My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SEPA review memo
>
LAND DIVISION AND DEVELOPMENT FINAL DETERMINATION FILES
>
LPS-2020-0001 1905 Anacopper Mine Road
>
SEPA review memo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 12:31:08 PM
Creation date
9/2/2020 12:31:02 PM
Metadata
Fields
Template:
PL_LandUseNotice
Document Type
Notice of Public Hearing
Document Title
SEPA review memo
Date
9/2/2020
Permit Number
LPS-2020-0001
Applicant Name (LN, FN)
Nels Strandberg
Project Name
The Crossings
Project Description
Cottage housing site plan and unit lot subdivision/preliminary long subdivision application to divide 5.2 acres into 21 lots, with 18 cottage units and 3 standard single family homes in the R2 zone.
Application Date
2/21/2020
Decision Date
1/1/1900
Date Recorded
1/1/1900
Street Name
Anacopper Mine Road
Street Number
1905
Location
1905 Anacopper Mine Rd.
Address
1905 Anacopper Mine Road
Status
Pending
Project Manager
Libby Grage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
LPS-2020-0001: The Crossings Cottages SEPA Review Staff Report <br />Page 1 of 5 <br /> <br /> <br /> <br />MEMO <br />To: Don Measamer, Planning Director, SEPA Responsible Official <br />From: Libby Grage, Planning Manager <br />Subject: SEPA Checklist Review – Staff Report <br />Date: September 1, 2020 <br /> <br />PROJECT NAME: The Crossings <br />FILE NUMBER: LPS-2020-0001 <br />APPLICANT & LANDOWNER: Anacopper LLC <br /> P.O. Box 319 <br />Anacortes, WA 98221 <br />SITE ADDRESS: 1905 Anacopper Mine Road <br />PARCEL NUMBERS: P31752 <br />PROJECT DESCRIPTION: The applicant is requesting preliminary approval of a 21 unit lot <br />subdivision, cottage housing site plan approval (Type 2), and SEPA review. The project includes 18 cottage <br />units/lots and 3 single family building lots, improvement of Oregon Avenue between W. 12th St. and <br />Meadows Lane, and site infrastructure improvements, including utilities and stormwater facilities. Wetland <br />buffer averaging and buffer enhancement is also proposed. <br />Staff Review & Amendments to the Environmental Checklist: <br />The following sections correspond with related categories of the environmental checklist submitted for <br />the proposal (dated January 30, 2020), and clarify, amend, or add to that document. <br />Environmental Checklist / Environmental Elements <br />1. EARTH: <br />The applicant submitted a geotechnical report for the project (GeoTest, April 12, 2018). The geotech <br />report makes recommendations for site preparation and earthwork, fill and compaction, wet weather <br />construction and seismic design considerations. The proposal’s conformance to AMC 19.76 Stormwater, <br />an approved stormwater site plan, the Department of Ecology 2014 Stormwater Management Manual for <br />Western Washington (SWMMWW) and recommendations in the geotechnical report will adequately <br />control erosion impacts and other impacts to the earth, during and after construction activities. <br /> <br /> <br />Anacortes Planning, Community & Economic Development Department <br />904 6TH Street / P.O. Box 547, Anacortes, WA 98221 <br />360.299-1984 - Office Hours: Mon-Fri 8:00 AM – 5:00 PM
The URL can be used to link to this page
Your browser does not support the video tag.