Laserfiche WebLink
r8.1Y0 <br /> tt <br /> ANACORTES PUBLIC WORKS DEPARTMENT <br /> P.O. BOX 547, ANACORTES, WA 98221 PH (360) 293-1919 <br /> IP �� FRED BUCKENMEYER,P.I.S., DIRECTOR FAX (360) 293-1938 <br /> E-MAIL: fredb@cityoronocortes.org <br /> June 20, 2007 <br /> Matt Click <br /> 806 Haddon Road <br /> Anacortes, WA 98221 <br /> SUBJECT: Performance Bond for Georgia and Oakes Ave Improvements (PW#06-035-DEV) <br /> Dear Matt, <br /> This letter is to confirm the required improvements for your project at Georgia and Oakes <br /> Avenue — 1208 Georgia Avenue — PW#06-035-DEV for a Performance Bond. <br /> The value of the work to be completed is based on the Engineering Plan Review and <br /> Construction Inspection Fees that was calculated by the Public Works Engineering Department. <br /> Please see the attached documents. The calculations were performed to determine the Project <br /> Value for the purpose of fee calculations. The project value for the required improvements is <br /> $22,201.80. <br /> Per the Anacortes Municipal Code, the Performance Bond value is the construction cost x <br /> 150%. The amount of Performance Bond for your project is $33,302.70. <br /> All work remaining to be completed will be per the approved construction plans, Herrigstad <br /> Engineering, dated 04-27-06. Per the City of Anacortes Municipal Code, the Performance Bond <br /> is good for 1-year from the date of issuance. <br /> Please be advised that the work remaining will need to be inspected and accepted by the City of <br /> Anacortes Public Works Department before the expiration date. Otherwise, the City of <br /> Anacortes Public Works Department will be forced to act on the Performance Bond. Please <br /> provide a Performance Bond in the amount of$33,302.70 <br /> If you have any questions, please contact me at 360.661.3468. <br /> Sincerely, <br /> CITY OF ANACORTES <br /> • <br /> Steven R. Lange <br /> Project Manager <br /> CC: Fred Buckenmeyer, Dave Walde, Don Measamer <br /> • Water • Wastewater • Streets•Storm Drainage •Engineering • Solid Waste <br /> •Transportation and Equipment • Capitol Projects • Development Services <br />