My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22ndSt_1111
>
Public
>
22ndSt_1111
>
22ndSt_1111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 1:15:09 AM
Creation date
2/8/2022 4:23:00 PM
Metadata
Fields
Date
4/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
ANACORTES PUBLIC WORKS DEPARTMENT <br /> Gx 14 Steven Lange, Project Manager <br /> P.O.BOX 547,ANACORTES,WA 98221 PH(360)293-1920 <br /> .W E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 <br /> /0016 <br /> Memo <br /> Date: February 27,2017 <br /> To: Paul Ingalls, Plans Examiner <br /> From: Steven Lange <br /> _->2J4-Le-ft-Ci' <br /> Subject: Site Plan Review#1 for 1111 22nd Street <br /> cc: Eric Shjarback, Jim Baldwin <br /> The submitted site plan for 1111 22nd Street was reviewed by the Public Works <br /> Engineering Department on February 27, 2017 <br /> • 02-09-17: Submittal to Public Works Engineering <br /> • 02-27-17: Public Works review and memo back to Building Department <br /> The following comments are provided: <br /> • Site Plan is incomplete. Use the checklist provided in the SPSWP to ensure all <br /> necessary items are shown on the site plan. <br /> • Small Parcel Storm Water Plan is incomplete. See attached comments. <br /> • Underground Franchised Utilities should use the trenchless method. No open <br /> cutting of the street. <br /> • All work within the Public Right-of-Way will require a Right-of-Way Permit. <br /> • Provided for the applicants convenience and use as part of the Small Parcel Storm <br /> Water Plan: <br /> • Erosion Control Notes for Residential Construction <br /> • WSDOT Standard Detail 1-30.15-02 <br /> • WSDOT Standard Detail 1-40.20-00 <br /> • WSDOT Standard Detail 1-80.10-02 <br /> • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> • Transportation•Equipment • Capital Projects • Development Services <br /> 9w P <br />
The URL can be used to link to this page
Your browser does not support the video tag.