HomeMy WebLinkAboutPermit File GVR-2024-007 305 30th StreetFor inspections, please call (360) 293-1901
PARCEL: P123039
LEGAL DESCRIPTION:
APPLICANT: O'Neal, Brian
155 NE 100th Street, Ste 302
Seattle, WA 98125
425-241-2627
OWNER: RUZICH RANDOLPH
SWEET 16 INVESTMENTS LLC
ANACORTES, WA 98221
FEES:Paid Due
Grading Permit Fee $23.50 $0.00
$0.00Totals :
REQUIRED INSPECTIONS
Storm Drain Connection Footings
$23.50
GVR-2024-007 CLEAR AND GRADE
ISSUED:
EXPIRES:
07/24/2024
03/24/2025
PROJECT NAME: NORTH HARBOR DIESEL GAS SHOP
STORMWATER IMPROVEMENTS
SITE ADDRESS: 305 30TH STREET ANACORTES
* Work within 200'-0" of the Ordinary High Water Mark (OHWM) has not been approved under this permit. If the scope of
work changes to include area within Shoreline Jurisdiction the work shall stop, and a Shoreline Exemption or Shoreline
Substantial Development Permit shall be submitted for review and processing with the Anacortes PCED Department prior to
any work in Shoreline Jurisdiction.
CONDITIONS
Page 1 of 1Printed by : Cheri Gleichmann on: 10/14/2024 09:37 AM
City of Anacortes, WA
904 6th Street
Anacortes, WA 98221
(360) 293-1901
http://cityofanacortes.org/
NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED
SEATTLE, WASHINGTON 98125
(206) 631-8680
PROJECT NO.
DRAWING NO.
DATE
SHEETAPPROVED BY:
REVIEWED BY:
DESIGNED BY:
DRAFTED BY:
DATEINITIALSTATUS:
155 NE 100TH STREET, STE 302
2177001.020
6-05-2024
B. PADGETT BMP 6-05-2024
B. O'NEAL
J. KALMAR
BLO 6-05-2024
JAK 6-05-2024
OF 5
NORTH HARBOR DIESEL & YACHT
STORMWATER SYSTEM IMPROVEMENTS
MAIN YARD (DISCHARGE S001)
LA
N
D
A
U
A
S
S
O
C
I
A
T
E
S
I
N
C
.
|
G:
\
P
R
O
J
E
C
T
S
\
2
1
7
7
\
0
0
1
\
0
2
0
\
C
L
E
A
R
I
N
G
A
N
D
G
R
A
D
I
N
G
P
E
R
M
I
T
P
L
A
N
S
\
M
A
I
N
Y
A
R
D
\
P
C
O
V
E
R
-
N
O
T
E
S
-
S
0
0
1
M
A
I
N
Y
A
R
D
.
D
W
G
|
6/
2
1
/
2
0
2
4
|
EZ
I
C
K
ISSUED FOR PERMITTING
JO S E P H A. KAL
M
A
R
NORTH HARBOR DIESEL & YACHT SERVICE INC.
MAIN YARD STORMWATER SYSTEM IMPROVEMENTS
ANACORTES, WASHINGTON
SITE ADDRESS
620 30TH STREET
ANACORTES, WA 98221
PARCEL NUMBERS
P77992
APPLICANT
NORTH HARBOR DIESEL & YACHT SERVICE INC.
720 30TH STREET
ANACORTES, WA 98221
(360) 299-1907
CONTACT: DIANNA CHONKA
DIANA@NORTHHARBORDIESEL.COM
ENGINEER
LANDAU ASSOCIATES
155 NE 100TH ST, STE 302
SEATTLE, WA 98125
(206) 631-8680
CONTACT: JOSEPH KALMAR, P.E.
JKALMAR@LANDAUINC.COM
EARTHWORK QUANTITIES (ON AND OFF-SITE)
CUT = 21 CY
FILL = 17 CY
NET IMPORT = -4 CY
TOTAL EARTHWORK = 38 CY
NOTES
1.HORIZONTAL DATUM FOR THIS PROJECT IS NAD 83/2011, WASHINGTON
COORDINATE SYSTEM. NORTH ZONE BASED ON GPS MEASUREMENTS
USING THE WASHINGTON STATE REFERENCE NETWORK.
2.VERTICAL DATUM FOR THIS SURVEY IS NAVD 88, BASED ON GPS
MEASUREMENTS USING THE WASHINGTON STATE REFERENCE
NETWORK. TOPOGRAPHIC DATA FROM LIDAR (DNR, KING COUNTY WEST
2021). REPORTED VERTICAL ACCURACY AVERAGE = -0.008 FT.
3.ALL WORK TO BE DONE AS PER CITY OF ANACORTES 2018 PUBLIC
WORKS ENGINEERING STANDARDS.
4.AERIAL IMAGERY SOURCED FROM THE CITY OF ANACORTES, 2024.
COVER SHEET C-1.0
1
SHEET INDEX
SHEET NO.SHEET NAME
C-1.0 COVER SHEET
C-2.0 NOTES
C-3.0 EXISTING CONDITIONS / TEMPORARY EROSION AND
SEDIMENT CONTROL (TESC) PLAN
C-4.0 STORMWATER TREATMENT IMPROVEMENTS
C-5.0 DETAILS
LEGAL DESCRIPTION
PARCEL 4463400090
(0.5800 ac) LOT 14, ANACORTES INDUSTRIAL PARK, ACCORDING TO THE PLAT
THEREOF, RECORDED IN VOLUME 10 OF PLATS, PAGES 19 TO 21, RECORDS OF
SKAGIT COUNTY, WASHINGTON. LESS RT 014-01
CONSTRUCTION SEQUENCE
1.MARK CLEARING/GRADING LIMITS.
2.CALL CITY INSPECTOR TO INSPECT CLEARING/GRADING LIMITS.
3.INSTALL INITIAL EROSION CONTROL PRACTICES (E.G., CONSTRUCTION
ENTRANCE, SILT FENCE, CATCH BASIN INSERTS).
4.CONTACT CITY INSPECTOR TO INSPECT INITIAL EROSION CONTROL PRACTICES.
5.CLEAR, GRADE AND FILL SITE AS OUTLINED IN THE SITE PLAN WHILE
IMPLEMENTING AND MAINTAINING TEMPORARY EROSION AND SEDIMENT
CONTROL PRACTICES AT THE SAME TIME.
6.INSTALL PERMANENT EROSION PROTECTION (IMPERVIOUS SURFACE,
LANDSCAPING, ETC.).
7.CONTACT CITY INSPECTOR FOR APPROVAL OF PERMANENT EROSION
PROTECTION AND SITE GRADES.
8.REMOVE EROSION CONTROL METHODS AS PERMITTED BY THE CITY
INSPECTOR AND REPAIR PERMANENT EROSION PROTECTION AS NECESSARY.
0 0.25 0.5
Miles
Stormwater Review
NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED
SEATTLE, WASHINGTON 98125
(206) 631-8680
PROJECT NO.
DRAWING NO.
DATE
SHEETAPPROVED BY:
REVIEWED BY:
DESIGNED BY:
DRAFTED BY:
DATEINITIALSTATUS:
155 NE 100TH STREET, STE 302
2177001.020
6-05-2024
B. PADGETT BMP 6-05-2024
B. O'NEAL
J. KALMAR
BLO 6-05-2024
JAK 6-05-2024
OF 5
NORTH HARBOR DIESEL & YACHT
STORMWATER SYSTEM IMPROVEMENTS
MAIN YARD (DISCHARGE S001)
LA
N
D
A
U
A
S
S
O
C
I
A
T
E
S
I
N
C
.
|
G:
\
P
R
O
J
E
C
T
S
\
2
1
7
7
\
0
0
1
\
0
2
0
\
C
L
E
A
R
I
N
G
A
N
D
G
R
A
D
I
N
G
P
E
R
M
I
T
P
L
A
N
S
\
M
A
I
N
Y
A
R
D
\
P
C
O
V
E
R
-
N
O
T
E
S
-
S
0
0
1
M
A
I
N
Y
A
R
D
.
D
W
G
|
6/
2
1
/
2
0
2
4
|
EZ
I
C
K
ISSUED FOR PERMITTING
JO S E P H A. KAL
M
A
R
NOTES
NOTES C-2.0
2
GENERAL NOTES:
CONSTRUCTION SHALL CONFORM TO THE CITY OF ANACORTERS PUBLIC WORKS
ENGINEERING STANDARDS, EDITION 7, NOVEMBER 2018, EXCEPT AS OTHERWISE
APPROVED BY DEVIATION, AND BE IN ACCORDANCE WITH THE APPROVED
PLANS. ANY SIGNIFICANT CHANGES FROM THE APPROVED PLAN WILL REQUIRE
APPROVAL FROM THE OWNER, ENGINEER OF RECORD, AND THE CITY.
ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE “WASHINGTON
STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD SPECIFICATIONS
FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION),”
EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY'S ENGINEERING
STANDARDS. THE ABOVE DOCUMENTS SHALL BE AVAILABLE AT THE JOB SITE
DURING CONSTRUCTION.
UNLESS STATED OTHERWISE, LOCATIONS SHOWN FOR EXISTING UTILITIES ARE
APPROXIMATE. THE CONTRACTOR IS CAUTIONED THAT OVERHEAD UTILITY LINES
MAY NOT BE SHOWN ON THE DRAWINGS. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS OF ALL
UNDERGROUND UTILITIES AND THE EXTENT OF ANY HAZARD CREATED BY
OVERHEAD UTILITY LINES. IDENTIFICATION, LOCATION, MARKING, AND
RESPONSIBILITY FOR UNDERGROUND FACILITIES OR UTILITIES, IS GOVERNED BY
THE PROVISIONS OF SECTION 19.122 REVISED CODE OF WASHINGTON (RCW).
PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE-CALL
(811) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS,
POWER, TELEPHONE, AND CABLE).
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY ON AND AROUND
THE PROJECT. PRIOR TO THE START OF WORK. CONTRACTORS AND THEIR
SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND
PROPERTY SUFFERED BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE
CONNECTED WITH THEM.
ANY CONSTRUCTION SURVEYING ASSOCIATED WITH THIS PROJECT SHALL BE
DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR
A WASHINGTON LICENSED PROFESSIONAL CIVIL ENGINEER.
GRADING AND EROSION CONTROL NOTES
ALL REQUIRED SEDIMENTATION AND EROSION CONTROL FACILITIES INDICATED
ON THE PLANS AND DESCRIBED IN THE FACILITY'S STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) MUST BE CONSTRUCTED AND IN OPERATION PRIOR
TO LAND CLEARING AND/OR OTHER CONSTRUCTION ACTIVITIES. THESE
FACILITIES SHALL BE MAINTAINED AND UPGRADED, IF NECESSARY, TO INSURE
THAT SEDIMENT-LADEN WATER AND STORM DRAINAGE RUNOFF DOES NOT
IMPACT THE ADJACENT PROPERTIES, NATURAL DRAINAGE WAYS, OR THE
EXISTING CITY STORM DRAINAGE SYSTEM.
SEDIMENTATION AND EROSION CONTROL FACILITIES WILL BE INSPECTED AT
LEAST WEEKLY DURING THE PROJECT. INSPECTIONS WILL BE DOCUMENTED ON
THE “CITY OF ANACORTES EROSION AND SEDIMENT CONTROL INSPECTION
SHEET - LOTS LESS THAN 1 ACRE”. A COPY OF THIS INSPECTION FORM IS
INCLUDED IN THE SWPPP.
THE STORM DRAINAGE DETENTION (RETENTION IF INFILTRATION SYSTEM IS
USED), SEDIMENTATION AND EROSION CONTROL FACILITIES DEPICTED ON THE
APPROVED DRAWINGS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO
MEET ANTICIPATED SITE CONDITIONS. ADDITIONAL DRAINAGE AND EROSION
CONTROL FACILITIES MAY BE REQUIRED AS SITUATIONS WARRANT DURING
CONSTRUCTION. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND
ADDITIONS TO THESE CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE
PERMITEE.
THE TEMPORARY EROSION CONTROL FACILITIES, INCLUDING ALL PERIMETER
CONTROLS, SHALL REMAIN IN PLACE UNTIL FINAL SITE CONSTRUCTION IS
COMPLETED. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL
TEMPORARY FACILITIES.
THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY, TO
REDUCE DUST EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY.
NO TRACKING IN THE ROADWAY IS ALLOWED. IF SEDIMENT IS TRACKED ONTO
THE ROAD, THE ROAD SHALL BE THOROUGHLY AND IMMEDIATELY CLEANED BY
SHOVELING OR PICKUP SWEEPING. TRANSPORT SEDIMENT TO A CONTROLLED
SEDIMENT DISPOSAL AREA. KEEP STREETS CLEAN AT ALL TIMES.
ALL AREAS OF ACTIVE EARTHWORK WHICH HAVE THE POTENTIAL FOR EROSION
AND SEDIMENTATION IMPACTS ON ADJACENT PROPERTIES, NATURAL DRAINAGE
WAYS, OR THE EXISTING CITY STORM DRAINAGE SYSTEM MUST BE STABILIZED
ACCORDING TO THE FOLLOWING SCHEDULE: FROM MAY 1 TO SEPTEMBER 30,
AREAS AT FINAL GRADE AND THOSE THAT ARE SCHEDULED TO REMAIN
UN-WORKED FOR MORE THAN SEVEN (7) DAYS SHALL BE STABILIZED. FROM
OCTOBER 1 TO APRIL 30 EARTHWORK ACTIVITIES SHALL BE CONDUCTED IN
STAGES IN ORDER TO MINIMIZE SOIL EXPOSURE. EXPOSED SOILS THAT WILL
REMAIN UN-WORKED FOR MORE THAN TWO (2) DAYS SHALL BE STABILIZED
IMMEDIATELY.
CONCRETE NOTES:
1.ALL CONCRETE SHALL BE HARD ROCK CONCRETE MEETING REQUIREMENTS
OF ACI-301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS". MIX PROPORTIONS SHALL BE PER ACI-301, METHOD 2 OR THE
ALTERNATE PROCEDURE. INCLUDE MASTERFIBER MAC 360 FF. DOSE AT
3-LBS PER CUBIC YARD.
2.STRUCTURAL CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM
COMPRESSIVE STRENGTH AT 28 DAYS:
3.ALLOW CONCRETE TO CURE FOR MINIMUM OF 7-DAYS OR 3,000 PSI
BREAK, WHICHEVER IS LATER.
4.ALL CONCRETE EXPOSED TO WEATHER SHALL CONTAIN 5% (±) 1% AIR
ENTRAINMENT BY VOLUME. AIR ENTRAINMENT SHALL BE IN
CONFORMANCE WITH ASTM C260 AND C494. COLD WEATHER PLACEMENT
SHALL CONFORM TO ACI-306. HOT WEATHER PLACEMENT SHALL
CONFORM TO ACI-305. MECHANICALLY VIBRATE ALL FORMED CONCRETE.
DO NOT OVER-VIBRATE. PLACE CONCRETE MONOLITHICALLY BETWEEN
CONSTRUCTION OR CONTROL JOINTS. PROTECT ALL CONCRETE FROM
PREMATURE DRYING.
5.CHAMFER ALL EXTERIOR CORNERS 1/2" UNLESS SHOWN OTHERWISE.
6.SLUMP LIMITS MAY BE INCREASED BY ADDITION OF ADMIXTURES
PROVIDED THAT THE WATER/CEMENT RATIO OF THE ORIGINAL MIX
DESIGN IS NOT EXCEEDED. WATER REDUCING ADMIXTURE SHALL BE IN
CONFORMANCE WITH ASTM494, USED IN CONFORMANCE WITH
MANUFACTURER'S INSTRUCTIONS. SUBMIT ADMIXTURES TO ENGINEER
FOR REVIEW PRIOR TO CONSTRUCTION.
7.CEMENT SHALL BY TYPE I OR II IN CONFORMANCE WITH ASTM C150.
AGGREGATES SHALL BE IN CONFORMANCE WITH ASTM C33. COARSE
AGGREGATES SHALL NOT EXCEED 3/4". WATER SHALL BE CLEAN AND
POTABLE.
8.REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. GRADE
40 MAY BE USED FOR #3 AND SMALLER TIES AND STIRRUPS. DETAIL AND
PLACE ACCORDING TO ACI MANUAL SP-66.
9.UNLESS OTHERWISE NOTED, MINIMUM COVER SHALL BE 1 1/2" FOR #5
AND SMALLER BARS, 2" FOR #6 AND LARGER BARS AND 3" WHEN POURED
AGAINST EARTH. SUPPORT REINFORCEMENT WITH APPROVED CHAIRS,
SPACERS, OR TIES.
10.PROVIDE MINIMUM 48 BAR DIAMETERS AT SPLICES. NO MORE THAN 50%
OF REINFORCING SHALL BE SPLICED AT ANY LOCATION. UNLESS
OTHERWISE NOTED, BEND ALL HORIZONTAL REINFORCING A MINIMUM
OF 2'-0" AT CORNERS AND WALL/FOOTING INTERSECTIONS WITH MIN.
EMBEDMENT BEYOND INTERFACE PER DEVELOPMENT LENGTH SPECIFIED
IN ACI 318.
11.FORMWORK SHALL BE IN ACCORDANCE WITH ACI-347 "GUIDE TO
FORMWORK FOR CONCRETE". FORMS SHALL BE DESIGNED BY THE
CONTRACTOR. BRACING SHALL BE PROVIDED AS REQUIRED OR UNTIL THE
CONCRETE HAS REACHED ITS SPECIFIED 28-DAY STRENGTH. ALL SHORING
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. FORMWORK,
SUPPORTS, AND SHORING SHALL PROVIDE FINISHED CONCRETE SURFACES
AT ALL FACES: LEVEL, PLUMB, AND TRUE TO DIMENSIONS AND
ELEVATIONS SHOWN IN THE DRAWINGS.
12.PLACE #4 BARS x 2'-0" MIN. @ ALL CORNERS AND ANGLE POINTS U.N.O.
TYPE f'c SLUMP w/c AIR
SLABS 3,000 psi 1-3"0.40 5%
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD SD SD SD SD
SD
SD
SD
IPIP
89
.
4
2
'
54.51'
5
0
49
4
8
47
4
5
44
4
4
43
43
45
47
4
7
48
42
42
43
41
40
4
0
4
1
39
NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED
SEATTLE, WASHINGTON 98125
(206) 631-8680
PROJECT NO.
DRAWING NO.
DATE
SHEETAPPROVED BY:
REVIEWED BY:
DESIGNED BY:
DRAFTED BY:
DATEINITIALSTATUS:
155 NE 100TH STREET, STE 302
2177001.020
6-05-2024
B. PADGETT BMP 6-05-2024
B. O'NEAL
J. KALMAR
BLO 6-05-2024
JAK 6-05-2024
OF 5
NORTH HARBOR DIESEL & YACHT
STORMWATER SYSTEM IMPROVEMENTS
MAIN YARD (DISCHARGE S001)
LA
N
D
A
U
A
S
S
O
C
I
A
T
E
S
I
N
C
.
|
G:
\
P
R
O
J
E
C
T
S
\
2
1
7
7
\
0
0
1
\
0
2
0
\
C
L
E
A
R
I
N
G
A
N
D
G
R
A
D
I
N
G
P
E
R
M
I
T
P
L
A
N
S
\
M
A
I
N
Y
A
R
D
\
P
E
X
C
O
N
D
-
S
0
0
1
M
A
I
N
Y
A
R
D
.
D
W
G
|
6/
2
1
/
2
0
2
4
|
EZ
I
C
K
ISSUED FOR PERMITTING
JO S E P H A. KAL
M
A
R
EXISTING CONDITIONS/TESC C-3.0
3
SWING/SLIDE GATE - CONSTRUCTION ENTRANCE
SEE SHEET C-4.0 FOR INFORMATION ON
STORMWATER TREATMENT IMPROVEMENTS
SD SD
LEGEND
PROPERTY BOUNDARY
EXISTING STORMDRAIN
STORM DRAIN INLET PROTECTION (BMP C220)
CHAINLINK FENCE (CLF)
EXISTING CATCH BASIN
SILT FENCE (BMP C233) OR STRAW WATTLES (BMP C235)
IP
SD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
A A'
NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED
SEATTLE, WASHINGTON 98125
(206) 631-8680
PROJECT NO.
DRAWING NO.
DATE
SHEETAPPROVED BY:
REVIEWED BY:
DESIGNED BY:
DRAFTED BY:
DATEINITIALSTATUS:
155 NE 100TH STREET, STE 302
2177001.020
6-05-2024
B. PADGETT BMP 6-05-2024
B. O'NEAL
J. KALMAR
BLO 6-05-2024
JAK 6-05-2024
OF 5
NORTH HARBOR DIESEL & YACHT
STORMWATER SYSTEM IMPROVEMENTS
MAIN YARD (DISCHARGE S001)
LA
N
D
A
U
A
S
S
O
C
I
A
T
E
S
I
N
C
.
|
G:
\
P
R
O
J
E
C
T
S
\
2
1
7
7
\
0
0
1
\
0
2
0
\
C
L
E
A
R
I
N
G
A
N
D
G
R
A
D
I
N
G
P
E
R
M
I
T
P
L
A
N
S
\
M
A
I
N
Y
A
R
D
\
P
P
R
O
P
C
O
N
D
-
S
0
0
1
M
A
I
N
Y
A
R
D
.
D
W
G
|
6/
2
1
/
2
0
2
4
|
EZ
I
C
K
ISSUED FOR PERMITTING
JO S E P H A. KAL
M
A
R
STORMWATER TREATMENT IMPROVEMENTSC-4.0
4
PROPOSED FORCE MAIN
NEW CB LOCATION
PUMP STATION S001
SECTION AA'
8" INLET PIPE
IE ≈ 39.63 FT
RIM ELE ≈ 42.25 FT
SAMPLE LID
6"
5'
-
6
"
6'
-
0
"
512"
1'-11"
PAD DIMENSIONS: 10'-6" WIDE x 12'-6" LONG.
SEE FILTER BOX PAD DETAIL ON SHEET C-5.0
CONSTRUCTION DETAILS
CONCRETE
PAD
SUBMERSIBLE
PUMP WITH
INTEGRAL
FLOAT
CONTROLS
(40 GPM AT
25 FT TDH)
CONCRETE PAD
PROPOSED STORMDRAIN
PROPOSED CATCH BASIN LOCATION
RIM ≈ 42.15 FT
EXISTING 8" IE (W) ≈ 39.57 FT
PROPOSED 8" IE (E) ≈ 39.53 FT
PLUG EXISTING 8" PVC (S) ≈ 39.53 FT
3" FORCE MAIN
TO TREATMENT
6" INLET PIPE FROM TREATMENT
IE ≈ 39.00 FT (NORTH)
8" OUTLET PIPE TO CITY DRAIN
IE ≈ 39.63 FT (SOUTH)
6' CHITOSAN LACTATE
SOCK WITHIN 4" PVC
PLUG
12" PVC CONTACT
PIPE (7 LF)
2'
-
3
.
5
"
2'
-
3
.
5
"
3'
GRAVITY
DRAIN
LEGEND
PROPERTY BOUNDARY
EXISTING STORMDRAIN
PROPOSED CATCH BASIN
CHAINLINK FENCE (CLF)
EXISTING CATCH BASIN
0 5 10
SCALE IN FEET
0 2 4
SCALE IN FEET
FILTER
BOX
FILTER BOX
DIMENSIONS: 8' WIDE x
12' LONG AND 4.5' HIGH
FILTER BOX
SEE VAULT COVER
DETAIL ON SHEET C-5.0
DISCHARGE MONITORING
POINT S001
MOVE EXISTING CATCH
BASIN TO NEW LOCATION
AS SHOWN AND REGRADE
SURROUNDING AREA TO
DRAIN TO NEW LOCATION
DETAIL A, THIS SHEET
DETAIL A
1'
6"
2
1
3/4" CHAMFER
ALL AROUND
TOP OF ADJACENT GRADE
4"
10'6" X 12'6" CONCRETE PAD
3"
C
L
R
T
Y
P
.
AT
B
O
T
T
O
M
3" CLR
AT SIDES
2"
C
L
R
AT
T
O
P
#4 AT 12" O.C.
TOP BARS: #4 AT 16" O.C.
W/ 90° HOOK AT EA. END
BOTTOM BARS: #4 AT 16" O.C.
EACH WAY AT BOTTOM
2'
CROSS BAR
SPACING (TYP.)
NO.DATE REVISIONS REVIEWEDDESIGNED APPROVED
SEATTLE, WASHINGTON 98125
(206) 631-8680
PROJECT NO.
DRAWING NO.
DATE
SHEETAPPROVED BY:
REVIEWED BY:
DESIGNED BY:
DRAFTED BY:
DATEINITIALSTATUS:
155 NE 100TH STREET, STE 302
2177001.020
6-05-2024
B. PADGETT BMP 6-05-2024
B. O'NEAL
J. KALMAR
BLO 6-05-2024
JAK 6-05-2024
OF 5
NORTH HARBOR DIESEL & YACHT
STORMWATER SYSTEM IMPROVEMENTS
MAIN YARD (DISCHARGE S001)
LA
N
D
A
U
A
S
S
O
C
I
A
T
E
S
I
N
C
.
|
G:
\
P
R
O
J
E
C
T
S
\
2
1
7
7
\
0
0
1
\
0
2
0
\
C
L
E
A
R
I
N
G
A
N
D
G
R
A
D
I
N
G
P
E
R
M
I
T
P
L
A
N
S
\
M
A
I
N
Y
A
R
D
\
P
D
E
T
A
I
L
S
-
S
0
0
1
M
A
I
N
Y
A
R
D
.
D
W
G
|
6/
2
1
/
2
0
2
4
|
EZ
I
C
K
ISSUED FOR PERMITTING
JO S E P H A. KAL
M
A
R
DETAILS C-5.0
5
VAULT LID PLAN VIEW
3" force main
Elbow
Cross bars or screen with
minimum opening of 1"
Reducer
6' chitosan lactate sock
Chitosan sock to be secured to the
wye cap with a clip/carabiner on
u-bolt
Filter unit
2" flow meter
Sample port
See Note 1
3" x 4" reducer
Elbow
Reducer
Notes
1.For 8" Ø pipe a total pipe run of 15 LF is required for 1 minute of contact time at design pumping
rate of 39 gpm. For 12" Ø pipe a total pipe run of 7 LF is required for 1 minute of contact time at
design pumping rate of 39 gpm. Support full length of new pipe as needed by attaching to side of
filter unit or providing other appropriate support. Protect from traffic impact.
2.Not to scale.
4" wye
SCALE: 1" = 1'
FILTER BOX PAD PROFILE
1.REFER TO SHEET C-2.0 FOR STRUCTURAL NOTES AND INFORMATION.
2.POSITION FILTER TANK CENTERED OVER CONCRETE PAD.
3.ALL REINFORCEMENT SHALL BE CONTINUOUS.
4.FOUNDATION SHALL NOT BE LOCATED DIRECTLY OVER UNDERGROUND UTILITIES AND/OR
STRUCTURES AND SHALL BE LOCATED A SUFFICIENT DISTANCE AWAY, AS RECOMMENDED BY
GEOTECH, TO AVOID SURCHARGE ON ANY UNDERGROUND UTILITIES AND/OR STRUCTURES.
NOTES
FORCE MAIN PIPE DETAIL
Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 1 of 6
Permit #:
Received by:
Small Site Construction SWPPP
City of Anacortes Stormwater · 904 6th Street · Anacortes, WA 98221 Stormwater Inspector: 360-630-1037
General Information
Project Name Parcel Size acres
Project Address
Property Owner Phone
Site Contact Phone
Project Description
Describe the nature and purpose of the construction project. Include the total size of the area, any increase in existing impervious area; the total area expected to be disturbed by clearing, grading, excavation or other
construction activities, including off-site borrow and fill areas; and the volumes of grading cut and fill that are proposed.
Erosion control lead or responsible party
Phone
Engineer/Firm Phone
Site Conditions
Adjacent Areas: See the site plan, drainage plan, and construction drawings approved for the associated permit.
Critical areas: See the critical areas site plan approved for the associated permit.
Attach a copy of your stormwater site plan submitted with your building/grading permit application and attach pictures
of construction site.
*Stormwater site plan shall list all BMPs for inspectors
*Add a map of where your stormwater goes from your project to the discharge site
0.24
GVR-2024-006
Aaron Esterholt
Stormwater Review
PLANNING, COMMUNITY, & ECONOMIC DEVELOPMENT DEPARTMENT
Mailing Address: P.O. Box 547, Anacortes, WA 98221
Office Location: 904 6th Street, Anacortes WA 98821
Phone: (360) 293-1901
Weekly Erosion Control Self-Inspection Reports
All sites that have a Stormwater Pollution
Prevention Plan #2, 1-5 or 1-9 are required to
submit a weekly erosion control/BMP monitoring
inspection report through the citizen portal.
These reports can be found on the city website
and through the link on the submittals tab in the
permitting customer portal.
Turning in the
weekly report
consistently will
help keep your
project on
schedule and
avoid unnecessary
delays due to
cancelled
inspections.
Erosion-Control-Inspection-Form--Sites-Less-Than-One-Acre-fillable-PDF (anacorteswa.gov)
Stormwater Site Inspection Form (anacorteswa.gov) (For larger sites)
We appreciate your assistance in keeping our documentation up to date.
Just complete the fillable PDF, save it, and
then upload it with the blue upload tab.
Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 2 of 6
Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 3 of 6
Best Management Practices Illustration
Turn the page to see information corresponding to each numbered circle below.
About this Pollution Prevention Plan
This is Anacortes’s Small Site Construction Stormwater
Pollution Prevention Plan (“Construction SWPPP”)
intended to ensure your construction project minimizes
erosion and does not contribute pollution, including
sediment, to stormwater. This SWPPP is primarily
intended for projects under 2,000 sq ft.
This plan uses certain Best Management Practices
(“BMPs”) from the Stormwater Management Manual.
Some detailed descriptions are included; the remainder
and additional information are available at
https://fortress.wa.gov/ecy/publications/parts/1410055pa
rt4.pdf#page=27 The listed BMPs are the minimum
necessary; if erosion occurs, you must add
additional BMPs as necessary to control it.
You should include your Construction SWPPP in your
contract with your builder. You must keep a copy of this
SWPPP on the construction site or within reasonable
access to the site for construction and inspection
personnel at all times.
Property owners and contractors are responsible for
ensuring all aspects of BMPs are followed, including
those not shown on the detail sheets. This Construction
SWPPP should be considered a living document and
must be updated as needed to reflect site conditions.
Preserve Vegetation/Mark Clearing Limits
Before any land disturbance, including clearing and
grading, clearly mark all clearing limits, sensitive areas
and their buffers, and trees that are to be preserved
within the construction area. Retain natural vegetation in
an undisturbed state to the maximum extent practical.
Use these BMPs:
•C101 to preserve natural vegetation
•C102 to establish buffer zones around important
vegetation you want to save
•C103 High Visibility Fencing to mark the
boundaries of your buffers
•C233 Silt Fence to ensure sediment doesn’t leavethe site
Establish Construction Access
Construction vehicles can damage or compact
soils, create sediment pollution, or track sediment
onto public roads.
All equipment and vehicles that access the construction
area must use an existing driveway or a stabilized
construction entrance.
•Use BMP C105 Stabilized Construction Entrance
wherever traffic will be entering or leaving a
construction site if paved roads are within 1,000 ft of
the site. Construct a 12-inch thick pad of 4-inch to 8-
inch quarry spalls, a 4-inch course of asphalt treated
base, or use existing pavement. Place a separation
geotextile under the spalls to prevent fine sediment
from pumping up into the rock pad. Install the
construction entrance prior to any vehicles entering
the site, at the location shown on the site plan.
Create only one construction entrance per site.
1
2
1b
1b
1b
2
1a
4
7
9a
9b
5
9b
Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 4 of 6
•Use BMP C103 High Visibility Fencing to restrict
traffic to the construction entrance.
•Remove any sediment that is tracked onto pavementby shoveling or street sweeping and remove the
collected sediment or stabilize it on site.
Control Flow Rates (not shown)
Stormwater on a cleared site can create significant
flows that can damage downstream properties.
Protect properties and waterways downstream of the
project site from erosion and the associated discharge of
turbid waters. If your project is required to control flow
rates, you must use the following BMPs as shown on the
approved site plan:
•C203 Water Bars
•C209 Outlet Protection
•C235 Straw Wattles
Install Sediment Controls
When land is cleared of vegetation, stormwater can
pick up sediment, a pollutant. BMPs can prevent
sediment from leaving the site.
You must install sediment controls before land
disturbance to effectively minimize and control the
discharge of pollutants and sediments.
Use and properly install BMP C233 Silt Fence. You
must bury the filter fabric as shown in the diagram in
order for the BMP to be effective. You must repair the silt
fence if it is damaged.
Consider the following additional BMPs:
•C231 Brush Barrier
•C232 Gravel Filter Berm
•C234 Vegetated Strip
•C235 Straw Wattles
Note that C230 Straw Bale Barrier is no longer an
approved BMP.
Stabilize Soils
Leaving soils devegetated or exposed needlessly
creates erosion and sediment problems.
•Stabilize all exposed soils whenever constructionwork will stop for more than two days at a time during
the wet season (October 1 to April 30) or 7 days the
rest of the year (the dry season).
•Stabilize all exposed soils at the end of the shift
before a holiday or weekend.
•Stabilize all exposed soils with either vegetation, matcoverings, mulching, or in those areas to be paved, a
compacted base material.
•Use BMP C123 Plastic Covering over all stockpiles
with plastic or burlap if left unworked. Place sand-
filled burlap or geotextile bags every 3 to 6 ft along
seams and tie them together with twine to hold them
in place.
•If you excavate soil for the foundation, backfill that
soil against the foundation and grade it to drain away
from the building. Once the disturbed landscape
areas are graded, you must seed or sod the grass
areas.
Consider the following additional BMPs:
•C120 Temporary and Permanent Seeding
•C121 Mulching
•C122 Nets and Blankets
•C124 Sodding
•C125 Topsoiling/Composting
•C131 Gradient Terraces
•C140 Dust Control
Protect Slopes (not shown)
Slopes can be especially vulnerable to erosion, but
BMPs can mitigate sediment problems.
Design and construct cut-and-fill slopes to minimize
erosion. Use the following practices:
•Reduce continuous length of slope with terracing and
diversions
•Reduce slope steepness
•Roughen slope surfaces
•Use BMP C123 Plastic Covering over all exposed
slopes
•Use BMP C120 Temporary and Permanent Seeding
as soon as possible on exposed slopes
Manage off-site stormwater (run-on) separately from
stormwater generated onsite. Divert off-site stormwater
or groundwater away from slopes and disturbed areas
with interceptor dikes, pipes, or swales.
You may not create cut slopes over 4 feet high or slopes
steeper than 2 feet horizontal to 1 foot vertical. Fill
slopes may not exceed 4 feet high or 3 feet horizontal to
1 foot vertical. Slopes that exceed these criteria require
engineering.
Consider the following additional BMPs:
•C121 Mulching
•C122 Nets and Blankets
•C124 Sodding
•C203 Water Bars
•C208 Triangular Silt Dike (Geotextile‐Encased Check
Dam
Protect Drain Inlets
Storm drains are designed to collect and transport
clean stormwater, not water contaminated with
sediment or other pollutants. Storm drain inlets
must be protected so that runoff does not enter the
3
4
5
6
7
Small Site Construc�on SWPPP (002) Updated 4/23/2024 page 5 of 6
stormwater system without first being filtered or
treated or both.
•Use BMP C220 Storm Drain Inlet Protection to
protect all proposed and existing storm drain inletsduring construction so that stormwater runoff does
not enter the stormwater conveyance system without
first being filtered or treated (or both) to remove
sediment or other pollutants.
•Clean or remove and replace inlet protection devices
when sediment has filled one-third of the available
storage (unless a different standard is specified by
the product manufacturer).
•Keep all approach roads clean.
•Do not allow sediment and street wash water to enter
storm drains without treatment.
Stabilize Channels and Outlets
Stormwater channels and outlets can themselves
erode unless stabilized with rock or other armoring.
Design, construct, and stabilize all on-site conveyance
channels to prevent erosion as needed. Use BMP C209
Outlet Protection to provide stabilization, including
armoring material adequate to prevent erosion of outlets,
adjacent streambanks, slopes, and downstream reaches
at the outlets of all conveyance systems.
Consider the following additional BMPs:
•C122 Nets and Blankets
•C202 Channel Lining
Control Pollutants
Waste materials, demolition debris, and other
pollutants that occur onsite during construction can
contaminate the stormwater system unless
managed. Cement and related products can modify
the pH of stormwater.
Provide cover, containment, and protection from
vandalism for all chemicals, liquid products, petroleum
products, and other materials that have the potential to
pose a threat to human health or the environment.
Anytime you pour concrete, perform washout of the
concrete trucks following BMP C154 Concrete Washout
Area at designated washout areas only. Locate washout
areas at least 50 ft from sensitive areas such as storm
drains, open ditches, or water bodies, including
wetlands.
Clean contaminated surfaces immediately following any
spill incident. Apply fertilizers and pesticides in a manner
and at rates that will not result in loss of chemical via
stormwater runoff.
Use the following additional BMPs:
•C151 Concrete Handling
•C152 Sawcutting and Surfacing Pollution Prevention
•C153 Material Storage, Delivery, and Containment
Control De-Watering (not shown)
De-watering water extracted from foundations,
vaults, or trenches, has similar characteristics to
stormwater runoff at the site and can cause the
same impacts unless properly managed.
You may discharge clean, non-turbid de-watering, such
as well-point ground water, to systems that are
tributaries to, or directly into, surface waters if the de-
watering flow does not cause erosion or flooding or
interfere with the operation of the stormwater system.
Use the following BMPs:
•C220 Storm Drain Inlet Protection
•C236 Vegetative Filtration
Maintain BMPs (not shown)
All temporary and permanent erosion and sediment
control BMPs must be maintained and repaired as
needed to assure continued performance of their
intended function.
During the dry season, inspect sediment control BMPs
weekly or after a runoff-producing storm event. During
the wet season, inspect BMPs daily. Use BMP C150
Materials on Hand to ensure you are ready for a heavy
rain.
All temporary erosion and sediment control BMPs must
be removed within 30 days after the City determines that
the site is stabilized or after the temporary BMPs are no
longer needed. Trapped sediment must be removed or
stabilized on site. Disturbed soil areas resulting from
removal of BMPs or vegetation must be permanently
stabilized.
Manage the Project (not shown)
Phasing a project, especially when revegetation
occurs as part of each phase, can help prevent the
transport of sediment from the site.
•Fully implement this Construction SWPPP at all
times.
•Modify this Construction SWPPP whenever there is a
change in design, construction, operation, or
maintenance at the construction site that has or could
have a significant effect on the discharge of
pollutants to waters of the state.
•Inspect, maintain, and repair all BMPs as needed to
ensure continued performance of their intended
function.
8
9
10
11