My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
583394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 12:34:43 PM
Creation date
10/5/2021 12:34:31 PM
Metadata
Fields
Template:
PL_LandUseFile
Permit Number
SDP-2021-0009
Applicant Name (LN, FN)
TYLER ZIMMERMAN
Project Name
Skyline Dock & Piling Replacement
Project Description
SDP for the replacement of existing creosote pilings and dock with gangway
Application Date
9/14/2021
Parcel
P80330
Location
2001 SKYLINE WAY APT 206 ANACORTES, WA 98221-2902
Document Type
Permit Application
Date
9/14/2021
Status
Application Complete
Project Manager
Emily Morgan
Document Relationships
583393
(Attachment)
Path:
\+LF\entry\583379
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br />August 18, 2021 <br />DEPARTMENT OF THE ARMY <br />SEATTLE DISTRICT, CORPS OF ENGINEERS <br />P.O. BOX 3755 <br />SEATTLE, WASHINGTON 98124-3755 <br /> REPLY TO <br /> ATTENTION OF <br />Regulatory Branch <br /> <br /> <br /> <br /> <br />Mr. Greg Van Zandt <br />5301 Doon Way <br />Anacortes, Washington 98221 <br /> <br /> Reference: NWS-2021-209 <br /> Van Zandt, Greg <br /> <br />Dear Mr. Van Zandt: <br /> <br />We have reviewed your application to replace piling and floats in Flounder Bay (Skyline <br />Marina) at Anacortes, Skagit County, Washington. Based on the information you provided to us, <br />Nationwide Permit (NWP) 3, Maintenance (Federal Register January 6, 2017, Vol. 82, No. 4), <br />authorizes your proposal as depicted on the enclosed drawings dated August 7, 2021. In order <br />for this authorization to be valid, you must ensure the work is performed in accordance with the <br />enclosed NWP 3, Terms and Conditions and the following special condition: <br /> <br />a. No residue from construction activity shall be allowed to remain in waters of the <br />U. S. The permittee must install and maintain debris collection measures until all project <br />operations are complete. <br /> <br />b. In order to meet the requirements of the Endangered Species Act (ESA) and Magnuson- <br />Stevens Fishery Conservation and Management Act (MSA) Phase I programmatic consultation <br />(National Marine Fisheries Service (NMFS) Reference Number 2005-07506; U.S. Fish and <br />Wildlife Service (USFWS) Reference Number 01EWFW00-2015-I-0104), you must implement <br />and abide by the List of Requirements for Piling Replacement dated May 3, 2017, available on <br />the U.S. Army Corps of Engineers (Corps) website (Permit Guidebook, Endangered Species, <br />Programmatic Consultations, Various Activities throughout Washington State typically <br />authorized by Nationwide Permit (Phase I)). In addition, you must comply with the relevant <br />conservation measures in the General Implementation Conditions also available on the Corps <br />website. Failure to comply with the commitments made in this document constitutes non- <br />compliance with the ESA and your Corps permit. If you cannot comply with the terms and <br />conditions of this programmatic consultation, you must, prior to commencing construction, <br />contact the Corps, Seattle District, Regulatory Branch for an individual consultation in <br />accordance with the requirements of the ESA and/or the Magnuson-Stevens Fishery <br />Conservation and Management Act. The USFWS/NMFS is the appropriate authority to <br />determine compliance with the ESA.
The URL can be used to link to this page
Your browser does not support the video tag.