Laserfiche WebLink
4� ttERf�IC�� <br /> ttA$t <br /> ~orm Water Drainage Report <br /> ' urn Requirements I through 9 <br /> . o ENGINEERING DEPARTMENT <br /> 27807 � 404 6" Street Anacortes, WA 98221 <br /> - - <br /> www,anacorteswa.gov <br /> Official Use Only: (Information to Inspectors) <br /> Required Storm Water Facility and other related requirements: <br /> -A , t <br /> A OaLx 5-4s TIEwt- <br /> Project Address: 1209 & 1219 32nd Street Submittal Date: 03 .1(�• oZZ <br /> Parcel Number: P57915 & P57916 Revision Number: ___ <br /> Permit Number: Reviewer: _Gz�_4 bSP. R 4S <br /> Acceptance Date (COA): p?5 • -Zb1.2 <br /> FRONT OF REPORT: <br /> Submittal Checklist: (All items listed below are required for a complete submittal) <br /> o Cover Sheet (Preparer to Provide): Project title, Location, Revision dates, Engineer's Stamp <br /> o TAB 1: Minimum Requirement#1 -Preparation of Stormwater Site Plans <br /> • TAB 2: Minimum Requirement##2 -Construction Stormwater Pollution Prevention (SWPP) <br /> o TAB:3:Minimum Requirement#3 -Source Control of Pollution <br /> • TAB 4: Minimum Requirement#4- Preservation of Natural Drainage Systems and Outfalls <br /> • TAB 5: Minimum Requirement#5-On-site Stormwater Managements <br /> • TAB 6: Minimum Requirement#6 Runoff Treatment <br /> J TAB 7: Minimum Requirement#7 - Flow Control <br /> o TAB 8: Minimum Requirement#8-Wetland Protection <br /> • TAB 9: Minimum Requirement#9-Operation and Maintenance <br /> • APPENDIX 1 - Survey performed by a Professional Land Surveyor <br /> a APPENDIX 2 Soils Analysis(Volume 1, Chapter 3.1.1) <br /> c APPENDIX 3 - Model Sail Management Plan for BMP T5.13 <br /> • APPENDIX 4 - Determining Construction Site Sediment Damage Potential (Appendix 7) <br /> • APPENDIX 5 - Site Plan with all applicable information (Minimum Size 11x17-30 scale) <br /> o APPENDIX 6 - Documented Site Photos (North, South; East and West) <br /> o APPENDIX 7 - Drainage BMP Facility Maintenance Covenant, if applicable. To be recorded prior to the <br /> Temporary Certificate of Occupancy, Certificate of Occupancy or Final Acceptance. FLOW CONTROL <br /> EXEMPT <br /> Stormwater Management Requirements: <br /> Version Date: October 7, 2019 Previous Version Date: February 20, 2019 <br />