Laserfiche WebLink
ANACORTES PUBLIC WORKS DEPARTMENT <br /> G ,. -16 Steven Lange, Project Manager <br /> P.O. BOX 547,ANACORTES,WA 98221 PH(360)293-1920 <br /> 9 tO <br /> SINS,47 E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 <br /> Memo <br /> Date:January 27, 2014 <br /> To: Libby Grage <br /> From:Steven Lange <br /> Subject:Site Development, located at 1820 Commercial Avenue <br /> cc: Don Measamer, Eric Shjarback <br /> The Engineering Department has reviewed the submitted documents and makes the <br /> following comments and or recommendations: <br /> • 2011 EDS Standards (www.cityofanacortes.org\Public Works\Engineering) <br /> • Project is subject to Engineering Plan and Review Fees, attached. Includes the <br /> on-site improvements, minus the building. <br /> Water: <br /> • Property is served by a 10-inch AC waterline in 19th Street. <br /> • Property is served by an 8-inch AC waterline in Commercial Avenue. <br /> • Water Meter for 1820 is off of 19th Street. <br /> • Water Meter for 1814 is off of Commercial Avenue. This is a 3/4 inch service line <br /> and can only service one building. <br /> Fire Coverage: <br /> • Existing Fire Hydrant is located at the NW corner of 19th Street and Commercial <br /> Avenue. <br /> Sewer: <br /> • Utility map identifies a potential Storm\Sewer combined connection. This will <br /> need to be corrected. <br /> Storm: <br /> • Water Quality is required for the redevelopment\Resurfacing of the project. <br /> • Provide a Large Parcel Storm Water Plan (AMC Section 13.36.110), attached. <br /> Street: <br /> • 8-foot minimum width sidewalk in the Commercial District. <br /> • Frontage improvements will need to be upgraded to meet ADA requirements. <br /> Such as the driveway approach to the north and the sidewalk ramp at 19th Street <br /> and Commercial Avenue.A0., <br /> � • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> • Transportation•Equipment • Capital Projects • Development Services <br /> 4`W P <br />