My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
663087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 6:56:22 AM
Creation date
3/9/2022 9:57:45 AM
Metadata
Fields
Template:
PL_LandUseFile
Permit Number
BLD-2022-0115
Applicant Name (LN, FN)
UNDERWOOD & ASSOCIATES
Project Name
29th Street Site Prep
Project Description
Prepare site for constuction of (4) duplexes and installation of utilities and access
Application Date
2/23/2022
Parcel
31894
31896
Location
1210 29TH ST ANACORTES, WA 98221-2721
Document Type
Permit Application
Date
2/23/2022
Status
Application Complete
Project Manager
Emily Morgan
Document Relationships
663077
(Attachment)
Path:
\+LF\entry\663053
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Version Date: November 29, 2021 Previous Version Date: October 7, 2019 <br />Storm Water Drainage Report <br />Minimum Requirements 1 through 5 <br />Minimum Requirement 1 through 9 <br /> ENGINEERING DEPARTMENT <br />904 6th Street Anacortes, WA 98221 <br />www.anacorteswa.gov <br />Official Use Only: (Information to Inspectors) <br />Required Storm Water Facility and other related requirements: <br />Project Address: ________________ Submittal Date: __________________ <br />Parcel Number: ________________ Revision Number: ________________ <br />Permit Number: ________________ Reviewer: _______________________ <br />Acceptance Date (COA):____________ <br />FRONT OF REPORT: <br />Submittal Checklist: (All items listed below are required for a complete submittal) <br />o Cover Sheet (Preparer to Provide): Project title, Location, Revision dates, Engineer’s Stamp <br />o TAB 1: Minimum Requirement #1 – Preparation of Stormwater Site Plans <br />o TAB 2: Minimum Requirement #2 – Construction Stormwater Pollution Prevention (SWPP) <br />o TAB 3: Minimum Requirement #3 – Source Control of Pollution <br />o TAB 4: Minimum Requirement #4 – Preservation of Natural Drainage Systems and Outfalls <br />o TAB 5: Minimum Requirement #5 – On-site Stormwater Managements <br />o TAB 6: Minimum Requirement #6 – Runoff Treatment <br />o TAB 7: Minimum Requirement #7 – Flow Control <br />o TAB 8: Minimum Requirement #8 – Wetland Protection <br />o TAB 9: Minimum Requirement #9 – Operation and Maintenance <br />o APPENDIX 1 - Survey performed by a Professional Land Surveyor <br />o APPENDIX 2 - Soils Analysis (Volume 1, Chapter 3.1.1) <br />o APPENDIX 3 - Model Soil Management Plan for BMP T5.13 <br />o APPENDIX 4 - Determining Construction Site Sediment Damage Potential (Appendix 7) <br />o APPENDIX 5 - Site Plan with all applicable information (Minimum Size 11x17 – 30 scale) <br />o APPENDIX 6 - Documented Site Photos (North, South, East and West) <br />o APPENDIX 7 - Drainage BMP Facility Maintenance Covenant, if applicable. To be recorded prior to the <br />Temporary Certificate of Occupancy, Certificate of Occupancy or Final Acceptance. <br />Stormwater Management Requirements: <br />o Refer to the 2012\14 Department of Ecology Manual, as amended in 2014 for further required <br />information. <br />o See also, City of Anacortes Municipal Code 19.76 for additional information <br />o See also, current Engineering Development Standards, Chapter 2- Storm Drainage for additional <br />information.
The URL can be used to link to this page
Your browser does not support the video tag.