HomeMy WebLinkAboutP33041 ANACORTES PUBLIC WORKS DEPARTMENT 'S. 0 Steven Lange, Project Manager k P.O. BOX 547,ANACORTES,WA 98221 PH(360)293-1920 rjr W E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 .1oog`S' Memo Date:June 6,2019 To:Tess Cooper,Associate Planner From: Steven Lange Subject: Proposed SFR—P33041 —4500 Block of Fidalgo Bay Road cc: Eric Shjarback, Don Measamer, Libby Grage, Fred Buckenmeyer The Public Works Engineering Department completed a review of the proposed Development Review documents on June 2, 2019 Below are the following comments and or recommendations: This memo of requirements is general in nature and may require additional review based on a submitted site plan or Civil Plans. Zoning: • CM Subdivision Type: • To be determined. The applicant provided different scenarios from one single family residents to 4 single family residents. Typically would be a Short Plat. Critical Areas: • Contact the Planning Department regarding Critical Areas requirements. Permits: • Right-of-Way Permit for work being performed Inside and Outside the Traveled Way within the Corporate City Limits, please contact Justin Symonds, Public Works Inspector, at 360.661.3547. • Contact the City of Anacortes Planning Department for additional permitting requirements such as SEPA, Grade and Fill permits, Conditional Use, Building, etc. <I( )", • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste ® ® • Transportation•Equipment • Capital Projects • Development Services 4P W p: City of Anacortes Development Standards: • The 2011 Development Standards can be found on-line at www.cityofanacortes.orq. If the Engineer of Record needs any COA Standard Details in AutoCAD format, they can email me at stevel(a cityofanacortes.orq and request a CD. This CD will be mailed to a provided address. • See the Required Submittal Checklist, attached. This document can be revised to meet the needs for the size of the project proposed. It is recommended for the owner and Public Works Engineering Representative to determine what documentation will be required for this project. Sewer: • For additional Sewer information and design criteria, see the 2011 EDS Standards, Chapter 5 —Sanitary Sewer. • There is no direct access to sanitary sewer from this site. • Options: Not in any particular order ■ Install a private pump force main along Fidalgo Bay Road to the north, approximately 1,060-feet. Installing a conduit that is sized to allow Lots B and C to use. Because there is a receiving benefit to Lots B and C, the applicant could place a Latecomer Agreement to recover costs. • Install a private pump force main, via an easement across, Lot B, C and D to the Samish Tribe. Meeting discussion was that the applicant would have to work with the condominium association, which is problematic. Applicant will have to obtain an agreement with the Samish Tribe for sewer access since the Tribes sewer is private. City concern regarding the pump station capacity. • Question at the meeting was can the applicant install a sewer main to the tribe within the abandoned railroad corridor, adjacent to the trail. Staff met on Monday, June 3, 2019 to discuss. Discussion items: 1) This is a feasible option; 2) Encroachment Agreement will be required, and; 3) There is a section of trail that has failing asphalt (near this property), which may need to be repaired. Applicant will have to obtain an agreement with the Samish Tribe for sewer access since the Tribes sewer is private. Storm: • For additional Storm information and design criteria, see the 2011 EDS Standards, Chapter 4—Storm Drainage. . • See Anacortes Municipal Code 19.76 for Storm Water requirements. • Project, as presented, is subject to Minimum Requirements 1 to 9 under the current 2012\14 Department of Ecology Manual. • A Construction Storm Water Discharge Permit (DOE) is required for all land disturbing activities over 1-acre. • If there is more than 1-acre of land disturbing activities, the project will be required to obtain a Construction Storm Water Discharge Permit from the Department of Ecology. a� 1K • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste ® ® • Transportation•Equipment • Capital Projects • Development Services 4.p W P • The proposed project will need to provide an Erosion Control Plan. Traffic: • Pedestrian facilities are required. • Current standard is 5-foot wide sidewalks, set 6-feet from the back of sidewalk. • WSDOT Standard Plan F-10.12-03 —Cement Concrete Curbs. See attached. • WSDOT Standard Plan F-10.16-00 —Cement Concrete Curb and Gutter Pan, modified by City of Anacortes for ease of maintenance. See attached. • WSDOT Standard Plan F-30.10-03 — Cement Concrete Sidewalk. See attached. • WSDOT Standard Plan F-80.10-04 — Cement Concrete Driveway Entrance Types 1, 2, 3 and 4. See attached. • Provide a Traffic Control Plan (Current MUTCD Manual) prior to any construction taking place for approval by the City Engineer. Street: (Fidalgo Bay Road) • For additional Street information and design criteria, see the 2011 EDS Standards, Chapter 3 —Street. • Per AMC 19.24.100 -All improvements required shall be extended as necessary to provide a smooth transition with existing improvements both laterally across the street and longitudinally up and down the street for drainage, vehicular and pedestrian traffic. • Street Designation — Local • Design standard for Fidalgo Bay Road —32-feet wide (two 11-foot driving lanes and two 5-foot bike lanes), including parking (parklet), 6-foot landscape buffer between the back of curb and sidewalk, sidewalk on one side. • Pedestrian facilities are required. See "Traffic" above. • Street Trees: Contact Jonn Lunsford @ 360.299.1953, Parks Department for a list of City approved Street Trees. See EDS Standards, Chapter 3—Streets, Section STR-18.2 regarding Street Trees and Root Barrier requirements. • Monumentation is not required to be installed as part of this land use proposal. Garbage: • Contact City of Anacortes Sanitation Department Matt Koegel at 360.293.1921 for further information as the design moves forward. Water: • For additional Water information and design criteria, see the 2011 EDS Standards, Chapter 6 —Water. • The property can be served by an existing 8-inch D.I P pipe that runs adjacent to the property in Fidalgo Bay Road. • The water meters will be placed along Fidalgo Avenue, locations are identified on the attached vicinity map. aW` � • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste ® • Transportation•Equipment • Capital Projects • Development Services q�/p Fire Coverage: • The property is located within 250-feet of an existing Fire Hydrant, located to the south. • City records indicate Fire Hydrant C#739 has 149 PSI. ■ Contact Jack Kennedy, Assistant Fire Chief, at 360.293.1925 regarding fire coverage requirements for this project. ■ The City of Anacortes does not have current Fire Flow Reports in this area. A 3rd party testing company will need to perform this task and provide reports at the submittal of the construction civil plans for review. Utility Companies: • See Anacortes Municipal Code, Section 16.20.080 — Utilities for required Franchised Utilities as well as City of Anacortes Utilities. • All new utilities are to be underground. ■ See attached copy of the local contacts for each utility for the applicants convenience. Fees: • See the Planning and Building Department for fees related to building permits. • Per AMC 15.24.010 this project is subject to Engineering Fees for Plan Review and Construction Inspection. • 0.5% = Plan Review. Based on the approved Estimated Construction amount. • 1.5% = Construction Inspection. Based on the approved Estimated Construction amount. • Engineering Plan Review and Construction Inspection Fee form. See attached. Other: • For Landscaping and Landscape requirements, see Planning Department. • Mail Boxes (See Chapter 3 —Streets, Section STR-19): For Mailbox Locations, coordinate location, type and size with the Anacortes Post Master. The access and areas around the mailboxes need to meet ADA requirements. • Encroachments (See Chapter 3 —Streets, Section STR-18.3): Prior to any placement of any barricades, material, earth, gravel, rock, debris or any other material or thing over, under or upon the Public Right-of-Way or easement, an Encroachment Agreement shall be obtain from the City of Anacortes. See the Anacortes Municipal Code, Section 12.30 for additional information regarding the Encroachment Agreement and processes. Contact Steven Lange at 360.299.1983 or via email at stevel@cityofanacortes.org regarding questions or to obtain an agreement. ■ Improvements shall be designed by a Professional Engineer, licensed in the State of Washington. 1 , K f,pi. • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste ® • Transportation •Equipment • Capital Projects • Development Services .PW • Improvements are subject to a 2-year Maintenance Bond in the amount of 10% of the actual construction costs. • Contractor shall be licensed by the State of Washington and hold a City of Anacortes Business License. Th , Steven Lange r j • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste ® . • Transportation •Equipment • Capital Projects • Development Services \ • // - \ / \� \ a\ N \ /. ,�// \ • • ° v• / '\ tr , x. 4( \ <9° \ \ .z.. .. z, _ 4/. _ : . \\IP4P •-.. • E.-‘ 1' foll S \ \ \ \ o i$ 4; ....._ •.\ • VESX1 er \ N \ ' t3.._ V\ '‘ tiN --\047 \ gE>`,5, \ \ \... \..)sit\ \ tys.,• 127_, \katt A ( 18) ti 7 -1-16.51. ..\ \ \ \ . \ \ \ 47)\ (Cif) .1/4 1/4 , , \ . align \, ,o t1/4, \ N \ - \ \ \ 87. V O . \ \ ' . • \\ \ \ .\ PC(2018� �j�j\ 9Q \ • . 1P1\‘t. \r146)14/ \ • \ 0 ` \\ r \ • \ �\ \ \ \$ty\ /L<0 \ \\ \ . `�. \ \ , '\ p \ 11 • \ \ \ . A \ \ \ \ \ \� P33041 \\ \ \ >\ SURVEY ( 2807120066) .il � \ \ Par \\\ N \\ .\ \ SG� \\ / \ \ \\ \ \� •.\ ( , \ /// \ ` . \ f \\ \\ \ • \ tee ) \ . / \ . \ N. \ ` \ `\ `/ \ r \ \ \ B / \ N . \ / \\ \ \.p'. ..\ / \ P33038 / \\ \\ \; ' YPC(2018) . \ \YIP; // / \ N \ \ \ \ \7. `h� / V \ \ \ \\ \\ \ • it \ ` \ \ // \ G• Q 7 \ \ \ . \ \\ \ \ / \ \ \ \ \ \ / C //' . 0 $ • • \ \ • -• /\ \ \ \\ .^.� \ / \ P33039 / C. p \ \ \ \ \\. \ � \ \ // 69 \ \\ \\ • \ \!/ \ \ \ // it. \ . \ \ \ \ `� \ \ \ / ' \ \\ \\ \\ Nix \ \ //Q l; N . \ \ \\ \ \ ' \ \ \ \ /p/ 7� / ¶1 `L \ \ \ \ 5 `• \ \ \ \ \ \ \ \ \ A Om #Pi \ \ . . \\ \\\ \\ \ \ ` \ \ \ / / C f° -oo s PSI \ \ \ \ \ \ \ \ \ \ . �c� 5 i, • : -‘"? \ \ 4501 . \ \\ \ , \ \ D iepoc) I 4.3' \ \ \ \ .. \ \ sS\e, \\N \ \ II. \ IN 11(.\\:: \ \\ \ h \ „, \ 6/.3. \ \ \ ) \ \ • \ €� \ / /i--1 PK \ \ \ Ira \.\ 144 \ \ \\\ N ` \ \ •N \\ 118 PSI Pt �,, \ `\ V-27 \ 0 E ticriet, ,:s, t 4„\\ \ \ . . . . ). \\__. , \ , , , \ . • ...„ . . 'c ' .. ti \ N / \ ( \\ \\ / N 4 � \ \ \ 3\ • 1\ / ` \\ \ \ \ / \ \ \ \\ \ \•/ \ \ A, : J \ \ ` \ \ \ \ \ \ \ \ n \\\ \ 27 � \ \ \ \ \ � \ \ \ \ \ \ / \ \ \ \ V g-i 4s, ,_ ,-, ,, , <A,,,30....-. 41\13 Zoi,s,,,,-0, . -R, ,._cr- AL F-Foh. L_ L•yc� A Uc. icls 44 E 3e ntsTS Mre i2e S aAv ATE R-•d2 t� .. R__ Bte anc.- # t.Urd.� "C'�hvrc,� j-t± n FS6�i `lila 1 t, ? TjaN-C.141 Ca jr 6Qtm- c, ? & 2teL "Ell A <<C „ wlLL ova - 6b(1e I5uel *ear R.oi. 1 `... '3 Z ' Lv IO ca\fic 1-- F?$Z-k/ LET - 1-4=iit-‘0‘e.p. SWAP •I- Ca ' 51/4,.I eE 414o1ZT - Tam ' 10 Rc7�. RLCT FR 74 LL&C., 'BiNvi la-.D. -- G , u . P Tat v Cm c\2S tom ccflNCB - �Po2-T RaT 9 b &�d2 S Sovy,E i--4Co , '\\ \-;?<I,"A•. .r.-., PC(2018) C8% (201 ' V \ \t., \\ -VG>,,i.,, \ NI______-, -----\ \A \ \ - ,\0\._ ;., 1.1 J \\\: \\ \-It , ` 1: �� ��j. �� \ i c l l I^? \ :�. (2 18) \ \ 6-i �7\ ` \ \ F ® "Pl \�� 4 \ \ \� \ \ PC(201s) ®//� �® \ \ \ \ \ \ Y \ \ 6-7 \ \ `\ \\ 11Pcgzols) \ \ PC(2018)4/ �``\ �Ni \ \ as \ F,�, \ \ \ ` \ N \ ems- \ \ 0 ..: \ 17.,\ \\\\ \ 9j \eN's'• \ \ FyF. SURVEY(AF#201807120066) \ \ \\i_ \ \'P \\ />\ \ \�Qry \\ I \ \ PC(2016) \ h \ \ \ "5\ \ / \ \ \ \ \ \ // / / L \ \ \ \ \ .� / /\ \ P33038 \ 2 \ 1t/PC(2018) \ �� APPENDIX C—CONSTRUCTION AND INSPECTION FORMS JULY 2011 ANACORTES PUBLIC WORKS DEPARTMENT osTY° Engineering and Development Services Required Submittals Construction Plan Submittal N/A Need Submitted (Check pertinent information for the following requirements) ❑ ❑ ❑ Pay Plan Review Fee per the Engineering Plan Review Fee and Construction Inspection Fee Form. Complete Submittal, but not limited to: ❑ ❑ ❑ Engineers Estimate of Construction ❑ ❑ ❑ 4 sets of black line prints of the Construction Plans ❑ ❑ ❑ 2 sets of Clear/Grade/Fill Permit application applied for and paid ❑ ❑ P 4 sets of black line prints of the Landscape Plan ❑ ❑ ❑ 2 copies of the Large Parcel Storm Water Plan ❑ ❑ ❑ 2 copies of the Small Parcel Storm Water Plan ❑ ❑ ❑ 2 copies of the Storm Water Quality Plan ❑ ❑ ❑ 2 copies of the Geotech Report ❑ ❑ ❑ 2 copies of the Traffic Control Plan for approval ❑ ❑ ❑ 2 copies of the NPDES Permit ❑ ❑ ❑ 2 copies of the recorded survey ❑ ❑ ❑ 2 copies of a Narrative as to how the construction plans conform to the Facts and Findings ❑ ❑ ❑ 2 copies of Request for Deviation from the EDS Standards ❑ ❑ ❑ 2 copies of the Fire Flow Test Report ❑ ❑ ❑ 2 copies of the Water System Design Report -17o 5e ScoPE or s I . 5Te.(E?-1Li.-1bE Page 1 of 4 City Project Manager Date APPENDIX C: INSP-04 City Contact Number Project Name APPENDIX C —CONSTRUCTION AND INSPECTION FORMS JULY 2011 Construction Plan Approval: N/A Need Submitted (Check pertinent information for the following requirements) ❑ ❑ ❑ Pay Construction Inspection Fee, per the Engineering Plan Review Fee and Construction Inspection Fee form. ❑ ❑ ❑ Mylar for signatures, includes a sign-off from the Building ❑ ❑ ❑ 4 sets of black line prints Preconstruction: ❑ ❑ ❑ No construction can begin until: (See Facts and Findings, if any) ❑ ❑ ❑ Clear/Grade/Fill has been applied, approved and paid for. ❑ ❑ ❑ Landscape Plan approved by Planning Commission or Planning Director, per the Facts and Findings. ❑ ❑ ❑ Schedule the preconstruction meeting. Information Required; ❑ ❑ n 1. Provide Liability Insurance with the City of Anacortes as additional insured in the amount of$1,000,000.00, form CG2026 or similar. ❑ ❑ ❑ 2. Provide copies of all flaggers' certifications ❑ ❑ ❑ 3. Provide verification of General Contractors State License ❑ ❑ ❑ 4. Provide verification of all Subcontractors State License ❑ ❑ ❑ 5. Provide verification of the Subcontractors City of Anacortes Business License. ❑ ❑ ❑ 6. Provide verification of General Contractors City of Anacortes Business License. ❑ ❑ ❑ 7. Provide a contact list of Key people that will be working on this project, as well as the order of communication. ❑ ❑ ❑ 8. Provide verification of the Erosion Control Supervisor Certification. ❑ n ❑ 9. Provide a Proctor and Sieve Analysis of Material Used. See the City of Anacortes Right-of-Way and Testing Practice. All material must be approved by the City of Anacortes Public Works Director ❑ ❑ ❑ 10. Establish a weekly meeting, if needed. ❑ ❑ ❑ 11. Indicate special inspection agency and geo-engineer. ❑ ❑ ❑ All Erosion Control Measures installed and approved the Public Works Inspector or designated Representative. ❑ ❑ ❑ All Construction Fencing in place and approved by the Public Works Inspector or designated Representative. ❑ ❑ ❑ 1 Copy of the Contractor's Spill Prevention Program ❑ ❑ ❑ Weekly Tool Box Safety Meeting Minutes ❑ ❑ ❑ Provide 1 copy of the PSE plans for Street Lighting approval. Page 2 of 4 City Project Manager Date APPENDIX C: INSP-04 City Contact Number Project Name APPENDIX C—CONSTRUCTION AND INSPECTION FORMS JULY 2011 Construction: N/A Need Submitted (Check pertinent information for the following requirements) ❑ ❑ ❑ Call for inspections. See the Preconstruction Agenda. ❑ ❑ ❑ Provide daily Compaction Testing. See the approved plans and Preconstruction Agenda. ❑ ❑ ❑ Call for Water Pressure Test. Contractor to provide pretest prior to calling for Inspection. ❑ ❑ ❑ Provide Water Sample to the Department of Health for testing. ❑ ❑ ❑ Provide Sewer Pressure Test. Contractor to provide pretest prior to calling for Inspection. A re-inspection fee will apply. ❑ ❑ ❑ Provided Erosion Control weekly/Monthy reports. See approved plans and EDS Standards. ❑ ❑ ❑ Provide daily on-site Geotech Inspections. n ❑ ❑ Provide daily Geotech Reports. ❑ ❑ n Video Inspection Request: Before a Television Inspection can be performed, all work has been inspected by the City of Anacortes and all items have been completed and the required information provided to the City of Anacortes: ❑ ❑ ❑ 1. Photos of installation. Including all connections made. To be supplied to the Public Works Inspector. ❑ ❑ ❑ 2. Trenches are backfilled and compacted to subgrade elevation. ❑ ❑ ❑ 3. Proctor and Sieve Analysis of the trench backfill material are supplied to the Public Works Inspector. ❑ ❑ ❑ 4. Compaction test reports for trench backfill are supplied to the Public Works Inspector. ❑ ❑ ❑ 5. Manholes are installed and backfilled, per the plans and standard specification. ❑ ❑ ❑ 6. Proper connections to the manholes. ❑ ❑ ❑ 7. Manhole channels have been installed, per the plans and standard specifications. ❑ ❑ ❑ 8. Lines have been flushed and cleaned. ❑ ❑ ❑ 9. Every line segment has been air pressure tested and passed ❑ ❑ ❑ 10 All work has been inspected and approved by the PW Inspector. Once this work has been completed and verified by the Public Works Inspector, the Contractor can request a "Video Inspection Request" from the Public Works Inspector. The Public Works Inspector will process the request with the Operations Department for scheduling of the sewer line and storm line. Before final acceptance of the sanitary sewer and storm drainage, the Contactor shall correct all deficiencies found during the Television Inspection. An additional inspection fee will apply. Page 3 of 4 City Project Manager Date APPENDIX C: INSP-04 City Contact Number Project Name APPENDIX C—CONSTRUCTION AND INSPECTION FORMS JULY 2011 Construction Acceptance: N/A Need Submitted (Check pertinent information for the following requirements) Prior to calling for a Final Inspection by the COA Public Works: ❑ ❑ ❑ Contractor to complete and return to the Public Works Inspector, the Final Inspection Guidelines for Contractors Inspection Form. The Public Works Inspector will verify completion. ❑ ❑ ❑ Provide a set of As-builts to use as reference at the site walk. ❑ ❑ ❑ Schedule the site walk. Wednesday mornings from 9:00 am to Noon is the time that the City Departments have set aside for this activity. ❑ ❑ ❑ Provide As-builts for City review and approval. (1) copy in Mylar form and (1) copy in digital form in AutoCAD 2000 minimum. ❑ ❑ ❑ Complete Punch List items, if any. ❑ ❑ ❑ Submit a formal request for a Performance Bond for minor work to be completed, if desired. The Performance Bond is the cost of construction x 150%. ❑ ❑ ❑ Provide a Performance Bond. Per the Anacortes Municipal Code, it is only valid for 1-year. Provide, but not limited to: ❑ ❑ ❑ All compaction testing information. ❑ ❑ ❑ All Video information, Sanitary Sewer, Storm Drainage ❑ ❑ ❑ All photos of construction with identification of location and description. ❑ ❑ ❑ All geotechnical reports, including Final Report ❑ ❑ ❑ Verification of correction notice completion ❑ ❑ ❑ Water Pressure Test Reports ❑ ❑ ❑ Sewer Pressure Test Reports ❑ ❑ ❑ Asphalt Inspection Forms [ ❑ ❑ Fire Flow Test Report ❑ ❑ n ❑ ❑ ❑ Final Plat Approval: ❑ ❑ ❑ Provide verification of Construction Cost. This is used to establish the 2-year Maintenance Bond. The Maintenance Bond is 10%of the Construction Cost. ❑ ❑ ❑ Provide a (2) year Maintenance Bond. If there is a Performance Bond in place, the (2) year Maintenance Bond does not take affect until the Performance Bond is completed and accepted by the City of Anacortes. ❑ ❑ ❑ Complete and submit the Final Plat Submittal checklist with the Supplemental Public Works Submittal Requirements. See EDS Standards Appendix "C". ❑ ❑ ❑ Provide(2) Copies of the recorded document. Page4of4 City Project Manager Date APPENDIX C: INSP-04 City Contact Number Project Name FACE OF CURB VARIES 12"TO 24" s--••- FACE OF CURB - FACE OF CURB FACE OF CURB --"" VARIES "7 .6 1/2" 6 1/2" VARIES FROM 6"(IN)TO 0"(IN) I" 10"TO 22~ 1 7R. (S CONTRACT) /_.. 1"(IN}R. ;r ,6 1/2" 1" VARIES MAINTAINIDE1 H: V SLOPE • 1"(IN) ON SIDE OF CURB MATCH ROADWAY MATCH ROADWAY i/2"(IN)R. 1"(IN)R. MATCH ROADWAY R. MATCH ROADWAY SLOPEi`'-•-,,.j1, .p....�---- f SLOPE •,,.--'+"' SLOPE 1/2"(IN)R. SLOPE i/2"(INj R. ry '«k' a a ! m /J / 1t2"(IN)R. o,......—_,....„_ t?. . . .' . .,—. i/2"(IN) r ROADWAY ^` //t/ . 1/2"(IN) ROADWAY ROADWAYmik / ROADWAY R. / 0 1 R. rre ID —so.. A •'' ' 111Iv.t^ a • • ' V a 1 •• b • ' c ' b. ' s a , 'vS ^ • , Fo m 4 _ • a ' : tt, FLUSH WITH GUTTER PAN AT CURB i d • RAMP ENTRANCE-in"(IN)VERTICAL -� 11 1/2" 11 1/2" 1'-6" i' g" LIP AT DRIVEWAY ENTRANCE DUAL-FACED CEMENT CONCRETE CEMENT CONCRETE DEPRESSED CURB SECTION TRAFFIC CURB AND GUTTER TRAFFIC CURB AND GUTTER AT CURB RAMPS AND DRIVEWAY ENTRANCES 6" 1/2"(IN)R, -\ 1"(IN)R. 6„ CEMENT CONCRETE NOTE CEMENT CONCRETE OR 1/2"(IN)Ft ••• CURB RAMP, LANDING, &a ASPHALT CONCRETE I 1"(IN) OR DRIVEWAY_1- See Standard Plan F-30.10 for Curb Expansion and 6 i �1 SIDEWALK OR PATH VARIES FROM R ENTRANCE Contraction Joint spacing and see Standard 8"(IN)TO 0"(IN) •F° ' Specification Sections t 14 and 9-04 for additional requirements. "—318"(IN)PREMOLOED JOINT FILLER ` a llta '- (WHEN ADJACENT TO CEMENT 3/8"(IN)PREMOLDED CONCRETE SIDEWALK) JOINT FILLER CEMENT CONCRETE PEDESTRIAN CURB CEMENT CONCRETE PEDESTRIAN CURB AT CURB RAMPS, LANDINGS, AND DRIVEWAY ENTRANCES w III ` FACE OF CURB ••• FACE OF CURB 4` t VARIES 12"TO 24" FACE OF CURB +< �-•�--------••••- i-••- FACE OF CURB `. m VARIES 71/4" r `'' . "1 �'01 �1-"+-� t 10"TO 22" 1" 6 1/2" ` 1 (SEE CONTRACT) 3" 4" 'mo ; gv' 5 112" 1" 1 112"{IN)R. l° i'D\ '4 1"(IN)R. 1"(IN)R. 1/2"(IN)R. • 1"(IN)R. � tf?�4* 615TO" 'S' �� i r 1/2"(IN)R. tr'' A C/ ROADWAY -•. i t: a _ `ROADWAY ', •. .a m ROADWAY ° , a I ROADWAY •f o , r ' f !'7 /�2 '!2.. ESany,F,d • ••y May 6 2014 3:31 PM r I « « ° . , . > CEMENT CONCRETE CURBS ______ �.._..._. , I __.__. ° STANDARD PLAN F-' q«' »D3 1 3/4".I 1 3/4" _ 8 1/4" I 81/4" SHEET 1 OF 1 SHEET I "`lll APPROVED FOR PUBLICATION ?, Pas,,Pas,, j`�-:..rc 4tie . ..- Jun 11 2014 1:25 PM .. :-xa DUAL-FACED CEMENT CEMENT CONCRETE MOUNTABLE CEMENT 411111b. STATE f)SSttJHE"KJtNBER Washington Stotts Deportment of TransPottoAten CONCRETE TRAFFIC CURB TRAFFIC CURB CONCRETE TRAFFIC CURB `,�,'+�' P. SC 3/8"PREMOLDED JOINT FILLER ~ . • • •• • ... ••• .• . .. .. . . . .. .. . . . .r.--.. . . . . .. .... . .. .. ..„. . . ... . . . .. .. ... ........_5-- co in 5' R, 5./4"R. O CEMENT CONCRETE CURB AND GUTTER 5'XR. 5' R. �5" O 5" RECTANGULAR FRAME AND GRATE—NOT GUTTER PAN INCLUDED IN CURB AND GUTTER BID ITEM NOTES PLAN VIEW 1. The intent of this design is to facilitate the compaction of Hot CATCH BASIN GUTTER PAN Mix Asphalt pavement adjacent to a drainage structure. CFACE OF L S FRAME 2. The centerline of the drainage structure may differ from the _S CURB S &GRATE-SEEE NOTE 2 centerline of the frame and grate. 1 2'-10 1/2" VARIES _ 6 1/2" 13" 6 112 1.-6" 2'-10 1/2" 5 1/2'. 1" (1.08') SLOPE THE GUTTER PAN DOWN TO _ 5 1/2" 1"� FACE OF CURB MATCH THE RECTANGULAR FRAME 1/2"R. 1� MATCH ROADWAY 1/2"R. 1"R. ROADWAY o SLOPE �{ SLOPE r Zo 1 G / 3"' RECESS 5 TOP OF ° io 1"R. TOP OF r'� 1"R. 1/2" 1/2"R. ROADWAY 1/2"R. • �� J b . ROADWAY �r CV — tV ' . D �� o ' rb Cl�r Ls ' • /,MiliiiiIIMMIIIIIIII D f0 r,,. . • • !r,.iiiii'siiiii si:ffi?iiiii>iiiitiiiii>iiiiii>iii>:r �' F�- '^` )•� �' F SECTION B .:: : „€ ;i.mii::• c• i gi I ADJUSTMENT SECTION—NOT INCLUDED �^�- �, IN CURB AND GUTTER BID ITEM "' DRAINAGE STRUCTURE^ NOT INCLUDED • �I`;S4 ! ;r'' O.p ,Pp.24035 ,O �V :RI i IN CURB AND GUTTER BID ITEM • • • � . , j �"r C1STAR �`\'111111.111 • ��� ,� 1 sJONA � iii K' r' ` I %% f <;;'` EXPIRES JULY 27, 2007 SECTION O rF .'` r ,m `� w I CEMENT CONCRETE I I `. " E ' ' CURB AND GUTTER PAN. IL�y} f ! g , STANDARD PLAN F-10.1 G-00 +,. A ,tc..'�k' s g I I a M YM r ! 1 1 SHEET 1 OF 1 SHEET s § ...:. ; APPROVED FOR PUBLICATION N " I ISOMETRIC VIEW Kevin J. Dayton 12-20-06 > , +€ ��� <. - STATE DESIGN ENGINEER A . -i...-. • �Washington StaleDspaNmant of Tmnsportalfon 0 1'- . 8" SIDEWALK _ FOR.SIDE TREATMENT • SIDEWALK B 1/2" SEE 0 6 1/2" (SEE CONTRACT) rl» y- CONTRACTION - FACE OF CURB 1'-1-�}}II--�.1`-0 SEE OTHER SIDEWALK SECTIONS! (SEE CONTRACT) JOINT 5 1/2" 1" ~R01JhfDENCs� 2.1jo/o ii2"(IN)R.(TYPJ ;�. I 1/2"(IN)R.(TYP.) CURB NOT INCLUDED IN BID ITEM- 1 1 0 • e sI 2.0%MAX "r1 • .._. • r 'n 2.0%MAX. SEE STANDARD PLAN F-10.12 _ y • c . v 4tcF`1d ; * � 1��� •'.,.. ia . . ... . .. >.. _,. .3� °1"(IN)R. T/ m7-- ROADWAY s'S Aga �,,, f '.. c (� SEE RAISED EDGE 318"(IN)PREMOLDED �" b. SEE CURB FACE DETAIL - . > DETAIL-THIS SHEET JOINT FILLER WITH RAISED EDGE MONOLITHIC CEMENT CONCRETE OFINISHED GRADE 1"(IN) BELOW 8„ $112" 1, TOP OF CONCRETE SURFACE CURB AND SIDEWALK 2'-0" SIDEWALK NOTE 1'-0„ 1,-0" MIN. (SEE CONTRACT) CURB FACE DETAIL. _ 1!2" IN)R.(rYP.) 1. Four feet of the sidewalk width shall be the minimum pedestrian accessible ROUNDING CURB NOT INCLUDED IN BID ITEM- route free of vertical and horizontal obstructions. Gratings, Access Covers, EXTEND SIDEWALK TRANSVERSE EXPANSION ,�pg�_ / 2.0%MAX. SEE STANDARD PLAN F-10.12 Junction Boxes, Cable Vaults, Pull Boxes and other appurtenances within the JOINTS TO INCLUDE CURB(FULL DEPTH) . - • -:• '"` sidewalk must have slip resistant surfaces, be flush with surface, and match grade of the sidewalk. rGP*4'�� i, • it 3/8"(IN) •.... 1 p!I' PREMOLDED WALL OR BARRIER -Or' JOINT FILLER ADJACENT TO CURB ,• -' '' (STEEP FILL SLOPES) SIDEWALK f�far, GROOMED FINISH(TYP.) 1'-0" SIDEWALK 1/2"(IN)R. t 'Cr..--______...--1--' A'' © / 4"(IN) IDE,SMOOTH-TROWELED O SLOPES I MIN. (SEE CONTRACT) • o . . Cr �� CEMENT CONCRETE CURB g •- 1/2"(IN)R.(TYR) ° A. �j N (CURB AND GUTTER SHOWN) '� 2.0% CURB NOT INCLUDED IN 81D ITEH1- T NOT INCLUDED IN BID ITEM 2.p%MAX. SEE STANDARD PLAN F-10.12 „ 3/8"(IN) PREMOLDED Q' ► SEE STANDARD PLAN F-10.12 N,R.l OR av --• JOINT FILLER a' FFa 3/8"(IN)PREMOLDED •,•,i . ' ''' ••'''';, ,,'"„ ' JOINT FILLER iy '',�.-•,r SIDEWALK ADJACENT TO WALL DETAIL ,�\�`• ` ,"- •• •". ,-' - ADJACENT TO CURB f � � � BRIDGE OR PEDESTRIAN '•�/ RAILI -`— 1^ / y ,� :''��.M . .... CONTRACTION JOINT �~ IN SIDEWALK ONLY BARRIER^-SEE • SIDEWALK �� ;: ', i E CONTRACT PLANS ``�,�+ (SEE CONTRACT) �' •�'i0 \� , ,ff i 1/2"(IN)R (TYP.) ALEVEL 1f2" - CURB AND S1D 1EiNALK80TH y ,T• /C' .. I 1/2 (IN)R. 4 1 CURB NOT INCLUDED IN BID ITEAl1- % 7. ' � S�ASy FLUSH ! 'v 2.0%MAX. SEE STANDARD PLAN F-10.12 ` / � �" �%p roM 3 ,,:f50,7%.r,„„ - , ,,,„, •� :��f3 tr 1"(IN)R. ISOMETRIC VIE14r s '.:: :.. VERTICAL WALL--• �s 318"(IN)PREMOLDED ,. JOINT AND FINISH % SEE DETAIL _ JOINT FILLER(TVA.) o...6DETAIL 'I`' 3'4.363 A, a� �l STD \'` ADJACENT TO CURB AND RAILING OR WALL RAISED EDGE DETAIL �`t1,�' (.1,��t , EXTEND SIDEWALK TRANSVERSE Daily,Ed 3'-0"MIN. JOINTS TO INCLUDE RAISED EDGE i'i ' ' '?,, FOR SIDE TREATMENT SIDEWALK , BUFFER STRIP •- May 6 2014 3:41 PM SEE OTHER SIDEWALK (SEE CONTRACT) (SEE CONTRACT) 318" 1!8 TO 1/A" SECTIONS _. ! .�-._.._ .....— CEMENT CONCRETE `4 1 2.0%MAX, - (TYP N)R. CURB�- SEE STANDARD PLAN F-110.12 T INCLUDED IN BID M - SIDEWALK I • " ' t'' ,• °.[ o - N STANDARD DARE PLAN F-30.10-03 • • p . • •..4 '4 ' u•7ti' TO F SHEET 1 OF 1 SHEET FINISHED GRADE 1"(IN)BELOW TOP OF CONCRET ^ ' - APPROVED FOR PUBLICATION fJ &vkuuch.Pavan SURFACE FOR PLANTING-FLUSH IF PAVED T'; ,4494,— Jun i 12014 t:25 PM PREMOLDED _ ✓I r: , JOINT FILLER wait aEsrors swciry ADJACENT TO BUFFER STRIP EXPANSION JOINT i CONTRACTION JOINT washing0ntn Stwv Deport/mint of Tnpnapeetation Y DR�vBW GE ES{ GgNTRAGT) a NtSF1 tTYP) S�E n�ALK VARti SSE (rYP) iiiiiimillill.11110001ES taTE 1} VS"(14)EX"--tv,RD PI) 3a \� 4014 sioivitoi SEE. STAN ,...\ 4.1111* TRAG� G PEDBBTRtAN G a({YP) 41‘ ` ENT GdNGRETE ! ,,,...--„,%,_, ,,,GpN uARtE5{SEE A � 1N Ga R GEMEN SpE�FiED N P 10.12 GEM SIDEWAL4C � tV fiN�N NQA¢D Pi A G,S1DE`NA {SEE GaNTRAGT) \ N�..\ (SEe NaTE t) SEE gTA GEMENT GON ,rr�"'"" ..„ 11 y 6RaaMBD ;lti WALKD�R l� PltltSti tTYP) ! , � u,AT�EEnpN'tRACTIY ENTRANCE 4, NS1flN,}piNT DRIvEW TYPSIDE SLdpE t3i PXSp. AND isAY3'(1M R' 1r � �ApERtP1�A��IEw RaAl�av���NT1 P)�\ j \ ill:2:6711116.1.1.11..........111111111111.1111.1111 IIII '� 8 �}R { (TY) �YP� �1 RACT p�xS / 1, E Gi}Ra \..._____2=------- (T(P) RAGS tyRB AND t �� `} � ADD ,UTTER{�E NpTE s) tNGt a full deAtt cline. CT) (SEE CaN�. DE�r6R gEE NpTE 3) 11.11111..1.\ cons Gen GdNTRA n Gu �►c �► exceeds l'' taton9 the dnven s parallel (5Ea � � ���,y,� ENT GaNGR ER �aTEs the driveway 3idgh tin}joint sal act eXAanst urn so: ing when 8 to) 3) 1. Wl'e ngian taint wrth F-341a Can 15 (it.) rrraxtim tN)R (TY?) Y RAMP � ry�t0 (sE expa Stanfill"plat~ reopred at 1!2"t DR1vEWA Pl-A 1 See 5e centerirne o ed 30' tit) Ik details. TYp� NpTE a) with the widths exc for sidewa for the tl...................." i MAX (sEE driveway p,30.10 act plans far }--- AY ALl< C } TYP) datd plan e the Gon'� �.14.12 DRtvEW srQ� P) C'CI�N �,••.� 6 V�d�y RAGT) GRADE BREAK a urb and Gut{eeG fed:s. eeStandard PtanXe5 (SRE NONAlA osR5 pl 30.14SE�5'MAX (5 E NOTE ) (s E k' 3• Q design5p Gt+onbo sta (SE(-r- P) E S TE PER TKAN ' tANRAMP curb QQtails. structures,lun entrances. fthect�oNGRA NOT ti GRADEpEDE5TR Gurb drainae driveway a LEC'ENC PE 1N EITNER ptRE OMMENpEnPORGRApS aREAKRdl- iaGingfront of entire length sh. Mold A tract: cis tin out the al}be fiu sta R REG MA�cJ etlIvAsZifieilmt..../ CBREAK *_*r J4tNT tNp') 4. Oi Other abS SSA 1g Cal5Uked RGetane8 5h Geed15{eelfir^ �,5°lo aR�ORdFtK t2°�0saOtt �� �' � pANStdN N P 30.�o GRAQE a adtacent aired to ex en appiyting Qs1GNlF QMEND tN) �-�` ere too requited 1Nh �� GaM ) � ors'(STANpARD p EN 5. 1 een the th, not plans lk1 the Fl ATT e.3 to M o sEE BETWE betty Ramp len9 Contract of sidewa 3°l0. 7.�°t�d� RMv�rORK t '. p ip j� 1I2 ttN)L1P TTRR tine the back Geed 8• tGNlfa x 6 The pedestrian to eX * oEs TE s} DESTR(.0 RAM SEC11014 DWAY G� E 'se shown�neasured from hawed Of sEE Nd "f` W PE TE AND GUR6(oR sE unless other`s length trrr ramp is a to toA ( �, , fir'' o ry T G GON e ti5 axf the 4je strtan of ramp ce �e�so flNGRE TRAG� #aot rn de from l�o °m tizontal distan �a� R�c i S l� ��` GEM WALK trip} cT) � B slop t slop a hoc Y siD� (s�E cnNTRA Da.PRsss R CURE running. to Ganstan sidewa4k over TE WA 1 ON A>' DR4vE S GaNTRAG� a As e N 1 3) se to match rnto the dpe$not include dr�ve+rtaY GEMENT co c4E ,PAY LtM�Ts gcalt TerhP ENTRANGE y}}122R1bd:2hPiy1 ;yi::.r, (see �� i,G9'�//r of .tra feet. pay item l/ . � �p��R,��G� * d limes sha'N� 1{z' N)R (sus GaNTRACT} fee Contract Plan C ram_ .T,�p•)- ?Lot p.3a.10 OP) QR�v 1y Z, 3, �` EXPANSidN f 3a STAr1DARD 0\flO '' T� F'8�'1d'��1 RAMP C 1 sEE 5T}ANDARD p� TRAGTlC1N G�IiS G EAYL 5 ACED A pRMIN.aG' / �� ��,AEETS 1JOI1 t THAN p" �--------------- 1v�wAY j GON Mp LEN NT aauA %' 'g►3`�'.N`� 5N>w��"�of� �tlo� \ DR lVcrAY 10� 0 Cq�RRAGTtdNJdl DRIVEWAY ! EDFORPuBe� a DR N flTR 7} caECY sEE NdTB 7) /'� APPRd� e'lles„ zota�:a�rµ Ow- v es 1114 (SEE ( e‘ svm vE`NAY QMENT GdNGRpsT„ppR,Y LtTJ4tTS aNCRETE gTg�pgstoNartmsnt of 4rnatp°t1°�On ODITRANGRa. 0011p i CL.40�5PEG $ag.3 '�]%' yla�hlnii�O° 5ta1�D�4 �i0: ` PER STAND°RD i� tit :... j r 0,40, / ( D Ne\N 7)\ I / ISC ETRtG VIEW " /' APE2Npp,s � lis �4 r GL• G5 C gAfi.3 = pERSTANDARp f �'' YPEM�PAS LAWS VARIES��r St0N SOW(TYP.}- NTRA QRs3 t8"ttN}EXPA p PLAN ff gp.10 ;SEE CO G� FiN��rIP•} 3 KDAR DTH +E SEESTA WALK WI \ ��\� �S�CONTRACT} � RR1E5 PLANS} tv'IATCR Ud ACT TYP}_ ss (5EE GO —/M NStON 301N F.34.10 ‘‘''' ED 318"(t STANDARDP�B,RggM P� �, � a � T FiNtSH t pTH t8 ul � � EWA��� � E �' T D E 5t R � � �Mp,TGH GON�RAGTI --\-______ —\ �s ` SEE i"- CEMEN AND GUTTER CEMET a> 1 CURB (SEE NOTE 3} CONCRETEALt< Logioll.1111.111111111111111 EENgTE1} SIDEWALK \ \� � 5 ___ __ ,0 E t a�` DRtVsys�° ��P} �Yp� T� y PEDESTRIAN Rot. 0 ,,. gyp, �,. i Nwiisil101 CEMENT CRB AND UR All NpT BE USED Al gNG A P �� ate\ t 2 fi �- EE NO TtiitS ENTRANCE APE 8N "' \-- 2: O'031 SO-SRANCS �P"} DRN�ppE CtYP'1 0WAY VI t TE 1} 51QE RgAD "' \ it CSEE Nq W (`SEE CONTRACT) 1f2" tN}�AN� S(OR SEE iiiii � t ¢�N�(1E GUTTER co % pE 3 ;� coN��rc�l aUFFER STRIP�TYP} \\ 54 rlP.} ;� /// /111� �, t 1l "ttN}R. t 1 � � �................ 5E:4SSpGu�ERul p ....... QE3}73 •� E�a cT} S DRtv>rw�7) DRtv��A� J $Ec�'i°� ("SEE Nq RAMP �G�04 �4A&ff( �'P a (SEE CONTRA 1t2"�1N)t_tP:11NeES0R_Olfri GURg( {�uu'.. ER AMA{CYl5tO NTRA TK ^ p CON RAC SEE Cq fl 4. iligOlialail a Art'OD * sE NpTE) s-"'" ED doh C(S��'�e�� 4 � ...-•--•.... Y � tiEPRESS 0 pRN RAMP CURB ANp GU S 3 �'��I ONAL .................. ROW (SEE NC '�►tec,3nt t'1:a7 AM „ ,. PANStON lOLA�F gp 14 pY f" f� OROS 3f8"�t SEE STANDARD P ryCTlOrl r+ poles ..CEMENT GONGRETE�aPP 14�itT � G���A�( E�� +A ENTRANCE t.�pE , i 0" $ 2, 3} EE 140T A7 �� D OF 2 SHEETs �, 5EE NgTE } / S�� A ET uSt IGA' 410 QR4VEWAY / % PPROQ FpR "'2pt6�t2:z2rM w ,.. CEMENT Cq�Gj^R{PE 3'PAY�tMtT i/' /� A A P�Q""�,v�(( fut to ENTRANC Y � '�; 4434 CONCRU63 i f lj�'Gf��I �s���E9E5tpld�µ� �� ortol ton of Sr+sni¢ DR1VE`1 IA �� C DA D SPEC'8 5►ot+D°p°'� (SEE NgTE }�y;' gk 10.ti R �' �esbtntltp" r PER �1/ A pARo 5Gcg-Ofi 3 /ele / L�": / 7TR1C vtEW PER S10100.0 T ! 15� Y�IM1l ://,, / 4111PIP:Ak 7,,W. j,. � / /" IC v1E W f ISQEf pAY L11T5 1 APE 3 1-- UTILITY FRANCHISE CONTACT LIST A. Comcast Cable Casey Jones, New Construction Cell: 425.508.7335 Fax: 360.527.8302 E-mail: casey lones(a cable.comcast.com B. Comcast Cable Bill Inama, Construction Maintenance Cell: 360.815.6354 Fax: 360.527.8302 E-mail: bill_inama@cable.comcast.com C. Cascade Natural Gas Ted McCammant Office: 360.336.3842 Cell: 360.708.4689 Fax: 360.336.2564 E-mail: ted.mccammantgcngc.com D. Cascade Natural Gas Jim Hobbs Office: 360.336.3911 Cell: 360.941.0499 Fax: 360.336.2564 E-mail: James.hobbs@cngc.com E. PSE/Intolight Lisa Kinney, Account Sales Manager Office: (425) 516-5432 E-mail: Lisa.kinney@pse.com F. Puget Sound Energy Jane Major, Municipal Construction Planner Office: 360.766.5571 Cell: 360.791.2748 E-mail:jane.major@pse.com G. Frontier Communications Company Lawrence Bogues, Construction Office: 360.354.1755 Cell: 360.395.8430 H. Frontier Communications Company Bret Murdock, Engineer Office: 360.707.0641 Cell: 425.417.7085 Fax: E-mail: bret.t.murdockftr.com ANACORTES PUBLIC WORKS DEPARTMENT ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES SITE INFORMATION AND PROJECT VALUE OWNER: SITE ADDRESS: PROJECT DESCRIPTION: PROJECT VALUE [PV]: (Page 3 of 3 Total Cost) ENGINEERING PLAN REVIEW FEE ENGINEERING PLAN REVIEW FEE (.005 of Project Value) $ TOTAL ENGINEERING REVIEW FEE $ DUE AT TIME OF SUBMITTAL OF PLANS FOR REVIEW CONSTRUCTION INSPECTION FEE CONSTRUCTION INSPECTION FEE BASE FEE $ 500.00 CONSTRUCTION INSPECTION FEE ( .015 of Project Value) $ CONSTRUCTION INSPECTION FEE SUBTOTAL $ REDUCTION* $ TOTAL CONSTRUCTION INSPECTION FEE $ DUE UPON CONSTRUCTION PLAN APPROVAL * SUBJECT TO THE DIRECTOR OF ENGINEERING&DEVELOPMENT SERVICES APPROVAL,A 50% REDUCTION TO THE CONSTRUCTION INSPECTION FEE MAY BE ASSESSED IF THE DEVELOPER PROVIDES ON-SITE CONSTRUCTION INSPECTION AND CONSTRUCTION ENGINEERING THROUGH PRIVATE CONSULTANTS TO THE SAME STANDARD AS THAT OF THE CITY. Plan Review Fee: $ +Construction Inspection Fee:$ = $ Page 1 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number APPENDIX C: INSP-05 (JULY 2011) ANACORTES PUBLIC WORKS DEPARTMENT yCj ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES ENGINEERING AND INSPECTION FEE WORKSHEET (DEVELOPER DEDICATED ASSETS) Engineering Project No. Project Location Project Name Project Engineer Developer The Developer shall enter the quantities shown on the construction drawings to be submitted to the City for review. This document is used to maintain the City's inventory of Public Works infrastructure and determine the amount of Engineering&Inspection Fees due to the City. DESCRIPTION UNITS QUANTITY Unit Cost', Total Cost FEE AMOUNT 6" L.F. $25.00 8" L.F. $30.00 10" L.F. $37.00 12" L.F. $45.00 15" L.F. 18" L.F. W 24" L.F. u' Other Other cp Catch Basin,Type I EA $740.00 m Catch Basin,Type II EA $3500.00 Storm Manholes EA $5000.00 Ponds EA Bioswales EA Vaults or other water EA quality measures 6" L.F. $35.00 8" L.F. $45.00 10" L.F. 12" L.F. 15" L.F. N 18" L.F. 24" L.F. a Other z Other w Sanitary Manholes 48" EA $5000.00 Sanitary Manholes EA Other Lift Station EA Page 2 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number APPENDIX C: INSP-05 (JULY 2011) ANACORTES PUBLIC WORKS DEPARTMENT ;. � ENGINEERING PLAN REVIEW FEE AND CONSTRUCTION FEES DESCRIPTION UNITS QUANTITY Unit Cost:: Total Cost FEE AMOUNT Y. 4" L.F. $45/$55 6" L.F. $55/$75 8" L.F. $55/$75 w 12" L.F. $65/$80 I— a 16" L.F. $75/$90 Other L.F. Water Meter EA $200.00 Fire Hydrant EA $5000.00 ($4)2'x length Street Construction ($3)24'x S.F. length Length Width 9 rn ($2.80)20'x length w w Street Lights EA $3000.00 F- Street&Stop Signs EA $200.00 Curb&Gutter L.F. $14.00 Overlay,Asphalt TON $100.00 Overlay, Concrete S.Y. Sidewalk S.Y. $28.80 Wheelchair Ramps S.Y. $36.00 Landscaping S.Y. $27.00 Trails S.F. Stream Enhancement S.F. Other Other Temporary w Erosion/Sediment Sump $2000.00 = Control 0 Earthwork C.Y. $15.00 Traffic Control $2000.00 Erosion Control $500.00 Utility EA $275.00 Relocation/Adjustment TOTAL COSTS $ ** Temporary Erosion/Sediment Control includes: Clear and Grade, Fill and Grade, ESC Supervisor, and Silt Fencing. Page 3 of 3 Engineering Plan Review Fee and Construction Inspection Fee Project Number APPENDIX C: INSP-05 (JULY 2011)