Laserfiche WebLink
<br />NOTICE OF APPLICATION <br />Notice Is Hereby Given That An Application Was Made For The Following Proposal: <br />File Number: LPS-2020-0001 <br />Applicant: Anacopper LLC <br />Date of Application: February 21, 2020 <br />Date of Complete Application: March 20, 2020 <br />Date of Notice of Application: March 24, 2020 <br /> <br />Project Location: 1905 Anacopper Mine Rd. (Parcel #P31752) <br /> <br />Application Type / Description: Cottage housing site plan and unit lot subdivision/preliminary long subdivision <br />application to divide 5.2 acres into 21 lots, with 18 cottage units and 3 standard single family homes in the R2 zone. <br />The project includes installation of private access road and driveways, pedestrian paths, parking, open space, <br />landscaping, stormwater infrastructure, extension of utilities, and construction of a portion of new public street <br />between Oregon Avenue and Meadows Lane. Wetlands and buffers are present on the site; buffer width averaging <br />is proposed. One existing home will be removed from the site. <br /> <br />Other Required Project Permits/Approvals: The following may be required in addition to the above: Construction <br />stormwater general permit from WADOE, construction plan approval, right-of-way permit, final land division <br />approval, building permits. <br /> <br />Existing Environmental Documents: The following environmental documents evaluate the proposed project: <br />Critical areas report, Traffic report, Stormwater Site Plan, Geotechnical Report, SEPA checklist. <br />Application documents may be reviewed at https://www.anacorteswa.gov/161/Planning-Community-Economic- <br />Development by clicking “Notices of Application” and then opening the appropriate project file number folder. <br /> <br />Public Comment Period: Written comments must be submitted to the contact below by 5:00 PM on April 22, <br />2020. Any person may comment on the application, receive notice of and participate in any hearings, and request <br />a copy of the decision, once made. <br /> <br />Public Hearing: A public hearing is required to be held before the Planning Commission; the hearing has not yet <br />been scheduled. <br /> <br />Preliminary Determination of Consistency: At a minimum, this project will be subject to the following plans and regulations: <br />Anacortes Municipal Code Title 16 Tree Preservation, Title 18 Environmental Protection, Ch. 17.70 Critical Areas, Title 19 Unified <br />Development Code Municipal Code, and the Anacortes Engineering Design Standards. <br /> <br />Appeals: The SEPA threshold determination, once made, is appealable to the Hearing Examiner per AMC Table 19.20.030. The <br />project permits are being processed using consolidated review under a Type 4 review process, which has no local appeal <br />available. Please refer to AMC 19.20.030 and AMC 19.20.210 for appeal procedures. <br /> <br />For Project Information: Libby Grage, Planning Manager; Phone: (360) 299-1986 <br />Email: libbyb@cityofanacortes.org; City of Anacortes, P.O. Box 547, Anacortes, WA 98221