Loading...
HomeMy WebLinkAboutSewer Replacement - 1999 - Y oe �h]2Grc2 K�JL 1F2 R�GLAG GMET)T CITY OF ANACORTES TITLE K"lS` 5�BY 71 EMI L-��L.� DATE Engineering Dept. (360)293-1920 CHECKED BY ^��� LAtJL 19 DATE t2�23�13 To f]i-O-I'� I 5 M701 SHEET OF C Ioe SCALE I tt= SnH v ��tJeR Satr4eeseR r i m a ss x I G � A c O X fi r O n ` 4 4 b.n`0 2lor-o' U _ � 0� L Q � j _gyp ,N F � � 6% L 1 ro � c.. m o m-ZA o b a_s JN _ t l7 s - -_ - - s a3 wIxAev '? c PaQT IT/fJ� pVL TO nIt Z= i 57 tV 2 J y I I i �xkI;T D Fa tol- n s cf i� ar 1 �AI.-3N 'NATO �r` _ tt wmn it _I -- I� -- - �� --' -- --_r flu $S 2ucn G ce. r 1,z Ili l III . IIC _ lh v�� I any I I i � I I o� I I I j Fill lt'> I�uLr+_! I P> L. Pt � rP I I G^IP1� I I to c G BC -- I 71 III—IN T JL7_ 1 II I I X 1 i I I /vPl r - I ;-1 I I I II-- I -I_ I I�I -11 II II I I I II IIII ICI �,I III I, II II I -9� _ CT- Ai I i I I I I - -_"_. ___ __-I'_ _II•__l _._�___ 11--_IIN I�p��I ' %_ I III II I '___ I F-TI I I II �-t-- I � I ' I I I I I ` i Ali JI 11 -I- � 11 I I I l I I I j I I I I I I I ! I I L - --II I r I - I - I I I I {I - -II I I I' I I I I II I I I I I I I II I I I I I I 'I I I I II I I I I I I I I i r r I CITY OF ANACORTES ENGINEERING DEPARTMENT (360)293-1920 BURGER KING SEWER REPLACEMENT 12-28-98: 1. MET ON-SITE TO DISCUSS PROCEDURE AND PARTS FOR NEW SEWER LINE. 2. XPRESS LUBE SIDE SEWER LOCATION IS NOT KNOWN. • 8"PVC SEWER • 6" CLEAN-OUT • 182'-0"AT 1% • 8"SEWER STUB TO VACANT LOT 12-29-98: 1. POTHOLED SEWER IN FRONT OF BURGER KING FOR GRADE AND LOCATION. 2. PULLED 3'X3' (APPROX.SIZE)ROCK OUT OF TRENCH THAT WAS ON TOP OF EXISTING TRENCH.IT IS NOT KNOWN AT THIS TIME IF THAT ROCK HAS EFFECTED THE MAIN LINE.THE ROCK WAS PUT IN THE TRENCH AFTER BURGER KING CONNECTED TO SEWER 12-31-98: 1. CITY MAINTENANCE CREW CLEANED OUT MANHOLE(L-18).RICK HARVEY CALLED AND SAID THAT IF WE NEEDED IT CLEANED AGAIN,THEY COULD GET TO IT FIRST THING MONDAY. 01-04-99: 1. STARTED PROJECT. 2. MAINTENANCE REQUESTED THAT THE NEW LINE COMM IN ABOUT 6"HIGHER THAN EXISTING AND RECHANNEL MANHOLE.I TALKED WITH GENE ABOUT IT, WORKED OUT OKAY.DONE DEAL. 3. HAD MAINTENANCE CREW JET MANHOLE ONE MORE TIME. 4. NOTIFIED POLICE AND FIRE OF LANE CLOSURE FOR TODAY. 5. TALKED WITH GENE ABOUT CLEAN-UP.COLD PATCH"O"AVENUE AND ENTRANCE RAMP TO PARKING LOT.5\8"MINUS LEVEL WITH TOP OF EXISTING ASPHALT TILL BATCH PLANT TO OPEN AT LAKESIDE FOR HOT PATCH. 6. FOUND PLANS FOR XPRESS LUBE AND BURGER KING.WENT TO SITE AND MEASURED OFF SIDE SEWER FOR XPRESS LUBE AND 6"PVC PIPE TO THE NORTH FOR VACANT LOT AND PAINTED.(85'TO XPRESS LUBE-6.92'DEEP FROM CENTER OF MANHOLE)(68'TO 6"PVC PIPE-6.72'DEEP FROM CENTER OF MANHOLE). 7. LARGE AREA IN"O"AVENUE THAT HAS OLD DUMP FOR BACKFILL(SEE DRAWING). 01-05-99: 1. STUBBED OFF 8"PVC PIPE TO THE NORTH FOR VACANT LOT.LOCATOR TAPE USED FOR FUTURE LOCATES.AT THE END OF PIPE IS A 4"PVC PIPE AND CAP TO MARK THE END OF 8". 2. LOCATED SIDE SERVICE FOR XPRESS LUBE AND CONNECTED TO NEW. 3. FOUND AND DUG OUT 3'X3'ROCK ON THE WEST SIDE OF XPRESS LUBE.THE ROCK WAS LOCATED ON TOP OF EXISTING PIPE.WHEN REMOVED,THE PIPE WAS CRUSHED.THIS IS THE AREA THAT THE CAMERA COULD NOT PASS BECAUSE OF BROKEN PIPE.(WOODING CONNECTED XPRESS LUBE ORIGINALLY).GENE TO DOCUMENT FINDINGS.HE WILL SEND COPIES TO THE ENGINEERING DEPARTMENT. 4. AT THE END OF THE DAY,CREW LOCATED END OF EXISTING PIPE TO LET SEWER FROM BURGER KING FLOW.DUG HOLE FOR COLLECTION. 5. DREW UP AS-BUILTS FOR YESTERDAY AND TODAYS WORK.SPEED HELPED PULL MEASUREMENTS. 01-06-99: 1. EVERYTHING WENT SMOOTHLY.UNTIL THE END WHEN THE FINAL TIE WAS TO BE MADE WITH BURGER KING.IT WAS FIGURED THAT THE SEWER CAME STRAIGHT OUT OF THE GREASE TRAP AND INTO THE SEWER.WE FOUND A CLEAN-OUT BY THE TELEPHONE BOOTH THAT WAS A SEWER CLEAN-OUT.IN FURTHER RESEARCH AND PHONE CALLING,THE LINE WAS TIED INTO THE SEWER MAIN ABOUT 15'-0"TO THE EAST.THE GREASE TRAP DID A 45 DEGREE BEND TO THE NE AND TIED INTO THE EXISTING SIDE SEWER.AT ANY RATE,GENE CALLED KODIAK CUTTER TO CUT THE ASPHALT.DECIDED TO RUN GREASE LINE INTO THE NEW MAIN AND INTERSECT THE SIDE SEWER INTO IT.A MIRROR IMAGE OF WHAT WE FOUND. 01-07-99: 1. SEWER CONNECTION WAS MADE.EVERYONE IS ON LINE TODAY.ALL THAT IS LEFT IS TO CHANNEL THE MANHOLE(FRIDAY OR MONDAY),PAVE THE STREET AND PARKING LOT,CONCRETE THE DRIVE ENTRANCE AND CLEAN UP.RICK HARVEY IS TO SET UP PUMP BYPASS SO THE MANHOLE CAN BE CHANNELED EITHER FRIDAY OR MONDAY.A PHONE CONVERSATION WITH RON THOMAS SAID FRIDAY. 2. GENE ALSO SAID HE WOULD BRING 2-3 LOADS OF 5/8 MINUS TO COVER THE VACANT PROPERTY TO THE NORTH.IT WAS USED AS A PLACE TO STORE MATERIALS AND EQUIPMENT. 3. NEED TO FIND OUT WHO IS GOING TO CONCRETE THE ENTRANCE RAMP!! JOB S� CITY OF ANACORTES TITLE � pj � CHECKED�Engineering Dept. CALCULATED BY DATE `i 360 293-1920 D BY DATE �W. 100 SHEET OF SCALE 1 ` w t 4•, , f 1. Laas 3 x3 Q�c K- Pse-T o F 64. �a R a¢- IScs lZa -cµeerc So+