My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-30-04 Final Agreement
>
Public
>
28th Street 1710
>
04-30-04 Final Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 1:00:45 AM
Creation date
3/7/2022 8:34:57 AM
Metadata
Fields
Date
1/31/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SHORT PLAT AND STREET VACATION: <br /> 2. City staff will assist in completing the Short plat and record in concurrent <br /> with the property deed from you, showing 1718 split in two lots — one <br /> 70'x134, and one 90'x134'. <br /> 3. The City will prepare, consider, approve, and record a new property Short <br /> plat of 1718 28th Street to create a new 90'x134' lot on the western portion <br /> of the property. The City will stake all property corners in the field. <br /> 4. The City will participate with the Evan's to vacate and deed in the Short <br /> plat, necessary land at H Avenue Right-of-Way to you in order to form a <br /> new lot split at 1718 28th Street (two parcels), measuring 90'x134' (12,060 <br /> Square Feet), and 70'x134' (existing residence on 9,380 Square Feet). <br /> 5. The City will handle notices and fees to complete this Short plat. <br /> 6. The City will provide to the new lot (1720 28th Street) for a two dwelling <br /> unit: <br /> 1. (1) 1-inch water service for a double meter. <br /> 2. (1) 6-inch sanitary sewer service. <br /> 3. (1) 3-inch conduit for Puget Sound Energy. <br /> 4. (1) 2-inch conduit for Verizon Northwest <br /> 5. (2) 4-inch conduit for AT&T Broadband\Comcast <br /> 6. (1) 1-inch service for Cascade Natural Gas <br /> If any additional conduits or services that are not listed above are needed, <br /> the City will work with each Utility Company to ensure that the correct <br /> number of services are provided during the construction of 28th Street. <br /> 7. The City will pay for a two dwelling unit, all hook-up fees and <br /> miscellaneous fees associated with a building permit that are required for <br /> construction. This will be paid at the time that the building permit is issued, <br /> providing that the building permit is applied for within 10-years from the <br /> date of recording of the said Short Plat. This will include: <br /> 1. Water hook-up fees. (Does not apply to Irrigation meters) <br /> 2. Sewer hook-up fees. <br /> 3. Storm drain hook-up fees. <br /> 4. Inspection fees. <br /> 5. General Facilities Charges. <br /> 6. Road Impact fees. <br /> 7. Park Impact fees. <br /> 8. Fire Impact fees. <br /> Not included in this agreement is the standard building, mechanical, <br /> electrical and plumbing permit fees that will be paid by the applicant of <br /> R:\Active Projects\Developments\Evan Short plat\Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.