Loading...
HomeMy WebLinkAboutPermit File GVR-2024-007 305 30th StreetFor inspections, please call (360) 293-1901 PARCEL: P123039 LEGAL DESCRIPTION: APPLICANT: O'Neal, Brian 155 NE 100th Street, Ste 302 Seattle, WA 98125 425-241-2627 OWNER: RUZICH RANDOLPH SWEET 16 INVESTMENTS LLC ANACORTES, WA 98221 FEES:Paid Due Grading Permit Fee $23.50 $0.00 $0.00Totals : REQUIRED INSPECTIONS Storm Drain Connection Footings $23.50 GVR-2024-007 CLEAR AND GRADE ISSUED: EXPIRES: 07/24/2024 03/24/2025 PROJECT NAME: NORTH HARBOR DIESEL GAS SHOP STORMWATER IMPROVEMENTS SITE ADDRESS: 305 30TH STREET ANACORTES * Work within 200'-0" of the Ordinary High Water Mark (OHWM) has not been approved under this permit. If the scope of work changes to include area within Shoreline Jurisdiction the work shall stop, and a Shoreline Exemption or Shoreline Substantial Development Permit shall be submitted for review and processing with the Anacortes PCED Department prior to any work in Shoreline Jurisdiction. CONDITIONS Page 1 of 1Printed by : Cheri Gleichmann on: 10/14/2024 09:37 AM City of Anacortes, WA 904 6th Street Anacortes, WA 98221 (360) 293-1901 http://cityofanacortes.org/ NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED SEATTLE, WASHINGTON 98125 (206) 631-8680 PROJECT NO. DRAWING NO. DATE SHEETAPPROVED BY: REVIEWED BY: DESIGNED BY: DRAFTED BY: DATEINITIALSTATUS: 155 NE 100TH STREET, STE 302 2177001.020 6-05-2024 B. PADGETT BMP 6-05-2024 B. O'NEAL J. KALMAR BLO 6-05-2024 JAK 6-05-2024 OF 5 NORTH HARBOR DIESEL & YACHT STORMWATER SYSTEM IMPROVEMENTS MAIN YARD (DISCHARGE S001) LA N D A U A S S O C I A T E S I N C . | G: \ P R O J E C T S \ 2 1 7 7 \ 0 0 1 \ 0 2 0 \ C L E A R I N G A N D G R A D I N G P E R M I T P L A N S \ M A I N Y A R D \ P C O V E R - N O T E S - S 0 0 1 M A I N Y A R D . D W G | 6/ 2 1 / 2 0 2 4 | EZ I C K ISSUED FOR PERMITTING JO S E P H A. KAL M A R NORTH HARBOR DIESEL & YACHT SERVICE INC. MAIN YARD STORMWATER SYSTEM IMPROVEMENTS ANACORTES, WASHINGTON SITE ADDRESS 620 30TH STREET ANACORTES, WA 98221 PARCEL NUMBERS P77992 APPLICANT NORTH HARBOR DIESEL & YACHT SERVICE INC. 720 30TH STREET ANACORTES, WA 98221 (360) 299-1907 CONTACT: DIANNA CHONKA DIANA@NORTHHARBORDIESEL.COM ENGINEER LANDAU ASSOCIATES 155 NE 100TH ST, STE 302 SEATTLE, WA 98125 (206) 631-8680 CONTACT: JOSEPH KALMAR, P.E. JKALMAR@LANDAUINC.COM EARTHWORK QUANTITIES (ON AND OFF-SITE) CUT = 21 CY FILL = 17 CY NET IMPORT = -4 CY TOTAL EARTHWORK = 38 CY NOTES 1.HORIZONTAL DATUM FOR THIS PROJECT IS NAD 83/2011, WASHINGTON COORDINATE SYSTEM. NORTH ZONE BASED ON GPS MEASUREMENTS USING THE WASHINGTON STATE REFERENCE NETWORK. 2.VERTICAL DATUM FOR THIS SURVEY IS NAVD 88, BASED ON GPS MEASUREMENTS USING THE WASHINGTON STATE REFERENCE NETWORK. TOPOGRAPHIC DATA FROM LIDAR (DNR, KING COUNTY WEST 2021). REPORTED VERTICAL ACCURACY AVERAGE = -0.008 FT. 3.ALL WORK TO BE DONE AS PER CITY OF ANACORTES 2018 PUBLIC WORKS ENGINEERING STANDARDS. 4.AERIAL IMAGERY SOURCED FROM THE CITY OF ANACORTES, 2024. COVER SHEET C-1.0 1 SHEET INDEX SHEET NO.SHEET NAME C-1.0 COVER SHEET C-2.0 NOTES C-3.0 EXISTING CONDITIONS / TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN C-4.0 STORMWATER TREATMENT IMPROVEMENTS C-5.0 DETAILS LEGAL DESCRIPTION PARCEL 4463400090 (0.5800 ac) LOT 14, ANACORTES INDUSTRIAL PARK, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 10 OF PLATS, PAGES 19 TO 21, RECORDS OF SKAGIT COUNTY, WASHINGTON. LESS RT 014-01 CONSTRUCTION SEQUENCE 1.MARK CLEARING/GRADING LIMITS. 2.CALL CITY INSPECTOR TO INSPECT CLEARING/GRADING LIMITS. 3.INSTALL INITIAL EROSION CONTROL PRACTICES (E.G., CONSTRUCTION ENTRANCE, SILT FENCE, CATCH BASIN INSERTS). 4.CONTACT CITY INSPECTOR TO INSPECT INITIAL EROSION CONTROL PRACTICES. 5.CLEAR, GRADE AND FILL SITE AS OUTLINED IN THE SITE PLAN WHILE IMPLEMENTING AND MAINTAINING TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES AT THE SAME TIME. 6.INSTALL PERMANENT EROSION PROTECTION (IMPERVIOUS SURFACE, LANDSCAPING, ETC.). 7.CONTACT CITY INSPECTOR FOR APPROVAL OF PERMANENT EROSION PROTECTION AND SITE GRADES. 8.REMOVE EROSION CONTROL METHODS AS PERMITTED BY THE CITY INSPECTOR AND REPAIR PERMANENT EROSION PROTECTION AS NECESSARY. 0 0.25 0.5 Miles Stormwater Review NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED SEATTLE, WASHINGTON 98125 (206) 631-8680 PROJECT NO. DRAWING NO. DATE SHEETAPPROVED BY: REVIEWED BY: DESIGNED BY: DRAFTED BY: DATEINITIALSTATUS: 155 NE 100TH STREET, STE 302 2177001.020 6-05-2024 B. PADGETT BMP 6-05-2024 B. O'NEAL J. KALMAR BLO 6-05-2024 JAK 6-05-2024 OF 5 NORTH HARBOR DIESEL & YACHT STORMWATER SYSTEM IMPROVEMENTS MAIN YARD (DISCHARGE S001) LA N D A U A S S O C I A T E S I N C . | G: \ P R O J E C T S \ 2 1 7 7 \ 0 0 1 \ 0 2 0 \ C L E A R I N G A N D G R A D I N G P E R M I T P L A N S \ M A I N Y A R D \ P C O V E R - N O T E S - S 0 0 1 M A I N Y A R D . D W G | 6/ 2 1 / 2 0 2 4 | EZ I C K ISSUED FOR PERMITTING JO S E P H A. KAL M A R NOTES NOTES C-2.0 2 GENERAL NOTES: CONSTRUCTION SHALL CONFORM TO THE CITY OF ANACORTERS PUBLIC WORKS ENGINEERING STANDARDS, EDITION 7, NOVEMBER 2018, EXCEPT AS OTHERWISE APPROVED BY DEVIATION, AND BE IN ACCORDANCE WITH THE APPROVED PLANS. ANY SIGNIFICANT CHANGES FROM THE APPROVED PLAN WILL REQUIRE APPROVAL FROM THE OWNER, ENGINEER OF RECORD, AND THE CITY. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE “WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION),” EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY'S ENGINEERING STANDARDS. THE ABOVE DOCUMENTS SHALL BE AVAILABLE AT THE JOB SITE DURING CONSTRUCTION. UNLESS STATED OTHERWISE, LOCATIONS SHOWN FOR EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR IS CAUTIONED THAT OVERHEAD UTILITY LINES MAY NOT BE SHOWN ON THE DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND THE EXTENT OF ANY HAZARD CREATED BY OVERHEAD UTILITY LINES. IDENTIFICATION, LOCATION, MARKING, AND RESPONSIBILITY FOR UNDERGROUND FACILITIES OR UTILITIES, IS GOVERNED BY THE PROVISIONS OF SECTION 19.122 REVISED CODE OF WASHINGTON (RCW). PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE-CALL (811) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS, POWER, TELEPHONE, AND CABLE). THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY ON AND AROUND THE PROJECT. PRIOR TO THE START OF WORK. CONTRACTORS AND THEIR SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND PROPERTY SUFFERED BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE CONNECTED WITH THEM. ANY CONSTRUCTION SURVEYING ASSOCIATED WITH THIS PROJECT SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR A WASHINGTON LICENSED PROFESSIONAL CIVIL ENGINEER. GRADING AND EROSION CONTROL NOTES ALL REQUIRED SEDIMENTATION AND EROSION CONTROL FACILITIES INDICATED ON THE PLANS AND DESCRIBED IN THE FACILITY'S STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION ACTIVITIES. THESE FACILITIES SHALL BE MAINTAINED AND UPGRADED, IF NECESSARY, TO INSURE THAT SEDIMENT-LADEN WATER AND STORM DRAINAGE RUNOFF DOES NOT IMPACT THE ADJACENT PROPERTIES, NATURAL DRAINAGE WAYS, OR THE EXISTING CITY STORM DRAINAGE SYSTEM. SEDIMENTATION AND EROSION CONTROL FACILITIES WILL BE INSPECTED AT LEAST WEEKLY DURING THE PROJECT. INSPECTIONS WILL BE DOCUMENTED ON THE “CITY OF ANACORTES EROSION AND SEDIMENT CONTROL INSPECTION SHEET - LOTS LESS THAN 1 ACRE”. A COPY OF THIS INSPECTION FORM IS INCLUDED IN THE SWPPP. THE STORM DRAINAGE DETENTION (RETENTION IF INFILTRATION SYSTEM IS USED), SEDIMENTATION AND EROSION CONTROL FACILITIES DEPICTED ON THE APPROVED DRAWINGS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. ADDITIONAL DRAINAGE AND EROSION CONTROL FACILITIES MAY BE REQUIRED AS SITUATIONS WARRANT DURING CONSTRUCTION. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO THESE CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. THE TEMPORARY EROSION CONTROL FACILITIES, INCLUDING ALL PERIMETER CONTROLS, SHALL REMAIN IN PLACE UNTIL FINAL SITE CONSTRUCTION IS COMPLETED. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL TEMPORARY FACILITIES. THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY, TO REDUCE DUST EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY. NO TRACKING IN THE ROADWAY IS ALLOWED. IF SEDIMENT IS TRACKED ONTO THE ROAD, THE ROAD SHALL BE THOROUGHLY AND IMMEDIATELY CLEANED BY SHOVELING OR PICKUP SWEEPING. TRANSPORT SEDIMENT TO A CONTROLLED SEDIMENT DISPOSAL AREA. KEEP STREETS CLEAN AT ALL TIMES. ALL AREAS OF ACTIVE EARTHWORK WHICH HAVE THE POTENTIAL FOR EROSION AND SEDIMENTATION IMPACTS ON ADJACENT PROPERTIES, NATURAL DRAINAGE WAYS, OR THE EXISTING CITY STORM DRAINAGE SYSTEM MUST BE STABILIZED ACCORDING TO THE FOLLOWING SCHEDULE: FROM MAY 1 TO SEPTEMBER 30, AREAS AT FINAL GRADE AND THOSE THAT ARE SCHEDULED TO REMAIN UN-WORKED FOR MORE THAN SEVEN (7) DAYS SHALL BE STABILIZED. FROM OCTOBER 1 TO APRIL 30 EARTHWORK ACTIVITIES SHALL BE CONDUCTED IN STAGES IN ORDER TO MINIMIZE SOIL EXPOSURE. EXPOSED SOILS THAT WILL REMAIN UN-WORKED FOR MORE THAN TWO (2) DAYS SHALL BE STABILIZED IMMEDIATELY. CONCRETE NOTES: 1.ALL CONCRETE SHALL BE HARD ROCK CONCRETE MEETING REQUIREMENTS OF ACI-301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS". MIX PROPORTIONS SHALL BE PER ACI-301, METHOD 2 OR THE ALTERNATE PROCEDURE. INCLUDE MASTERFIBER MAC 360 FF. DOSE AT 3-LBS PER CUBIC YARD. 2.STRUCTURAL CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: 3.ALLOW CONCRETE TO CURE FOR MINIMUM OF 7-DAYS OR 3,000 PSI BREAK, WHICHEVER IS LATER. 4.ALL CONCRETE EXPOSED TO WEATHER SHALL CONTAIN 5% (±) 1% AIR ENTRAINMENT BY VOLUME. AIR ENTRAINMENT SHALL BE IN CONFORMANCE WITH ASTM C260 AND C494. COLD WEATHER PLACEMENT SHALL CONFORM TO ACI-306. HOT WEATHER PLACEMENT SHALL CONFORM TO ACI-305. MECHANICALLY VIBRATE ALL FORMED CONCRETE. DO NOT OVER-VIBRATE. PLACE CONCRETE MONOLITHICALLY BETWEEN CONSTRUCTION OR CONTROL JOINTS. PROTECT ALL CONCRETE FROM PREMATURE DRYING. 5.CHAMFER ALL EXTERIOR CORNERS 1/2" UNLESS SHOWN OTHERWISE. 6.SLUMP LIMITS MAY BE INCREASED BY ADDITION OF ADMIXTURES PROVIDED THAT THE WATER/CEMENT RATIO OF THE ORIGINAL MIX DESIGN IS NOT EXCEEDED. WATER REDUCING ADMIXTURE SHALL BE IN CONFORMANCE WITH ASTM494, USED IN CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS. SUBMIT ADMIXTURES TO ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION. 7.CEMENT SHALL BY TYPE I OR II IN CONFORMANCE WITH ASTM C150. AGGREGATES SHALL BE IN CONFORMANCE WITH ASTM C33. COARSE AGGREGATES SHALL NOT EXCEED 3/4". WATER SHALL BE CLEAN AND POTABLE. 8.REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. GRADE 40 MAY BE USED FOR #3 AND SMALLER TIES AND STIRRUPS. DETAIL AND PLACE ACCORDING TO ACI MANUAL SP-66. 9.UNLESS OTHERWISE NOTED, MINIMUM COVER SHALL BE 1 1/2" FOR #5 AND SMALLER BARS, 2" FOR #6 AND LARGER BARS AND 3" WHEN POURED AGAINST EARTH. SUPPORT REINFORCEMENT WITH APPROVED CHAIRS, SPACERS, OR TIES. 10.PROVIDE MINIMUM 48 BAR DIAMETERS AT SPLICES. NO MORE THAN 50% OF REINFORCING SHALL BE SPLICED AT ANY LOCATION. UNLESS OTHERWISE NOTED, BEND ALL HORIZONTAL REINFORCING A MINIMUM OF 2'-0" AT CORNERS AND WALL/FOOTING INTERSECTIONS WITH MIN. EMBEDMENT BEYOND INTERFACE PER DEVELOPMENT LENGTH SPECIFIED IN ACI 318. 11.FORMWORK SHALL BE IN ACCORDANCE WITH ACI-347 "GUIDE TO FORMWORK FOR CONCRETE". FORMS SHALL BE DESIGNED BY THE CONTRACTOR. BRACING SHALL BE PROVIDED AS REQUIRED OR UNTIL THE CONCRETE HAS REACHED ITS SPECIFIED 28-DAY STRENGTH. ALL SHORING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. FORMWORK, SUPPORTS, AND SHORING SHALL PROVIDE FINISHED CONCRETE SURFACES AT ALL FACES: LEVEL, PLUMB, AND TRUE TO DIMENSIONS AND ELEVATIONS SHOWN IN THE DRAWINGS. 12.PLACE #4 BARS x 2'-0" MIN. @ ALL CORNERS AND ANGLE POINTS U.N.O. TYPE f'c SLUMP w/c AIR SLABS 3,000 psi 1-3"0.40 5% SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD IPIP 89 . 4 2 ' 54.51' 5 0 49 4 8 47 4 5 44 4 4 43 43 45 47 4 7 48 42 42 43 41 40 4 0 4 1 39 NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED SEATTLE, WASHINGTON 98125 (206) 631-8680 PROJECT NO. DRAWING NO. DATE SHEETAPPROVED BY: REVIEWED BY: DESIGNED BY: DRAFTED BY: DATEINITIALSTATUS: 155 NE 100TH STREET, STE 302 2177001.020 6-05-2024 B. PADGETT BMP 6-05-2024 B. O'NEAL J. KALMAR BLO 6-05-2024 JAK 6-05-2024 OF 5 NORTH HARBOR DIESEL & YACHT STORMWATER SYSTEM IMPROVEMENTS MAIN YARD (DISCHARGE S001) LA N D A U A S S O C I A T E S I N C . | G: \ P R O J E C T S \ 2 1 7 7 \ 0 0 1 \ 0 2 0 \ C L E A R I N G A N D G R A D I N G P E R M I T P L A N S \ M A I N Y A R D \ P E X C O N D - S 0 0 1 M A I N Y A R D . D W G | 6/ 2 1 / 2 0 2 4 | EZ I C K ISSUED FOR PERMITTING JO S E P H A. KAL M A R EXISTING CONDITIONS/TESC C-3.0 3 SWING/SLIDE GATE - CONSTRUCTION ENTRANCE SEE SHEET C-4.0 FOR INFORMATION ON STORMWATER TREATMENT IMPROVEMENTS SD SD LEGEND PROPERTY BOUNDARY EXISTING STORMDRAIN STORM DRAIN INLET PROTECTION (BMP C220) CHAINLINK FENCE (CLF) EXISTING CATCH BASIN SILT FENCE (BMP C233) OR STRAW WATTLES (BMP C235) IP SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD A A' NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED SEATTLE, WASHINGTON 98125 (206) 631-8680 PROJECT NO. DRAWING NO. DATE SHEETAPPROVED BY: REVIEWED BY: DESIGNED BY: DRAFTED BY: DATEINITIALSTATUS: 155 NE 100TH STREET, STE 302 2177001.020 6-05-2024 B. PADGETT BMP 6-05-2024 B. O'NEAL J. KALMAR BLO 6-05-2024 JAK 6-05-2024 OF 5 NORTH HARBOR DIESEL & YACHT STORMWATER SYSTEM IMPROVEMENTS MAIN YARD (DISCHARGE S001) LA N D A U A S S O C I A T E S I N C . | G: \ P R O J E C T S \ 2 1 7 7 \ 0 0 1 \ 0 2 0 \ C L E A R I N G A N D G R A D I N G P E R M I T P L A N S \ M A I N Y A R D \ P P R O P C O N D - S 0 0 1 M A I N Y A R D . D W G | 6/ 2 1 / 2 0 2 4 | EZ I C K ISSUED FOR PERMITTING JO S E P H A. KAL M A R STORMWATER TREATMENT IMPROVEMENTSC-4.0 4 PROPOSED FORCE MAIN NEW CB LOCATION PUMP STATION S001 SECTION AA' 8" INLET PIPE IE ≈ 39.63 FT RIM ELE ≈ 42.25 FT SAMPLE LID 6" 5' - 6 " 6' - 0 " 512" 1'-11" PAD DIMENSIONS: 10'-6" WIDE x 12'-6" LONG. SEE FILTER BOX PAD DETAIL ON SHEET C-5.0 CONSTRUCTION DETAILS CONCRETE PAD SUBMERSIBLE PUMP WITH INTEGRAL FLOAT CONTROLS (40 GPM AT 25 FT TDH) CONCRETE PAD PROPOSED STORMDRAIN PROPOSED CATCH BASIN LOCATION RIM ≈ 42.15 FT EXISTING 8" IE (W) ≈ 39.57 FT PROPOSED 8" IE (E) ≈ 39.53 FT PLUG EXISTING 8" PVC (S) ≈ 39.53 FT 3" FORCE MAIN TO TREATMENT 6" INLET PIPE FROM TREATMENT IE ≈ 39.00 FT (NORTH) 8" OUTLET PIPE TO CITY DRAIN IE ≈ 39.63 FT (SOUTH) 6' CHITOSAN LACTATE SOCK WITHIN 4" PVC PLUG 12" PVC CONTACT PIPE (7 LF) 2' - 3 . 5 " 2' - 3 . 5 " 3' GRAVITY DRAIN LEGEND PROPERTY BOUNDARY EXISTING STORMDRAIN PROPOSED CATCH BASIN CHAINLINK FENCE (CLF) EXISTING CATCH BASIN 0 5 10 SCALE IN FEET 0 2 4 SCALE IN FEET FILTER BOX FILTER BOX DIMENSIONS: 8' WIDE x 12' LONG AND 4.5' HIGH FILTER BOX SEE VAULT COVER DETAIL ON SHEET C-5.0 DISCHARGE MONITORING POINT S001 MOVE EXISTING CATCH BASIN TO NEW LOCATION AS SHOWN AND REGRADE SURROUNDING AREA TO DRAIN TO NEW LOCATION DETAIL A, THIS SHEET DETAIL A 1' 6" 2 1 3/4" CHAMFER ALL AROUND TOP OF ADJACENT GRADE 4" 10'6" X 12'6" CONCRETE PAD 3" C L R T Y P . AT B O T T O M 3" CLR AT SIDES 2" C L R AT T O P #4 AT 12" O.C. TOP BARS: #4 AT 16" O.C. W/ 90° HOOK AT EA. END BOTTOM BARS: #4 AT 16" O.C. EACH WAY AT BOTTOM 2' CROSS BAR SPACING (TYP.) NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED SEATTLE, WASHINGTON 98125 (206) 631-8680 PROJECT NO. DRAWING NO. DATE SHEETAPPROVED BY: REVIEWED BY: DESIGNED BY: DRAFTED BY: DATEINITIALSTATUS: 155 NE 100TH STREET, STE 302 2177001.020 6-05-2024 B. PADGETT BMP 6-05-2024 B. O'NEAL J. KALMAR BLO 6-05-2024 JAK 6-05-2024 OF 5 NORTH HARBOR DIESEL & YACHT STORMWATER SYSTEM IMPROVEMENTS MAIN YARD (DISCHARGE S001) LA N D A U A S S O C I A T E S I N C . | G: \ P R O J E C T S \ 2 1 7 7 \ 0 0 1 \ 0 2 0 \ C L E A R I N G A N D G R A D I N G P E R M I T P L A N S \ M A I N Y A R D \ P D E T A I L S - S 0 0 1 M A I N Y A R D . D W G | 6/ 2 1 / 2 0 2 4 | EZ I C K ISSUED FOR PERMITTING JO S E P H A. KAL M A R DETAILS C-5.0 5 VAULT LID PLAN VIEW 3" force main Elbow Cross bars or screen with minimum opening of 1" Reducer 6' chitosan lactate sock Chitosan sock to be secured to the wye cap with a clip/carabiner on u-bolt Filter unit 2" flow meter Sample port See Note 1 3" x 4" reducer Elbow Reducer Notes 1.For 8" Ø pipe a total pipe run of 15 LF is required for 1 minute of contact time at design pumping rate of 39 gpm. For 12" Ø pipe a total pipe run of 7 LF is required for 1 minute of contact time at design pumping rate of 39 gpm. Support full length of new pipe as needed by attaching to side of filter unit or providing other appropriate support. Protect from traffic impact. 2.Not to scale. 4" wye SCALE: 1" = 1' FILTER BOX PAD PROFILE 1.REFER TO SHEET C-2.0 FOR STRUCTURAL NOTES AND INFORMATION. 2.POSITION FILTER TANK CENTERED OVER CONCRETE PAD. 3.ALL REINFORCEMENT SHALL BE CONTINUOUS. 4.FOUNDATION SHALL NOT BE LOCATED DIRECTLY OVER UNDERGROUND UTILITIES AND/OR STRUCTURES AND SHALL BE LOCATED A SUFFICIENT DISTANCE AWAY, AS RECOMMENDED BY GEOTECH, TO AVOID SURCHARGE ON ANY UNDERGROUND UTILITIES AND/OR STRUCTURES. NOTES FORCE MAIN PIPE DETAIL Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 1 of 6 Permit #: Received by: Small Site Construction SWPPP City of Anacortes Stormwater · 904 6th Street · Anacortes, WA 98221 Stormwater Inspector: 360-630-1037 General Information Project Name Parcel Size acres Project Address Property Owner Phone Site Contact Phone Project Description Describe the nature and purpose of the construction project. Include the total size of the area, any increase in existing impervious area; the total area expected to be disturbed by clearing, grading, excavation or other construction activities, including off-site borrow and fill areas; and the volumes of grading cut and fill that are proposed. Erosion control lead or responsible party Phone Engineer/Firm Phone Site Conditions Adjacent Areas: See the site plan, drainage plan, and construction drawings approved for the associated permit. Critical areas: See the critical areas site plan approved for the associated permit. Attach a copy of your stormwater site plan submitted with your building/grading permit application and attach pictures of construction site. *Stormwater site plan shall list all BMPs for inspectors *Add a map of where your stormwater goes from your project to the discharge site 0.24 GVR-2024-006 Aaron Esterholt Stormwater Review PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT Mailing Address: P.O. Box 547, Anacortes, WA 98221 Office Location: 904 6th Street, Anacortes WA 98821 Phone: (360) 293-1901 Weekly Erosion Control Self-Inspection Reports All sites that have a Stormwater Pollution Prevention Plan #2, 1-5 or 1-9 are required to submit a weekly erosion control/BMP monitoring inspection report through the citizen portal. These reports can be found on the city website and through the link on the submittals tab in the permitting customer portal. Turning in the weekly report consistently will help keep your project on schedule and avoid unnecessary delays due to cancelled inspections. Erosion-Control-Inspection-Form--Sites-Less-Than-One-Acre-fillable-PDF (anacorteswa.gov) Stormwater Site Inspection Form (anacorteswa.gov) (For larger sites) We appreciate your assistance in keeping our documentation up to date. Just complete the fillable PDF, save it, and then upload it with the blue upload tab. Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 2 of 6 Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 3 of 6 Best Management Practices Illustration Turn the page to see information corresponding to each numbered circle below. About this Pollution Prevention Plan This is Anacortes’s Small Site Construction Stormwater Pollution Prevention Plan (“Construction SWPPP”) intended to ensure your construction project minimizes erosion and does not contribute pollution, including sediment, to stormwater. This SWPPP is primarily intended for projects under 2,000 sq ft. This plan uses certain Best Management Practices (“BMPs”) from the Stormwater Management Manual. Some detailed descriptions are included; the remainder and additional information are available at https://fortress.wa.gov/ecy/publications/parts/1410055pa rt4.pdf#page=27 The listed BMPs are the minimum necessary; if erosion occurs, you must add additional BMPs as necessary to control it. You should include your Construction SWPPP in your contract with your builder. You must keep a copy of this SWPPP on the construction site or within reasonable access to the site for construction and inspection personnel at all times. Property owners and contractors are responsible for ensuring all aspects of BMPs are followed, including those not shown on the detail sheets. This Construction SWPPP should be considered a living document and must be updated as needed to reflect site conditions. Preserve Vegetation/Mark Clearing Limits Before any land disturbance, including clearing and grading, clearly mark all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area. Retain natural vegetation in an undisturbed state to the maximum extent practical. Use these BMPs: •C101 to preserve natural vegetation •C102 to establish buffer zones around important vegetation you want to save •C103 High Visibility Fencing to mark the boundaries of your buffers •C233 Silt Fence to ensure sediment doesn’t leavethe site Establish Construction Access Construction vehicles can damage or compact soils, create sediment pollution, or track sediment onto public roads. All equipment and vehicles that access the construction area must use an existing driveway or a stabilized construction entrance. •Use BMP C105 Stabilized Construction Entrance wherever traffic will be entering or leaving a construction site if paved roads are within 1,000 ft of the site. Construct a 12-inch thick pad of 4-inch to 8- inch quarry spalls, a 4-inch course of asphalt treated base, or use existing pavement. Place a separation geotextile under the spalls to prevent fine sediment from pumping up into the rock pad. Install the construction entrance prior to any vehicles entering the site, at the location shown on the site plan. Create only one construction entrance per site. 1 2 1b 1b 1b 2 1a 4 7 9a 9b 5 9b Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 4 of 6 •Use BMP C103 High Visibility Fencing to restrict traffic to the construction entrance. •Remove any sediment that is tracked onto pavementby shoveling or street sweeping and remove the collected sediment or stabilize it on site. Control Flow Rates (not shown) Stormwater on a cleared site can create significant flows that can damage downstream properties. Protect properties and waterways downstream of the project site from erosion and the associated discharge of turbid waters. If your project is required to control flow rates, you must use the following BMPs as shown on the approved site plan: •C203 Water Bars •C209 Outlet Protection •C235 Straw Wattles Install Sediment Controls When land is cleared of vegetation, stormwater can pick up sediment, a pollutant. BMPs can prevent sediment from leaving the site. You must install sediment controls before land disturbance to effectively minimize and control the discharge of pollutants and sediments. Use and properly install BMP C233 Silt Fence. You must bury the filter fabric as shown in the diagram in order for the BMP to be effective. You must repair the silt fence if it is damaged. Consider the following additional BMPs: •C231 Brush Barrier •C232 Gravel Filter Berm •C234 Vegetated Strip •C235 Straw Wattles Note that C230 Straw Bale Barrier is no longer an approved BMP. Stabilize Soils Leaving soils devegetated or exposed needlessly creates erosion and sediment problems. •Stabilize all exposed soils whenever constructionwork will stop for more than two days at a time during the wet season (October 1 to April 30) or 7 days the rest of the year (the dry season). •Stabilize all exposed soils at the end of the shift before a holiday or weekend. •Stabilize all exposed soils with either vegetation, matcoverings, mulching, or in those areas to be paved, a compacted base material. •Use BMP C123 Plastic Covering over all stockpiles with plastic or burlap if left unworked. Place sand- filled burlap or geotextile bags every 3 to 6 ft along seams and tie them together with twine to hold them in place. •If you excavate soil for the foundation, backfill that soil against the foundation and grade it to drain away from the building. Once the disturbed landscape areas are graded, you must seed or sod the grass areas. Consider the following additional BMPs: •C120 Temporary and Permanent Seeding •C121 Mulching •C122 Nets and Blankets •C124 Sodding •C125 Topsoiling/Composting •C131 Gradient Terraces •C140 Dust Control Protect Slopes (not shown) Slopes can be especially vulnerable to erosion, but BMPs can mitigate sediment problems. Design and construct cut-and-fill slopes to minimize erosion. Use the following practices: •Reduce continuous length of slope with terracing and diversions •Reduce slope steepness •Roughen slope surfaces •Use BMP C123 Plastic Covering over all exposed slopes •Use BMP C120 Temporary and Permanent Seeding as soon as possible on exposed slopes Manage off-site stormwater (run-on) separately from stormwater generated onsite. Divert off-site stormwater or groundwater away from slopes and disturbed areas with interceptor dikes, pipes, or swales. You may not create cut slopes over 4 feet high or slopes steeper than 2 feet horizontal to 1 foot vertical. Fill slopes may not exceed 4 feet high or 3 feet horizontal to 1 foot vertical. Slopes that exceed these criteria require engineering. Consider the following additional BMPs: •C121 Mulching •C122 Nets and Blankets •C124 Sodding •C203 Water Bars •C208 Triangular Silt Dike (Geotextile‐Encased Check Dam Protect Drain Inlets Storm drains are designed to collect and transport clean stormwater, not water contaminated with sediment or other pollutants. Storm drain inlets must be protected so that runoff does not enter the 3 4 5 6 7 Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 5 of 6 stormwater system without first being filtered or treated or both. •Use BMP C220 Storm Drain Inlet Protection to protect all proposed and existing storm drain inletsduring construction so that stormwater runoff does not enter the stormwater conveyance system without first being filtered or treated (or both) to remove sediment or other pollutants. •Clean or remove and replace inlet protection devices when sediment has filled one-third of the available storage (unless a different standard is specified by the product manufacturer). •Keep all approach roads clean. •Do not allow sediment and street wash water to enter storm drains without treatment. Stabilize Channels and Outlets Stormwater channels and outlets can themselves erode unless stabilized with rock or other armoring. Design, construct, and stabilize all on-site conveyance channels to prevent erosion as needed. Use BMP C209 Outlet Protection to provide stabilization, including armoring material adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches at the outlets of all conveyance systems. Consider the following additional BMPs: •C122 Nets and Blankets •C202 Channel Lining Control Pollutants Waste materials, demolition debris, and other pollutants that occur onsite during construction can contaminate the stormwater system unless managed. Cement and related products can modify the pH of stormwater. Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. Anytime you pour concrete, perform washout of the concrete trucks following BMP C154 Concrete Washout Area at designated washout areas only. Locate washout areas at least 50 ft from sensitive areas such as storm drains, open ditches, or water bodies, including wetlands. Clean contaminated surfaces immediately following any spill incident. Apply fertilizers and pesticides in a manner and at rates that will not result in loss of chemical via stormwater runoff. Use the following additional BMPs: •C151 Concrete Handling •C152 Sawcutting and Surfacing Pollution Prevention •C153 Material Storage, Delivery, and Containment Control De-Watering (not shown) De-watering water extracted from foundations, vaults, or trenches, has similar characteristics to stormwater runoff at the site and can cause the same impacts unless properly managed. You may discharge clean, non-turbid de-watering, such as well-point ground water, to systems that are tributaries to, or directly into, surface waters if the de- watering flow does not cause erosion or flooding or interfere with the operation of the stormwater system. Use the following BMPs: •C220 Storm Drain Inlet Protection •C236 Vegetative Filtration Maintain BMPs (not shown) All temporary and permanent erosion and sediment control BMPs must be maintained and repaired as needed to assure continued performance of their intended function. During the dry season, inspect sediment control BMPs weekly or after a runoff-producing storm event. During the wet season, inspect BMPs daily. Use BMP C150 Materials on Hand to ensure you are ready for a heavy rain. All temporary erosion and sediment control BMPs must be removed within 30 days after the City determines that the site is stabilized or after the temporary BMPs are no longer needed. Trapped sediment must be removed or stabilized on site. Disturbed soil areas resulting from removal of BMPs or vegetation must be permanently stabilized. Manage the Project (not shown) Phasing a project, especially when revegetation occurs as part of each phase, can help prevent the transport of sediment from the site. •Fully implement this Construction SWPPP at all times. •Modify this Construction SWPPP whenever there is a change in design, construction, operation, or maintenance at the construction site that has or could have a significant effect on the discharge of pollutants to waters of the state. •Inspect, maintain, and repair all BMPs as needed to ensure continued performance of their intended function. 8 9 10 11 12