HomeMy WebLinkAboutPermit File BLD-2023-0058 1918 Bay Place (3) , City of Anacortes .
.:, Y Invoice/Permit#. BLD-2023-0058
u 904 6th Street Applied date: 01/30/2023
P.O.Box 547 Issue date: 03/28/2023
Anacortes, WA 98221-0547
Expire date: 09/23/2024
r 360 293-1901
'... � c00
.,p.,.
Job Address: 1918 BAY PL Permit Type: Single Family Interior Only Alteration Permit
ANACORTES WA 98221-2923 Project:
APN: P59622
Remarks: Remodel interior plus add a 296sf covered porch over existing concrete and a major landcape project that triggers a
stormwater report. Fence will be added on another permit, BLD-2023-0063.
Owner: SANDRA RUSSELL Contractor: KREIDER CONSTRUCTION
Address: 1918 BAY PL Address: 1010 22ND ST
ANACORTES WA 98221-2923 ANACORTES WA 98221-2521
Phone: (360)293-6105 Phone: (360)707-5588
License#:
General Information: Fees:
Use Zone R2 Building Permit Fee 3,233.75
Deck Square Footage 296 Plan Review Fee 2,101.94
Building Valuation 500000 State Building Code Fee Resi 6.50
Stove, Appliance 1 Mechanical Permit Fees 66.85
# Forced Air Furnace<=100k 1 Plumbing Permit Fee 83.00
#of Ventilation Fans 1 Total Calculated: 53492.04
#of Range Hoods 1 Deposits/Receipts: 0.00
#of Tubs, bath 1
#of Clothes Dryers 1 Total Due: 51492.04
#of Clothes Washers 1
#of Dishwashers 1
#of Showers 1
#of utility Sinks 1
#of Kitchen Sinks 1
#of Water Closets(Toilets) 1
#of Water Piping 1
#of Other Fixtures 1
The issuance or granting of this permit shall not be construed to be a permit for,or approval of, any violation of this Code or any other ordinance or order of
the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or
granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or
federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be
valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order, proclamation, guidance advice or decision of
the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,
inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or
decision of the Governor.This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction work is
suspended or abandoned for a period of 180 days at any time after work is commenced. I have read and examined this application and know the same to
be true and correct.
SIGNATURE OF OWNER OR AUTHORIZED AGENT ISSUED BY