My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comment Letter
>
Preapplication Conferences & DRG Meetings
>
PRE-2020-0013
>
Comment Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2020 4:35:16 PM
Creation date
12/9/2020 4:35:11 PM
Metadata
Fields
Template:
PL_LandUseFile
Permit Number
PRE-2020-0013
Applicant Name (LN, FN)
Marine Floats Corp. Bob Bergquist
Project Name
Bayside Moorage Marina Replacement
Project Description
The project is for a marina replacement of all floats and piling. The existing piers and ramps will be reused.
Application Date
5/13/2020
Parcel
P32370
Location
2410 Skyline Way Anacortes
Document Type
Comment Letter
Status
Pre-Application Conference
Project Manager
TESS COOPER
Document Relationships
DRG Routing - Final
(Attachment)
Path:
\Planning\Preapplication Conferences & DRG Meetings\PRE-2020-0013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 1 of 3 <br /> <br />June 2, 2020 <br /> <br />To: Bayside Marina, LLC. <br /> 1910 Fairview Ave E <br /> Suite 500 <br /> Seattle, WA 98102 <br /> <br />RE: Pre Application Conference Pre-2020-0013 – Bayside Moorage Marina dock replacement <br /> <br />A preapplication meeting for the above-referenced proposal was held on June 2, 2020. The following <br />comments are provided: <br /> <br />PLANNING, COMMUNITY & ECONOMIC DEVELOPMENT: <br />General <br />1. The project is for a complete marina replacement. The proposal is a like for like replacement <br />with 7,968 square feet of existing floating marina removed and new floating marina installed as <br />well as the removal, demolition and disposal of the existing forty-nine creosote piling and <br />replace with forty-three galvanized steel piling. The existing pier will be re-used and re-decked <br />with fiberglass grating. The existing ramps will be re-used and may require new grated decking. <br />Electrical, potable water, and fire system utilities will also be re-installed in the floating docks. <br />Zoning Designation <br />2. The property is Marine Mixed Use zoned; the Land Use designation in the Comprehensive Plan is <br />Marine Mixed Use. Marinas and boat moorage is considered a permitted use. <br /> <br /> <br /> <br />Anacortes Planning, Community & Economic Development Dept. <br />Permit Center <br />P.O. Box 547, Anacortes, WA 98221-0547 PH (360) 299-1984 <br />Don Measamer, Director of Planning, Community and Economic Development FAX (360) 293-1938
The URL can be used to link to this page
Your browser does not support the video tag.