Laserfiche WebLink
G1� Y O� <br /> ANACORTES PUBLIC WORKS DEPARTMENT <br /> f.O. BOX 547, ANRCORTES,WA 98221 PH (360) 293-1919 <br /> Az FRED BUCHENMEVER,P.I.S.,DIRECTOR FAX (360) 293-1938 <br /> E-MAIL: fredb@citpofonocortes.org <br /> February 5, 2008 <br /> Mike Pizzuto <br /> 903 E. Division Street <br /> Mount Vernon, WA 98274 <br /> SUBJECT: Required Frontage Improvements at 1815 10th Street - Final <br /> Dear Mike, <br /> Thank you for meeting with me on February 4, 2008 to discuss your frontage improvements for <br /> your project at 1815 10th Street. <br /> As we discussed: <br /> 1. You are not required to pave the alley across the frontage of your property. <br /> 2. You are not required to pave the parking area along the frontage of your property along <br /> 10th Street. <br /> 3. Provide a grass lined water quality swale, per the original requirements, across the <br /> frontage of your property and the property to the east. The swale will transition back to <br /> the existing alignment beyond the most easterly property line of the adjacent property. <br /> 4. The parking area will transition at the same slope as the existing street to the edge of the <br /> water quality swale. <br /> 5. The parking area can finished with crushed rock surfacing top course on top of an <br /> approved WSDOT structural fill material. <br /> If you have any additional questions or would like to meet and discuss, please contact me at <br /> 360.661.3468 <br /> Sincerely, <br /> CITY OF ANACORTES <br /> Steven R. Lange <br /> Project Manager <br /> CC: Fred Buckenmeyer, Eric Shjarback, Jim Baldwin, Don Measamer <br /> • Water • Wastewater • Streets•Storm Drainage • Engineering • Solid Waste <br /> •Transportation and Equipment • Capitol Projects • Development Services <br />