Laserfiche WebLink
TRACT "K" 30' WIDE NATIVE GROWTH PROTECTION EASEMENT/BUFFER ZONE W/ STORM WATERw <br /> ��� EXIST, SWALE CLEARING CONVEYANC- <br /> �-�' TEMP SEDIMENT EXIST. SWALE BMP C233 NTERCEPTUR Q <br /> 7,41 f LIMITS �� EXIST. SWALE <br /> POND SILT FENCE SWALE 4' ROCK ci <br /> _ T R A T B i __ RETAINING TUP=259 <br /> �j ' WIDE BER ELEV.=258' AW�.�.�� A-41,4 �b:4"/ ..11��I��. er -- <br /> WALL <br /> V v <br /> 13 252 ' SF � '� _ _ <br /> �I _ 59 <br /> / / - - - - - - _ _ — - - - - _____ 2 1' <br /> CULVERT I '� <br /> / ��� - - �� — — — � I�� _ - - - 258'� %I' 4' ROCK <br /> f \ ,3 A "R E S % / �/i — — — — _ �25 % RETAINING WALL <br /> / / / �� — — ' — Vim \ <br /> / //z -- — ___ — __,, N \ LOT 18 D <br /> ///i// LET 16 Z <br /> I /97 / // EDIMENT POZ'�� G \\ � \ 2,231 SF 2. 218 TV D AD <br /> / O <br /> �— �;T9 �1 � BMP C233 AT - \ - WS / C <br /> \�I 131 I I I I CONSTRUCTION \ H➢USE & GARAGE HOUSE & GARAGE HOUSE & GARAGE <br /> 1 _ EXISTING GRAVEL ROAD TO 3E \ \ 110 ��F - ����� I I I I I BOTTOM ELEV,=249,5' OUTLET ��0 I I_I 1,270 SF 1,270 SF SILT FENCE <br /> ► N: pi0 \ \ SEE DETAIL SHEET C3� // / I / FF=261,5 FF=261,5 FF=261 ► / W <br /> 11270 SF III <br /> . . <br /> REMIVED AND RESTORED TE ��P �,,� / <br /> \ x ,4\ _� � 1 ,� INTERCEPTOR DIV \ <br /> NATIVE CUNDITIENS / \ _ 1 <br /> �1 G•- \� - - — T �`� 1261,35' / AEI SWALE / o <br /> w ���. � i� 259,47' ' ' o� <br /> 4" PVC PUMP LINE v4( t — _ \ --k I I I , ' _1% —1% — l 43 LF SWALE — BMP C123 \ Ail- # P8P4OOE8 / <br /> — �h �\ 259,9 SLOPE=1% <br /> �7 \ / - — _ _ 261.15 TEMP. SOIL STOCKPILE T A \ D 60LFOF 1 - i ) ( , <br /> \ SD ,�P�� - - - - - J - - - - - 1 BOTTOM WIDTH <br /> \, PERFORATED \ .—R+M" E /V= 9'-- -260'- - - P IBC-(]NSTRUC ON SDIL COVERING WITH STRAW OR <br /> POND WATER x o� _ _ /— _ _ _ — / a: <br /> �, PtJ1rBASIWI — — ��' AND-DAP rP ° - - VISQUEEN & SILT FENCE <br /> ELEVATION 245 PVC PIPE TEMP -LOT 13 / / 26o <br /> 15 LE 14 \ LOT 12 w <br /> 10 DISPERSION x L° 2�,0 ,901 SF - - J/ / ,725 SF LET 11 AROUND SIDES, a; ® �-- <br /> DISCHARGE PI��E O ,SE & GARAGE HOUSI <br /> 1 �� 12 OP5 SF HOUSE ARC I & GARS — —� c —I <br /> W E GARAGE �00 SF QI� 4• Pvc f- 1,270 SF 1,2'0 Sf 1,270 SF N °'4 _ )(/-01:1-SE <br /> 1,270 SF Hp SE & GARAGE 1 WFROM SEDIME Tx ► CLEARING,' SHEDULE 40 LE <br /> FF=267' \ 1,270 SF I <br /> TRACT A POND SEE F=265' \ FF 6' \- - - - / FF=266,5 �„ ' LIMITS / <br /> m \ — _ m \ — \ FF=265 \ �--i <br /> 1 '4,199 SF DETAIL I — `�' \\ `� - BMP C103 / \ <br /> w <br /> �,39 ACRES SHEDULE" PVC / , BMP 33 G I \c6S 264 HIGH VISIBILTY CB INSERT x 4-3, w <br /> Jr DRILL 1' HOLES AT / j 0 26 I <br /> 4' ON CENTER. S I L T F E N C E FENCE PROTECTION WITH w <br /> LAY PIPE ON — — <br /> UNDISTURBED GRASS 0 / 266 , _ _ _ \/ — — — — — �J EX. CB TYPE2 #2468 WSDOT I- 0,20-00 w <br /> LEVEL FOR LENTH OF ± — — — — — 1 <br /> PIPE FOR EVEN IN E R C E P T O R �� — _ —265 270� dr <br /> FF=266 \ RIM=265,16 <br /> DISTRIBUTIDN, o o I,E, 262,16 INSERT F L T E R SOCK ,� <br /> 1/2 CAPS ON END— S ALE IFF=266 FF=267 _ LOT 6 Q �' <br /> FOR OVERFLOW LOT CLJ <br /> cv FF=268 - ' - FF=268 - SF EX SSMH U3 275 I <br /> WETLAND BUFFER I LET 0 ,250 SF LOT ,8 LET 7 HOUSEI & GARAGE I EM=259 81' I <br /> PUMP DISCHARGE PIPE DETAIL AVER DING BOUNDARY 2,02 SE 2,�29 SF W _ w <br /> NUT TO SCALE \ r 1,270 SF �I.65 .. <br /> HOUSE & GARAGE HOUSE & GAR GE 2,906 <br /> BMP 10 "�/ 270 SF 1,270 SF HOUSE GARAGE HOUSE & GARAGE v dpi, _ — <br /> / S <br /> r ,270 SF 1,270 SF \ / ‘� <br /> 3UFFER ZONE _ , �I - - _ ?6-8� \ o� N AO <br /> N 81°4337„ W ►� <br /> x P T5,13 _ , , I AMP T5,13 N ` s — 205,76, <br /> � "OST-CONSTRUCTION _SU-IL69'- __ RUST aINS,TRUCTIUN SOIL QUF\LITY �L i ��„ ^ 1VE-41----DO <br /> BMP C2 <br /> AND DEPTH 'Tr f`P T� <br /> QUALITY ANDPTH TYP— —270,_ — I 8 <br /> SILT F NCE _4 NE <br /> — � — �� — � ALL DISTURBE� SOILS \ 1 I '� ' <br /> h- x I-N -AL-L ETSTURBE-$ R-EA2 <br /> 2 1 — — — 270.5' LOT 1 I I PA <br /> EX. CB TYPE2 #2468 — _ <br /> INTER EPTORRIM=26481' <br /> 8 / LET 4 LOT 3 VLIJ 12 I — <br /> 2zo SW ACE �� x LOT 5 I 2,513 SF 2,436 SF 2,279 SF �$•/ / EX. CB TYPE1 I,E, 26161 <br /> / <br /> D 3 317bP 2,025 2,246E HOUSE & GARAG j RIM=265�17' _ <br /> �' I JI ➢1�SE� �GARAGE70 GSF ARAGE HOUSE & GARAGE - <br /> EX, 12" (PEP SD \; I <br /> HOUSE & GARAGE I HOUSE'' 70 1,270 SF ' \ E ,c) <br /> I E,=262J7 1 <br /> 1 LE.=244 7' x 1,� 0 SF 1,27Q v v END OF EXIST. •RING ' FF=270 I FF=268 SIDEWALK I ) Gt <br /> 1✓4'T 110' 0FF 270 FF=272 FF=271 _ _ I4, x x x <br /> <qN� �IMITS / f CI n I o 75 ,' / ,� BMP C105 FENCE <br /> . . <br /> ��/�' \ I 2 2 rJp <br /> illb . ' DATUM SANITARY <br /> FFR \ / I / I �/ / �I / TOP OF MONUMENT STABILIZED SEWER ss <br /> „� (1i 270' / 272' I _ _ / �,z, / Ail <br /> IN CASE CONSTRUCTION <br /> --- /-- _ — _ _ J — / I� ELEV.=265.88' ENTRANCE STORM <br /> SD sD <br /> / iiiiP x .m Oa AIM <br /> • E BMP C154 SEWER _ <br /> BMP T5.11 CONCETRATED 2'-4' ROCK BMP C103 o GAS G - <br /> T E S ( \ O T E S BMP C 1 3 FLOW DISPERSION RETAINING q CONCRETE N C R E T E <br /> A. A Certified Erosion and Sediment Control Supervisor is required. The ESC Supervisor must TEMP SOIL S T U C K P _E FLOW PATH IS GREATER WALL HIGH VISIBILTY I <br /> " : U N DE RG ROUND <br /> p q P / THAN 50 FEET V WASHOUT TUB UGP ® � <br /> have attended and Erosion and Sediment Control class within 3 years from today's date. Must C O V E R I N G WITH ,2'T R A W FENCE I X POWER <br /> Iprovide certification card. 1 - W EX. SDMH WATER <br /> IOR VISQUEEN SILT 1P A h - A / <br /> �� �I TYPE2 #2844 MAIN W 0 <br /> B. The Certified Erosion and Sediment Control Supervisor will oversee and be responsible for all 1 - LH - BMP C 4 O RIM267,02' ® U <br /> erosion control. The facilities shall be inspected daily and maintained to ensure proper FENCE A R U U� SIDES EOM IRE,=262 82' Catch Basin sin I I a) <br /> TEMP SEDIMEN 17,41Power Vault P � � �functioning. Written records shall be kept of weekly reviews and after every significant storm 8H # 8 00 / 0 / / / 008 8 TRAP g event of the ESC facilities during the wet season (October 1 to April 30). Monthly reviews / IA \ END OF EXIST. ASPHALT Sanitary Sewer Clean Out c, <br /> during the dry season (May 1 to September 30). Written records shall be turned into the 1 / \ 22'X22' 2� & CURB & GUTTER Cable Pea Sanitary Sewer Man Hole <br /> Project Manager or Inspector on a weekly basis at the weekly scheduled project meetings. <br /> I/ \ EX. SSMH U3-276 T <br /> p pp / <br /> C. Erosion Control BMPS shall be in laceper the approved set ofplansprior to any \ / LT 1 1 y <br /> RIM=267,18' Fire Hydrant 0 <br /> / <br /> construction start. / o C S F <br /> - I E =260.43' <br /> CB INSERT Water Gate Valve M <br /> = Water Meter <br /> D. The erosion control shall be inspected once a day and modified to meet the surrounding \ PROTECTION WITH <br /> conditions as needed. \ x WSDOT I-40,20-00 V <br /> SEDI E\T PEI\D PUVP CAPACITY <br /> E. Provide a sign displaying a 24-hour contact number and name of the ESC Supervisor. The 1 / INSERT FILTER SOCK PUMP CAPACITY SHOULD BE PROVIDED FOR THE 2 YEAR <br /> letter size shall be a minimum of 2" letters. This shall be in place prior to construction start. \ BMP C103 ��o DEVELOPED STORM WATER FLOW OF APPROXIMATELYCt <br /> Remember, the look of the sign will be a reflection of the Contractor and Developer and \ / / HIGH VISIBILTY x BMP C233 0.24 CFS (100 GPM) PUMPING CAPACITY, <br /> Development, \ <br /> FENCE SILT FENCE f 4 <br /> I .F. <br /> The storm drain system and existing ditches shall be cleaned daily (Section 707.3). All E A R I N G A N x CLEARING City of Anacortes <br /> drainage systems shall be cleaned to the acceptance of the City of Anacortes prior to 1 ( ) LIMITSN <br /> acceptance of the project. I I LIMITS Received PEED c —4 <br /> Ct <br /> x Date: April l2020 <br /> G. Stabilized construction entrances and roads shall be installed at the beginning of 6, F 4 <br /> construction and maintained during the duration of the project. Additional measures may be �� I — T required such as wash pads to ensure that all paved areas are kept clean. No mud is allowed =. 0 ; GRAPHIC SCALE i , ci .) <br /> to enter onto City streets. — — — — 1 <br /> II <br /> L2-) 1 SF V \ 30 0 15 30 60 120 <br /> H. Any soils exposed that will not be disturbed for two (2) days during the wet season or \ \ I C _i 1 �' xII 15?506 !! !!!!!!!!!!! cr....) r.H'ici <br /> seven (7) days in the dry season shall be immediately stabilized with the approved ESC methods ' x Q <br /> (seeding, mulching, plastic covering, etc.) 3 ( IN FEET ) <br /> LEI 1 inch = 30 ft. i <br /> I. Two (2) weeks prior to the beginning of the wet season (October 1), all disturbed areas \ <br /> CD Ct <br /> shall be reviewed to identify which ones can be seeded in preparation for the winter rains. E \� <br /> Disturbed areas shall be seeded within one (1) week of the beginning of the wet season. A \ n , P �OJ ECT DATU V `�`� 1 C — 1 X X V � <br /> sketch mapof those areas to be seeded and those areas to remain uncovered shall be C submitted to the Project Manager, The Project Manager can require seeding in additional areas x TOP OF V O \ U V E NT \ CD <br /> in order to protect surface waters, adjacent properties or drainage facilities. �j This plan sheet is accepted for construction in accordance with the <br /> I I I City of Anacortes ordinances and policies. Actual conformance of the <br /> CASE AT \ EW GOAD design with applicable laws is the sole responsibility of the <br /> J. Penalties for an Erosion Control violation are subject to a $300 to $1000 fine under I n x professional engineer, whose name and stamp appear on this sheet. <br /> Chapter 17.66 - Penalties for Violation. Each day is considered a different violation. — — - L T 21 co110 E \THY AS SHOW \ 0\ Acquiring, complying with, and providing mitigation for all Federal, <br /> State, County, and Local Laws, permits, and mandates, including but <br /> PLA\S. \AV388 <br /> SHEET NO. <br /> K. Remove all temporary erosion control measures when the site is landscaped and soils are / / <br /> W x not limited to the Endangered Species Act, Federal Wetland Permit, <br /> stabilized, i / State Department of Fisheries Hydraulics Permit, Federal Flood Plain <br /> / �/ 6 Permits, National Pollutant Discharge Elimination System Permits isC7 <br /> BMP C103 J BMP C 2 3 3 the responsibility of the Developer, Landowner, and their Engineer. <br /> L. All Dewatering shall discharge into a sediment trap or sediment pond. x SILT FENCE The issuance of this permit shall not be construed as proof of <br /> HIGH VISIBILTY compliance with applicable laws and permit requirements. REV.: — <br /> HER , <br /> M. The contractor is to provide to the city inspector their spill prevention program to be FENCE q N w 31oF wash�G� JOB N0: 2017-150 <br /> inplace during construction. I — — / R� x ���-T ���; coz�, DATE: Jan. 2020 <br /> 3i I� 4, , ,t CITY ENGINEER DATE <br /> N. A sign shall be posted at the project site that complies with AMC chapter 17.40.060(E) / (� m ' The acceptance will expire one year from the date SCALE: Noted <br /> . EX. SSMH U3=299 '� <br /> regulating signage within the City of Anacortes. The sign shall advertise the name and phone RIM=285,93' noted above. <br /> 0 27807 DRAWN: D <br /> number of the Contractor who is accessible 24/7 to handle complaints. / .E.-277,03' 'o RE o <br /> x _ x xtiltriiitir• ,•� cisTEN �/ CHECK: <br /> x _ SS/ONAL ENG 1 <br /> O. Work hours are limited to TOO AM to 10:00 PM, Sunday to Saturday. No work outside these / C t e J a n u C r I 2 C 2 0 <br /> hours are permitted. / iilti ' y <br /> I / <br /> 1 -31 -2020 SHEET____OF____ <br />