Laserfiche WebLink
1.1 Cleaner Guys <br /> t � N <br /> . * <br /> e ' Cleaner Guys, LLC <br /> 1E @ 114 Lind Street <br /> T, PTT. <br /> N Mount Vernon, WA 98273 <br /> www.CleanerGuys.com y JUL .1 6 2Q19 <br /> FED ID #: 47-0914672 <br /> CONTINUED - Kitchen OF ANAC®RTE� <br /> DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL <br /> 14. Detach & Reset Backsplash - solid 10.00 LF 2.98 0.00 0.00 3.04 5.96 38.80 <br /> surface - Unattached <br /> 15. Carpenter - Finish, Trim / Cabinet - 4.00 HR 0.00 63.24 25.80 50.60 329.36 <br /> per hour <br /> Additional labor to handle a large, one-piece composite counter top. All efforts will be made to detach for re-use but it is possible the material will <br /> break taking it out, especially the under mount sink. Two additional personnel for an hour or so to remove/relocate and then again to bring back in <br /> and reset on the cabinets. <br /> 16. CABINETRY - decore shelf, 5.00 LF 0.00 12.50 6.37 12.50 81.37 <br /> detach and reset <br /> Installed over the kitchen sink between the two upper cabinet units. <br /> 17. Detach & Reset Cabinetry - upper 5.50 LF 44.33 0.00 0.00 24.86 48.76 317.44 <br /> (wall) units <br /> 18. Detach & Reset Cabinetry - full 2.00 LF 51.61 0.00 0.00 10.52 20.64 134.38 <br /> height unit <br /> 19. Detach & Reset Cabinetry - lower 8.00 LF 51.84 0.00 0.00 42.30 82.94 539.96 <br /> (base) units <br /> 20. Material Only Cabinetry - lower 6.00 LF 0.00 162.76 99.61 195.32 1,271.49 <br /> (base) units - High grade <br /> New cabinet boxes to replace/repair water damaged lower cabinets. <br /> 21. Material Only Cabinetry - full 2.00 LF 0.00 223.34 45.56 89.34 581.58 <br /> height unit <br /> Replacement box for water damaged full height unit. <br /> 22. Carpenter - Finish, Trim / Cabinet- 12.00 HR 0.00 63.24 77.40 151.78 988.06 <br /> per hour <br /> Labor time to detach face frames, hardware (including pull out cookery drawers) and install in new cabinets repairing/replacing the damaged units <br /> keeping the good parts to avoid full cabinet replacement. <br /> 23. Add for prefinished crown molding 15.00 LF 0.00 9.50 14.53 28.50 185.53 <br /> per LF <br /> Detach and reset top trim/crown piece between the upper cabinets and ceiling. <br /> 24. R&R Re-skin toe kick 12.00 LF 1.91 7.36 11.35 22.24 144.83 <br /> 25. Detach &Reset Light fixture 1.00 EA 73.60 0.00 0.00 7.51 14.72 95.83 <br /> Under cabinet lighting attached to the underside of the upper cabinets. <br /> 26. R&R Heat/AC register - 1.00 EA 2.54 24.35 2.74 5.38 35.01 <br /> Mechanically attached <br /> 27. R&R Batt insulation - 6" - R19 - 96.00 SF 0.29 0.90 11.65 22.84 148.73 <br /> unfaced batt <br /> 28. R&R Sheathing - plywood - 3/4" - SF 1.37 2.53 0.00 0.00 0.00 <br /> tongue and groove <br /> There may be sub-floor damage hidden below the cabinets. <br /> 29. Mask per square foot for drywall 95.33 SF 0.00 0.22 2.14 4.20 27.31 <br /> work <br /> 2018 NEUPERT MIT 4/17/2018 Page: 3 <br />