Laserfiche WebLink
1� Y O <br /> &74)ICar4f7 <br /> 1COR STATE ENVIRONMENTAL POLICY ACT (SEPA) <br /> Determination of Non-Significance(DNS) <br /> Project Title Skyline Dock& Piling Project <br /> File Number SDP-2021-0009 <br /> Site Address 2001 Skyline Way <br /> APN(s) P80330 <br /> Applicant/Owner Bruce Cay for Interbay Condominiums Marina <br /> Agent Tyler Zimmerman, TZ Engineering, LLC <br /> Application Date September 14, 2021 <br /> Notice of Application October 13, 2021; comment period ended November 12, 2021 <br /> The applicant has requested Shoreline Substantial Development permit with <br /> SEPA Review for the upgrade to an existing community dock on Flounders <br /> Bay. The project proposes to replace (10) existing creosote pilings with 12 in. <br /> galvanized steel pilings. The existing concrete floats, totaling 1,722 sq. ft., <br /> would be replaced with steel framed FRP grated floats; the floats are to be <br /> installed in the same layout and location as existing. The existing 3 ft. by 32 ft. <br /> Request gangway is to be replaced by a 4 ft. by 40 ft. grated gangway. <br /> The project proposes the use of FRP grated decking material which would <br /> allow for 62% light permeability, a reduction in complete over water coverage <br /> that the existing solid wood decking presented. <br /> The subject property is located within the Urban shoreline environment <br /> designation with majority of the work occurring within the Aquatic shoreline <br /> environment designation. <br /> The City of Anacortes Department of Planning, Community & Economic Development has determined <br /> that this project does not have a probable significant adverse,impact on the environment. An <br /> environmental impact statement(EIS) is not required under RCW§43.21 C.030(2)(c). This decision was <br /> made after review of a completed environmental checklist and other information on file with the lead <br /> agency. This information is available at https://www.anacorteswa.gov/161/Planning-CommunityEconomic- <br /> Development under "Current Land Use Projects and Notices". <br /> This determination is based on the following findings and conclusions: <br /> • No comments regarding potential environmental impacts were received from the public or agencies. <br /> • Comments relaying"no objection to the proposed project"were received from City of Anacortes Building <br /> Department, Public Works Department, and the Suak-Suiattle Indian Tribe. <br /> • Comments of the City of Anacortes Fire Department and Building Department provided requirements <br /> for construction, to be satisfied at time of building permit submittal. <br /> • The proposal's conformance with existing Anacortes Municipal Code regulations and acquisition of <br /> applicable agency permits prior to site construction adequately address potential impacts of this project. <br /> • This DNS is issued under WAC 197-11-340(2) after using the Optional DNS process in WAC 197-11- <br /> 355. There is no further comment period on this DNS. <br /> SDP-2021-0009—Skyline Dock& Piling Project SEPA DNS <br /> Page 1 of 2 <br />