My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CommercialAve_2107
>
Public
>
CommercialAve_2107
>
CommercialAve_2107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 2:55:52 AM
Creation date
2/8/2022 5:27:42 PM
Metadata
Fields
Date
1/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
ANACORTES PUBLIC WORKS DEPARTMENT <br /> 81Y0 Steven Lange, Project Manager <br /> P.O.BOX 547,ANACORTES,WA 98221 PH(360)293-1920 <br /> E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 <br /> Memo <br /> Date: November 29,2018 <br /> To: Kait Nelson, Planner <br /> ,____ Je._ <br /> From: Steven Lange \___ejiz_____ <br /> Subject: PW's Review for the Commercial Avenue Pocket Park <br /> cc: Don Measamer, Libby Grage, Eric Shjarback <br /> The Public Works Engineering Department completed a review of the submitted <br /> documents related to the Commercial Avenue Pocket Park, November 29, 2018. <br /> Below are the findings and recommendations: <br /> Frontage Improvements: <br /> • Driveway access along Commercial Avenue was removed and replaced under a <br /> City\Developer Agreement with Jerry McCool, Contractor for Jimmy Johns. <br /> Storm Drainage Review: <br /> • The Applicability Flow Chart to determine Minimum Requirements was <br /> completed and determined that Minimum Requirement#2 is required. <br /> • BMP T5.13 Post Construction Soils is required. See attached information for <br /> Testing, Review and implementation requirements. <br /> • The submitted Minimum Requirement#2 appears to be from another project. <br /> This should be revised to reflect this project. Additiionaly, the site plan should <br /> reflect the SWPPP. <br /> Ati <br /> c�o`I� r • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> ® � • Transportation•Equipment • Capital Projects • Development Services <br /> 4 + yP <br />
The URL can be used to link to this page
Your browser does not support the video tag.