Laserfiche WebLink
City of Anacortes Development Standards: <br /> • The 2011 Development Standards can be found on-line at <br /> www.cityofanacortes.orq. If the Engineer of Record needs any COA Standard <br /> Details in AutoCAD format, they can email me at stevel(a cityofanacortes.orq and <br /> request a CD. This CD will be mailed to a provided address. <br /> • See the Required Submittal Checklist, attached. This document can be revised to <br /> meet the needs for the size of the project proposed. It is recommended for the <br /> owner and Public Works Engineering Representative to determine what <br /> documentation will be required for this project. <br /> Sewer: <br /> • For additional Sewer information and design criteria, see the 2011 EDS <br /> Standards, Chapter 5 —Sanitary Sewer. <br /> • There is no direct access to sanitary sewer from this site. <br /> • Options: Not in any particular order <br /> ■ Install a private pump force main along Fidalgo Bay Road to the north, <br /> approximately 1,060-feet. Installing a conduit that is sized to allow Lots B <br /> and C to use. Because there is a receiving benefit to Lots B and C, the <br /> applicant could place a Latecomer Agreement to recover costs. <br /> • Install a private pump force main, via an easement across, Lot B, C and D to <br /> the Samish Tribe. Meeting discussion was that the applicant would have to <br /> work with the condominium association, which is problematic. <br /> Applicant will have to obtain an agreement with the Samish Tribe for sewer <br /> access since the Tribes sewer is private. City concern regarding the pump <br /> station capacity. <br /> • Question at the meeting was can the applicant install a sewer main to the <br /> tribe within the abandoned railroad corridor, adjacent to the trail. <br /> Staff met on Monday, June 3, 2019 to discuss. Discussion items: 1) This is a <br /> feasible option; 2) Encroachment Agreement will be required, and; 3) There <br /> is a section of trail that has failing asphalt (near this property), which may <br /> need to be repaired. <br /> Applicant will have to obtain an agreement with the Samish Tribe for sewer <br /> access since the Tribes sewer is private. <br /> Storm: <br /> • For additional Storm information and design criteria, see the 2011 EDS <br /> Standards, Chapter 4—Storm Drainage. <br /> . • See Anacortes Municipal Code 19.76 for Storm Water requirements. <br /> • Project, as presented, is subject to Minimum Requirements 1 to 9 under the <br /> current 2012\14 Department of Ecology Manual. <br /> • A Construction Storm Water Discharge Permit (DOE) is required for all land <br /> disturbing activities over 1-acre. <br /> • If there is more than 1-acre of land disturbing activities, the project will be <br /> required to obtain a Construction Storm Water Discharge Permit from the <br /> Department of Ecology. <br /> a� 1K • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> ® ® • Transportation•Equipment • Capital Projects • Development Services <br /> 4.p W P <br />