Laserfiche WebLink
Name Project Name Applicant Name (LN, FN) Application Date Decision Date Project Description
SEPA MDNS[Icon] Cascade Natural Gas Corp. March Point Replacement Phase 2 John Bailey, Cascade Natural Gas Coporation 9/3/2020 Install 3,100 linear feet of new 8-inch steel high pressure gas line, 2,200 linear feet of new 2-inch PE distribution pressure pipeline, and a new valve station to replace existing infrastructure.
SEPA review memo[Icon] Cascade Natural Gas Corp. March Point Replacement Phase 2 John Bailey, Cascade Natural Gas Coporation 9/3/2020 Install 3,100 linear feet of new 8-inch steel high pressure gas line, 2,200 linear feet of new 2-inch PE distribution pressure pipeline, and a new valve station to replace existing infrastructure.
Page 1 of 1
2 Entries
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.