HomeMy WebLinkAboutPermit File BLD-2025-0014 815 6th StreetFIXTURES Qty Mechanical Fixtures 1 Clothes Dryer and Duct 1 Range Hood 1 Stove/Range/Oven 1 Gas Water Heater 1 Furnace 2 Exhaust Fans Qty Plumbing Fixtures PARCEL: P54945 LEGAL DESCRIPTION: APPLICANT: Carr, Graham 901 Metcalf St. Sedro-Woolley, WA 98284 3608404595 OWNER: DOROTICH CATHERINE L UNKNOWN ANACORTES, WA 98221 VALUATIONS: Estimated construction cost 179205.00 $179,205.00 $179,205.00Total: FEES:Paid Due Mechanical and plumbing remodel fixtures fees $167.95 $0.00 State Building Code Council fee $6.50 $0.00 Building Permit Fee $1,441.75 $0.00 Plan Review Fee $1,009.94 $0.00 $0.00Totals : REQUIRED INSPECTIONS Footings Foundation Shear Wall and Nailing Framing CONSTRUCTION CONTRACTOR:GRAHAM CARR CONSTRUCTION 901 METCALF ST PMB 158 SEDRO WOOLLEY, WA 98284 3608404595 License: GRAHACC767KM Expires: 05/14/2026 $2,626.14 BLD-2025-0014 RESIDENTIAL INTERIOR ONLY REMODEL ISSUED: EXPIRES: 01/22/2025 07/22/2026 PROJECT NAME: DOROTICH REMODEL SITE ADDRESS: 815 6TH ST ANACORTES Page 1 of 2Printed by : Cheri Gleichmann on: 05/13/2025 10:45 AM City of Anacortes, WA 904 6th Street Anacortes, WA 98221 (360) 293-1901 http://cityofanacortes.org/ For inspections, please call (360) 293-1901 Fenestration U-Factors Gas Piping Mechanical Rough-In Plumbing Rough-In Drywall or Lath Insulation Roofing Final Building Final Page 2 of 2Printed by : Cheri Gleichmann on: 05/13/2025 10:45 AM City of Anacortes, WA RESIDENTIAL INTERIOR ONLY REMODEL BLD-2025-0014 AUTHOR NAME Project Location: 815 6th St Anacortes, WA 98221-1714 Permit stamp area Existing Asbestos Siding (This has been removed) Dorotich Project This home was damaged from a kitchen fire All Interior finishes have been removed. Only Existing framing is in place. All new wiring, plumbing, HVAC will be installed. All existing wood framing will be updated structural to meet the 2018 IRC Table of Contents A1 Exterior Elevations A2 Basement Layout A3 First Floor Layout A4 Second Floor Layout A5 1st Fl - Kitchen & Bathroom Layout A6 First Floor - Floor Joist Repairs A7 1st Fl Isometric A8 2nd Floor Isometric A9 1st Fl - Drop Ceiling - Knee Wall & Fire Blocking A10 Second Floor - New Structural Floor Surpport A11 2nd Fl structural Isometric View A12 Structural Support Section A13 Sun Porch / Breakfast Nook Framing A14 Electrical Layout - First Floor A15 Roof View CITY OF ANACORTES PLANNING AND BUILDING DEPT: APPROVED PLANS REVIEWED FOR CODE COMPLIANCE PERMIT #:______________________________ ADDRESS:____ _______________ APPROVED BY: ______________ SUBJECT TO FIELD INSPECTION. APPROVED PLANS SHALL NOT BE ALTERED WITHOUT AUTHORIZATION. BLD-2025-0014 815 6TH ST DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 Front Elevation (North Side) Back Elevation (South Side) Right side Elevation (West Side) Left Side Elevation (East Side) 10 12 12' 0" 13' 11" 28' 2" 28'-0"4' - 0 " 6' 0" 42'-0" Do Not Scale off this plan N A 1 Exterior Elevations All Bedroom windows to meet 2018 IRC Minimum Egress requriments Entrance From Backyard DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 Existing Wash Room Converted into the New Mechanical Room 1st Floor Cold air return chase 2nd Floor Cold air return chase area. This is between the existing floor joist and the new structural floor system. New Gas Furnace PEX Water Pipe manifoldPEX Water Pipe Manifold New Gas Furnace New water heater (Tank) New Sump Pump Location Existing Sump Pump New 200 AMP Panel New Data Panel Do Not Scale off this plan A 2 Existing wood beam Existing walls for the existing wash room Mech Room Conditioned Space Existing Stone Foundation Existing concrete Foundation All Turquoise components are new walls or framing dteails.Basement Layout Storage Only Unconditioned space Storage Only Unconditioned space Storage Only Unconditioned space DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 14' 0" 14' 7" 14' 0"6' 0" 14' 0" 14' 0" 6' 0"36' 0" 2' 0 " 18' 6" 7' 6" 13' 1" 1' 0" 11' 0" 3' 0" 5' 3" 8' 6" 4' 9" 4" x 4" wood post Knee Wall 50" High Living Room Dining Room Kitchen Breakfast Nook Sun Room Main Badroom Main Bathroom Front Foyer HVAC Chase to second floor Stacked Washer & Dryer Down to Basement Up to second floor 4'-0" 2'-0" 32'-0" 9' 0" 1' 3" N A B 6 6 Do Not Scale off this plan A 3 Light Blue = Existing Walls Green + New Walls First Floor Layout EGRESS BEDROOM WINDOWS The bottom of the egress window opening can't exceed 44" from the finished floor. The minimum opening area of the egress window is 5.7 square feet. The minimum egress window opening height is 24" high. The minimum egress window opening is 20" wide. Windows within 5' of Bathroom floor to be tempered. Ma i n Ba t h r o o m 13' 7 1/16" DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 3' 11" 1'2"9'10" 7' 10" 2' 0" 5' 10" 6" 5'0"2' 6" 6" 5' 0" 8' 0"5' 6" 13' 6" 2"2' 0" Down Bedroom #2 Bedroom #3 Main Bathroom All Exterior walls furred out with 2" x 2" Do Not Scale off this plan Attic Storage HeatedAttic Storage Uncondtioned Attic Storage Uncondtioned Attic Storage Uncondtioned Attic Storage Uncondtioned N A 4 Second Floor Layout Light Blue = Existing Walls Green + New Walls EGRESS BEDROOM WINDOWS The bottom of the egress window opening can't exceed 44" from the finished floor. The minimum opening area of the egress window is 5.7 square feet. The minimum egress window opening height is 24" high. The minimum egress window opening is 20" wide. Windows within 5' of Bathroom floor to be tempered. Toilet space to be 30" minimum at finish stage. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 Kitchen Main Badroom Breakfast Nook Sun Room Main Bathroom Stacked Washer & Dryer Front Foyer Dining Room Living Room 2nd Fl HVAC Chase Down to Basement Up to second floor Front Door Back Door Garden Level steps to basement Laundry Room A 5 EGRESS BEDROOM WINDOWS The bottom of the egress window opening can't exceed 44" from the finished floor. The minimum opening area of the egress window is 5.7 square feet. The minimum egress window opening height is 24" high. The minimum egress window opening is 20" wide. Toilet space to be minimum of 30" between tub and vanity. Smoke detectors required in all bedrooms. CO detectors required outside of all sleeping rooms. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 HVAC Chase to second floor N Do Not Scale off this plan Red shows the new floor joist framing First Floor - Floor Joist Repairs Back Porch A 6 DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 A 7 All Turquoise components are new walls or framing dteails. Do Not Scale off this plan 1st Floor Isometric DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 All Turquoise components are new walls or framing dteails. Label text Do Not Scale off this plan A 8 2ndt Floor Isometric DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 A 9 All Turquoise components are new floor systems, walls or framing details. Such as the conceal space above the new Structural Drop Ceilings See Page A-12 for section details First Floor - Structural Drop ceiling - Knee wall and Fire Blocking Red areas show the 5/8" Type X Sheetrock for fire blocking. 2" x 4" Knee wall to transfer existing 2nd Fl, floor joist to the new Structural Drop Ceiling. R302.11Fireblocking In combustible construction, fireblocking shall be provided to cut off both vertical and horizontal concealed draft openings and to form an effective fire barrier between stories, and between a top story and the roof space. Fireblocking shall be provided in wood-framed construction in the following locations: 1.In concealed spaces of stud walls and partitions, including furred spaces and parallel rows of studs or staggered studs, as follows: 1.1.Vertically at the ceiling and floor levels. 1.2.Horizontally at intervals not exceeding 10 feet (3048 mm). 2.At interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings. 3.In concealed spaces between stair stringers at the top and bottom of the run. Enclosed spaces under stairs shall comply with Section R302.7. 4.At openings around vents, pipes, ducts, cables and wires at ceiling and floor level, with an approved material to resist the free passage of flame and products of combustion. The material filling this annular space shall not be required to meet the ASTM E136 requirements. 5.For the fireblocking of chimneys and fireplaces, see Section R1003.19. 6.Fireblocking of cornices of a two-family dwelling is required at the line of dwelling unit separation. R302.12 Draftstopping. In combustible construction where there is usable space both above and below the concealed space of a floor-ceiling assembly, draftstops shall be installed so that the area of the concealed space does not exceed 1,000 square feet (92.9 m2). Draftstopping shall divide the concealed space into approximately equal areas. Where the assembly is enclosed by a floor membrane above and a ceiling membrane below, draftstopping shall be provided in floor-ceiling assemblies under the following circumstances: 1. Ceiling is suspended under the floor framing. 2. Floor framing is constructed of truss-type open-web or perforated members. Floor cavities can be up to 1000 square feet. A single draft stop that reduces the concealed space in the floor system to two spaces, each no Larger than 1000 sq ft is adequate. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 3 - 11 7/8" LVL 2- 11 7/8" LVL 2 - 11 7/8" 2" x 6" Ledger 2" x 6" Ledger Do Not Scale off this plan HVAC Chase to second floor N A 10 11-7/8" IJ Second Floor - New Structural Floor Surpport Light Blue = Existing Walls Green = New Walls Wall insulation to be R-21 minimum in 2X6 walls and R-15 minimum in 2X4 walls. Attic insulation shall be R-60. Existing rafters to be insulated to the greatest extent possible and new rafters to be insulated to R-38. Windows to be U=.30 or lower. Floors over unheated space, R-30. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 Notes New First Floor structural Ceiling to support the existing under sized and over spanned 2" x 6" DF 2nd Fl - Floor joist. I-Joist 16" ).C 2" x 4" Knee wall to transfer the existing 2" x 6" DF floor joist (Not Shown) loads to the new I-Joist system. Isometric View 2nd Fl, Floor Joist Purple shows the area dedicated for the 2nd Floor cold air return chase. Do Not Scale off this plan A 11 All Turquoise components are new walls or framing details. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 New 9-1/2" I-Joist New 3 - 11"7/8" LVL New 2" x 6" DF New 2" x 12" DF Ledger New 2" x 12" DF Ledger New 2" x 4" Knee wall New 2" x 4" Knee wall New 11 7/8" I-Joist New 3/4" CDX Plywood glued and nailed with 8d ring shank nails over existing 1" x 6" DF floor sheathing Exsiting 2" x 8" DF Joist 16" O.C. Existing 2" x 4" DF studs New 1/2" bolts with washer and nuts 16" O.C. New surpport post Soild block floor joist bays to transfer load to the foundation Existing 2" x 8" DF Joist 16" O.C. Soild blocking as needed Existing 2" x 6" Mud sill Existing 2" x 8" DF Joist 16" O.C. 9A scale: Not to Scale 9B scale: Not to scale DINING ROOM BAY WINDOW ALCOVE 2nd Fl - Existing Floor joist structural Support System Do Not Scale off this plan HVAC Trunkline run area for the 2nd Floor HVAC Trunkline area for the 2nd Floor HVAC Trunkline run area for the 1st Floor New 2" x 4" Knee wall Existing 2nd Fl 2" x 6" DF floor joist Existing 2nd Fl 2" x 6" DF floor joist Existing 2nd Fl 2" x 6" DF floor joist Existing 2nd Fl 2" x 6" DF floor joist Existing 6" x 12" Solid Wood Beam Existing 6" x 12" Solid Wood Beam Basement Area Basement Area Basement Area Basement Area A 12 STRUCTURAL FLOOR SECTION DETAILS 9'-0" Finished ceiling hieght I-joists are listed as 9 1/2" in some places and 11 7/8" in others. 9 1/2" TJI 110 meets the minimum requirements for supporting the floor load. Fasten ledger with two ledgerlok screws per stud/16" on center or two 1/2" lag screws or bolts per stud/16" OC. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 A 13 Existing Stone Foundation Existing concrete Foundation Existing Framing (Green) #4 Rebar 16" O.C. #4 Rebar Grid 16" O.C. Existing Basement concrete slab 8" Finished Grade 6" Min 18" min 9-1/2" I-Joist 3/4" T&G CDX Plywood Sheathing 2" x 6" PT Mudsill 2 " x 6" DF Framing 16" O.C with 2" x 6" DF Bottom & Double Top Plates. Existing 2" x 4" Wall Framing Support the existing wall, ceiling joists and roof system, with temporary post, beams and bracing as needed for support, while the existing undersized and rotted floor joist system can be removed and new a new Monolithic slab is poured The existing floor system has 1" x 6" DF diagonal sheathing. This will be overlaid with mew 3/4" T&G CDX Plywood Sheathing. Align the new floor system so it matches the existing floor system. Backyard Garden entrance. Ledger Bolt Placement Galvanized 1/2" bolts Through-Bolts shall be placed 2 inches (51 mm) in from the bottom or top of the deck ledger and between 2 and 5 inches (51 and 127 mm) in from the ends. The lag screws or bolts shall be staggered from the top to the bottom along the horizontal run of the 2" x 12" DF ledger. Double fasteners will be placed at the leger ends and butt joints. 9/16" Clearance holes to be used for all 1/2" bolts. Monolithic Slab 4" thick (3500 PSI concrete) Monolithic slab with a 8" wide turn down stem, 8" deep below finished grade with 6 " min above grade. All rebar to be #4 Rebar. Rebar Mat is to be 16" O.C. Knee wall Sheathing to be Smooth Fiber Cement Panel Siding Breakfast Nook & Sunroom 1/2 in. x 8 in. Hot-Galvanized Anchor Bolt. Spaced 32" O.C. Each plate section shall have no more than 8" spacing from the ends. 12" minimum width at footing. Conditioned portion of basement is required to have R-21 insulated wall. Bolt spacing not to be greater than 24" on center. DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 Do Not Scale off this plan Kitchen lighting layout TBD Sunroom lighting layout TBD Meter / Disconnect Motion Sensor lighting Kitchen Cabinet layout design pending A 14 Electrical Layout - First Floor DOROTICH PROJECTJanuary 20, 2025 815 6th St, Anacortes, WA 98221-1714 A 15 Roof design will not change. All roofing will be removed Sheathing inspected for damage New Roofing will be installed Existing Brick Chimney will be completly removed Do Not Scale off this plan ROOF