Laserfiche WebLink
ANACORTES PUBLIC WORKS DEPARTMENT <br /> oST ;0 Steven Lange, Project Manager <br /> P.O.BOX 547,ANACORTES,WA 98221 PH(360)293-1920 <br /> 9 wv.4b•z <br /> �rt E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 <br /> 1C0go. <br /> Memo <br /> Date:January 14,2016 <br /> To: Paul Ingalls, Plans Examiner <br /> From: Steven Lange <br /> Subject: Site Plan Review for 709 Fidalgo Avenue( 8841) <br /> cc: Kevin Cricchio, Jim Baldwin, Eric Shjarback <br /> The submitted site plan for 709 Fidalgo Avenue was reviewed by the Public Works <br /> Engineering Department on January 13, 2016. The following comments are provided: <br /> • It appears that the project will increase the value to more than 50%, which triggers <br /> the need for off-site improvements. <br /> • This property, under the BLA project is required to construct off-site improvements <br /> along Fidalgo Avenue. See attached plan. <br /> • The project submittal did not include a site plan. Needed to determine if there will <br /> be a 1,000 SF of new impervious area with driveway widening, etc. Site plan <br /> should identify where all of the utilities are located. See attached vicinity map. <br /> • Applicant needs to provide a Large Parcel Storm Water Plan for 5,000 SF of <br /> disturbed soils. <br /> • Applicant needs to provide a Drainage Analysis Report that includes a rain garden <br /> design for each rain garden proposed. <br /> • Applicant needs to provide grading and civil plans for the roadway paving and <br /> drainage. <br /> • Fees for the civil plan review and construction inspection is 2% of the estimated <br /> construction costs. See attached Plan Review and Construction Inspection fee <br /> form. <br /> vj • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> :° <br /> • Transportation•Equipment • Capital Projects • Development Services <br />