My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-04-12 10th and N 4-lot
>
Public
>
10thSt_1111-1113-1117-1119
>
12-04-12 10th and N 4-lot
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 1:00:50 AM
Creation date
2/7/2022 3:34:28 PM
Metadata
Fields
Date
2/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
ANACORTES PUBLIC WORKS DEPARTMENT <br /> G .- It> Steven Lange, Project Manager <br /> P.O. BOX 547,ANACORTES,WA 98221 PH(360)293-1920 <br /> 9 tO <br /> SINS,47 E-MAIL:stevel@cityofanacortes.org FAX(360)293-1938 <br /> Memo <br /> Date: December 4, 2012 <br /> To: Libby Grage <br /> From:Steven Lange <br /> Subject: Proposed 4-Lot Short Plat @ 10th Street and N Avenue—Irving Construction <br /> cc: Don Measamer, Eric Shjarback <br /> The Engineering Department has reviewed the submitted documents and makes the <br /> following comments and or recommendations: <br /> Water: <br /> • All lots are served by an existing water system in 10' Street. <br /> • Lot 1 and 2: Existing services are available to each Lot. <br /> • Lot 3 and 4: A 1-inch water service will need to be installed to service both Lots. <br /> • Fire coverage exists for all Lots via fire hydrants at 11 t" Street and N Avenue and <br /> 10" Street and 0 Avenue. <br /> Sewer: <br /> • All lots are served by an existing Sanitary Sewer System in the Alley Way. <br /> • Each Lot is serviced with a 6" PVC Side Service installed during the 2012 <br /> Sanitary Sewer Replacement Project by the City of Anacortes. <br /> Storm: <br /> • No existing services provided to these Lots. <br /> • A new storm conveyance system will need to be constructed in the alley way to <br /> collect the storm runoff from the paved alley way. Additionally, a side service stub <br /> will need to be installed to service each Lot.A��` • Water • Wastewater • Streets • Storm Drainage • Engineering • Solid Waste <br /> a • Transportation•Equipment • Capital Projects • Development Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.