5 PveNv� o :
<br /> ol
<br /> N: 5136.88 E: 10426.38 RCP SS® INSTALL:
<br /> EXISTING SS MH-TYPE 1 24. 32 LF GEO TEXTILE
<br /> RIM: 68.25 �e • SILT FENCING
<br /> t
<br /> N.• 5148.18 E• 10352.9 a ..
<br /> ' -XISANG-SS_MkL-T1PE 1 '
<br /> RI•�EXJSA . d
<br /> a
<br /> A \------
<br /> ----
<br /> / p 3
<br /> _ r/ _- 7‘r. . / N: 5118.26 E: 10483.941
<br /> C to g
<br /> t- �_._� �_- ' P,�I, INSTALL: \ p0 =o 0 5
<br /> ���� 1-G 0 XTILE B INSER \ \ I1141
<br /> E: 10429.55 v AifliTN.• 5f03.95 E: 10385.63 111;1,1:5:gA8
<br /> L: ' ISlEXISTING SS MH-TYPE 1 lkRIM: EXISTING GRADE BALE CH CK DAM \ / / I \ �1�O! a
<br /> lf.• -5.55 N; 51 7.46 E. 10429.55 TAL• / / -
<br /> 6,AO
<br /> 'tp`'a o
<br /> 1-GENE
<br /> E00 \%TILEE CB.INSERT / I!illli�
<br /> _ _ IN: 507 .69 E. • .16 t
<br /> MST XALE ,8 • ERT \
<br /> INSTALL:
<br /> 145 LF GEO TEXTILE
<br /> SILT FENCING \ 44 \
<br /> 1 \ N: 5060.47 E: 10479.10
<br /> \ INSTALL: H
<br /> \ 1-GEO TEXTILE CB INSERT
<br /> �i� 1
<br /> z �g
<br /> FBI1St �. Nfl TROL NOTES, \Y 1. `'a • W L^
<br /> m� •p , 63 0 2� F-� �
<br /> A. A CERTIFIED EROSION AND SEDIMENT CONTROL SUPERVISOR IS 7a� ��, •Lr \ �� xn SE W a gN
<br /> REQUIRED, THE ESC SUPERVISOR MUST HAVE ATTENDED AND EROSION -
<br /> *14'
<br /> AND SEDIMENT CONTROL CLASS WITHIN 3-YEARS FROM TODAY'S DATE, C+ /" ' De 3
<br /> MUST PROVIDE CERTIFICATION CARD. (n Na • \ ���' .1 ' .,
<br /> B. THE CERTIFIED EROSION AND SEDIMENT CONTROL SUPERVISOR WILL V �'T £w
<br /> OVERSEE AND BE RESPONSIBLE FOR ALL EROSION CONTROL. THE (li — � , = 8 8
<br /> FACILITIES SHALL BE INSPECTED DAILY AND MAINTAINED TO ENSURE
<br /> PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY
<br /> O.\ / - ❑ (U M
<br /> REVIEWS AND AFTER EVERY SIGNIFICANT STORM EVENT OF THE ESC V� .
<br /> FACILITIES DURING THE WET SEASON (OCTOBER 1 TO APRIL 30). a k
<br /> MONTHLY REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPTEMBER • 111111100.14
<br /> 30). WRITTEN RECORDS SHALL BE TURNED INTO THE PROJECT MANAGER ` Q . � INSTALL:
<br /> OR INSPECTOR ON A WEEKLY BASIS AT THE WEEKLY SCHEDULED 145 LF Eo TEXTILE
<br /> PROJECT MEETINGS. 4 41,
<br /> SILT FENCING
<br /> C. SHALL BE IN PLACE PER THE APPROVED SET OF PLANS PRIOR TO ANY L 4� �}
<br /> CONSTRUCTION START. �: �r
<br /> D. THE EROSION CONTROL SHALL BE INSPECTED ONCE A DAY AND �c /�••a
<br /> MODIFIED TO MEET THE SURROUNDING CONDITIONS AS NEEDED. —� � :�• �;�:r it 111Pre$111P'
<br /> E. PROVIDE A SIGN DISPLAYING A 24 HOUR CONTACT NUMBER AND NAME ^ i
<br /> ❑F THE ESC SUPERVISOR. THE LETTER SIZE SHALL BE A MINIMUM ❑F i�!�• �• ���,0��
<br /> 2' LETTERS, THIS SHALL BE IN PLACE PRIOR TO CONSTRUCTION a �.� 0 7� t�:` 4. •fit_. N: .68.63 E: 10502.26
<br /> 1- ALL:
<br /> • \\‘'
<br /> START, REMEMBER, THE LOOK OF THE SIGN WILL BE A REFLECTION OF �; • Na%a`�` �' IN A TEXTILE CB INSERT
<br /> THE CONTRACTOR AND DEVELOPER AND DEVELOPMENT, $PapArei4116_00.,
<br /> �v��,., 1S�<� 0 '0
<br /> F. THE STORM DRAIN SYSTEM AND EXISTING DITCHES SHALL BE CLEANED � Ai Q1 c ��
<br /> DAILY (SECTION 7 07,3), ALL DRAINAGE SYSTEMS SHALL BE CLEANED -4%„4" _T❑ THE ACCEPTANCE OF THE CITY OF ANACORTES PRIOR TO w �v �.�ACCEPTANCE OF THE PROJECT. � 0�'_ S�j ce
<br /> Z Z N
<br /> G. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE • f p / N
<br /> III/ --Zra SCALE 1'=10'
<br /> INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED ` , ® CL 00
<br /> DURING THE DURATION OF THE PROJECT, ADDITIONAL MEASURES MAY �� 0 5 f0 , 0 LL1 BE REQUIRED SUCH AS WASH PADS TO ENSURE THAT ALL PAVED
<br /> AREAS ARE KEPT CLEAN, NO MUD IS ALLOWED TO ENTER ONTO CITY • ( �y >- Q
<br /> STREETS, ��
<br /> H. ANY SOILS EXPOSED THAT WILL NOT BE DISTURBED FOR TWO (2) DAYS i� INS •LL: W W
<br /> DURING THE WET SEASON OR SEVEN (7) DAYS IN THE DRY SEASON '" 1-0 -RRY--ALL
<br /> SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC \� CONS
<br /> ON PW# 06-022-DEV ae Ce r+ a
<br /> METHODS (SEEDING, MULCHING, PLASTIC COVERING, ETC.) J Ce
<br /> SEE . AIL. THIS PLAN SHEET IS APPROVED FOR CONSTRUCTION IN ACCORDANCE MTH THE v CI 0 0I, TWO (2) WEEKS PRIOR TO THE BEGINNING OF THE WET SEASON Le221d
<br /> CITY OF ANACORTES ORDINANCES AND PWGES.
<br /> (OCTOBER 1), ALL DISTURBED AREAS SHALL BE REVIEWED T❑ IDENTIFYN: 4 =6.80 10426.68 THE PROFESSIONAL ENGINEER%NOSE NAME MD STAMP APPEAR ON THIS SHEET N Q
<br /> WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS, ' EXI NG SS -TYPE 1 BEARS SOLE RESPONSBIUTY FOR THE ACTUAL CONFORMANCE OF THE DESIGN W <
<br /> DISTURBED AREAS SHALL BE SEEDED WITHIN ONE (1) WEEK OF THE _ R EXISTING•BADE wss APPLICABLE LAWS. Q ,-.1 Q
<br /> BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO , ` ,�C� �� IM' TO MATCH -AGE SIDEWALK
<br /> BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE �✓ FlNSIHED ADE THE DEVELOPER,LANDOWNER,AND THEIR ENGINEER MUST CODUIRE,COMPLY
<br /> IE: -4.65 CALL 48 HOURS MiH,AND PROVIDE MITIGATION FOR ALL FEDERAL,STALE,COUNTY AND LOCAL
<br /> SUBMITTED TO THE PROJECT MANAGER. THE PROJECT MANAGER CAN /I[^i� ENDS,PERMITS, CIE MANDATED,INCLUDING BUT NOT,SITED TO THE
<br /> REQUIRE SEEDING IN ADDITIONAL AREAS IN ORDER TO PROTECT (dam BEFORE YOU DIG FISHERIESENDANGERED HYDRApCS PES RMIT,FEDERAL FLOOERAL ODPPLAAIIN PERMITS.NATIONAL STATE T OF 1�NO.
<br /> 05-209
<br /> SURFACE WATERS, ADJACENT PROPERTIES OR DRAINAGE FACILITIES. 1-800-424-5555 . POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMITS.
<br /> J. PENALTIES FOR AN EROSION CONTROL VIOLATION ARE SUBJECT TO A ISSUANCE OF THIS PERMIT SHALL NOT BE CONSTRUED AS PROOF OF SHEET
<br /> $300 TO $1000 FINE UNDER CHAPTER 17,66 - PENALTIES FOR • COMPLIANCE WITH APPLICABLE LAWS AND PERMIT REQUIREMENTS. Cl
<br /> VIOLATION. EACH DAY IS CONSIDERED A DIFFERENT VIOLATION. OAS
<br /> THIS APPROVAL EXPIRES ONE YEAR FROM THE DATE NOTED ABOVE. 1
<br /> CAD FILE: I PLOT DATE: I of 7
<br />
|