Laserfiche WebLink
ANACORTES PUBLIC WORKS DEPARTMENT <br /> tiY ° Steven Lange, Project Manager <br /> ti <br /> P.O. BOX 547,ANACORTES,WA 98221 PH(360)293-1920 <br /> W E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 <br /> /cab`s <br /> Memo <br /> Date:January 3, 2018 <br /> To: Paul Ingalls, Plans Examiner <br /> From: Steven Lange <br /> Subject: Site Plan Review#1 for 121315Th Street <br /> cc: Eric Shjarback, Justin Symonds <br /> The submitted site plan for 1213 15th Street was reviewed by the Public Works <br /> Engineering Department on January 3, 2018. <br /> • 12-22-17: Submittal to Public Works Engineering <br /> • 01-03-18: Public Works review and memo back to Building Department <br /> The following comments are provided: <br /> • No frontage improvements required under this proposal. <br /> • Known subsurface flows in the area. Known Artesian Wells in the area. Suggest <br /> installing perimeter drains along the boundaries and also a drainage system inside <br /> the foundation. <br /> • Applicant needs to apply for a demolition permit to remove the existing garage. <br /> • Site Plan does not identify utility connection locations. <br /> • Any encroachments into the Public Right-of-Way will require an encroachment <br /> agreement. <br /> • Any excavation work within the Public Right-of-Way will require a Right-of-Way <br /> Permit. Includes sanitary sewer and waterline installation work. <br /> • There is access to the City of Anacortes Storm Water Conveyance system at the <br /> intersection of 15th Street and N Avenue. No thru-curb holes allowed, per the <br /> Anacortes Municipal Code. <br /> °`��o <br /> Q < • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> • Transportation•Equipment • Capital Projects • Development Services <br /> q %4 <br />