Loading...
HomeMy WebLinkAboutPermit File BLD-2024-0184 3951 Rock Ridge ParkwayFIXTURES Qty Plumbing Fixtures PARCEL: P134319 LEGAL DESCRIPTION: APPLICANT: ANDERSON, JOHN 5780 WILLOW SPRINGS WAY Ferndale, WA 98248 360-815-2350 OWNER: Gurvir Khunkhun 2213 Berryman Loop Lynden, WA 98264 VALUATIONS: Entered valuation 446492.00 $446,492.00 $446,492.00Total: FEES:Paid Due Storm Drain GFC - MF Residential $2,826.99 $0.00 Fire Impact Fee Fire Portion $123.81 $0.00 Storm Water Review Sq Ft $396.00 $0.00 SFR or duplex site plan review $60.00 $0.00 State Building Code Council fee $6.50 $0.00 Plan Application Fee $200.00 $0.00 Building Permit Fee $2,936.95 $0.00 SFR TRANSPORTATION IMPACT FEE $3,400.68 $0.00 Sewer Inspection Fee $60.51 $0.00 Park Impact Fee SFR $1,644.37 $0.00 Mechanical and plumbing remodel fixtures fees $233.45 $0.00 Plan Review Fee $2,065.54 $0.00 Fire Impact Fee EMS Portion $438.93 $0.00 SFR SEWER GFC $11,349.00 $0.00 $0.00Totals : CONSTRUCTION CONTRACTOR:MT BAKER VIEW BUILDERS LLC 2213 BERRYMAN LOOP LYNDEN, WA 98264 3607469017 License: MTBAKBV782DH Expires: 03/15/2026 $25,742.73 BLD-2024-0184 RESIDENTIAL SINGLE FAMILY BUILDING ISSUED: EXPIRES: 12/05/2024 12/05/2026 PROJECT NAME: LOT 8 ROCK RIDGE SITE ADDRESS: 3951 ROCK RIDGE PARKWAY ANACORTES Page 1 of 2Printed by : Cheri Gleichmann on: 12/23/2024 12:44 PM City of Anacortes, WA 904 6th Street Anacortes, WA 98221 (360) 293-1901 http://cityofanacortes.org/ Qty Mechanical Fixtures 1 Electric Water Heater 1 Air Conditioner / Handler 1 Clothes Dryer and Duct 1 Fireplace 1 Range Hood 1 Refrigeration Unit 1 Stove/Range/Oven 1 Heat Pump 2 Gas Piping/ Outlet(s) for first 4 4 Exhaust Fans For inspections, please call (360) 293-1901 REQUIRED INSPECTIONS Initial BMP's Sewer Line Storm Drain Connection Footings Perimeter Drains Foundation Wall STORMWATER BMPS 1ST MID PROJECT INSPECTION Underfloor Underground Plumbing Underslab Mechanical Rough-In Gas Piping Plumbing Rough-In Shear Wall and Nailing Framing STORMWATER BMPS 2ND MID PROJECT INSPECTION Insulation Drywall or Lath Roofing Final Cross Connection or backflow assembly verified Fenestration U-Factors Permeable Soil Depth CURB FORM INSPECTION CURB FINAL INSPECTION Public Works Final Building Final Stormwater Final Page 2 of 2Printed by : Cheri Gleichmann on: 12/23/2024 12:44 PM City of Anacortes, WA RESIDENTIAL SINGLE FAMILY BUILDING BLD-2024-0184 CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 PLAN INDEX PG A-1 SITE PLAN AND ANALYSIS PG A-2 SWPPP NARRATIVE PG A-3 GENERAL NOTES - SWPPP DETAILS - ENERGY PG A-4 ELEVATIONS PG A-5 ELEVATIONS PG A-6 FOUNDATION PG A-7 FLOOR FRAMING PG A-8 FLOORPLANS PG A-9 ROOF FRAMING PG A-10 SECTIONS PG L-1 LANDSCAPING PLAN S1.0 - 3.0ENGINEERING N 1,8 4 1 S .F . S F R 5 2 1 S .F G A R A G E / M E C H . 2 0 7 S .F . C O N R E T E P A TI O >1 8 " A V G A B O V E G R A D E 2 3 4 S .F . C O N R E T E P A TI O >1 8 " A V G A B O V E G R A D E 4 5 S .F . C O V E R E D P O R C H 3 1'- 4 " 3 1'- 3 1 / 2 " 3 6 '- 8 " 2 4 '- 5 " 4 5 '- 6 " 2 1'- 8 3 / 1 6 " 9'-6 " 6 3 '-5 5 /1 6 " 6 '-2 5 /1 6 " 8 ' 1 9 ' 5 ' 1 0 ' 2 4 ' 8 '-6 " 6 '-1 1 /2 " S S 4 2 0 4 2 1 4 2 2 417 426 428 427 4 2 5 4 2 4 4 2 9 4 3 0 4 3 1 4 3 2 4 3 3 4 3 4 L O T 8 T R A C T "I" 4 2 9 4 2 5 4 2 0 8 0.4 3' N 4 3 ° 2 6' 4 5 "E 9 9 .1 1' S 3 6 ° 1 4 ' 2 0 " E 3 1.2 6' R =3 0 0 ' 4 8 .2 2' S 4 9 ° 5 1' 5 3 "W 9 1 . 7 3 '' N 3 6 ° 1 4 ' 2 0 " W SITE PLAN SCALE: 1" = 10'-0" 418 419 4 2 1 4 2 2 4 2 4 4 2 3 4 2 6 4 2 74 2 8 4 3 0 10' HEIGHT RESTRICTION - NPS MEASURED AT PROPERTY CORNER P W R WSTORM W A T E R T N A T U R A L G A S STEP G U T T E R D R A I N S T O R M E N G I N E E R E D 5 ' R E T A I N I N G W A L L S T E R R A C E D ENGINEERED 4'-5' RETAINING WALLS 2 0' S E T B A C K 5 ' S E T B A C K 5 ' S E T B A C K 2 0' S E T B A C K LOT 9 OWNED BY THE SAME BUILDER SPOILS STEP DN S I L T F E N C E SIL T F E N C E ROOF AREA = 2,624 S.F. FOOTPRINT = 2,407 S.F. TOTAL EAVES = 217 S.F. SITE ANALYSIS LOT 8, ROCK RIDGE, PHASE 5 PARCEL# 134319 LOT SIZE 7,503 S.F. BUILDING COVER S.F. RESIDENCE GARAGE COV. PORCHES 1,841 S.F. 521 S.F. 45 S.F. 2,624 S.F. HARD SURFACES DRIVEWAY SIDEWALKS 826 S.F. 177 S.F. 1,830 S.F.24.4 % EXCAVATION FOUNDATION 2624 x 1.5' 145 YARDS TRENCHING 100' x 2' 20 YARDS FLATWORK 1,463 x 1' 55 YARDS CLEAN FILL FOOTINGS 35 YARDS 220 YARDS 255 YARDS 475 YARDSTOTAL YARDS LEGAL: PARCEL#: P134319 217 S.F.EAVES GARAGE 35 YARDS FLATWORK 30 YARDS PORCH 5 YARDS 34.97 % LOT 8, ROCK RIDGE, PHASE 5 3951 ROCK RIDGE PARKWAY, ANACORTES, WA PARCEL# 134319 3 9 5 1 R O C K STAMPED SLATE FINISH CONCRETE DRIVEWAY 826 S.F. S I D E W A L K 1 0 0 S .F . RETAINING 386 S.F. 150 YARDSTOP SOIL FILL 4' RETAINING WALL 425.25' MAIN FINISHED FLOOR 4 2 2 .2 5' GAR A GE T.O .S. R I D G E P A R K W A Y U P P E R F L O O R L I N E C O N S T R U C TI O N E N T R A N C E SEWER 1 0' D R AIN A G E /U TILITIE S E A S E M E N T 1 0 ' U TI LITIE S E A S E M E N T PATIOS >18"441 S.F. T R A C T "I" 426' 421'419' 426' AVG GRADE CALCULATIONS GRADE @ NW WALL CENTER = 421.00' GRADE @ NE WALL CENTER = 419.00' GRADE @ SW WALL CENTER = 426.00' GRADE @ SE WALL CENTER = 426.00' AVG GRADE = 422.25' L A N D S C A P E E A S E M E N T I N F A V O R O F L O T 7 T E R R A C E D R E T A I N I N G W A L L S TERRACED RETAINING WALLS AS PER CITY OF ANACORTES STANDARDSAMC19.66.080, NOT TO EXCEED A HEIGHTOF 5-FEET. Pacific Dogwood SPECIFICATIONS CODE INFORMATION 2018 INTERNATIONAL RESIDENTIAL CODE 2018 WA STATE ENERGY CODE S.F.R. BEDROOMS 3 BATHROOMS 2.5 MAIN FLOOR 1,841 S.F. UPPER FLOOR 613 S.F. TOTAL LIVING AREA 2,454 S.F. GARAGE (UNHEATED) 541 S.F. COVERED PORCH/DECK 45 S.F. DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-1 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 SITE PLAN *SEE SWPPP NOTES PG A-2 AND A-3 NEW REVISED PLAN AUG 27, 2024 Energy Credits on page 3 Upper Floor 613 S.F. Approved plans required on site at time of inspection (R106.3.1) Manufacturer’s specifications shall be available on the job site at the time of inspection (R106.1.2) Truss design drawings must be on site at time of framing inspection (R502.11.4) CITY OF ANACORTES PLANNING AND BUILDING DEPT: APPROVED PLANS REVIEWED FOR CODE COMPLIANCE PERMIT#___________________________ ADDRESS___________________________ SIGNATURE DATE PLANNING APPROVED_____________________________ BUILDING APPROVED______________________________ ENGINEERING ACCEPTED__________________________ STORMWATER ACCEPTED__________________________ Stamp not valid unless signed BLD-2024-0184 3951 Rock Ridge Pkwy 09/03/2024 BUILDING FOOTPRINT 2,407 S.F. 4,237 S.F.56.5% Eaves are not shown to exceed 3-feet thus roof overhang is not included in lot coverage calculations. 2,407 S.F.32% Rear 10' PRIVATE drainage easement is for the benefit of lots 8 through 11 (per the recorded plant map AF# 201807270027). It is the responsibility of the property owner to ensure the proposed structural improvements located within this private easement do not conflict with the legal rights granted to Lots 9, 10 & 11 over and upon this area of land. Per the recorded plat map: The front 10-foot PUBLIC utility easement is reserved for and conveyed to the City of Anacortes, Puget Sound Energy, Frontier Communications, Cascade Natural Gas, and Comcast Cable and their respective successors in which to construct, operate, maintain, repair, replace and enlarge underground pipes, conduits, cables and wires all necessary or convenient underground or ground mounted appurtenances thereto for the purpose of serving this subdivision and other property with electric, gas, telephone and other utility service, together with the right to enter upon the streets, lots, tracts and spaces at all times for the purposes stated on the recorded plat map. It is at the owner's sole risk and expense to locate any structures within this easement. By locating structures (i.e. retaining walls/rockeries) within this easement the owner(s) acknowledge they may be responsible for the removal and replacement of these improvements, and the associated costs, if it is deemed necessary by any of the above entities for any of the above reasons. Maximum height per AMC (35') = 457.25' H E AT PUMP 4 6 ' - 1 / 2 " 20'-7" 3 1 ' - 6 " UPPE R F L O O R B A L C O N Y Per foundation plan dimension is 31'-6", not 31'-3 1/2".6" 23'-7 3 / 4 " 9'-6" 6'-1 1 / 2 " 5'-2" 5'-5 1 / 2 " PROPERTY CORNERS MUST BE STAKED BY A SURVEYOR PRIOR TO CONSTRUCTION OF RETAINING WALLS TO ENSURE STRUCTURES DO NOT EXTEND BEYOND LOT PERIMETERS. Proposed Building Width = 63'-6" Proposed NE Setback = 6'-1 1/2" Proposed SW Setback = 9'-6" Building width + side setbacks = 79'-1 1/2" Lot Width = 79'-1 1/2"12/04/2024 Aaron Esterholt Logan Lee 9/12/2024 8/30/2024 521 S.F. CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 GENERAL CONSTRUCTION STORM WATER POLLUTION PREVENTION NARRATIVE ELEMENT 1 - PRESERVE VEGETATION/MARK CLEARING LIMITS PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES, INCLUDING CLEARING AND GRADING, ALL CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND TREES THAT ARE TO BE PRESERVED WITHIN THE CONSTRUCTION AREA SHOULD BE CLEARLY MARKED, BOTHIN THE FIELD AND ON THE PLANS, TO PREVENT DAMAGE AND OFF SITE IMPACTS. PLASTIC, METAL, OR STAKE WIRE FENCING MAY BE USED TO MARK THE CLEARING LIMITS. RETAIN THE DUFF LAYER, NATIVE TOP SOIL, AND NATURAL VEGETATION IN AN UNDISTURBED STATE TO THE MAXIMUM DEGREE PRACTICABLE. ELEMENT 2 - ESTABLISH CONSTRUCTION ACCESS (A) CONSTRUCTION VEHICLE ACCESS SHALL BE LIMITED TO ONE ROUTE IF POSSIBLE. (B) ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALL OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. (C) WHEEL WASH OR TIRE BATHS SHOULD BE LOCATED ON SITE, IF APPLICABLE. (D) PUBLIC ROADS SHALL AT A MINIMUM BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR PICKUP SWEEPING AND SHALL BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING WILL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. (E) STREET WASH WASTEWATER SHALL BE CONTROLLED BY PUMPING BACK ON SITE, OR OTHERWISE BE PREVENTED FROM DISCHARGING INTO SYSTEMS TRIBUTARY TO STATE SURFACE WATERS. (F) CONTROL STREET WASH WASTEWATER BY PUMPING BACK ON SITE, OR OTHERWISE PREVENTIT FROM DISCHARGING IN SYSTEMS TRIBUTARY TO WATERS OF THE STATE. ELEMENT 3 - CONTROL FLOW RATES (A) PROTECT PROPERTIES AND WATERWAYS DOWNSTREAM OF DEVELOPMENT SITES FROM EROSION AND THE ASSOCIATED DISCHARGE OF TURBID WATERS DUE TO INCREASES IN THE VELOCITY AND PEAK VOLUMETRIC FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. (B) PROPERTIES SUBJECT TO MINIMUM REQUIREMENT No. 5 AND/OR No. 7 SHALL IMPLEMENT CONTROLS AS EARLY IN THE DEVELOPMENT AS IS PRACTICABLE TO MITIGATE FOR FLOW RATES. (C) WHERE NECESSARY TO COMPLY WITH REQUIREMENT No. 7, STORM WATER RETENSION/ DETENSION FACILITIES SHALL BE CONSTRUCTED AS ONE OF THE FIRST STEPS IN GRADING. DETENSION FACILITES SHALL BE FUNCTIONAL PRIOR TO CONSTRUCTION OF SITE IMPROVEMENTS (e.g. IMPERVIOUS SURFACES).(D) IF PERMANENT INFILTRATION PONDS ARE USED FOR FLOW CONTROL DURING CONSTRUCTION, THESE FACILITES SHOULD BE PROTECTED FROM SILTATION DURING THE CONSTRUCTION PHASE. ELEMENT 4 - INSTALL SEDIMENT CONTROLS (A) DESIGN, INSTALL, AND MAINTAIN EFFECTIVE EROSION CONTROLS AND SEDIMENT CONTROLS TO MINIMIZE THE DISCHARGE OF POLLUTANTS. (B) CONSTRUCT SEDIMENT CONTROL BMP's (SEDIMENT PONDS, TRAPS, FILTERS, ETC.) AS ONE OF THE FIRST STEPS IN GRADING. THESE BMP's SHALL BE FUNCTIONAL BEFORE OTHER LAND DISTURBING ACTIVITIES TAKE PLACE. (C) MINIMIZE SEDIMENT DISCHARGES FROM THE SITE. THE DESIGN, INSTALLATION AND MAINTAINANCE OF EROSION AND SEDIMENT CONTROLS MUST ADDRESS FACTORS SUCH AS THE AMOUNT, FREQUENCY, INTENSITY AND DURATION OF PRECIPITATION, THE NATURE OF RESULTING STORM WATER RUNOFF, AND SOIL CHARACTERISTICS, INCLUDING THE RANGE OF SOIL PARTICLE SIZES EXOERCTED TO BE PRESENT ON THE SITE. (D) DIRECT STORM WATER RUNOFF FROM DISTURBED AREAS THROULD A SEDIMENT POND OR OTHER APPROPRIATE SEDIMENT REMOVAL BMP, BEFORE THE RUNOFF LEAVES A CONSTRUCTION SITE OR BEFORE DISCHARGE TO AN INFILTRATION FACILITY. RUNOFF FROM FULLY STABILIZED AREAS MAY BE DISCHARGED WITHOUT A SEDIMENT REMOVAL BMP, BUT MUST MEET THE FLOW CONTROL PERFORMANCE STANDARD IN SUB-SECTION (F) (2) (e)(iii) (A) OF THIS SECTION. (E) LOCATE BMP's INTENDED TO TRAP SEDIMENT ON SITE IN A MANNER TO AVOID INTERFERENCE WITH THE MOVEMENT OF JUVENILE SALMONIDS ATTEMPTING TO ENTER OFF- CHANNEL AREAS OR DRAINAGES. (F) WHERE FEASIBLE, DESIGN OUTLET STRUCTURES THAT WITHDRAW IMPOUNDED STORM WATER FROM THE SURFACE TO AVOID DISCHARGING SEDIMENT THAT IS STILL SUSPENDED LOWER IN THE WATER COLUMN. ELEMENT 5 - STABILIZE SOILS (A) ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY APPLICATION OF EFFECTIVE BMP's THAT PROTECT THE SOIL FROM THE EROSIVE FORCES OF RAINDROP IMPACT AND FLOWING WATER, AND WIND EROSION. APPLICABLE BMP's INCLUDE, BUT ARE NOT LIMITED TO: TEMPORARY AND PERMANENT SEEDING, SODDING, MULCHING, PLASTIC COVERING, EROSION CONTROL FABRICS AND MATTING, SOIL APPLICATION POLYACRYLAMIDE (PAM), THE EARLY APPLICATION OF GRAVEL BASE EARLY ON AREAS TO BE PAVED, AND DUST CONTROL. (B) CONTROL STORMWATER VOLUME AND VELOCITY WITHIN THE SITE TO MINIMIZE SOIL EROSION. (C) CONTROL STORM WATER DISCHARGES, INCLUDING BOTH PEAK FLOW RATES AND TOTAL STORM WATER VOLUME, TO MINIMIZE EROSION AT OUTLETS AND TO MINIMIZE DOWNSTREAM CHANNEL AND STREAM BANK EROSION. (D) FROM OCTOBER 1 THROUGH APRIL 30 OF EACH YEAR, NO SOILS SHALL REMAIN EXPOSED AND UNWORKED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPTEMBER 30 OF EACH YEAR, NO SOILS SHALL REMAIN EXPOSED AND UNWORKED FOR MORE THAN 7 DAYS. THIS CONDITION APPLIES TO ALL SOILS ON SITE, WHETHER AT FINAL GRADE OR NOT. (E) STABILIZE SOILS AT THE END OF THE SHIFT BEFORE A HOLIDAY OR WEEKEND IF NEEDED BASED ON THE WEATHER FORECAST. (F) MINIMIZE THE AMOUNT OF SOIL EXPOSED DURING CONSTRUCTION ACTIVITY. (G) MINIMIZE THE DISTURBANCE OF STEEP SLOPES. (H) MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOP SOIL.(I) APPLICABLE PRACTICES INCLUDE, BUT ARE NOT LIMITED TO, TEMPORARY AND PERMANENT SEEDING, SODDING, MULCHING, PLASTIC COVERING, SOIL APPLICATION OF POLYACRYLAMIDE (PAM), EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED, AND DUST CONTROL. (J) SOIL STABILZATION MEASURES SELECTED SHOULD BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS, ESTIMATED DURATION OF USE, AND POTENTIAL WATER QUALITY IMPACTS THATSTABILIZATION AGENTS MAY HAVE ON DOWNSTREAM WATERS OR GROUND WATER. (K) SOIL STOCKPILES MUST BE STABILIZED AND PROTECTED WITH SEDIMENT TRAPPING MEASURES AND, WHERE POSSIBLE, LOCATE AWAY FROM STORM DRAIN INLETS, WATERWAYS AND DRAINAGE CHANNELS. (L) WORK ON LINEAR CONSTRUCTION SITES AND ACTIVITIES, INCLUDING RIGHT-OF-WAY AND EASEMENT CLEARING, ROADWAY DEVELOPMENT, PIPELINES, AND TRENCHING FOR UTILITIES, SHALL NOT EXCEED THE CAPABILITY OF THE INDIVIDUAL CONTRACTOR FOR HIS PORTION OF THE PROJECT TO INSTALL THE BEDDING MATERIALS, ROADBEDS, STRUCTURES, PIPELINES, AND/OR UTILITIES, AND TO RE STABILIZE THE DISTURBED SOILS, MEETING THE TIMING CONDITIONS LISTED ABOVE. (M) IN ADDITION, AT THE DISCRETION OF THE PUBLIC WORKS DIRECTOR, THOSE SITES UNABLE TO MAINTAIN THE QUALITY OF THEIR STORM WATER DISCHARGE MAY BE REQUIRED TO PROVIDE SOIL STABILIZATION TO ALL EXPOSED SOIL AREAS REGARDLESS OF THE WORKING STATUS OF THE AREA. UPON WRITTEN NOTIFICATION, THE PROPERTY OWNER SHALL PROVIDE FULL STABILIZATION OF ALL EXPOSED SOIL AREAS WITHIN 24 HOURS. ELEMENT 6 - PROTECT SLOPES (A) CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. APPLICABLE PRACTICES INCLUDE, BUT ARE NOT LIMITED TO, REDUCING CONTINUOUS LENGTH OF SLOPE WITH TERRACING AND DIVERSIONS, REDUCING SLOPE STEEPNESS, AND ROUGHENING SLOPE SURFACES (FOR EXAMPLE TRACK WALKING). (B) CONSIDER SOIL TYPE AND ITS POTENTIAL FOR EROSION. (C) REDUCE SLOPE RUNOFF VELOCITIES BY REDUCING THE CONTINUOUS LENGTH OF SLOPE WITH TERRACING AND DIVERSIONS, REDUCE SLOPE STEEPNESS, AND ROUGHEN SLOPE SURFACE. (D) DIVERT UPSLOPE DRAINAGE AND RUN-ON WATERS FROM OFF-SITE WITH INTERSCEPTORS AT TOP OF SLOPE. OFF-SITE STORM WATER SHOULD BE HANDLED SEPARATELY FROM STORM WATER GENERATED ON THE SITE. DIVERSION OF OFF-SITE STORM WATER AROUND THE SITE MAY BE A VIABLE OPTION. DIVERTED FLOWS SHALL BE REDIRECTED TO THE NATURAL DRAINAGE LOCATION AT OR BEFORE THE PROPERTY BOUNDARY. (E) CONTAIN DOWNSLOPE COLLECTED FLOWS IN PIPES, SLOPE DRAINS, OR PROTECTED CHANNELS TO PREVENT EROSION. TEMPORARY PIPE SLOPE DRAINS MUST HANDLE THE PEAK VOLUMETRIC FLOW RATE CALCULATED USING A 10 MINUTE TIME STEP FROM A TYPE 1A, 10 YEAR, 24 HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. ALTERNATELY, THE 10 YEAR 1 HOUR FLOW RATE PREDICTED BY AN APPROVED CONTINUOUS RUNOFF MODEL, INCREASED BY A FACTOR OF 1.6, MAY BE USED. THE HYDROLOGIC ANALYSIS MUST USE THE EXISTING LAND COVER CONDITION FOR PREDICTING FLOW RATES FROM TRIBUTARY AREAS OUTSIDE THE PROJECT LIMITS. FOR TRIBUTARY AREAS ON THE PROJECT SITE, THE ANALYSIS MUST USE THE TEMPORARY OR PERMANENT PROJECT LAND COVER CONDITION, WHICHEVER WILL PRODUCE THE HIGHEST FLOW RATES. IF USING THE WESTERN WASHINGTON HYDROLOGY MODEL TO PREDICT FLOWS, BARE SOIL AREAS SHOULD BE MODELED AS "LANDSCAPED AREA". (F) PROVIDE DRAINAGE TO REMOVE GROUND WATER INTERSECTING THE SLOPE SURFACE OF EXPOSED SOILS AREAS. (G) EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS. (H) CHECK DAMS SHALL BE PLACED AT REGULAR INTERVALS WITHIN TRENCHES THAT ARE CUT DOWN A SLOPE. (I) STABILIZE SOILS ON SLOPES, AS SPECIFIES IN ELEMENT No. 5. ELEMENT 7 - PROTECT DRAIN INLETS (A) ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR TREATED TO REMOVE SEDIMENT. (B) ALL APPROACH ROADS SHALL BE KEPT CLEAN, AND ALL SEDIMENT AND STREET WASH WATER SHALL NOT BE ALLOWED TO ENTER STORM DRAINS WITHOUT PRIOR AND ADEQUATE TREATMENT UNLESS TREATMENT IS PROVIDED BEFORE THE STORM DRAIN DISCHARGES TO WATERS OF THE STATE. ELEMENT 8 - STABILIZE CHANNELS AND OUTLETS (A) ALL TEMPORARY ON-SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM EXPECTED PEAK FLOWS. CHANNELS MUSTHANDLE THE PEAK VOLUMETRIC FLOW RATE CALCULATED USING A 10 MINUTE TIME STEP FROM A TYPE. 1A, TEN YEAR, 24 HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. ALTERNATIVELY, THE 10 YEAR, 1 HOUR FLOW RATE INDICATED BY AN APPROVED CONTINUOUS RUNOFF MODEL, INCREASED BY A FACTOR OF 1.6, MAY BE USED. THE HYDROLOGIC ANALYSIS MUST USE THE EXISTING LAND COVER CONDITION FOR PREDICTING FLOW RATES FROMTRIBUTARY AREAS OUTSIDE THE PROJECT LIMITS. FOR TRIBUTARY AREAS ON THE PROJECT SITE, THE ANALYSIS SHALL USE THE TEMPORARY OR PERMANENT PROJECT LAND COVER CONDITION, WHICHEVER WILL PRODUCE THE HIGHEST FLOW RATES. IF USING THE WESTERN WASHINGTON HYDROLOGY MODEL TO PREDICT FLOWS, BARE SOIL AREAS SHOULD BE MODELED AS "LANDSCAPED AREA".(B) STABILIZATION, INCLUDING ARMORING MATERIAL, ADEQUATE TO PREVENT EROSION OF OUTLETS AT, ADJACENT STREAM BANKS, SLOPES AND DOWSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. ELEMENT 9 - CONTROL POLLUTANTS (A) DESIGN, INSTALL, IMPLEMENT AND MAINTAIN EFFECTIVE POLLUTION PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS. (B) ALL POLLUTANTS, INCLUDING WASTE MATERIAL AND DEMOLITION DEBRIS, THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER.(C) COVER, CONTAINMENT, AND PROTECTION FROM VANDALISM SHALL BE PROVIDED FOR ALL CHEMICALS, LIQUID PRODUCTS, PETROLEUM PRODUCTS, AND NONINERT WASTES PRESENT ON THE SITE (SEE CHAPTER 173-304 W.A.C., AS CURRENTLY ENACTED OR HEREAFTER MODIFIED, FOR THE DEFINITION OF INERT WASTE, WHICH IS INCORPORATED HEREIN BY THIS REFERENCE). (D) MAINTENANCE AND REPAIR OF HEAVY EQUIPMENT AND VEHICLES INVOLVING OIL CHANGES,HYDROLIC SYSTEM DRAIN DOWN, SOLVENT AND DE-GREASING CLEANING OPERATIONS, FUEL TANK DRAIN DOWN AND REMOVAL, AND OTHER ACTIVITIES WHICH MAY RESULT IN DISCHARGE OR SPILLAGE OF POLLUTANTS TO THE GROUND OR INTO STORM WATER RUNOFF MUST BE CONDUCTED USING SPILL PREVENTION MEASURES, SUCH AS DRIP PANS. CONTAMINATED SURFACES SHALL BE CLEANED IMMEDIATELY FOLLOWING ANY DISCHARGE OR SPILL INCIDENT. EMERGENCY REPAIRS MAY BE PERFORMED ON SITE USING TEMPORARY PLASTIC PLACED BENEATH AND, IF RAINING, OVER THE VEHICLE. (E) WHEEL WASH OR TIRE BATH WASTE WATER, SHALL BE DISCHARGED TO A SEPARATE ON-SITE TREATMENT SYSTEM OR TO THE SANITARY SEWER. (F) APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING FERTILIZERS AND PESITICIDES, SHALL BE CONDUCTED IN A MANNER AND AT APPLICATION RATES THAT WILL NOT RESULT IN LOSS OF CHEMICAL TO STORM WATER RUNOFF. MANUFACTURERS' RECOMMENDTIONS SHALL BE FOLLOWED FOR APPLICATION RATES AND PROCEDURES. (G) MANAGEMENT OF PH-MODIFYING SOURCES SHALL PREVENT CONTAMINATION OF RUNOFF AND STORM WATER COLLECTED ON THE SITE. THESE SOURCES INCLUDE, BUT ARE NOT LIMITED TO, BULK CEMENT, CEMENT KILN DUST, FLY ASH, NEW CONCRETE WASHING AND CURING WATERS, WASTE STREAMS GENERATED FROM CONCRETE GRINDING AND SAWING, EXPOSED AGGREGATE PROCESSES, AND CONCRETE PUMPING AND MIXER WASHOUT WATERS. (H) ADJUST THE pH OF STORM WATER IF NECESSARY TO PREVENT VIOLATIONS OF WATER QUALITY STANDARDS. (I) ASSURE THAT WASHOUT OF CONCRETE TRUCKS IS PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASH OUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND OR INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS. DO NOT DUMP EXCESS CONCRETE ON SITE, EXCEPT IN DESIGNATED CONCRETE WASH OUT AREAS. CONCRETE SPILLAGE OR CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED. (J) OBTAIN WRITTEN APPROVAL FROM ECOLOGY BEFORE USING CHEMICAL TREATMENT OTHER THAN CO2 OR DRY ICE TO ADJUST pH. ELEMENT 10 - CONTROL DEWATERING (A) ALL FOUNDATION, VAULT, AND TRENCH DEWATERING WATER, WHICH HAVE SIMILAR CHARACTERISTICS TO STORM WATER RUNOFF AT THE SITE, SHALL BE DISCHARGED INTO A CONTROLLED CONVEYANCE SYSTEM, PRIOR TO DISCHARGE TO A SEDIMENT TRAP OR SEDIMENT POND. CHANNELS MUST BE STABILIZED, AS SPECIFIED IN ELEMENT No. 8. (B) CLEAN, NONTURBID DEWATERING WATER, SUCH AS WELL-POINT GROUND WATER, CAN BE DISCHARGED TO SYSTEMS TRIBUTARY TO STATE SURFACE WATERS, AS SPECIFIED IN ELEMENT No. 8, PROVIDED THE DEWATERING FLOW DOES NOT CAUSE EROSION OR FLOODING OF THE RECEIVING WATERS. THESE CLEAN WATERS SHOULD NOT BE ROUTED THROUGH SEDIMENT PONDS WITH STORM WATER. (C) HIGHLY TURBID OR OTHERWISE CANTAMINATED DEWATERING WATER, SUCH AS FROM CONSTRUCTION EQUIPMENT OPERATION, CLAM SHELL DIGGING, CONCRETE TREMIE POUR, OR WORK INSIDE A COFFERDAM, SHALL BE HANDLED SEPARTATELY FROM STORM WATER AT THE SITE. (D) OTHER DISPOSAL OPTIONS, DEPENDING ON SITE CONSTRAINTS, MAY INCLUDE, BY WAY OF EXAMPLE: (1) INFILTRATION, (2) TRANSPORT OFF-SITE IN VEHICLE, SUCH AS A VACUUM FLUSH TRUCK, FOR LEGAL DISPOSAL IN A MANNER THAT DOES NOT POLLUTE STATE WATERS, (3) ON- SITE TREATMENT USING ECOLOGY APPROVED CHEMICAL TREATMENT OR OTHER SUITABLE TREATMENT TECHNOLOGIES, (4) SANITARY OR COMBINED SEWER DISCHARGE WITH LOCAL SEWER DISTRICT APPROVAL, OR THERE IS NO OTHER OPTION, (5) USE OF A SEDIMENTATION BAG THAT DISCHARGES TO A DITCH OR SWALE FOR SMALL VOLUMES OF LOCALIZE DEWATERING. ELEMENT 11 - MAINTAIN BMPs (A) ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH BMPs. (B) SEDIMENT CONTROL BMPs SHALL BE INSPECTED WEEKLY OR AFTER A RUNOFF PRODUCING STORM EVENT DURING THE DRY SEASON AND DAILY DURING THE WET SEASON. ALL PROJECTS THAT DISTURB AN AREA GREATER THAN 1 ACRE SHALL HAVE A CERTIFIED EROSION CONTROL LEAD AVAILABLE TO THE SITE. THIS EROSION CONTROL LEAD SHALL BE RESPONSIBLE TO PROVIDE OVERVIEW OF ONGOING DAY TO DAY EROSION CONTROL REQUIREMENTS. THE EROSION CONTROL LEAD SHALL (WITHIN 24 HOURS) REPORT TO THE CITY AND DEPARTMENT OF ECOLOGY ANY SITE DISCHARGES THAT EXCEED STATE WATER QUALITY STANDARDS THAT HAVE OR ARE LIKELY TO HAVE ENTERED WATERS OF THE STATE. (C) ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPs SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPs ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL OF BMPs OR VEGETATION SHALL BE PERMANENTLY STABILIZED. ELEMENT 12 - MANAGE THE PROJECT (A) PHASING OF CONSTRUCTION. DEVELOPMENT PROJECTS SHALL BE PHASED WHERE FEASIBLE IN ORDER TO PREVENT, TO THE MAXIMUM EXTENT PRACTICABLE, THE TRANSPORT OF SEDIMENT FROM THE DEVELOPMENT SITE DURING CONSTRUCTION. RE-VEGETATION OF EXPOSED AREAS AND MAINTENANCE OF THAT VEGETATION SHALL BE AN INTEGRAL PART OF THE CLEARING ACTIVITIES FOR ANY PHASE. (B) WHEN ESTABLISHING THESE PERMITTED CLEARING AND GRADING AREAS, CONSIDERATION SHOULD BE GIVEN TO MINIMIZING REMOVAL OF EXISTING TREES AND MINIMIZING DISTURBANCE/ COMPACTION OF NATIVE SOILS EXCEPT AS NEEDED FOR BUILDING PURPOSES. PERMITTED CLEARING AND GRADING AREAS AND ANY OTHER AREAS REQUIRED TO PRESERVE CRITICAL OR SENSITIVE AREAS, BUFFERS, NATIVE GROWTH PROTECTION EASEMENTS, OR TREE RETENTION AREAS, SHALL BE DELINEATED ON THE SITE PLANS AND THE DEVELOPMENT SITE. (C) COORDINATION WITH UTILITIES AND OTHER CONTRACTORS. THE PRIMARY PROJECT PROPONENT SHALL EVALUTATE, WITH INPUT FROM UTILITIES AND OTHER CONTRACTORS, THE STORM WATER MANAGEMENT REQUIREMENTS FOR THE ENTIRE PROJECT, INCLUDING THE UTILITIES, WHEN PREPARING THE CONSTRUCTION SWPPP. (D) INSPECTION AND MONITORING. ALL BMPs SHALL BE INSPECTED, MAINTAINED, AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. (E) FOR ANY PROJECT DISTURBING MORE THAN 1 ACRE, A CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL SHALL BE IDENTIFIED IN THE CONSTRUCTION SWPPP AND SHALL BE ON SITE OR ON CALL AT ALL TIMES. CERTIFICATION MAY BE THROUGH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION/ASSOCIATED GENERAL CONTRACTORS (WSDOT/AGC) CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL CERTIFICATION PROGRAM OR ANY EQUIVILENT LOCAL OR NATIONAL CERTIFICATION AND/OR TRAINING PROGRAM, IN THE CITY'S DISCRETION. (F) WHENEVER INSPECTION AND/OR MONITORING REVEALS THAT THE BMPs IDENTIFIED IN THE CONSTRUCTION SWPPP ARE INADEQUATE, DUE TO THE ACTUAL DISCHARGE OF OR POTENTIAL TO DISCHARGE A SIGNIFICANT AMOUNT OF ANY POLLUTANT, THE SWPPP SHALL BE MODIFIED, AS APPROPRIATE, IN A TIMELY MANNER. (G) MAINTENANCE OF THE CONSTRUCTION SWPPP. THE CONSTRUCTION SWPPP SHALL BE RETAINED ON SITE. THE CONSTRUCTION SWPPP SHALL BE MODIFIED WHENEVER THERE IS A SIGNIFICANT CHANGE IN THE DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE OF ANY BMP. ELEMENT 13 - PROTECT LOW IMPACT DEVELOPMENT BMPs (A) PROTECT ALL BIORETENTION AND RAIN GARDEN BMPs FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPs ON PORTIONS OFTHE SITE THAT DRAIN INTO THE BIORETENTION AND/OR RAIN GARDEN BMPs. RESTORE THE BMPs TO THEIR FULLY FUNCTIONING CONDITION IF THEY ACCUMULATE SEDIMENT DURING CONSTRUCTION. RESTORING THE BMP MUST INCLUDE REMOVAL OF SEDIMENT AND ANY SEDIMENT-LADEN BIORETENTION/RAIN GARDEN SOILS, AND REPLACING THE REMOVED SOILS WITH SOILS MEETING THE DESIGN SPECIFICATION.(B) PREVENT COMPACTING BIORETENTION AND RAIN GARDEN BMPs BY EXCLUDING CONSTRUCTION EQUIPMENT AND FOOT TRAFFIC. PROTECT COMPLETED LAWN AND LANDSCAPED AREAS FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT. (C) CONTROL EROSION AND AVOID INTRODUCING SEDIMENT FROM SURROUNDING LAND USES ONTO PERMEABLE PAVEMENTS. DO NOT ALLOW MUDDY CONSTRUCTION EQUIPMENT ON THE BASE MATERIAL OR PAVEMENT. DO NOT ALLOW SEDIMENT-LADEN RUNOFF ONTO PERMEABLE PAVEMENTS OR BASE MATERIALS. (D) PAVEMENT FOULED WITH SEDIMENTS OR NO LONGER PASSING AN INITAL INFILTRATION TEST MUST BE CLEANED USING PROCEDURES IN ACCORDANCE WITH THE ECOLOGY MANUAL OR THE MANUFACTURERS PROCEDURES. (E) KEEP ALL HEAVY EQUIPMENT OFF EXISTING SOILS UNDER LID FACILITIES THAT HAVE BEEN EXCAVATED TO FINAL GRADE TO RETAIN THE INFILTRATION RATE OF THE SOILS. DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-2 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 SWPPP NARRATIVE AUG 27, 2024 CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 ENERGY NOTES: (FOR A PRESCRIPTIVE BUILDING ENVELOPE) 1. COMPLETELY FILL OUT WSEC PRESCRIPTIVE WORKSHEET. 2. ATTIC INSULATION TO BE R-49 EXCEPT w/RAISED HEEL TRUSS IT CAN BE R-38. (SEE TRUSS DETAIL) 3. ALL EXTERIOR CORNERS TO BE ADVANCED FRAMING CORNERS. (SEE DETAIL) 4. ALL DUCTWORK MUST BE IN A CONDITIONED SPACE OR DUCTS ARE TO BE SEALED, PRESSURE TESTED AND INSULATED w/R-8 INSULATION. 5. AS COMMON PRACTICE, ALL WALL PENETRATIONS MUST BE SEALED. 6. WHOLE HOUSE VENTILATION CAN BE ACCOMPLISHED THREE WAYS: A. MECHANICAL VENTING THROUGH HEATING EQUIPMENT B. MECHANICAL PORTS THROUGH EXTERIOR WALLS IN HABITABLE SPACES C. WHOLE HOUSE FAN w/ALL WINDOWS FRAMES CONTAINING VENTS. 7. (1) BLOWER DOOR TEST MUST BE PERFORMED: BEST TIME FOR THIS TEST WOULD BE AFTER SHEETROCK BUT BEFORE ATTIC INSULATION. THIS ALLOWS FOR ANY RE-SEALING TO BE DONE CONVENIENTLY. SET UP A PRELIMINARY TEST TO FIX ANY LEAKS BEFORE OFFICIAL INSPECTION TO AVOID ANY RE-INSPECTION FEES. 8. INSPECTION MUST BE PERFORMED BY A CERTIFIED 3RD PARTY WITH BUILDING OFFICIAL PRESENT. 9. SEE THE 2018 WSEC FOR ALL OTHER INFORMATION REGARDING HIGH EFFICIENCY BUILDING ENVELOPE. COMPLIANCE w/2018 ENERGY CODE (PER TABLE 406.2 W.S.E.C.) HEATING OPTION 2: HEAT PUMP 1 CREDIT ENERGY OPTIONS: 1.3 .28 U-VALUE ON VERTICAL FENESTRATIONS .5 CREDITS R-38 INSULATION IN FLOORS 2.1 REDUCE AIR LEAKAGE TO 3 CHANGES PER HOUR .5 CREDITS HIGH EFF. WHOLE HOUSE FANS MAX. 3.5 WATTS/CFM 3.2 AIR SOURCE, CENTRALLY DUCTED HEAT PUMP MIN HSPF 9.5 1 CREDIT 4.2 COMPONENTS OF SYSTEMS LOCATED IN CONDITIONED SPACE 1 CREDIT 5.5 TIER III HIGH EFF. WATER HEATING EQUIPMENT 2 CREDITS TOTAL CREDITS: 6 CREDITS 1. REINFORCING STEEL TO HAVE MINIMUM 2" COVERAGE - 3" COVERAGE IN FOOTING 2. ALL EDGES OF WELDED WIRE FABRIC AND REBAR TO HAVE MINIMUM 10" OVERLAP. 3. ALL CONCRETE SHALL DEVELOPE A MINIMUM COMPRESSIVE STRENGTH OF 2500 P.S.I. 4. ALL REINFORCING STEEL TO BE DEFORMED STEEL BARS CONFORMING TO ASTM A615 GRADE 40. ALL WELDED WIRE FABRIC TO CONFORM TO ASTM A185. FOUNDATION NOTES: GENERAL NOTES: THIS DRAWING PROVIDES CONSTRUCTION DETAILS FOR A NEW HOME ON LOT 8, ROCK RIDGE, 3951 ROCK RIDGE PARKWAY, ANACORTES, WA FOR MT. BAKER BUILDER, LLC. THIS DRAWING HAS BEEN PREPARED UNDER THE IRC 2018 CODES BY BLUEPRINT DESIGN CONSULTANTS AND NO STRUCTURAL MODIFICATIONS ARE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF BLUEPRINT DESIGN CONSULTANTS. CONTRACTOR TO VERIFY ALL BUILDING AND LOT DIMENSIONS, AND NOTIFY THE DESIGNER OF ANY DISCREPANSIES, DIMENSIONAL ERRORS AND OMMISSIONS PRIOR TO COMMENCING WITH WORK. CONTRACTOR TO VERIFY ALL STRUCTURAL DETAILS, BUILDING CODES AND GRADE REQUIREMENTS. HOMEOWNER WILL TAKE NECESSARY PRECAUTIONS TO REMOVE OR RELOCATE ITEMS OF VALUE TO BE SAVED AND/OR REUSED OR IN ANY DANGER OF BEING DAMAGED DURING CONSTRUCTION. TO THE BEST OF OUR KNOWLEDGE THESE DRAWINGS COMPLY WITH THE SPECIFICATIONS OF THE OWNER AND/OR BUILDER, AND ANY CHANGES MADE TO THEM AFTER THEIR COMPLETION ARE THE RESPONSIBILITY OF THE OWNER AND/OR BUILDER. CONSTRUCTION SPECIFICATIONS: 1. GENERAL NOTES: A. SEISMIC ZONE D1 B. WIND EXPOSURE AND SPEED 85 M.P.H., EXP. C C. SNOW LOAD TO BE 25 P.S.F. D. FLOOR LIVE LOAD TO BE 40 P.S.F. E. DECK LIVE LOAD TO BE 60 P.S.F. F. SOIL BEARING PRESSURE TO BE 1500 P.S.F. G. FROST DEPTH TO BE MIN. 18" BELOW FINISH GRADE H. ALL GLASS IN DOORS, SIDELIGHTS AND BATHROOMS TO BE TEMPERED GLASS PER (IRC R308.1) H. ALL SIMPSON ANCHORS MAY BE REPLACED BY APPROVED EQUALS. I. ROOF VENTILATION TO BE 1/150 OF TOTAL ATTIC AREA. 2. FRAMING NOTES: A. FLOOR: TO BE FRAMED IN ACCORDANCE w/SPECIFICATIONS OF DRAWINGS. - ALLOWABLE FLOOR LOADS ARE AS SET FORTH IN IRC R301.4 & R301.5 - ALL STRUCTURAL MEMBERS OF FLOOR ARE TO BE PROPERLY FIT AND FASTENED IN ACCORDANCE IRC. - ALL STRUCTURAL LUMBER TO BE #2 DOUGLAS FIR OR BETTER. B. WALLS: EXTERIOR WOOD FRAMED WALLS TO BE 2" x 6" @ 16" O.C.. HEIGHT TO BE AS SET FORTH IN SECTIONS. - ALL EXTERIOR WALLS TO BE SHEATHED w/ 1/2" STRUCTURAL PLYWOOD OR 7/16" OSB - ALL WINDOW/DOOR HEADERS AND BEARING WALL BEAMS TO BE 4" x 10" UNLESS OTHERWISE NOTED. - INTERIOR WALLS TO BE 2" x 4" @ 16" O.C.. HEIGHT TO BE AS SET FORTH IN SECTIONS. - WET WALLS MAY BE 2" x 6" CONSTRUCTION TO ALLOW FOR PLUMBING CLEARANCE. C. CONNECTIONS: - ALL WALL TO BEAM CONNECTIONS TO BE POSITIVE FOR UPLIFT & LATERAL SUPPORT PER IRC. - ALL NAILING TO BE PER IRC TABLE R602.3 - ALL CONNECTORS ARE SPECIFIED AS SIMPSON AND MAY BE REPLACE BY APPROVED EQUALS. 3. ENERGY CODE: COMPLY WITH WASHINGTON STATE 2018 ENERGY CODE. A. ALL WINDOWS AND DOORS TO BE SEALED INTO WALL w/CAULKING AND WEATHERSTRIPPING. B. ALL FRAMING INTERSECTIONS BETWEEN CONDITIONED AND UNCONDITIONED WALLS & FOUNDATIONS TO BE CAULKED TO STOP AIR LEAKAGE. C. ALL WIRING, PLUMBING AND DUCTING PENETRATIONS TO BE SEALED. D. VENTILATION DUCTS SHALL HAVE R-4 INSULATION COVERING. E. WHOLE HOUSE VENTILATION NEVER LESS THAN 120 CFM w/ 1.0 SONE RATING. F. WINDOWS TO HAVE U-VALUE OF .28 OR BETTER. 4. INSULATION: A. ROOF/CEILING TO HAVE A MINIMUM OF R-49 BATT INSULATION. B. FLOOR TO HAVE A MINIMUM OF R-38 BATT. INSULATION. C. WALLS TO HAVE A MINIMUM OF R-21 BATT INSULATION. D. ALL EXTERIOR WALLS TO HAVE ONE OF THE FOLLOWING VAPOR BARRIERS: - TYVEK HOUSE WRAP - TYPAR HOUSE WRAP - 15# FELT PAPER. MECHANICAL SPECIFICATIONS: 1. CLOTHES DRYER LOCATED IN AN AREA THAT IS HABITABLE OR CONTAINING OTHER FUEL BURNING APPLIANCE SHALL BE VENTED TO EXTERIOR OF STRUCTURE. THE EXHAUST DUCT LENGTH IS LIMITED TO LENGTHS SET FOR IN IRC SECTION M1501. 2. ELEMENTS OF APPLIANCES WHICH CREATE A GLOW, FLAME OR SPARK SHALL BE LOCATED A MINIMUM OF 18" ABOVE THE GARAGE FLOOR. (M 1307.3) 3. EXHAUST DUCTS TO BE CONSTRUCTED OF SMOOTH-WALL METAL .016 IN. APPROVED FLEX CONNECTORS NOT EXCEEDING 8 FT IN LENGTH MAY BE USED IN CONNECTION WITH DOMESTIC DRYER EXHAUST. (M1501.1) M1502.3.1 DRYER DUCT TERMINATION - A MINIMUM OF 12.5 SQ. INCHES FOR TERMINATION OUTLET OF DRYER DUCT REQUIRED. 4. HOT WATER TANKS HAVING FLEXIBLE PIPE CONNECTIONS AND OVER FOUR FEET TALL SHALL BE STRAPPED BOTH TOP AND BOTTOM WITH APPROVED SEISMIC STRAPS. PLUMBING SPECIFICATIONS: 1. PRESSURE RELEASE VALVE FOR HOT WATER TANK TO DRAIN TO EXTERIOR OF BUILDING WITH DRAIN END NOT MORE THAN TWO FEET NOR LESS THAN 6" ABOVE THE GROUND, POINTING DOWN. (UPC 1007e) 2. PROVIDE AN AIR GAP FOR THE DISHWASHER IF PROVIDED (UPC 608d) 3. PROVIDE APPROVED BACK FLOW PREVENTION DEVICE AT ALL HOSE BIBS. (UPC 1107) 4. EACH HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT AT ITS UPPER TERMINAL. (UPC 406a) BLUEPRINT DESIGN CONSULTANTS HEREBY ISSUES AN EXCLUSIVE LICENSE TO PURCHASER , TO CONSTRUCT ONE HOME ONLY ON ONE LOT FROM THESE PLANS. THESE PLANS IN ANY FORM CANNOT BE RESOLD OR COPIED WITHOUT WRITTEN APPROVAL FROM BLUEPRINT DESIGN CONSULTANTS. 1/2" = 1'-0" ADVANCED CORNER FRAMING OUTSIDE CORNER INSIDE CORNER 16" R-10 HDR H2.5 2" RIGID 4x10 (TYP.) 1/2" = 1'-0"1/2" = 1'-0" ATTIC INSULATION R-38 w/RAISED HEEL TRUSS OR R-49 w/STANDARD TRUSS ATTIC VENTILATION 1/150 ADVANCED FRAMING TRUSS H2.5 @ ALL TRUSSES DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-3 MT. BAKERVIEW BUILDERS GENERAL NOTES SWPPP DETAILS ENERGY LOT 8, ROCKRIDGE ANACORTES, WA 98221 ENERGY swppp details AUG 27, 2024 CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com 10' 8'-9" 3' 10' 10' 5' 6' 21'-6" 3070 SH24"VENT 5050XO 5050XO 3070 SH24"VENT 6040XO CORNER PIN434.0' FINISHED FLR. 425.25' TOP OF SLAB (AVG. GRADE) 422.25' MAXIMUM HEIGHT444.0' PLATE HEIGHT 435.25' SOUTHEAST ELEVATION SCALE: 1/4" = 1'-0" STEP GARAGE T.O.S. 422.25' P/L P/L C E D A R S I D I N G (4 ") E X P O S U R E C E D A R S I D I N G (4 ") E X P O S U R E C E D A R S I D I N G (4 ") E X P O S U R E 9080 PLANK STYLE OVERHEAD DOORS HARDI PANEL SIDING TYP. STANDING SEAM METAL ROOFING (BLACK) 14" CEDAR FASCIA W/DRIP LEDGE 6X10 DF CCQ66Z CEDAR T&GSOFFITS TYP. ABU66Z 6X6 P.T. 2X4" FRAMED 18"X18" COLUMN W/STONE VENEER 6030 PIC 3680DOOR GRADE GRADE COLUMN FACE 16 S.F. STONE FRONT FACE = 1,081 S.F. 5% = 54 S.F. STONE REQUIRED GARAGE 40 S.F. STONE TOTAL STONE = 56 S.F. CULTURE STONE VENEERPROFIT LEDGESTONE"BLACK RUNDLE" 5' RETAINING WALL (NOT TO EXCEED) 5' RETAINING WALL 6'6" STEM WALL 2% GRADE FINISHED GRADE 36" RETAINING WALL 3616 PIC TRANS 1'-0" O.H. TYP AVG GRADE CALCULATIONS GRADE @ NW WALL CENTER = 421.00'GRADE @ NE WALL CENTER = 419.00' GRADE @ SW WALL CENTER = 426.00' GRADE @ SE WALL CENTER = 426.00' AVG GRADE = 422.25' EXISTING GRADE @ MID S.W.WALL = 426.00' EXISTING GRADE @ MID N.E. WALL = 419.00' RIDGE HEIGHT21'6" ABOVE AVG. GRADE NOTE: ELEVATIONS ARE ALL BASED FROMCORNER PIN SET BY SURVEYORS FORHEIGHT REGULATION. SOUTH PROPERTY CORNER 91.73 ft 24'-6" SOUTHWEST ELEVATION SCALE: 1/4" = 1'-0" 2040SHOBSC. P/L 4 4 4 .0 ' 4 3 0 .0 ' P/L HIGHEST POINT OF ROOF STRUCTURE 4 3 4 .0 ' GRADE @ PROPERTY LINE TOP OF UPPER RETAINING WALL TOP OF LOWER RETAINING WALL GRADE @ PATIO CONC. PATIO DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-4 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 ELEVATIONS AUG 27, 2024 Maximum height per AMC (35') = 457.25' 35'-0" 7'-6" Eaves may encroach into side setback by not more than 2-feet. MAXIMUM HEIGHT ALLOWED BY ANACORTES MUNICIPAL CODE. 10'-1 1/4" 4'-0" Site plan shows proposed distance to southwest lot line is 9'-6", this elevation drawing is showing 10'-1 1/4". Site plan shall dictate location of structures, not elevation drawings. 5'-10 1/4" Site plan shows proposed distance to northwest lot line is 6'-1 1/2", this elevation drawing shows distance is 5'-10 1/4" and northwest elevation drawings states 5'-9 3/4". Site plan shall dictate location of structures, not elevation drawings. 7'-10" Minimum upper floor required side setback. CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com dwgmodels.com 2' 5'-9 3/4" NORTHWEST ELEVATION SCALE: 1/4" = 1'-0" G R A D E GRAD E P/LP/L 90610 OXO SGD HEAT PUMP GRADE 5' HIGH RETAINING RETAINING WALLSTO MATCH EXISTING NEIGHBORHOOD 3030 PIC 3030PIC 3070 SH 24" VENT 8090 SGD 8030 PIC 1/2":12 PITCH TYP. ALL ROOF PLANES SETBACK W.P. BALCONY W/CABLE RALING STANDING SEAM METAL ROOFING TYP. (BLACK) 3070 SH24" VENT 4046 PIC TMP 9060 XOX 30"VENTS CONCRETE PATIO AVG HT = >18" AVG HT CONCRETE PATIO SIDEWALK NORTHEAST ELEVATION SCALE: 1/4" = 1'-0" 2040 SH OBSC. 2036 SH OBSC. STONE RETAINING WALLSNOT TO BE MORE THAN 5' TALL STONE RETAINING WALLSNOT TO BE MORE THAN 5' TALL CONC. PATIO < 18"AVG ABOVE GRADE CONC. PATIO/SIDEWALK Terraced retaining walls as per City of Anacortes standards AMC19.66.080, not to exceed a height of 5-feet. DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-5 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 ELEVATIONS AUG 27, 2024 See approved site plan for setback dimensions. 1'-1/2" 2'-0" Concrete patios not exceeding 18 inches average height above finished grade are permitted within any required setback (AMC 19.42.140(F)(8)). 0'-6 1/2" 10'-1 1/4" See approved site plan for setback dimensions. CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 8" X 16" 8" X 16" 8" X 16" 8" X 16" 8" X 16" 8" X 16" 8" X 16" 8" X 16"8" X 16"8" X 16"8" X 16"8" X 16" S1 CROSS SECTION 1 4'8'4'5'-6"2'-1"11'-10"2'-1"26' 63'-6" 22'-3 1/2" 9'-2 1/2" 31'-6" 2'-1" 6'-6" 1'-0 7/16" 11' 45' 1'-0 7/16" 46'-0 7/16" 4' 2'-1" 26'-8"36'-10" 63'-6" 9'-2 1/2" 4'-10 1/2"9'-3" 9" 9'-3" 1'-10 1/2" 3'-6" 2' 3' 2' 3' 2' 3' 2' 3' 7' 3'-6" 15'-7"6'15'-3" 38'-3 1/4" 7'-10 1/4" 15'-11" SEE ENGINEERING FOR DETAILS 19IRC 20IRC REINF. CONCRETE SLABOVER 6X6 WIRE MESH 2" RIGID FOAM INSUL. 6 MIL. VISQUEEN AND PEA GRAVEL FILL B.P. B.P. B.P. B.P. B.P.B.P. PONY WALL SCALE: 1/4" = 1'-0" FOUNDATION PLAN 30"x30" 24" VENTED ACCESS WELL W/16" X 24" OPENING IN PERIMETER WALL (MIN.) IRC 408.3 CRAWL SPACE 6 MIL VISQUEEN 18" MIN. CLEARANCE TO JOIST 12" MIN. CLEARANCE TO GIRDERS IRC 408.1 1779 S.F. 300=5.93 S.F. VENT AREA 12 VENTS REQ'D IRC 408.2 CRAWL ACCESS B.P.B.P. ELECTRICAL GROUNDING NOTE: BEND A 20' PIECE OF REBAR 90° AT EACH END ENOUGH TO TIE TO THE FOOTING REBAR AND RUN 4" ABOVE AND THROUGH THE STEM WALL. SEE BUILDER FOR LOCATION. 2x6 P.T. SECOND STUB ALLOWS FOR CONTINUITY CHECK 9'-1 1/8" 1'-0 3/4" 8'-1 1/8" 15# FELT TYP. 7/16"" MIN. APA RATED SHEATHING U.N.O. w/ 8' PANEL LENGTH PLACED PERP. TO DIRECTION OF FRAMING AND ALTERNATE PANEL END JOINTS BY 4'. NAIL w/8d @ 6" o.c. PERIMETER & ALL SUPPORTED PANEL EDGES @ 12" o.c. TYPICAL UNO. AIR BAFFFLE 1" SPACE MIN TO EXTEND 12" MIN. ABOVE INSULATION SIMPSON H2.5 TIE @ EA. TRUSS. (INSTALL PRIOR TO SHEATHING ON EXTERIOR SIDE) 2x8 FASCIA W/ CONT. GUTTER 2x SOFFIT FRAMING (VENTED SOFFIT PER OWNER) DBL. TOP PLATE COMPOSITION ROOF R-49 INSULATION 4" SOLID TILE 4" PERF TILE w/DRAINROCK GRADE LANDSCAP E CLOTH (18" OVERHANG) 2x10 BAND 4x10 DFIR HDR (TYP.) 1/2" GWB HARDIPLANK SIDING (TYP) 7/16 OSB SHEATHING w/TYVEK HOUSE WRAP R-21 INSULATION "Z" FLASHING 2x10 BAND EXT. WARM WALLS - 2x6 STUDS @ 16" o.c. OVER 7/16" APA RATED SHEATHING . INSTALL BUILDING PAPER OR FELT BETWEEN SIDING AND WALL SHEATHING TYPICAL ALL EXTERIOR WALLS. BLOCK @ 8' EA. STUD BAY. ATTIC INSULATION R-49 W/ EQUIV. R-VALUE TO BE USED IN ATTICS WHERE CLEARANCE NOT AVAIL. FOR BATT.) 1/2" G.W.B. (TYP.) ATTIC VENTILATION 1/ 150 OF SPACE NOTES: 1. ALL EXTERIOR WALLS TO BE CONSTRUCTED IN ACCORDENCE W/ THE MIN. PROVISIONS PER U.B.C. 2326. 2. INTERIOR WALLS TO BE 2x4" CONSTRUCTION TYPICAL EXCEPT @ PLUMBING AND OCCUPANCY SEPARATION. PERMA-GARD PRIMER VAPOR BARRIER NOTE: TYP NOTE: OSB SHEATHING FOR WALLS, FLOORS REQUIRE MINIMUM 1/8" SPACE BETWEEN ALL PANEL ENDS AND EDGES. USE METAL STRAPS BETWEEN 1ST & 2ND FLOORS AFTER WALL SHEATHING ARE IN PLACE. LOCATION OF STRAPS WILL BE DETERMINED AT THE JOB SITE. WALL SECTION (TYP.) 1/2" = 1'-0" 6-MIL VISQUEEN TJI @ 16" O.C. PER PLAN 3/4" T&G PLYWOOD TJI @ 16" O.C. PER PLAN ENGINEERED TRUSS 1/2" GWB (TYP.) 3/4" T&G . SHTG. GLUE & NAIL w/10d 6" o.c. EDGES & BLOCKING. 10" o.c. FIELD - TYPICAL. 8d @ 4" O.C. @ (EACH MEMBER) R-38 INSULATION 2 x BIRD BLOCK W/ SCREEN - TOE NAIL w/(2) @ ea. END TO TRUSS OR RAFTER R-21 INS. BATTS w/VAPOR BARRIERPER PLAN PER PLAN R-1O TYP. SHOWING TYPICAL CONSTRUCTION ITEMS ONLY. DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-6 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 FOUNDATION PLAN TYPICAL WALL SECTION *SEE ENGINEERING FOR DETAILS AUG 27, 2024 CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 DRILL & EPOXY WEDGE ANCHOR BOLTS THROUGH P.T. RIM JOISTS & SECURE 1 1 7 /8 " T J I 2 1 0 @ 1 6 " O .C . 30" STEP DOWN TO MUD RM FLOOR 11 7/8" TJI210 @ 16" O.C. MAIN FLOOR FRAMING SCALE: 1/4" = 1'-0" FLOOR NOTES: 1. 4x10 DF BEAMS w/4x4 P.T. POST PER PLAN 2. 11 7/8" TJI210 @ 16" O.C. TYPICAL 3. BLOCK OVER ALL BEARING 4. 3/4" T&G PLYW'D SUBFLR. 26'-5 1/2" 1'-3 1/4" 6'16'-5 1/2" 2' 11 7/8" TJI510 @ 16" O.C. 11 7/8" TJI210 @ 16" O.C. BLOCKING BLOCKING BLOCKING BLOCKING FRAME 12" EXTENSIONAND BOLT TO BEAM & LET T&G PLYW'D LAYCANTELEVERED OUT ENGINEERED BEAM ENGINEERED BEAM GABLE END WALL GABLE END WALL BLOCKING UPPER FLOOR FRAMING SCALE: 1/4" = 1'-0" FLOOR NOTES: 1. 4x10 DF BEAMS w/4x4 P.T. POST PER PLAN 2. 11 7/8" TJI210 @ 16" O.C. TYPICAL 3. BLOCK OVER ALL BEARING 4. 3/4" T&G PLYW'D SUBFLR. 5. 2x10 P.T. DECK JOISTS @ 16" O.C. 6. W/P DECKING PER BUILDERS 7. ALUMINUM RAILING SYSTEM TYP. 2X10 DF DECK JOISTS TAPERED TO DRAIN BLOCKING DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-7 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 FLOOR FRAMING AUG 27, 2024 SEE ENGINEERING FOR DETAILS 1'-1/4" CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 5050 XO5050 XO 10068 OXO SGD 4046 PIC TMP 2668 3068 2036 SH OBSC. 2668 N SD CO S1 CROSS SECTION 1 10'-1" 24'-5 1/2" 16'-1" 1' 24'-5 1/2" 4'16'-5 1/2"4' 16'-1" 1'1' 10'-6" 3'-6" 14'-0 1/2" 5'-6 15/16"4' 6 1/16" 14'-4 1/2" 25' 3'-1 1/4"5' 3" 5'3'-1 1/4" 3'13'-5" X 4'-0" 19'-8" X 11'-0" 13'-5" X 13'-8" 8'-4" X 6'-5" 9'-9" X 9'-11" UPPER FLOORPLAN SCALE: 1/4" = 1'-0" REC RM UPPER FLR.613 S.F. BALCONY 63 S.F. MASTERBDRM 36" CAPPED WALL 1IRC 2 IRC 6 IRC 7 IRC 110 CFM CLST BALCONY MASTER BATH 3IRC 9 C W D Wine Cellar HEAT PUMP 308020 MIN. DOOR 2040 SH OBSC. 90809080 2040 SH OBSC. TMP 3070 SH 24" VENT3070 SH 24" VENT 3030 PIC TRANS 7030 PIC TRANS 3030 PIC TRANS 9060 XOX 30" VENTS 3070 SH 24" VENT 7090 SGD 3070 SH 24" VENT 3680 3616 PIC TRANS 3680 2880 6040 XO W/6030 PIC TR. 2880 2480 2880 3080 3080 2680 PKT 3080 2880 2468PKT N 10. M1307.2 P2801.6 & 7 - WATER HTR TO BE ANCHORED TOP & BOTTOM TO RESIST HORIZONTAL DISPLACEMENT DUE TO EARTHQUAKE MOTION. STRAPPING TO BE WITHIN THE UPPER 1/3 AND LOWER 1/3 OF THE APPLIANCE. INTERIOR NOTES 6. IRC 314.1 - 314.5 - SMOKE DETECTORS GARAGE NOTES 13. IRC 309.1 - 4" REINF. (6x6 WIRE MESH) CONC. SLAB OVER COMPACTED FILL. SLOPE THE SLAB AS TO FACILITATE THE FLOW OF LIQUIDS TOWARD A FLR. DRAIN OR THE OVERHEAD DOOR ENTRY. 15. IRC 302.7 - ENCLOSED ACCESSIBLESPACE UNDER STAIRS SHALL HAVE WALLS,UNDER-STAIR SURFACE AND ANY SOFFITSPROTECTED ON THE ENCLOSED SIDE WITH1/2" GYPSUM WALL BOARD. EXTERIOR NOTES 20. IRC 317.1.1 -317.1.7 - PROTECTION OF WOOD AND WOOD BASED PRODUCTS FROM DECAY SHALL BE PROVIDED IN THE FOLLOWING LOCATIONS BY THE USE OF NATURALLY DURABLE WOOD OR WOOD THAT IS PRESERVATIVE- TREATED IN ACCORDANCE WITH APWA U1 FOR THE SPECIES, PRODUCT, PRESERVATIVE AND END USE. PRESERVATIVES SHALL BE LISTED IN SECTION 4 OF AWPA U1. FLOORS TO HAVE AN18" MIN CLEARANCE - WOOD GIRDERS TO HAVE A MIN. OF 12" CLEARANCE. 4. M1307.1 - APPROVED FACTORY-BUILT FIREPLACES (ZERO CLEARANCE) GAS FIREPLACE INSTALLED PER MFR INSTRUCTIONS. (INSTRUCTIONS TO BE ON SITE FOR INSPECTION) 17. IRC 319.1 - APPROVED ADDRESS NUMBERS SHALL BE PLACED ON ALL NEW AND REMODELED BUILDINGS, INCLUDING ONE AND TWO FAMILY DWELLINGS, IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE ROAD OR STREET FRONTING THE PROPERTY 2. IRC 311.7 - STAIRWAYS AND RAILINGS SHALL COMPLY WITH IRC 301.5, 303.6, 311.5 18. IRC 507.2 - POSTS, COLUMNS, GIRDERS, JOISTS, DECKING, STAIR JACKS, AND TREADS OF ALL DECKS SHALL BE OF WOOD WHICH IS RESISTANT TO DECAY. CEDAR, REDWOOD, PRESSURE TREATED. 8. IRC 807.1 - 22" x 30" ATTIC ACCESS w/12" DAM 16. IRC 312.1 AND 312.2 - GUARD RAILSSHALL BE LOCATED ALONG OPEN SIDEDWALKING SURFACES, INCL. STAIRS, RAMPSAND LANDINGS LOCATED MORE THAN 30"ABOVE GRADE AND SHALL NOT BE LESSTHAN 36" HIGH FROM THE TOP OF WALKINGSURFACE. 11. M1307.3 - RELIEF VALVE TO BE PLUMBED TO EXTERIOR OF BUILDING - WATER HEATER TO BE PLACE ON 1 HR. FLOOR CONSTRUCTION A MINIMUM OF 18" HIGH 5. M1501.1 - EXHAUST DUCTS FROM DOMESTIC DRYER TO WALL OR ROOF TERMINATION SHALL NOT EXCEED25-FT. 2.5 FT. OF MAXIMUM ALLOWED LENGTH SHALL BE DEDUCTED FOR EACH 45-DEGREE ELBOW AND 5 FT FOR EACH 90 DEGREE ELBOW. DUCTS ARE TO BE SMOOTH .016 IN. METAL AND SHALL HAVE NO SCREWS OR FASTENERS WHICH WILL OBSTRUCT FLOW. ( DOES NOT INCLUDE THE TRANSITION DUCT) 3. IRC 308.1 - GLAZING IN HAZARDOUS LOCATIONS SHALL BE OF SAFETY GLASS. EACH LIGHT OF SAFETY GLAZING SHALL BE IDENTIFIED BY A PERMANENT LABEL VISIBLE AFTER INSTALLATION. 12. IRC 302.6 - SELF CLOSING, 20 MIN. DOOR 1. IRC 310.1 - PROVIDE AT LEAST ONE OPERABLE WINDOW OF NOT LESS THAN 5.7 S.F. OF OPENABLE AREA, WITH CLEAR MINIMUM HEIGHT 24" AND WIDTH 20", MAXIMUM SILL HEIGHT 44" ABOVE FINISHED FLOOR 19. IRC 502.4 - SOLID BLOCKING REQUIRED AT ALL BEARING POINTS OF FLOOR, CEILING & ROOF SYSTEMS 9. IRC 302.5.2 - DUCTS IN THE GARAGEAND DUCTS PENETRATING THE WALL ORCEILING SEPARATING THE DWELLING FROMTHE GARAGE SHALL BE CONSTRUCTED OFA MINIMUM 26 GAGE SHEET STEEL AND SHALL HAVE NO OPENINGS INTO THEGARAGE. THIS WOULD ALSO PROHIBITFILTER ACCESS OPENINGS IN THE RETURNAIR DUCT SYSTEM OR ANY HEAT SUPPLYOPENINGS INTO THE GARAGE. 7. IRC 315.1 - CARBON MONOXIDE 7b. IRC 314.2.3 - HEAT DETECTOR IN GARAGE 14. IRC 302.6 - 1/2" GWB BETWEEN GARAGE & LIVING SPACE. IF LIVING AREA ABOVE GARAGE, APPLY 5/8" TYPE "X" GWB TO CEILING. THIS ALSO APPLYS TO ANY SUPPORT STRUCTURE (IE. BEAMS & POSTS) TO BE COVERED BY 1/2" GYPSUM WALL BOARD. 8 IRC CO HD CO SD SD S1 CROSS SECTION 1 3'2'7'3'3' 2'-2 1/2" 3'-1"9'3'-6" 5'9'1'9'2'2'-11"6'2'-11" 26' 2'-1"2'-1" 23' 10' 3'-3 1/2" 7'-1"3'-5"4'-0 1/2" 5' 1'-11" 10 1/2"3'3"3'10 1/2" 4'8'4'5'-6"2'-1"11'-10"2'-1"26' 63'-6" 13'-4" 4'-10" 8'-9" 5'-6" 12'-7" 1' 46' 4' 2'-1" 22'-9" 5' 3'-6 1/2" 2'-1" 27'-7" 1' 11' 18'-5 1/2" 18'-5 1/2"8'21'-5 1/2"15'-7" 63'-6" 27'-7" 5'-1"5'-5" 3'-6" 3'-6"3'-6"4'7'-6" 3'-11 1/2" 3'-6" 4'-3 1/2" 3'-6" 10' 5 1/2" 2' 2'-3" 5'-11" 31'-3 1/2" 12'-10" X 8'-0" 5'-4" X 5'-2" 23'-0" X 9'-11" 20'-11" X 8'-6" 20'-11" X 17'-4" 14'-11" X 16'-3" 14'-10" X 13'-1" 4'-10" X 5'-2"3'-5" X 6'-9" 15'-0" X 13'-3" 21'-6" X 21'-9" 5'-5" X 7'-2" 1'-10" X 3'-0" 7'-6" X 4'-3" 6'-10" X 4'-6" GARAGE PATIO MAIN FLOORPLAN SCALE: 1/4" = 1'-0" BEDRM 2/FLEX GUEST SUITE GREAT RM KITCHEN ENTRY PANTRY CLST MAIN FLR.1,841 S.F. UPPER FLR. 613 S.F. GARAGE/MECH 521 S.F. COV. PORCH 45 S.F. PATIO (NOT COUNTED) 230 S.F. LOWER PATIO 260 S.F TOTAL BLDG COVER 2,407 S.F. MW 4 FLOATING SHELVES LINEN PETWASH PWD DBL OVEN DW (9'-5" CEILING) BUILT-INBOOKCASE CLST EATING BAR DINING (9'-5" CEILING) (14'-0" PLAT HEIGHT) (14'-0" PLAT HEIGHT) COMPLIANCE W/2018 ENERGY CODE (PER TABLE 406.2 W.S.E.C.) HEATING OPTION 2: HEAT PUMP 1 CREDITENERGY OPTIONS:1.3 .28 U-VALUE ON VERTICAL FENESTRATIONS .5 CREDITS R-38 INSULATION IN FLOORS2.1 REDUCE AIR LEAKAGE TO 3-CHANGES PER HOUR .5 CREDITS HIGH EFF. WHOLE HOUSE FANS MAX. 3.5 WATTS/CFM3.2 AIR SOURCE CENTRALLY DUCTED HEAT PUMP 1 CREDIT MIN. HSPF 9.5 4.2 COMPONENTS OF SYSTEMS LOCATED IN 1 CREDIT CONDITIONED SPACE5.5 TIER III HIGH EFF. WATER HEATING EQUIPMENT 2 CREDITS TOTAL CREDITS 6 (230 S.F.) 1IRC 2 IRC 3 IRC 4 IRC 5IRC 6 IRC 7IRC 9-11 IRC 12 IRC 13 IRC 14 IRC 15 IRC 16 IRC 17IRC 18 IRC 1IRC 6 IRC 7IRC 7b IRC 100 CFM 350 CFM 110 CFMW.H.F. 100 CFM UPPER FLOORLINE 9 A 9 A 9 B 9 B 9 D 9 C 9 C 9 E 9 E 9 D MECHANICAL MUD RM 9 F 9 F B.P. B.P. B.P. B.P.BW B.P.B.P. ENGINEERED HDR PORCH & STEPS 72 S.F. LOWER PATIO 26' X 10'260 S.F. EAVES 217 S.F. TOTAL W/EAVES 2,624 S.F. 3IRC 5/8 TYPE X DRYWALL REQUIRED ONGARAGE CEILING AIR GAP REQUIREDAT DISHWASHER(UPC 807.3) NO STUDOR VENTS OR AIR ADMITTANCEVALVES PERMITTED WITHOUT PRIOR APPROVALOF ENGINEERED PLUMBING PLANS. B.P.B.P. DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-8 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 FLOOR PLANS SEE ENGINEERING FOR DETAILS AUG 27, 2024 Interconnected heat alarm required in garage (R314.2.3) Appliances installed in locations subject to damage from vehicles must be protected by approved barriers (M1307.3.1) 30 inch clearance required for toilet Smoke detector required outside of each sleeping area in the immediate vicinity of the bedroom group R314.3 Water hammer arrestor required at all devices with quick-closing valves (UPC 609.10) 1' - 0 " 31 ' - 6 " 30 ' - 0 " Balcony above 4' - 1 / 2 " Check dimensions. It's measuring 14'-4 1/2" not 13'-5". Eaves are not shown to exceed 3-feet thus roof overhang is not included in lot coverage calculations. 13'-5" 3' - 7 " CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 1/2 : 121/2 : 12 1/2 : 12 1/2 : 12 3'-3 1/2" ROOF PLAN SCALE: 1/4" = 1'-0" ROOF NOTES: 1. ALL RAFTERS SHALL BE 14" TJI230 @ 24" O.C. TYPICAL. 2. DESIGN DETAILS AND RAFTER LAYOUT TO BE PROVIDED BY STRUCTURAL ENGINEER. 3. ALL PERIMETER AND BEARING WALL BEAMS AND HEADERS TO BE #2 DFIR 4"X10" A.N.O. 4. PROVIDE SCREENED BLOCKING OVER SUPPORTS. 5. ALL ROOF PITCH TO BE 1/2":12" OR AS SHOWN ON ELEVATIONS. 6. ALL OVERHANGS ARE 24" WITH 24" BARGE ENDS EXCEPT AS NOTED OTHERWISE. 7. ROOF VENTILATION TO BE PER IRC R806.2 8. (2) SIMPSON SDWC SCREWS PER TRUSS TO PLATE CONNECTION 9. BARGE AND FASCIA TO BE 2x4 AND 2x12 PRIMED CEDAR COMBINED FOR 15" FACE 10. STANDING SEAM ROOFING (BLACK) w/ICE SHIELD MATT ON SHEATHING PER IRC R905 ROOF LEDGER THIS WALL ROOF LEDGER THIS WALL 1 4 " T J I 2 3 0 @ 2 4 " O . C , T Y P . 14" TJI230 @ 24" O.C. TYP. 14" TJI230 @ 24" O.C. TYP. 1 4 " T J I 21 0 @ 2 4 " O .C . 12" STANDING SEAM METAL ROOFING "BLACK" OVER "ICE GUARD" UNDERLAYMENT FABRIC 5/8" PLY'W'D SHEATHING14" TJI230 @ 24" O.C. TYPICAL STARTER FLASHING TO BTM. OF GUTTER OVER ICE GUARD FABRIC 2X4 + 2X12 PRIMED CEDAR FASCIA VENTED BLOCKING4" T&G SOFFIT w/VENT STRIP 4 1/4" SDWC SIMPSON TRUSS SCREW THRU FLANGE AND INTO TOP WALL PLATES EA. SIDE TRUSS OF FLANGE TYP. EAVE 1" = 1'-0" 1/2 : 12 2'-1" 1 4 " T J I 2 3 0 @ 2 4 " O . C , T Y P . DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-9 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 ROOF PLAN SEE ENGINEERING FOR DETAILS AUG 27, 2024 CERTIFIED PROFESSIONAL BUILDING DESIGNER NATIONAL COUNCIL OF B UIL DING D E SIGN ER CERTIFICATION John AndersonCPBD No. 48-654 10'-1 1/8" 84" 23 1/8" 8'-11 1/8" 95 1/8" 2'-11 1/8" 6' 8'-11 1/8" 1' 2040SHOBSC. A SECTION 1/4" = 1'-0" GRADEFURRING PER ENGINEERING GUEST SUITE GUEST BATHRM PWD RMBEDRM 2/FLEX RM 11 7/8" TJI210 @ 16" O.C. TYP.or PER ENGINEER R-10 TYP. R-21 TYP. R-10 TYP. R-21 TYP. R-49 TYP. R-38 TYP. 1'1' 14' 14' 10'-0 1/4" 1'-6" 5 1/2" 8'-0 3/4" 10'-8 5/8" 14'-4 1/8" 14'-8 7/16" 14'-4 1/8" 36" 12 1/2" 84" 23" 12'-11 1/2" 8'-11" B SECTION 1/4" = 1'-0" CONCRETE PATIO GRADE BEAMS PER ENGINEERING R-49 TYP. R-38 TYP.FLR JOISTS PER ENGINEERING R-10 TYP R-21 TYP. R-21 TYP. FLASHING TYP. 9'-5" 1'-0 5/8" 9' 3' C SECTION 1/4" = 1'-0" 6040 XO W/6030 PIC TR. 3616 PIC TRANS GARAGE FLR JOISTS PER ENGINEERING M. BDRM M. BATH STAIRWELL G. BDRM ENTRY KITCHEN R-49 TYP.R-21 TYP. R-21 TYP. R-49 TYP. R-21 TYP R-10 TYP R-10 TYP R-21 TYP. R-38 TYP 5/8 TYPE "X"SHEETROCK TYP. R-38 TYP 9'-5 1/8" 3' 10'-1 1/8" 7'-5 1/8" 6 3/4"11 1/2" D SECTION 1/4" = 1'-0" GRADE 14" LVL LEDGERW/ITS 2.06/141/2 12 14" TJI210 @ 24" O.C. 3070 SH24" VENT 9060 XOX 30" VENTS 3070 SH24" VENT 3030PICTRANS 3030PICTRANS 7090 SGD 8030 PIC TRANS PWDR LAUNDRY GARAGE SLAB HTR-38 TYP 4046 PIC TMPM. BATH MSTR BDRM R-21 TYP. R-21 TYP. R-21 TYP. R-21 TYP. R-38 TYP.JOISTS PER ENGINEERING JOISTS PER ENGINEERING R-49 TYP. R-49 TYP. 8' 9'-5 1/8" 9'-2 3/4" 2'-8" 5' 9'-8 5/8" 8'-8 1/8" E SECTION 1/4" = 1'-0" 11 7/8" TJI JOISTS @ 16" O.C. SLOPE TO FRONT GARAGE LEDGER W/1TS HANGER ENGINEERED HDR (3 1/2"X14" SHOWN) STRIP DRAIN FIR DOWN W/P BALCONY MASTER BDRM FAMILY RM R-38 TYP. R-49 TYP R-21 TYP. R-10 TYP R-21 TYP. R-10 TYP R-21 TYP. R-21 TYP. T.V. 10'-1 1/8" 10'-8 7/8" 1' 3070 SH 24" VENT3070 SH 24" VENT F SECTION 1/4" = 1'-0" H2.5 TYP R-21 TYP R-21 TYP R-38 TYP. BEAM PER PLAN DESIGNED BY: CONTRACTOR TO VERIFY ALL LOT AND BUILDING DIMENSIONS BEFORE PROCEEDING WITH CONSTRUCTION DATE: REVISED: A.I.B.D. - C.P.B.D. - M.B.A. John Anderson DESIGN PROFESSIONAL COUNCIL 5780 WILLOW SPRINGS WAY FERNDALE, WA 98248 (360) 733-7206 OR 815-2350 A-10 MT. BAKERVIEW BUILDERS LOT 8, ROCKRIDGE ANACORTES, WA 98221 SECTIONS AUG 27, 2024 SEE ENGINEERING FOR DETAILS 4'-0" 0'-11 1/4" CITY OF ANACORTESPCED Dept - Planning DivisionAPPROVED LANDSCAPE PLANPERMIT #: PARENT PERMIT #: ADDRESS: APPROVED BY: DATE:11/26/24 BLD-2024-0184 N/A 3951 Rock Ridge Parkway · S1.0 FO U N D A T I O N P L A N MT . B A K E R V I E W B U I L D E R S NE W S I N G L E F A M I L Y R E S I D E N C E 521 S.F G M 207 S.F. CONRETE PATIO >18" AVG ABOVE GRADE 234 S.F. CONRETE PATIO >18" AVG ABOVE GRADE 63'-5 5/16" N 4 D 5' G WALLS ED A C K S I L T F E N C 422.25' G 1 0 ' D R A I N A G E /U T I L I 421' HEAT PUMP UPPER FLOOR BALCONY 6" Per site plan concrete patio continues across the entire back side of the building. UP P E R F L O O R F R A M I N G & M A I N F L O O R SH E A R W A L L P L A N MT . B A K E R V I E W B U I L D E R S NE W S I N G L E F A M I L Y R E S I D E N C E S1.1 RO O F F R A M I N G & UP P E R F L O O R SH E A R W A L L P L A N MT . B A K E R V I E W B U I L D E R S NE W S I N G L E F A M I L Y R E S I D E N C E S1.2 ST R U C T U R A L D E T A I L S MT . B A K E R V I E W B U I L D E R S NE W S I N G L E F A M I L Y R E S I D E N C E S2.0 N/AN/AN/AN/AST R U C T U R A L D E T A I L S MT . B A K E R V I E W B U I L D E R S NE W S I N G L E F A M I L Y R E S I D E N C E S2.1 ׀׀ ^ ST R U C T U R A L N O T E S MT . B A K E R V I E W B U I L D E R S NE W S I N G L E F A M I L Y R E S I D E N C E S3.0 3951 ROCK RIDGE PKWY 134319 BLD-2024-0184 3/14/2024 X X X X X X X X X X X X X X X X X 8/30/2024 aaron esterholt Stormwater Review PLATTED DEVELOPMENT PER STORMWATER MANUAL FOR WESTERN WA HOOK UP TO STUB 7,503 SITE IS CLEARED (NO EXISTING BRUSH OR VEGITATION) BASICALLY CHIPPED OUT OF ROCK. MORE ROCK WILL NEED TO BE REMOVED AND GOOD FILL BROUGHT IN. SILT FENCE WILL BE INSTALLED PRIOR TO AND EXCAVATION. CONSTRUCTION ENTRANCE WILL BE PROIVIDED TO MINIMIZE TRACKING. THE MAJORITY OF THE CUT AREAS WERE DONE DURING PLAT DEVELOPMENT. JUST FINE TUNING FOR FOOTINGS ETC. ROCK 4,905 SF 65 Start Here Does the Slte have 35% Ves See Redevelopment Project Thresholds and the Figure "Flow or more of existing hard Chart for Determining surface coverage? Requirements for Redevelopment", No Does the Project convert acres or more of vegetation to Does the Project result in lawn or landscaped areas, or 5,000 square feet. or No convert 2.5 acres or more of greater, of new plus native vegetation to pasture? replaced hard surface \No area? Ves Ves Does the Project result In 2,000 square feet. or greater, of new plus • replaced hard surface area? Al] M[nlmum Requirements apply to the new and replaced hard surfaces and converted Ves No vegetation areas, Does the Project have land Minimum Requlrements #1 disturbing activities of 7,000 through #5 apply to the new Yes square feet or greater? and replaced hard surfaces and the land disturbed. No MIn[mum Requirement #f2 applles. Revised March 2019 Flow Chart for Determining Requirements for New Development State of Washington DEPARTMENT OF ecoLoGYr ................... llrtatlon of Ilabilly, and dlsclalmer, Does the Project result In 2,000 square feet. or more. of new plus replaced hard surface area? OR Does the land disturbing activity total 7,000 square feet or greater? Yes No Minimum Requirements #1 through #5 apply to the new and replaced hard Minimum Requirement #2 applles. surfaces and the land disturbed, Next Question • Does the Project add 5,000 square feet or more of new hard surfaces? OR Convert / acres or more of vegetatlon to lawn or landscaped areas? OR Convert 2.5 acres or more of natlve vegetatlon to pasture? Yes No All Minimum Requirements apply Next Question ls thls a road to the new hard surfaces and the related project? No converted vegetatlon areas, Yes Does the Project add 5,000 square feet or more of new hard surfaces? Ves No ls the total of new plus replaced hard surfaces 5,0OO square feet or more, Do the new hard AND surfaces add 50% or No No does the value of the proposed improvements - No additional Including Interlor Improvements - exceed 50% of the more to the exlsting requirements, assessed value (or replacement value) of the; hard surfaces within lhe Sile? • exlsting Project Sle Improvements (for commerclal or Industrdal projects) OR • exlsting Slte Improvements (for all other projects) Yes All Minimum Requirements apply to the new and replaced ) hard surfaces and converted vegetation areas. Ves Flow Chart for Determining Requirements for Redevelopment Revised March 2019 DEPARTMENT OF ECOLOGY Please see http.//www.ecy.wa.gov/copyright.html for copyright notice Including permisslons, State of Washington [lmltatlon of Ilablllty, and disclaimer, THIS IS A PRE-DESIGNED DEVELOPMENT THIS IS A PRE-DESIGNED DEVELOPMENT THIS IS A PRE-DESIGNED DEVELOPMENT THIS IS A PRE-DESIGNED DEVELOPMENT THIS SITE IS BASICALLY ALL HARD SURFACE RIGHT NOW BECAUSE IT IS ALL ROCK ADD A CONSTRUCTION ENTRANCE, SILT FENCE BEFORE EXCAVATION OR CONSTRUCTION BEGINS MAKE SURE TO FOLLOW THE DOE MANUAL FOR SOIL BMP T5.13 POST CONSTRUCTION SOILS PRE DEVELOPED PLAT WITH APPROVED STORM SYSTEM PRE DEVELOPED PLAT WITH APPROVED STORM SYSTEM Construction Stormwater Pollution Prevention Plan Checklist Project Name:=------------------------- City Reference No. Construction Permit No. Rf-ell( On-site Inspection Review Date: Construction SWPPP Reviewer. Section I - Construction SPPP Narrative Construction Storm»water Pollution Prevention Elements I. Descnbe how each of the Construction Stormwater Pollution Prevention Elements has been addressed though the Construction SWPPP 2. _Identify the type and location of BMPs used to satisfy the required element. 3. _Provide wnitten justification identifying the reason an element is not applicable to the proposal Thirteen Required Elements - Construction Stormwater Pollution Prevention Plan I _Mark Clearing Limits 2. Establish Construction Access 3. Control Flow Rates 4. Install Sediment Controls S. Stabilize Soils 6. _Protect Slopes 7. Protect Drain Inlets 8. Stabilize Channels and Outlets 9. Control Pollutants 10._Control De-Watering 11. Maintain BMPs 12. _Manage the Project 13._ Protect Low Impact Development BMPs Project Description I. _ Total project area 2. _Total proposed impervious area 3 _Total proposed area to be disturbed. including off-site borrow and fill areas 4 _Total volumes of proposed cut and fill Revised February 2016 X X X X X X X X X X X X X X X X Existing Site Conditions l _Description of the existing topography 2_Description of the existing vegetation 3. _Description of the existing drainage Adjacent Areas I Description of adjacent areas which may be affected by site disturbance or drain to project site. a Streams b. Lakes c. Wetlands d Residential Areas e Roads f Other 2._Description of the downstream drainage path leading from the site to the receiving body of water. (Minimum distance of 400 yards.) Critical Areas l _Description of cnitical areas that are on or adjacent to the site 2._Description of special requirements for working in or near cnitical areas Soils I. Description of on-site soils. -a Soil name(s) _ b. Soil mapping unit _ c. Erodibility _ d Settleability e Permeability -f Depth g Texture h. Soil Structure Revised February 2016 X X NONE X X N/A N/A N/A ROCKX Erosion Problem Areas l _Description of potential erosion problems on site. Construction Phasing l _ Construction sequence 2_Construction phasing (if proposed) Construction Schedule I. _ Provide a proposed construction schedule. 2. Wet Season Construction Activities a Proposed wet season construction activities _b Proposed wet season construction restraints for environmentally sensitive/cnitical areas. Financial Owership Responsibilities l _Identify the property owner responsible for the initiation of bonds and/or other financial secunities. 2._Descnibe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. Engineering Calculations I. _Provide Design Calculations. a Sediment Ponds Traps b. Diversions c. Waterways d Runoff Stormwater Detention Calculations Revised February 2016 PRE DEVELOPED PLAT WITH APPROVED STORM SYSTEM Section II - Erosion and Sediment Control Plans General 1 _Vicinity Map 2 _CityCounty of_, Clearing and Grading Approval Block 3. Erosion and Sediment Control Notes Site Plan I. _ Note legal description of subject property. 2. Show North Anow. 3. _Indicate boundaries of existing vegetation e.g tree lines, pasture areas. etc. 4. _Identify and label areas of potential erosion problems. • _Identify on-site or adjacent surface waters, critical areas and associated buffers. 6. _Identify FEMA base flood boundaries and Shoreline Management boundaries (if applicable) 7. _ Show existing and proposed contours. 8. _Indicate drainage basins and direction of flow for individual drainage areas. 9._Label final grade contours and identify developed condition drainage basins. 10._ Delineate areas that are to be cleared and graded. 11_ Show all cut and fill slopes indicating top and bottom of slope catch lines. Conveyance Systems l _Designate locations for swales, interceptor trenches, or ditches. 2._Show all temporary and permanent drainage pipes, ditches, or cut-off trenches required for erosion and sediment control 3 _ Provide minimum slope and cover for all temporary pipes or call out pipe inverts. 4. _Show grades, dimensions, and direction of flow in all ditches, swales, culverts and pipes. 5. _ Provide details for bypassing off-site runoff around disturbed areas 6. _Indicate locations and outlets of any dewatering systems Location of Detention BMPs 1 _Identify location of detention BMPs. Revised February 2016 PRE DEVELOPED PLAT WITH APPROVED STORM SYSTEM PRE DEVELOPED PLAT WITH APPROVED STORM SYSTEM LOT 8, ROCK RIDGE, PHASE 5 Erosion and Sediment Control Facilities I _Show the locations of sediment trap(s), pond(s), pipes and structures. 2_Dimension pond berm widths and inside and outside pond slopes. 3. _Indicate the trap pond storage required and the depth, length, and width dimensions. 4. _Provide typical section views through pond and outlet structure 5. _Provide typical details of gravel cone and standpipe, and/or other filtering devices. 6. _Detail stabilization techniques for outlet inlet 7. Detail control restnictor device location and details. 8. _Specify mulch and/or recommended cover of berms and slopes. 9._Provide rock specifications and detail for rock check dam(s), if applicable IO._ Specify spacing for rock check dams as required. 1_Provide front and side sections of typical rock check dams 12 _Indicate the locations and provide details and specifications for silt fabric. 13._Locate the construction entrance and provide a detail. Detailed Drawings l _Any structural practices used that are not referenced in the Ecology Manual should be explained and illustrated with detailed drawings. Other Pollutant BMPs I. _ Indicate on the site plan the location ofBMPs to be used for the control of pollutants other than sediment, e.g, concrete wash water Monitoring Locations l _Indicate on the site plan the water quality sampling locations to be used for monitoring water quality on the construction site. if applicable. Revised February 2016 PRE DEVELOPED PLAT WITH APPROVED STORM SYSTEM SILT FENCE MT BAKER VIEW BUILDERS 3951 ROCK RIDGE PKWY X BDC STABILIZED CONSTRUCTION ENTRANCE FILTER SOCKS AROUND STORM DRAINS SILT FENCE PLASTIC COVERING OVER EXPOSED EXCAVATION PILES & MULCHING MULCHING, GRADIENT TERRACES FILTER SOCKS N/A CONCRETE HANDLING, CONCRETE WASHOUT AREA DIRECT TO STORM DRAINS WITH FILTER SOCKS TO ELIMINATE SILT, ETC MATERIALS ON HAND MATERIALS ON HAND PRE DESIGNED STORM SYSTEM STUB-OUT INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. INFEASIBLE, SITE IS ALL ROCK, LESS THAN 2" OF SOIL ON TOP. THIS SITE WILL REQUIRE 4" PERIMITER DRAINS TIGHTLINED TO STUB-OUT STORM SYSTEM (PROVIDED). DRIVEWAY WILL USE STRIP DRAIN THAT IS CONNECTED TO PERIMETER DRAINS. THIS SITE WILL REQUIRE 4" PERIMITER DRAINS TIGHTLINED TO STUB-OUT STORM SYSTEM (PROVIDED). DRIVEWAY WILL USE STRIP DRAIN THAT IS CONNECTED TO PERIMETER DRAINS. N/A - NO WETLANDS CONSTRUCTION ENTRANCE & SILT FENCE DONE BY PLAT DEVELOPER VISUAL - ALL ROCK