _ (SEE NOTE 3) It H E 7, i � i ADJUSTABLE �a HEAD CONTROL 6' (SEE NOTE 3) (SEE 17- NOTE 6) 4' f (SEE i ) NOTE 6) _ r $ l,-3„ 2"INLET PIPE CONNECTION FILTRATION MEDIA REINFORCED CONCRETE (SEE NOTE 5) (SEE NOTE 2) LEVEL PAD FORKLIFT POCKETS (SEE NOTE 4) (48"ON CENTER) SECTION VIEW Aaqui 1 AQUIP MODEL 50S SHEET STORMWATER FILTRATION SYSTEM stormwateRx STANDARD DETAIL i www.stormwaterx.com DATE: SCALE: FILE NAME: DRAWN: CHECKED: 05-06-09 NTS ISRX-AQUIP-50S-DTL LCO ARG 1 OF 1 Stormwater Treatment System R Quotation - Option 1 It stormwateRx0l Rada'mirl the miftwateP, Date: September 20, 2011 Revision No. 0 Quote Expire Date: October 31, 2011 Prepared for: Brett Van Sandt Project: Trident Anacortes Site Address: 1400 4th Street, Anacortes,WA, 98221 Prepared By: Ayn Generes, StormwateRx LLC, 122 Southeast 27th Avenue, Portland OR 97214 800.680.3543,fax 800.407.2914, ayng@stormwaterx.com System Design/Application Notes: 1. Site Design Parameters: a. Drainage Area: 1.5 acres(Outfall Al) b. Design Treatment Flow: 50 gpm (Outfall A1) c. Pollutants of Concern: Total suspended solids, heavy metals (zinc, copper, lead) 2. Achieving the benchmarks consistently requires rigorous implementation of BMPs including source control, structural and treatment BMPs. Treatment BMPs are not designed to operate in the absence of other BMPs. 3. Maintenance to restore system capacity includes periodic removal of caked solids on the filter surface, raking the surface filter sand to restore porosity, and eventually replacing the media to restore metals original pollutant removal capacity. Media longevity depends on frequency of routine maintenance and the pollutant loading rate to the Aquip. TMns;, DO 8 t 1 � 0 1 Aquip@ Aquip Enhanced Stormwater Filtration System with an operating $50,200 $50,200 Enhanced rate of 50 gpm at 1 gpm/sf and system footprint of 7'x 15'x 7' Model includes: 050SBE •6.7'x11.5'x7' high 12 gage steel, water tight structure with forklift (Outfall Al) pockets, inside/outside access ladder, sandblasted/painted RxBlue • Pretreatment buffering media and support trays • Layered inert and sorptive filtration media, 21 inch depth and underdrain gravel • Internal flow distribution piping, underdrain manifold with cleanouts, internal emergency overflow, adjustable head control and passive overflow level indicator • Inlet/inline totalizing flow meter and flow control valve • Inlet and outlet sample ports • Filter maintenance shovel and custom bed rake • Standard detail of level reinforced concrete pad for Aquip 1 Standard Standard Treatment Pump&Bypass System includes: $6,300 $6,300 Treatment ■41x6'concrete vault with internal bypass weir less than 8' deep Pump &Bypass and 30-in access frame&cover System for • 0.5HP(115V/1 Ph/14.5A) 50 gpm pump at less than 25 ft total Aquip 050SBE dynamic head • Double piggyback float switch 2 inch flow control valve •A control panel is not required and is not included StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC1 of 2 k p ( �s rep 9 %'tlir"ity- NO 1 Startup&Training (Included) (Included) • On-site assembly and installation oversight by factory technician (2 man-days maximum) •Operation and Maintenance Manual and training Note: Equipment assembly, installation and training must be completed during same visit. • One courtesy scheduled post-startup site visit is included (not to exceed 4 onsite hours).Any subsequent StormwateRx LLC representative visit charged at$75/hr plus expenses. � p 7I3=_ y <` ip"-N k :s #. �� i 'r�i'�7 �� �''r` I' r r -� 44' a5 f2 — i i —+ €d 0-1- d� �1. T- t� m ,r- • Site preparation including, but not limited to providing level concrete pad for Aquip 050SBE, min dimensions 9.5'x12.5' •Vertical equipment clearance of 14'or greater above concrete pad for installation and maintenance • Receiving, unloading and storing the equipment; equipment to be kept clean of trash &debris until installation • Placement of equipment, provide operator and forklift with 48 inch spacing on center capable of 4000 Ibs pick • Provide onsite labor(8-10 hours)for assembly of the Aquip 050SBE • Provide and install all piping and appurtenances not otherwise provided for by Section 1 (i.e. all inlet plumbing up to flow meter and outlet plumbing from outlet tee to discharge point) • Provide and install seismic anchors, if required • Installation of electrical and plumbing components in conformance with applicable codes, if required • Provide inlet(untreated) and outlet(treated)stormwater monitoring results to StormwateRx for system tuning, if required •Water testing labor and lab fees, if required • Obtaining all city, county, state, federal government and/or other permits for the site construction and operation of proposed system Equipment Total: $56,500 Total: $66,600 Deposit $28,260 Terms: • FOB Jobsite(freight included), unless otherwise indicated • State and local taxes not included Read and initial attached Terms&Conditions Payment Terms: • 50%deposit required with confirming order • 50%and taxes (if any) due upon shipment • 50% restocking fee applies for all cancelled orders Delivery/Lead Time: . Normal =6-8 weeks from drawing approval. • Delivery within 6 months or order subject to price increase (with 30 days notice) at time of drawing approval. Authorizing Person (Print): Authorizing Signature: Date: Billing Contact Email StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC2 of 2 o - RecWming the warld's water. ..,�...... www.storrnwaterx.com 122 southeast 2714 Avenue Portland,OR 97214 (600)680.3543 September 20, 2011 Mr. Brett VanSandt Trident Seafoods 1400 4th Street Anacortes, WA 98221 RE: Stormwater Treatment System Recommendation—Trident Seafoods, Anacortes Dear Brett: Thank you for your time to discuss your stormwater needs with Mike Peters. Based on the desire to reduce copper and zinc at the Trident Seafoods Anacortes facility we recommend an Aquip@ enhanced filtration system. Two options for treating Outfalls Al and T1 are proposed. To incorporate the a treatment system at either outfall slight modifications to the existing system will be required. These modifications are summarized below. Optionl -Outfall Al Treatment: • Treatment Pump & Bypass System— install a treatment pump & bypass system between the existing catch basin and discharge point to the city storm drain line. This will house the pump to divert the treatment flow rate to the above ground filtration system. The system includes an internal bypass weir to route peak storm events around the treatment system. • Aquip Enhanced Filtration System — Install an Aquip 50SBE near the existing building. Based on the Washington DOE Western Washington Hydrology Model (WWHM), the Aquip 50SBE is sized to treat the 91% storm volume for the estimated total drainage area of 1.5 acres, which is 50 gpm. The outlet from the Aquip would discharge to the outlet side of the new Treatment Pump & Bypass System. to „, N m -I n tor Aimi C� + G m F o O 22zi co M p z 0 � m m _ m D fA � I -Di m m D m _ J i o D 0 (h m Om O Z r M t ., - .i. D Q n C m T < � O X z + h m 3 m g -a CD Xi: m r_ B (D v 3 o 3 :3 v cn c � m 3 �N� Z J Z Q F LL (n F- W 0 Z J -< N F 7 W 0 a —r °z J j w E "�1 ✓..w,r � a EEC o. o z z w3 a o aI $ O O r O 0 I.I.I z 14'"'"—0 J O cp7� w J w ow xa - a 0 d l; o w x m LLl ho J y I------------- ` f o zw X�w za 00 s r'w oww wo w ra 05� a aj¢ 2w a 3a z¢0 a � o 3. N. uwp =J wF w a d w z z vs w Q x w c z z n a_ w0 Oa r w u z� r p U x w + ABOVE-GROUND AQUIP® FILTRATION SYSTEM SHEET ' WITH TREATMENT PUMP & BYPASS SYSTEM INSTALLATION SCHEMATIC stormwate DATE: SCALE:. FILE NAME: DRAWN: CHECKED: 1 OF 1 www.stormwaterx.com 10/06/10 NTS AQUIP PUMPBBYPASS SCHEMATIC I ARG CPN GENERAL NOTES 1. AQUIP®FILTRATION SYSTEM BY STORMWATERX LLC-PORTLAND,OREGON- 800.680.3543 (PATENT PENDING). 2. PRETREATMENT AND FILTER MEDIA COMBINATION DEPENDENT ON POLLUTANT REMOVAL REQUIREMENTS. MODELS:SBE: BUFFERING&INERT/SORPTIVE MEDIA,SXI:SETTLING PRETREATMENT&INERT MEDIA,SOB:COALESCING&INERT/SORPTIVE MEDIA,SCI:COALESCING&INERT MEDIA. 3. INTERNAL APPURTENANCES BY STORMWATERX INCLUDE INLET/OUTLET SAMPLE PORTS,INLET FLOW CONTROL&CHECK VALVES, INLET DISTRIBUTOR,UNDERDRAIN SYSTEM,EMERGENCY OVERFLOW AND ADJUSTABLE HEAD CONTROL. 4. SYSTEM REQUIRES A REINFORCED CONCRETE LEVEL PAD WITH A MINIMUM FOOTPRINT OF 9.5'W X 13.5'L AND LOAD BEARING CAPACITY OF 35,000 LBS. 5. INLET AND OUTLET PIPING CONNECTIONS TO BE SPECIFIED BY THE ENGINEER AND PROVIDED BY OTHERS.CENTER INLET STANDARD.OPTIONAL LEFT OR RIGHT OUTLET(LEFT OUTLET SHOWN). 6. PERMANENT POOL DEPTH IS 4 FEET ABOVE THE BOTTOM OF STRUCTURE.THE OPERATING WATER SURFACE HEIGHT IS 6 FEET ABOVE BOTTOM OF STRUCTURE. 4"OUTLET PIPE EXTERNAL ACCESS LADDER 11'6 CONNECTION �(SEENOTES) _ PASSIVE OVERFLOW i INDICATOR 1 ' FLOW CONTROL VALVE a (SEE NOTE 5) t � ri �A ADJUSTABLE HEAD CONTROL _. j� (SEE NOTE 3) INLET SAMPLE PORT a A — -- OUTLET SAMPLE PORT INTERNAUEXTERNAL s ACCESSLADDER PRETREATMENT MEDIA (SEE NOTE 2) INLET DISTRIBUTOR TOP VIEW 1 (SEE NOTE 3) 1 EMERGENCY OVERFLOW (SEE NOTE 3) ADJUSTABLE 7' g a I HEAD CONTROL + (SEE NOTE 3) 6' (SEE NOTE 6) (SEE j NOTE 6) � I 2' L L � 1 3„ 2"INLET PIPE / CONNECTION FILTRATION MEDIA / REINFORCED CONCRETE (SEE NOTE 5) (SEE NOTE 2)JJJ LEVEL PAD FORKLIFT POCKETS (SEE NOTE 4) (48"ON CENTER) ,�Z SECTION VIEW A 1 AQUIP MODEL 50S SHEET STORMWATER FILTRATION SYSTEM _ `a STANDARD DETAIL storm _ l DATE: SCALE: FILE NAME: DRAWN: CHECKED: www.stormwaterx.com 05-06-09 NTS SRX-AQUIP-50S-DTL I LC, ARG 1 OF 1 Stormwater Treatment System I Quotation - 6 r - { Red,wi q thewrldswater.l �.� Date: September 20, 2011 Revision No. 0 Quote Expire Date: October 31, 2011 Prepared for: Brett Van Sandt Project: Trident Anacortes Site Address: 1400 4th Street,Anacortes,WA, 98221 Prepared By: Ayn Generes, StormwateRx LLC, 122 Southeast 27th Avenue, Portland OR 97214 800.680.3543,fax 800.407.2914, ayng@stormwaterx.com System Design/Application Notes: 1. Site Design Parameters: a. Drainage Area: 1.5 acres (Outfall Al) b. Design Treatment Flow: 50 gpm (Outfall Al) c. Pollutants of Concern: Total suspended solids, heavy metals (zinc, copper, lead) 2. Achieving the benchmarks consistently requires rigorous implementation of BMPs including source control, structural and treatment BMPs. Treatment BMPs are not designed to operate in the absence of other BMPs. 3. Maintenance to restore system capacity includes periodic removal of caked solids on the filter surface, raking the surface filter sand to restore porosity, and eventually replacing the media to restore metals original pollutant removal capacity. Media longevity depends on frequency of routine maintenance and the pollutant loading rate to the Aquip. Seclt01 Stormwater Re"clarnaton System QTY; .Part Number,. Desni ,tron pf Goods401rice Exferidetl 1 Aquip@ Aquip Enhanced Stormwater Filtration System with an operating $50,200 $50,200 Enhanced rate of 50 gpm at 1 gpm/sf and system footprint of 7'x 15'x 7' Model includes: 050SBE •6.7'x11.5'x7' high 12 gage steel,water tight structure with forklift (Outfall Al) pockets, inside/outside access ladder, sandblasted/painted RxBlue • Pretreatment buffering media and support trays • Layered inert and sorptive filtration media, 21 inch depth and underdrain gravel • Internal flow distribution piping, underdrain manifold with cleanouts, internal emergency overflow, adjustable head control and passive overflow level indicator • Inlet/inline totalizing flow meter and flow control valve Inlet and outlet sample ports • Filter maintenance shovel and custom bed rake • Standard detail of level reinforced concrete pad for Aquip 1 Standard Standard Treatment Pump&Bypass System includes: $6,300 $6,300 Treatment •4'x6'concrete vault with internal bypass weir less than 8'deep Pump &Bypass and 30-in access frame&cover System for • 0.5HP (115V/1 Ph/14.5A) 50 gpm pump at less than 25 ft total Aquip 050SBE dynamic head • Double piggyback float switch 2 inch flow control valve •A control panel is not required and is not included StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC1 of 2 a QTY Part Number Description of Goods Unit Price Extended 1 Startup&Training: (Included) (Included) • On-site assembly and installation oversight by factory technician (2 man-days maximum) • Operation and Maintenance Manual and training Note: Equipment assembly, installation and training must be completed during same visit. •One courtesy scheduled post-startup site visit is included (not to exceed 4 onsite hours).Any subsequent StormwateRx LLC representative visit charged at$75/hr plus expenses. Section 2) Customer IZesponsibilities • Site preparation including, but not limited to providing level concrete pad for Aquip 050SBE, min dimensions 9.5'x12.5' Vertical equipment clearance of 14'or greater above concrete pad for installation and maintenance • Receiving, unloading and storing the equipment; equipment to be kept clean of trash &debris until installation • Placement of equipment, provide operator and forklift with 48 inch spacing on center capable of 4000 Ibs pick • Provide onsite labor(8-10 hours)for assembly of the Aquip 050SBE • Provide and install all piping and appurtenances not otherwise provided for by Section 1 (i.e. all inlet plumbing up to flow meter and outlet plumbing from outlet tee to discharge point) • Provide and install seismic anchors,if required • Installation of electrical and plumbing components in conformance with applicable codes, if required • Provide inlet(untreated) and outlet(treated)stormwater monitoring results to StormwateRx for system tuning, if required •Water testing labor and lab fees, if required • Obtaining all city, county, state, federal government and/or other permits for the site construction and operation of proposed system Equipment Total: $56,500 Total: $56,600 Deposit $28,260 Terms: • FOB Jobsite(freight included),unless otherwise indicated • State and local taxes not included • Read and initial attached Terms&Conditions Payment Terms: • 50% deposit required with confirming order • 50% and taxes (if any)due upon shipment 50% restocking fee applies for all cancelled orders Delivery/Lead Time: • Normal =6-8 weeks from drawing approval • Delivery within 6 months or order subject to price increase (with 30 days notice) at time of drawing approval. Authorizing Person (Print): Authorizing Signature: Date: Billing Contact Email StormwateRx Quote TridentAnacortes Op1.xlsm StormwateRx LLC2 of 2