Request for Information RF1 1
u
,
Date: November 3, 2022
u. a 1'is
To: Michael Quinn ' p �
b
D
Project: Macartney Residence
Y
„N
AE Project #: 22053
Subject: Revision 1 — Concrete details
Comments:
Detail 1/S-3.1 Typical Concrete Slab; #3 Bar at 18" On Center Each Way is our recommended
minimum reinforcement. This is a non-structural slab and the reinforcement spacing can be
modified at the discretion of the builder. However Alpine Engineering can not guarantee slab
performance if the reinforcement is modified.
Detail 3/S-3.1; Slab At Door Opening. The foundation at the door opening can be mono poured.
Detail 4/S-3.1; The CBSQ post base can be substituted with a ABU66Z. Post install the base using
a 5/8" all thread rod, 4" embed with Simpson Set3G Epoxy. Install epoxy per manufacturer
requirements.
Please do not hesitate to contact my office if you have any further questions or need anything else.
Sincerely,
gkl_�
Brandon Hausmann, PE.
8
W
171
'Iff" At
SIIIIIU C
I U I'�R A I000a
m wpm III I�..p... III, JJZI WIII..111,.°III
�� III� �����i'� Ilf..11l'',I III III..III a' a' �i�