Routes Pre-Application materials to entire DRG for comments,
•�. 00 then files Comment Letter and emails it to applicant.
Application Information
Routing Date
5/28/2020
Managing Planner Planner Email
TESS COOPER tessc@cityofanacortes.org
Application Number Application Date
PRE-2020-0013 5/13/2020
Applicant Name Applicant Email
Marine Floats Corp. Bob Bergquist rbergquist@marinefloats.com
Applicant Address
1208 East D Street,
Tacoma,WA 98421
Project Name Project Address
Bayside Moorage Marina Replacement 2410 Skyline Way Anacortes
Parcel(s)
Parcel No.
P32370
Project Description
The project is for a marina replacement of all floats and piling.The existing piers and
ramps will be reused.
Meeting Type
r General Informational Meeting Meeting Location
f� Pre-Application Conference Online Meeting
Meeting Date Meeting Time
6/2/2020 1:30:00 PM
DRG Review
Click here to view the submitted application materials.
Reviewer Comment Documents
Please enter review comments in the Comments box and/or upload additional comment documents here.
Reviewer Comments
1. No issues for Public Works Engineering at this time.All questions by the applicant are Planning related.
2. Further review of the project when Civil Plans are submitted.
3.The project will trigger Minimum Requirement 2.
Planning Comment Letter
Comment Letter
PCED Letter, PRE-2020-0013.pdf 420KB
Upload the completed Comment Letter here; it will be filed in the Laserfiche repository and a link will be emailed to the
applicant.
Action History (UTC-08:00)Pacific Time(US&Canada)
Begin Routing by Cooper,Tess 5/28/2020 10:48:51 AM(Route Application Materials)
by Workflow 5/28/2020 10:50:31 AM(Workflow Start Event)
Review Complete by Frisinger, Rob 6/1/2020 9:44:45 AM(Building Review)
* Building permit required. Typically the demo is included in a building permit.
• The task was assigned to Frisinger, Rob.The due date is:June 5,2020 5:00 PM 5/28/2020 10:50 AM
Review Complete by Andersen, Sandi 6/1/2020 10:56:48 AM(Operations Review)
• The task was assigned to Andersen,Sandi.The due date is:June 5, 2020 5:00 PM
6/1/2020 10:50 AM
Review Complete by Lange,Steve 6/1/2020 3:35:01 PM(Engineering Review)
• The task was assigned to Lange, Steve.The due date is:June 5,2020 5:00 PM 6/1/2020 10:51 AM
Review Complete by Kennedy,Jack 8/18/2020 8:14:15 AM(Fire Review)
* Fire: Will await fire standpipe plans.
• The task was assigned to Kennedy,Jack.The due date is:June 5,2020 5:00 PM 8/14/2020 10:58 AM
Ready for Meeting by Hunt, Marcia 12/9/2020 4:33:46 PM(Planner Prepares for Meeting)
• Hunt, Marcia reassigned the task to Hunt, Marcia 12/9/2020 4:33 PM
• The task was assigned to Cooper,Tess 8/18/2020 8:15 AM
File Comment Letter by Hunt, Marcia 12/9/2020 4:34:59 PM(Planner notified to prepare Comment Letter)
• Hunt, Marcia reassigned the task to Hunt, Marcia 12/9/2020 4:34 PM
• The task was assigned to Cooper,Tess 12/9/2020 4:33 PM