Laserfiche WebLink
4 <br /> JUDGES BENCH <br /> p Policy <br /> E Group <br /> Command <br /> Logistics Staff Finance <br /> C <br /> U <br /> B <br /> Planning <br /> C <br /> L Liaison <br /> E <br /> S <br /> EOC ACTIVATION <br /> Phase I Activation - Alert/Watch Operation <br /> Initiated in the event of an impending or occurring incident that <br /> requires close monitoring. <br /> • flood watch <br /> • minor/localized small stream flooding <br /> • winter storm watch <br /> • high wind warning <br /> • minor hazardous materials incidents <br /> Phase II Activation - Limited Operation <br /> Expected to grow beyond the capability of alert/watch operation <br /> staffing levels and requires additional EOC staffing and <br /> capabilities to manage the incident <br /> • moderately sized hazardous materials incidents <br /> • winter storm events <br /> • moderate wildfire <br />