Laserfiche WebLink
October 21, 2005 <br /> Tim Fisher <br /> Fisher Excavating <br /> 3816 West 5th Street <br /> Anacortes, WA 98221 <br /> Dear Tim, <br /> SUBJECT: Sewer Connection at 4020 Jasper Way critical area <br /> Thank you for the submittals, as requested by Don Measamer, outlining the location of the <br /> sewer stub and the narrative of the work to be completed. <br /> After review of the submittals by Ian Munce, Planning Director, it has been determined that the <br /> work to construct the sanitary sewer for 4020 Jasper Way can proceed. <br /> The restoration of the work area is very critical. If possible, restore the area with the same <br /> material as before. A suggestion would be to remove the top 2-inches of sod and placing it to <br /> the side, then using the sod to complete the trench restoration. <br /> If you have any additional questions or concerns, please contact me at 360.661.3468 <br /> Sincerely, <br /> CITY OF ANACORTES <br /> Steven R. Lange <br /> Project Manager <br /> CC: Fred Buckenmeyer, Bob Hyde, Don Measamer, Dave Walde, Rick Harvey <br />