My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comment Letter
>
Preapplication Conferences & DRG Meetings
>
PRE-2020-0030
>
Comment Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 4:54:21 PM
Creation date
10/28/2020 4:54:15 PM
Metadata
Fields
Template:
PL_LandUseFile
Permit Number
PRE-2020-0030
Applicant Name (LN, FN)
Jeremy McNett
Project Name
Anacortes Family Center Affordable Housing Complex
Project Description
Multi-family low-income housing building with an integrated early learning center on the ground floor
Application Date
9/17/2020
Parcel
P57344
Location
1019 26th St.
Document Type
Comment Letter
Status
Pre-Application Conference
Project Manager
LIBBY GRAGE
Document Relationships
DRG Routing - Final
(Attachment)
Path:
\Planning\Preapplication Conferences & DRG Meetings\PRE-2020-0030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Planning, Community & Economic Development Department <br />904 6th Street; P.O. Box 547 Anacortes, WA 98221 <br />360-299-1984 - pced@cityofanacortes.org <br /> <br />October 27, 2020 <br /> <br />Jeremy McNett <br />1005 4th St. <br />Anacortes, WA 98221 <br />Sent via email: jeremy@underwoodarchitecture.com <br /> <br />RE: PRE-2020-0030: Preapplication meeting – October 13, 2020 – 1:30 PM <br /> Anacortes Family Center Affordable Housing Complex <br /> 1019 26th Street <br /> <br />Dear Mr. McNett: <br /> <br />Thank you for your submitting preapplication meeting request to the City of Anacortes. The <br />comments below are provided after review by city staff of the materials provided in your submittal. <br />City staff strive to provide a comprehensive review based on the information you provided and the <br />codes and standards in place at the time of the review. Please note that these comments are <br />preliminary in nature and are subject to change based on changed circumstances, changes in the <br />proposal, changes in City policies and development regulations, and/or new information. <br /> <br />City Department Comments (received as of October 13, 2020): <br />Department Comments <br />Public Works – <br />Engineering <br />Steven Lange, Engineering <br />Tech IV <br />Public Works Engineering: Storm Water Quantity and Quality will be <br />critical for this project. This property is within the F3 Basin. There is a <br />surcharging system 600-feet downstream. Therefore, the project is not <br />Flow Control Exempt. The downstream will need to be modeled to <br />determine hydraulic capacity of the conveyance system. The project will <br />most likely need to provide Detention and, for sure, Water Quality. <br /> <br />Sewer: See EDS Standards for multi-family with more than 10-units. <br />Fire <br />Jack Kennedy, Fire Marshall <br />No comments received as of 10/13/20 at 8:23 AM. <br />Fire department connection location needs to be identified. <br />Water <br />Terry Nemeth <br />There is a 320' section of 6" AC pipe on 26th St that may need to be <br />replaced to accommodate fire flow <br />Museum <br />Bret Lunsford <br />None received. <br />Solid Waste <br />Matt Koegel, Solid Waste <br />Supervisor <br />Follow city dumpster pad specs, if dumpster requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.