Loading...
HomeMy WebLinkAboutDRG Routing - Final FileCouuiaxit Letter by Morgan, Emily 12/22/2020 10:26:23 AM(Planner notified to prepare Comment Letter) . The task was assigned to Morgan, Emily 12/22/2020 10:20 AM '� DRG Pre-Application Routing ANACORTES WASHINGTC]Iti Routes Pre-Application materials to entire DRG for comments, � � •�. 00 then files Comment Letter and emails it to applicant. Application Information Routing Date 11/23/2020 Managing Planner Planner Email EMILY MORGAN emilym@cityofanacortes.org Application Number Application Date PRE-2020-0034 11/18/2020 Applicant Name Applicant Email VINCE&KELLI LANG TEAM@TEAMKELLILANG.COM Applicant Address 4401 MARINE HEIGHTS WAY ANACORTES,WA 98221-8288 Project Name Project Address LANG MIXED USE DEVELOPMENT 2802 COMMERCIAL AVE Parcel(s) Parcel No. 57371 Project Description PROPOSED DEMOLITION OF EXISTING STRUCTURE AND CONSTRUCTION OF 3-4 STORY MULTI-FAMILY AND OFFICE SPACE IN(C)ZONING DISTRICT Meeting Type r General Informational Meeting Meeting Location f� Pre-Application Conference Online Meeting Meeting Date Meeting Time 12/15/2020 1:30:00 PM DRG Review Click here to view the submitted application materials. Reviewer Comment Documents PRE-2020-34 2802 Commercial Ave Mixed use.asd.docx 76.06KB 12-14-20 PW DRG Memo-2802 Comm.pdf 6.38MB Fire Requirements_multi story_mixed use_incomplete.docx 13.32KB Please enter review comments in the Comments box and/or upload additional comment documents here. Reviewer Comments In 1926 the Pilgrim Congregational Church built a church at 2802 Commercial Avenue. This is a significant building, but not one that is on the registers of historic places for Anacortes,Washington or the national register. More information can be found on its history in the museum's online database at: https://anacortes.pastperfectonline.comlbysearchterm?keyword=Pilgrim+Congregational+Church Planning Comment Letter ..................................................................................................................................................................................................................................................................................................................................................................................................... Comment Letter PRE-2020-0034-Meeting Summary.pdf 2.53MB Upload the completed Comment Letter here; it will be filed in the Laserfiche repository and a link will be emailed to the applicant. Action History (UTC-08:00)Pacific Time(US&Canada) Begin Routing by Morgan, Emily 11/23/2020 2:15:06 PM(Route Application Materials) by Workflow 11/23/2020 2:17:03 PM(Workflow Start Event) Review Complete by Koegel, Matt 11/24/2020 11:18:06 AM(Sanitation Review) * Follow city of Anacortes dumpster pad specs,if dumpster requested. • The task was assigned to Koegel, Matt.The due date is: December 14,2020 5:00 PM 11/23/2020 3:00 PM Review Complete by Small,John 11/23/2020 4:48:41 PM(Police Review) • The task was assigned to Small,John.The due date is: December 14, 2020 5:00 PM 11/23/2020 3:00 PM Review Complete by Lunsford, Bret 11/25/2020 3:08:46 PM(Museum Review) • The task was assigned to Lunsford, Bret.The due date is: December 14, 2020 5:00 PM 11/25/2020 3:00 PM Review Complete by Nemeth,Terry 11/27/2020 10:32:24 AM(Water Distribution Review) * Looks good so far, but I will need a calculation for GPM demand through fixture count to determine if a 1"meter will supply enough water. Both fire and domestic taps will be performed by the city crew at time and material to the owner. • The task was assigned to Nemeth,Terry.The due date is: December 14,2020 5:00 PM 11/26/2020 3:00 PM Review Complete by Cooper,Tess 12/14/2020 1:48:53 PM(Cooper Review) • The task was assigned to Cooper,Tess.The due date is: December 14,2020 5:00 PM 12/11/2020 3:02 PM Review Complete by Grage, Libby 12/15/2020 11:24:23 AM(Grage Review) • The task was assigned to Grage, Libby.The due date is: December 14,2020 5:00 PM 12/11/2020 3:02 PM Review Complete by Frisinger, Rob 12/14/2020 7:58:22 AM(Building Review) • The task was assigned to Frisinger, Rob.The due date is: December 14,2020 5:00 PM 12/11/2020 3:02 PM Review Complete by Lange,Steve 12/14/2020 4:30:31 PM(Engineering Review) • The task was assigned to Lange, Steve.The due date is: December 14,2020 5:00 PM 12/11/2020 3:02 PM Review Complete by Kennedy,Jack 12/15/2020 9:41:06 AM(Fire Review) • The task was assigned to Kennedy,Jack.The due date is: December 14,2020 5:00 PM 12/11/2020 3:02 PM Review Complete by Morgan, Emily 12/15/2020 11:54:45 AM(Morgan Review) • The task was assigned to Morgan, Emily.The due date is: December 14,2020 5:00 PM 12/11/2020 3:02 PM Review Complete by Morgan, Emily 12/22/2020 10:15:28 AM(Measamer Review) • Hunt, Marcia reassigned the task to Morgan, Emily 12/22/2020 9:59 AM • The task was assigned to Measamer, Don.The due date is: December 14, 2020 5:00 PM 12/21/2020 3:03 PM Review Complete by Morgan, Emily 12/22/2020 10:15:06 AM(Streets Review) • Hunt, Marcia reassigned the task to Morgan, Emily 12/22/2020 9:59 AM • The task was assigned to Larson, Bill.The due date is: December 14, 2020 5:00 PM 12/21/2020 3:03 PM Ready for Meeting by Morgan, Emily 12/22/2020 10:20:26 AM(Planner Prepares for Meeting) • The task was assigned to Morgan, Emily 12/22/2020 10:16 AM