Laserfiche WebLink
NOTICE OF APPLICATION with OPTIONAL SEPA DNS: <br />Notice Is Hereby Given That An Application Was Made For The Following Proposal: <br />Request: The applicant has applied for a Shoreline Substantial Development Permit (SSDP) to permit the removal, <br />demolition and disposal of the existing creosote piling and floating marina (7,968 sq ft). Forty-three galvanized <br />steel piling will be installed, and new floating docks using the EnviroCrete® System will be fabricated in Tacoma <br />and towed to the Bayside Moorage Marina for installation. The existing pier and ramps will be reused and re- <br />decked with new grating. This project is a like for like replacement within the existing footprint, using <br />contemporary designs to reduce the environmental impact. <br /> <br />File Number: SDP-2020-0002 Subject Parcels #: P32370 <br />Date of Application: September 23, 2020 Date of Completeness: November 6, 2020 <br />Applicant: Bob Bergquist, Marine Floats Corporation 1208 E. “D” St, Tacoma, WA 98421 <br />Landowner: Jeff Wright 1910 Fairview Ave, Suite 500, Seattle, WA 98102 <br /> <br />Project Location: The project site is located at 2410 Skyline Way, Anacortes, WA 98221, within a portion of <br />Section 27; Township 35 North; Range 01 East; Willamette Meridian. <br />Public Comment Period: Any person may comment on this application by writing to the address below and/or by <br />testifying at the public hearing. Staff will issue a recommendation on the project after the comment period ends <br />at 5:00 PM on Friday, December 11, 2020. Written comments on the proposal should be submitted before the <br />end of the comment period but will be accepted until the close of the Pre-Decision Open-Record Public Hearing. <br />Required Project Permits/Approvals: The following may be required in addition to the above: Shoreline Permit, <br />SEPA environmental review, building permit, WDFW HPA Permit, USACE permit/authorization. <br />Preliminary Determination of Consistency: At a minimum, this project will be subject to the following plans and <br />regulations: 2010 Shoreline Master Program; 2016 Anacortes Comprehensive Plan; Municipal Code (Zoning, etc.); <br />& Engineering Design and Building Standards. <br />SEPA Review: Based on the submitted application and available information, the City anticipates issuing an MDNS <br />for this proposal and the optional DNS process as specified in WAC § 197.11.355 is being utilized. Consequently, <br />this may be the only opportunity to comment on the environmental impacts of this proposal. This proposal may <br />include mitigation measures under applicable codes, and the project review process may incorporate or require <br />mitigation measures regardless of whether an EIS is prepared. A copy of the subsequent SEPA threshold <br />determination for the proposal may be obtained upon request. <br />Existing Environmental Documents: JARPA, Biological Evaluation, SEPA Checklist <br />Application documents may be reviewed at https://www.anacorteswa.gov/161/Planning-Community-Economic- <br />Development by clicking “Notices of Application” and then opening the appropriate project file number folder. <br /> <br />Pre-Decision Open-Record Public Hearing: A pre-decision open-record public hearing is required to be held by <br />the Planning Commission and will be scheduled at a later date – due to COVID-19 restrictions. <br /> <br />For Project Information: Tess Cooper, Senior Planner; Phone: (360) 588-8234; Email: tessc@cityofanacortes.org; <br />City of Anacortes, P.O. Box 547, Anacortes, WA 98221 <br />Date Issued: November 6, 2020 <br />Date Published: November 11, 2020