• SMP A-3: Geologically Hazardous Areas <br /> o Based on City mapping, the subject property is located in a geologically hazard area <br /> for tsunami hazard; a geological site assessment was provided with application. <br /> • SMP A-1: Frequently Flooded Areas <br /> o Based on FEMA's National Flood Hazard Mapping, the subject property is located <br /> in FIRM panel 5303170055A and is identified as Zone AE. <br /> • SMP A-5: Fish &Wildlife Conservation Habitat Areas <br /> o Based on the City mapping, the subject property is adjacent to priority habitat and <br /> species for red sea urchin. <br /> Repair and maintenance of an existing structure is permitted as a Use by Right. <br /> SHORELINE INFORMATION <br /> The project site has a split shoreline environment designation of primarily Urban with a <br /> Environment small portion in Natural. <br /> Water Body Burrows Bay <br /> VICINITY MAP <br /> ira <br /> 1-;!1. ` err'` < '� igiff. i%! -,- <br /> Shoreline <br /> 7..--,-,7*.!ti:....---„: I <br /> -‘,:' i ' .---1...- '44. , <br /> rt <br /> ,, ,,-,;:ti-,,,,,,ar.51vv-i,,,,,,,,..ii qz--*4, <br /> 4 <br /> fr: - <br /> 1E1----,--t---- ',--, - I ,,,,-,-.T.--,--:!.f.:,A'3-::,-----'-' <br /> ., p...'� „, ;1 ✓f,. .T„ .' E <br /> . ..„- ...it, ‘..,,-._ , - <br /> , , <br /> . ,,,vi,.1... t� `'* u� w i om` "" 9 <br /> ,.. ..,;-41,,,,,,,..„7:,,, ,,,,,, ,,\I <br /> itiii. <br /> + t. t ' e <br /> Yam ' ' 1 <br /> FINDINGS OF FACT <br /> 1. The project proposes removing the failing footing toe from the approximately 84 ft. long seawall, then <br /> repairing via replacement the structural footing. The scope of work proposed is as follows: <br /> 1.1. The existing riprap is to be moved while a new concrete footing, totaling 10 cu. yds will be installed. <br /> 1.2. The failing footing toe will be removed via jackhammer; a 3-4 ft. trench would be excavated adjacent to <br /> the wall where the old footing toe is to be removed. <br /> 1.3. Epoxy-coated rebar is to be driven into the base of the existing wall on 12 in. centers and new 8 in. form <br /> panels are to be installed; concrete is to be poured into the forms and allowed to flow into the voids <br /> under the existing wall. <br /> 1.4. The previously removed riprap will be relocated and restacked in front of the new footing. <br /> SLX 2021 0008—Skyline Seawall Repair& Maintenance Shoreline Exemption Decision <br /> Page 2 of 4 <br />