Laserfiche WebLink
PROPOSED WILSON HOTEL PARKING LOT <br /> ENGINEERING ESTIMATE (04-04-2012) <br /> PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> NO. QUANTITY (Figures) (Figures) <br /> All MOBILIZATION At <br /> 1* 1 1-09.7 $5,080.75 $5,080.75 <br /> LS Per Lump Sum <br /> Private PROJECT TEMPORARY TRAFFIC At <br /> CONTROL <br /> 2* 1 1-10.5(1) $1,000.00 $1,000.00 <br /> LS Per Lump Sum <br /> Private EROSION/WATER POLLUTION CONTROL <br /> 3* 1 8-01.5 $2,000.00 $2,000.00 <br /> LS Per Lump Sum <br /> Private S.P.C.0 PLAN At <br /> 4* 1 1-07.15(1) $500.00 $500.00 <br /> LS Per Lump Sum <br /> Private WOVEN GEOTEXTILE FABRIC At <br /> 9-33.4(5) <br /> 5* 667 $2.00 $1,334.00 <br /> SY Per Square Yard <br /> Private SAWCUTTING ASPHALT At <br /> 2-02.5 <br /> 6* 71 $3.50 $248.50 <br /> LF Per Linear Foot <br /> Private SAWCUTTING CONCRETE At <br /> 7* 30 2-02.5 $7.00 $210.00 <br /> LF Per Linear Foot <br /> Private ROADWAY EXCAVATION INCL. HAUL At <br /> 8* 185 2-03.5 $15.00 $2,775.00 <br /> CY Per Cubic Yard <br /> Private GRAVEL BORROW, INCL. HAUL At <br /> 9* 206 2-03.5 $30.00 $6,180.00 <br /> TON Per Ton <br /> Private CRUSHED SURFACING TOP COURSE At <br /> 10* 69 4-04.5 $30.00 $2,070.00 <br /> TON Per Ton <br /> P-1 <br />