• SMP A-3: Geologically Hazardous Areas
<br /> o Based on City mapping, the subject property is located in a geologically hazard area
<br /> for tsunami hazard; a geological site assessment was provided with application.
<br /> • SMP A-1: Frequently Flooded Areas
<br /> o Based on FEMA's National Flood Hazard Mapping, the subject property is located
<br /> in FIRM panel 5303170055A and is identified as Zone AE.
<br /> • SMP A-5: Fish &Wildlife Conservation Habitat Areas
<br /> o Based on the City mapping, the subject property is adjacent to priority habitat and
<br /> species for red sea urchin.
<br /> Repair and maintenance of an existing structure is permitted as a Use by Right.
<br /> SHORELINE INFORMATION
<br /> The project site has a split shoreline environment designation of primarily Urban with a
<br /> Environment small portion in Natural.
<br /> Water Body Burrows Bay
<br /> VICINITY MAP
<br /> ira
<br /> 1-;!1. ` err'` < '� igiff. i%! -,-
<br /> Shoreline
<br /> 7..--,-,7*.!ti:....---„: I
<br /> -‘,:' i ' .---1...- '44. ,
<br /> rt
<br /> ,, ,,-,;:ti-,,,,,,ar.51vv-i,,,,,,,,..ii qz--*4,
<br /> 4
<br /> fr: -
<br /> 1E1----,--t---- ',--, - I ,,,,-,-.T.--,--:!.f.:,A'3-::,-----'-'
<br /> ., p...'� „, ;1 ✓f,. .T„ .' E
<br /> . ..„- ...it, ‘..,,-._ , -
<br /> , ,
<br /> . ,,,vi,.1... t� `'* u� w i om` "" 9
<br /> ,.. ..,;-41,,,,,,,..„7:,,, ,,,,,, ,,\I
<br /> itiii.
<br /> + t. t ' e
<br /> Yam ' ' 1
<br /> FINDINGS OF FACT
<br /> 1. The project proposes removing the failing footing toe from the approximately 84 ft. long seawall, then
<br /> repairing via replacement the structural footing. The scope of work proposed is as follows:
<br /> 1.1. The existing riprap is to be moved while a new concrete footing, totaling 10 cu. yds will be installed.
<br /> 1.2. The failing footing toe will be removed via jackhammer; a 3-4 ft. trench would be excavated adjacent to
<br /> the wall where the old footing toe is to be removed.
<br /> 1.3. Epoxy-coated rebar is to be driven into the base of the existing wall on 12 in. centers and new 8 in. form
<br /> panels are to be installed; concrete is to be poured into the forms and allowed to flow into the voids
<br /> under the existing wall.
<br /> 1.4. The previously removed riprap will be relocated and restacked in front of the new footing.
<br /> SLX 2021 0008—Skyline Seawall Repair& Maintenance Shoreline Exemption Decision
<br /> Page 2 of 4