'� DRG Pre-Application Routing
ANACORTES
WASHINGTC]Iti
Routes Pre-Application materials to entire DRG for comments,
� �
•�. 00 then files Comment Letter and emails it to applicant.
Application Information
Routing Date
11/23/2020
Managing Planner Planner Email
EMILY MORGAN emilym@cityofanacortes.org
Application Number Application Date
PRE-2020-0034 11/18/2020
Applicant Name Applicant Email
VINCE&KELLI LANG TEAM@TEAMKELLILANG.COM
Applicant Address
4401 MARINE HEIGHTS WAY
ANACORTES,WA 98221-8288
Project Name Project Address
LANG MIXED USE DEVELOPMENT 2802 COMMERCIAL AVE
Parcel(s)
Parcel No.
57371
Project Description
PROPOSED DEMOLITION OF EXISTING STRUCTURE AND CONSTRUCTION OF 3-4
STORY MULTI-FAMILY AND OFFICE SPACE IN(C)ZONING DISTRICT
Meeting Type
r General Informational Meeting Meeting Location
f� Pre-Application Conference Online Meeting
Meeting Date Meeting Time
12/15/2020 1:30:00 PM
DRG Review
Click here to view the submitted application materials.
Reviewer Comment Documents
PRE-2020-34 2802 Commercial Ave Mixed use.asd.docx 76.06KB
12-14-20 PW DRG Memo-2802 Comm.pdf 6.38MB
Fire Requirements_multi story_mixed use_incomplete.docx 13.32KB
Please enter review comments in the Comments box and/or upload additional comment documents here.
Reviewer Comments
In 1926 the Pilgrim Congregational Church built a church at 2802 Commercial Avenue. This is a significant
building, but not one that is on the registers of historic places for Anacortes,Washington or the national
register.
More information can be found on its history in the museum's online database at:
https://anacortes.pastperfectonline.comlbysearchterm?keyword=Pilgrim+Congregational+Church
Planning Comment Letter
.....................................................................................................................................................................................................................................................................................................................................................................................................
Comment Letter
PRE-2020-0034-Meeting Summary.pdf 2.53MB
Upload the completed Comment Letter here; it will be filed in the Laserfiche repository and a link will be emailed to the
applicant.
Action History (UTC-08:00)Pacific Time(US&Canada)
Begin Routing by Morgan, Emily 11/23/2020 2:15:06 PM(Route Application Materials)
by Workflow 11/23/2020 2:17:03 PM(Workflow Start Event)
Review Complete by Koegel, Matt 11/24/2020 11:18:06 AM(Sanitation Review)
* Follow city of Anacortes dumpster pad specs,if dumpster requested.
• The task was assigned to Koegel, Matt.The due date is: December 14,2020 5:00 PM
11/23/2020 3:00 PM
Review Complete by Small,John 11/23/2020 4:48:41 PM(Police Review)
• The task was assigned to Small,John.The due date is: December 14, 2020 5:00 PM
11/23/2020 3:00 PM
Review Complete by Lunsford, Bret 11/25/2020 3:08:46 PM(Museum Review)
• The task was assigned to Lunsford, Bret.The due date is: December 14, 2020 5:00 PM
11/25/2020 3:00 PM
Review Complete by Nemeth,Terry 11/27/2020 10:32:24 AM(Water Distribution Review)
* Looks good so far, but I will need a calculation for GPM demand through fixture count to determine if a
1"meter will supply enough water. Both fire and domestic taps will be performed by the city crew at time
and material to the owner.
• The task was assigned to Nemeth,Terry.The due date is: December 14,2020 5:00 PM
11/26/2020 3:00 PM
Review Complete by Cooper,Tess 12/14/2020 1:48:53 PM(Cooper Review)
• The task was assigned to Cooper,Tess.The due date is: December 14,2020 5:00 PM
12/11/2020 3:02 PM
Review Complete by Grage, Libby 12/15/2020 11:24:23 AM(Grage Review)
• The task was assigned to Grage, Libby.The due date is: December 14,2020 5:00 PM
12/11/2020 3:02 PM
Review Complete by Frisinger, Rob 12/14/2020 7:58:22 AM(Building Review)
• The task was assigned to Frisinger, Rob.The due date is: December 14,2020 5:00 PM
12/11/2020 3:02 PM
Review Complete by Lange,Steve 12/14/2020 4:30:31 PM(Engineering Review)
• The task was assigned to Lange, Steve.The due date is: December 14,2020 5:00 PM
12/11/2020 3:02 PM
Review Complete by Kennedy,Jack 12/15/2020 9:41:06 AM(Fire Review)
• The task was assigned to Kennedy,Jack.The due date is: December 14,2020 5:00 PM
12/11/2020 3:02 PM
Review Complete by Morgan, Emily 12/15/2020 11:54:45 AM(Morgan Review)
• The task was assigned to Morgan, Emily.The due date is: December 14,2020 5:00 PM
12/11/2020 3:02 PM
Review Complete by Morgan, Emily 12/22/2020 10:15:28 AM(Measamer Review)
• Hunt, Marcia reassigned the task to Morgan, Emily 12/22/2020 9:59 AM
• The task was assigned to Measamer, Don.The due date is: December 14, 2020 5:00 PM
12/21/2020 3:03 PM
Review Complete by Morgan, Emily 12/22/2020 10:15:06 AM(Streets Review)
• Hunt, Marcia reassigned the task to Morgan, Emily 12/22/2020 9:59 AM
• The task was assigned to Larson, Bill.The due date is: December 14, 2020 5:00 PM
12/21/2020 3:03 PM
Ready for Meeting by Morgan, Emily 12/22/2020 10:20:26 AM(Planner Prepares for Meeting)
• The task was assigned to Morgan, Emily 12/22/2020 10:16 AM